MONTHYEARML23298A0532024-04-11011 April 2024 Exemption FA Cover Letter ML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton 05000029/LER-2021-001, Compensatory Measure Not Established for a Momentary I/O Board Communication Loss2021-01-12012 January 2021 Compensatory Measure Not Established for a Momentary I/O Board Communication Loss ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 2024-04-11
[Table view] |
Text
YANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts 01367 BYR 2015-00 1 10 CFR 72.4 and 10 CFR 72.48 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission Washington, DC 20555 -0001 Yankee Atomic Electric Company Yankee Rowe Independent Spent Fuel Storage Installation NRC License No. DPR-3 and SFGL- 13 (NRC Docket Nos.50-029 and 72-31)
Subject:
Report of 10 CFR 72.48 Changes, Tests, and Experiments In accordance with 10 CFR 72.48(d)(2), Yankee Atomic Electric Company is required to submit to the NRC a brief description of any changes, tests or experiments made pursuant to 10 CFR 72.48(c), including a summary of the evaluation of each. This report covers the period from January 1, 2013 through December 31, 2014. The attachment provides a summary of the changes, tests, or experiments made pursuant to paragraph (c) of 10 CFR 72.48 during that time period.If you have any questions regarding this submittal, please do not hesitate to contact me at (413) 424-5261 ext. 303.R pectfu y, obert M. Mitchell ISFSI Manager cc: D. Dorman, NRC Region I Administrator M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region 1 J. Goshen, NRC Project Manager, Yankee Rowe J. Giarrusso, Planning, Preparedness
& Nuclear Section Chief, MEMA J. Cope-Flanagan, Assistant General Counsel, MDPU J. Reyes, State of Massachusetts Office of the Attorney General* N~i15$s I iLiSS1(c, Attachment to BYR 2015-001 Summary of Changes and Evaluations Made in Accordance with 10 CFR 72.48(c)10 CFR 72.48 Evaluation No. 2014-01 -Revision 0 Summary of Change The 10 CFR 72.212 Evaluation Report was revised to adopt the change evaluated in NAC 10 CFR 72.48 Determination ID No. NAC-13.MPC-001.
The Technical Specification (TS)Bases for NAC-MPC Surveillance Requirement (SR) 3.1.6.1 was revised to clarify an inconsistency between the NAC-MPC TSs, NAC-MPC TS Bases and NAC-MPC Final Safety Analysis Report (FSAR) accident analysis.
Specifically, the Bases for NAC-MPC TS SR 3.1.6.1 currently describes the system as being inoperable when two or more inlet or outlet vents are blocked. This is being revised to state that the system is inoperable when more than two inlet or outlet vents are fully blocked or the equivalent effective screen area of more than two inlet or outlet vents is fully blocked.Summary of 10 CFR 72.48 Evaluation The TS Bases for NAC-MPC SR 3.1.6.1 is revised to clarify an inconsistency between the NAC-MPC TSs, NAC-MPC TS Bases and NAC-MPC FSAR accident analysis.
Thus, the operability of the Concrete Cask Heat Removal System is assured.Per NAC 10 CFR 72.48 Determination ID No. NAC-13-MPC-001, the TS bases for SR 3.1.6.1 is not consistent with what is described in the FSAR accident analysis or administrative TS A 5.3.The accident analysis, as presented in NAC-MPC FSAR, demonstrates that when half of the air inlets are fully blocked the system remains within the allowable temperature limits for all components and is therefore operable.
This is also reflected in administrative TS A 5.3 where at least one-half of the inlets and outlets on each concrete cask must be cleared of blockage or debris within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore air circulation.
In addition, as stated in the NAC 10 CFR 72.48 Determination ID No. NAC- I 3-MPC-00 1, the thermal evaluation of the system utilizes an axisymmetric model. When performing the thermal evaluation for half of the inlets blocked, the axisysmmetric model assumes an effective screen area being blocked that is equivalent to two vents being blocked in their entirety if the entire system was being modeled. In other words, the thermal model evaluates an effective screen area reduction that is equivalent to the area of two air inlets being fully blocked.The change does not:* Affect any evaluations of accidents or malfunctions made in the NAC International (NAC) -Multi-Purpose Canister System (MPC) Final Safety Analysis Report (FSAR) (NAC-MPC FSAR).* Creation of a new type of event not previously evaluated in the NAC-MPC FSAR." Affect any Fission Product Barriers as described in the NAC-MPC FSAR." Affect any Evaluation Methodologies described in the NAC-MPC FSAR.