Category:License-Operator
MONTHYEARML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) ML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination ML21111A3522021-04-16016 April 2021 March 2021 GFE IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20276A1512020-10-0202 October 2020 RO Exam ML20276A2052020-10-0202 October 2020 SRO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16197A0392016-07-15015 July 2016 NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 2024-03-19
[Table view] Category:Other HQ and Regional Correspondence
MONTHYEARML16197A0392016-07-15015 July 2016 NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations ML1003901052010-02-0808 February 2010 June 2009 - Watts Bar - NRC Generic Fundamentals Examination Results ML1002509082010-01-25025 January 2010 NRC Generic Fundamentals Examination (GFE) Results ML0819001692008-06-0303 June 2008 June 05000390/2008301 Exam Final Ro/Sro Written Exam References ML0430604362004-10-27027 October 2004 Requalification Program Inspection - Watts Bar Nuclear Plant 2016-07-15
[Table view] |
See also: IR 05000390/2008301
Text
Final Submittal(BluePaper)FINALRO/SRO
WRITTEN EXAMINATION
REFERENCES
AOI*30.2 WBNFIRESAFE SHUTDOWN Rev.27 Pace 17 of 1291 4.5 Safe Shutdown Logic Diagram NOTES (1)IN InA TIN G EVENTIS AN APPENDIXRF IRE (2)REFERTOSECTION 4.3 FOR A COMPLETE DESCRIPTIONOFTH E SHumOW N KEYS.THEIR FUNCTION S AND COMPONENTS.(3)LEGENDF OR DIA GRAM SYMBOLSA S FOLLOWS*DE SCRIPTIONOFK EY KE Y NUMBER I<3'S A F ETYFUN CTIO N ORE.ND STATETOBEATTAINE D (4)OFFSITE POWERNOTCREDITED FOR A L TE RNA W E S H UID OWN.(5)R CP THERMAL BARRIERCOOLI N G REQUIRES SUPP ORT OF ERCW(KEY1C)&CCS (KEY lB),'-_b.::::: 1\./\QJ-'"?"'J\.1"...:.2*, 01 , 0 J't,........-4 T',J\)." f'\q ,\
Ba tt ery CellP a ra met ers 3.8.6 3.8 ELE CT RI CAL P OWER SYSTEMS 3.8.6 Ba tte ryCell Pa ra meters LCO 3.8.6 APPLICABILITY:
ACTI ONS Batter y cell parameter s for 1 25Vv it al batter ies and125V di esel g e nera tor (D G)batt eri es sha ll be wit hin t he limi ts ofT able 3.8.6-1.When ass ociat ed DC electrical
p ow er subs ystems and DGs ar e required t o be OPERABLE.-------------------------------------N OTE-------------------------------
Separate Condition entry i s all owed f or each batter y bank.A.CONDITION One o r more batteries with one o r more battery cel l parameter s n ot within Cate goryA orB limit s.A.l AND A.2 AND A.3 REQUIREDACT ION Ver ify pilot cel ls electrolyte
leve l and fl oat voltage meet Table 3.8.6-1 Categ ory C limits.Verify battery c el l parameters
meet Table 3.8.6-1 Categ ory C limit s.Rest ore batterycell parameters
to Cate go ry A and B li mit s o f Table3.8.6-1.COMPLETION TIMEIh our 24h ours A ND O nc e per 7 d ays t her e aft er 3 1 d ays (cont inued)W attsBa r-Unit1 3.8-33
ACTIONS (c ontinued)CONDITIONREQUIREDACTION
Battery Cell Parameters
3.8.6 C OMPLETION TIME B.Required Actio n and associated
C ompleti on Time of ConditionAn ot met.O R One o r more batteries with average electrolyte
temperature
of the representative
cells<60°F for vital batteries and<50°F for DG batteries.
O R One o r more batteries with one o r more battery cell parameters
not within Category C values.B.1 Declare ass ociated battery in operable.Immediat ely SURVEILLANCE
REQUIREMENTS
SURVEILLANCE
FREQUENCY SR 3.8.6.1 Wa tt s Bar-Un it 1 Verify battery cell parameters
meet Table 3.8.6-1 Categ or y A limits.3.8-34 7 days (continued)
SURVEILLANCE
RE QUIREMENTS
(cont inued)SURVEILLA NC E B atteryC el l Paramete rs 3.8.6 FREQUENCY S R 3.8.6.2 SR 3.8.6.3 W attsB ar-Unit1 Veri fy batte ry cell parameters
m eet Tab le 3.8.6-1 Cate go ry B limits.Verify average ele ctr olyte temperatu re o f representati
ve cells is6 0°F f or vital batteries and50°F for the DG batteries.3.8-3 5 9 2 days AND O nc e within 24h ours after a battery dis charge<110 V for vital batteries (113.5 V f or vital battery V)or 106.5Vf or DG batterie s AND O nc e within 2 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after a battery overcharge
>150 V f or vital batter i es (155Vf or vital batteryV)o r 145 V f or D G batteries 92 days
Battery Cell Para meters 3.8.6 Table 3.8.6-1 (page 1 of1)Bat tery Cell Parame te rs Requ irements CAT EGORY A: CATEGORY B: CATE GORYC: PARAMETER LIMITSF OR EACH LI MITSFOREA CH AL LOWABLE L IMIT D ES IGNATED P ILOT CONNECTEDCELL
F OR EACH CELL CO NNECTED CELL E lectrolyte
Lev el>Minimum level>M inim um level A bove top of indica t i o n mark , indicat ion mark , plates, andn ot and$1/4 inch and1/4 inch o v erfl owing above m aximum ab ove maxi mum le ve l ind icat ion le vel indicati on mark (a)mark(a)F loa t Volt age2.13 V2.13 V>2.07 V S pec if ic Gr av i ty1.2001.195 Not more than (b)(c)0.020 bel ow A ND a v er a ge of all--c on nected cell s Aver age o f all co n ne cted cells AND 1.205-->A verage ofa ll connected cells1.195 (a)I t is ac cep ta ble f or the elec trolyte level t o temp orarily increase ab o ve the s pecif ie d maximum le vel during equal i zing charges prov ided i t isno t over flo w ing.(b)C o rrec ted f or elec troly te temperature
and level.Level corr ec t io n is n ot r eq ui re d , ho wever,w h en b a ttery char ging i s<2ampswhen o n float charge f or v it al b atteries and<1.0am p f or DG batteries.(c l A battery charg ing cu rren t o f<2ampswhen on f l oat charge f o r vital batte ries and<1.0 amp f o r DG b a tteries is ac cept a ble for meeting s pecific gr avity limi ts fo llowing a ba ttery rech arge , f or a maximum o f 3 1 days.When cha rging current is used t o satis fy specif ic gra vit y requ irement s , speci f ic g ravity of each connec ted cel l shal l be mea s ur ed pri or t o e xp i ration o f the 3 1 day allowance.Watts Bar-U nit 1 3.8-36\