ENCLOSURE 1REVISED PAGES OF FACILITY OPERATING LICENSE NOS. DPR-80 AND DPR-82DOCKET NOS. 50-275 AND 50-323DIABLO CANYON POWER PLANT, UNITS 1 AND 2Replace the following pages of the Facility Operating Licenses. The revised pages areidentified by the date of the letter issuing these pages and contain marginal lines indicating theareas of change.REMOVEINSERTLicense DPR-80License DPR-80Page 9 Page 9 - Page 10License DPR-82License DPR-82Page 7 Page 7 - Page 8 E.Physical ProtectionThe licensee shall fully implement and maintain in effect all provisions of theCommission-approved physical security, training and qualification, and safeguards contingency plans Including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, by Training and Qualification Plan, and Safeguards Contingency Plan," submitted by letter dated May 16, 2006.F.Deleted.
G.Deleted.
H.Financial ProtectionPG&E shall have and maintain financial protection of such type and in such amounts asthe Commission shall require In accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.I.Mitigation Strategy License Condition llDevelop and maintain strategies for addressing large fires and explosions and thatl include the following key areas:l l(a) Fire fighting response strategy with the following elements:l1. Pre-defined coordinated fire response strategy and guidancel
- 2. Assessment of mutual aid fire fighting assetsl
- 3. Designated staging areas for equipment and materialsl
- 4. Command and controll
- 5. Training of response personnell l(b) Operations to mitigate fuel damage considering the following:l1. Protection and use of personnel assetsl
- 2. Communicationsl
- 3. Minimizing fire spreadl
- 4. Procedures for implementing integrated fire response strategyl
- 5. Identification of readily-available pre-staged equipmentl
- 6. Training on integrated fire response strategyl
- 7. Spent fuel pool mitigation measuresl l(c) Actions to minimize release to include consideration of:l1. Water spray scrubbingl
- 2. Dose to onsite responderslRevised by letter dated December 11, 2006Revised by letter dated July 11, 2007 lJ.Term of LicenseThis License is effective as of the date of Issuance and shall expire at midnight onNovember 2, 2024.FOR THE NUCLEAR REGULATORY COMMISSIONOriginal Signed by:Edson G. Case forHarold R. Denton, DirectorOffice of Nuclear Reactor Regulation Attachments:1. Appendix A - Technical Specifications
- 2. Appendix B - Environmental Protection Plan
- 3. Appendix C - Deleted
- 4. Appendix D - Additional ConditionsDate of Issuance: November 2, 1984Amendment No. 82, 75, 97, 129, 188, 189, 193Revised by letter dated July 11, 2007 F.Deleted.
G.Deleted.
H.Financial ProtectionPG&E shall have and maintain financial protection of such type and in such amounts as theCommission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.I.Mitigation Strategy llDevelop and maintain strategies for addressing large fires and explosions and that include thel following key areas:
ll(a) Fire fighting response strategy with the following elements:l1. Pre-defined coordinated fire response strategy and guidancel
- 2. Assessment of mutual aid fire fighting assetsl
- 3. Designated staging areas for equipment and materialsl
- 4. Command and controll
- 5. Training of response personnell l(b) Operations to mitigate fuel damage considering the following:l1. Protection and use of personnel assetsl
- 2. Communicationsl
- 3. Minimizing fire spreadl
- 4. Procedures for implementing integrated fire response strategyl
- 5. Identification of readily-available pre-staged equipmentl
- 6. Training on integrated fire response strategyl
- 7. Spent fuel pool mitigation measuresl l(c) Actions to minimize release to include consideration of:l1. Water spray scrubbingl
- 2. Dose to onsite respondersl lRevised by letter dated December 11, 2006Revised by letter dated July 11, 2007 lJ.Term of LicenseThis License is effective as of the date of issuance and shall expire at midnight on August 26, 2025.FOR THE NUCLEAR REGULATORY COMMISSIONOriginal Signed by:Harold R. DentonHarold R. Denton, DirectorOffice of Nuclear Reactor Regulation Attachments:1.Appendix A Technical Specifications (NUREG-1151) 2.Appendix B - Environmental Protection Plan 3.Appendix C - Deleted 4.Appendix D - Additional ConditionsDate of Issuance: August 26, 1985Amendment No. 96, 118, 190, 191, 194Revised by letter dated December 11, 2006Revised by letter dated July 11, 2007