|
---|
Category:Environmental Report
MONTHYEARML23019A3432023-01-19019 January 2023 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2022 ML21028A5252021-01-28028 January 2021 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2020 ML18116A2872018-04-26026 April 2018 Annual Radioactive Effluent Release Report for 2017 Monitoring Period ML17346A1502017-12-12012 December 2017 Annual Non-Radiological Environmental Operating Report - 2017 ML15351A4132015-12-11011 December 2015 Annual Non-Radiological Environmental Operating Report CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 32014-05-27027 May 2014 Documents for the Environmental Review of License Renewal Application - Env 3 ML14118A3812014-04-16016 April 2014 Annual Radiological Environmental Operating Report ML13289A2562013-12-31031 December 2013 6.a.iv.3.7 SQN 2010 ML13289A2482013-10-28028 October 2013 6.a.iii.l.a SQN Fukushima DG, Diesel Pumps/Tow Truck List, Docketed Letter ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A1662013-07-30030 July 2013 Excel File Containing Velocity Measurements Recorded at Nine Locations on July 30-31, 2003 ML1316805732013-06-12012 June 2013 Tennessee Valley Authority - Sequoyah Nuclear Plant - NPDES Permit No. TN0026450 - Discharge Monitoring Report for May 2013 ML13289A0922013-05-31031 May 2013 Estimation of River Flow at Sequoyah Nuclear Plant for NPDES Thermal Compliance U.S. NRC RAI 1.b.i May, 2013 ML13289A2272013-05-13013 May 2013 6.a.ii.14 SQN Hours of Operation Annual Air Report 2012 ML13289A0942013-05-0202 May 2013 Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal ML13127A0042013-05-0202 May 2013 Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant (SQN) - NPDES Permit No. TN0026450 - Application for Renewal. Part 2 of 3 ML13289A1652013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011, April 2013 ML13289A0952013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1002013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1742013-02-11011 February 2013 NPDES Permit No. TN0026459 - Annual Water Withdrawal Updated ML13289A1972013-02-11011 February 2013 1.e.iii.2.10, Sequoyah Nuclear Plant (Sqn), Annual Water Withdrawal Updates for 2013, NPDES Permit No. TN0026450-Discharge Monitoring Report (DMR) for January 2013 ML13289A1732013-02-0101 February 2013 NPDES Permit No. TN0026450 - Annual Water Withdrawal Update ML13024A0072013-01-0707 January 2013 License Renewal Application, Part 5 of 8 ML13024A0082013-01-0707 January 2013 License Renewal Application, Attachment a, Part 6 of 8 ML13024A0122013-01-0707 January 2013 License Renewal Application, Part 2 of 8 2023-01-19
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee May 10, 2012 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416
Dear Mr. Frazier:
SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1, 2011 to March 31, 2012 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-0BC and 4150-20200102-11 C. If you have any questions regarding this report, please contact Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff. Si *ce President Sequoyah Nuclear Plant Enclosure SEQUOYAH NUCLEAR PLANT-HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2011 to MARCH 31, 2012 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)
Boiler A 0 Hours Boiler B 0 Hours Total 2,000 (combined) 0 Hours Emergency Diesel 204 Hours 64.58 Hours Generator 1-A Emergency Diesel 204 Hours 36.53 Hours Generator 2-A Emergency Diesel 204 Hours 65.90 Hours Generator 1-B Emergency Diesel 204 Hours 37.25 Hours Generator 2-B Blackout Diesel 204 Hours 1.31 Hours Generator 1 Blackout Diesel 204 Hours 1.26 Hours Generator 2