Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Appendix F, Interaction of Units 2 and 3
ML17130A292
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/06/2017
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17130A259 List: ... further results
References
Download: ML17130A292 (9)


Text

PBAPS UFSAR APPENDIX F F-i REV. 22, APRIL 2009 APPENDIX F - INTERACTION OF UNITS 2 AND 3 TABLE OF CONTENTS

SECTION TITLE F.1

SUMMARY

DESCRIPTION

F.2 SHARED SITE FACILITIES F.2.1 Facilities Shared Between Units 2 and 3

F.2.1.1 Communications F.2.1.2 Offices and Administration F.2.1.3 Shops, Laboratories, and Storerooms F.2.1.4 Cooling Water Intake and Discharge F.2.1.5 Control Room, Cable Spreading Room, and Turbine Hall F.2.1.6 Independent Spent Fuel Storage Installation (ISFSI)

F.3 SHARED SYSTEMS AND EQUIPMENT F.3.1 Criteria for Shared Systems and Equipment F.3.2 Systems Shared Between Units 2 and 3 F.3.2.1 Auxiliary Power System F.3.2.2 Standby Diesel Generators F.3.2.3 125/250 V Batteries

F.3.2.4 Deleted F.3.2.5 Liquid and Solid Radioactive Waste Systems F.3.2.6 Gaseous Radioactive Waste F.3.3 Standby Gas Treatment System F.3.4 Service Water Systems F.3.5 Emergency Heat Sink F.3.6 Fuel Pool Filter-Demineralizer System

F.3.7 Miscellaneous