ML17130A220

From kanterella
Jump to navigation Jump to search
6 to Updated Final Safety Analysis Report, Section 3.0 Reactor, Figures, Part 2 of 2
ML17130A220
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/06/2017
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17130A259 List: ... further results
References
Download: ML17130A220 (35)


Text

Rev. 25 04/15

    • Steam Dryer shown reflects original steam dryer.

STEAM Df!YERS STEAM SEPARATORS MAIN fEED fLOW DRIVINO fl.CW~

RECIRCULATION PUMP PECO ENERCY CCU-ANY PEACH aonoM ATOMIC POWER STATION UNITS2 AND3 UPDATED FINAL SAFOY ANALYSIS REPORT REACTOR VESSEL INTERNAL FLOW SCHEMATIC FIGURE 3.3.2 REV. 14 05/97

I I

~

I ~

TO RECIRCULATION J RETURNING WATER TURNING VANES (INLET NOZZLE)

STANDPIPE PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT STEAM SEPARATOR FIGURE 3.3.3

FUEL ASSEMBLY-----____,...,

FUEL SUPPORT PIECE aJRE SUPPORT ORIFICE FLOW COflTROL ROD GUIDE TUBE FOUR-LOBED(QNE LOBE SHOWN)

FLOI PERIPHERAL PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT FUEL SUPPORT PIECES FIGURE 3.3.4

SECTION D*O AXIAL COMPRESSIVE BOLT LOAD:

1 25,000 LB & 300 LB BOLT SHALL BE LOADED USING JET PUMP TENSIONER, DWG # 731 E89261, OR ENG APPVD EQUIV.

(SEE NOTE 7 AND 9) r a

ORMNG NOZZl.E SUCTION INLET THROAT/ MIXING SECTION

+

B 0 l.

DIFFUSER VIEW A*A ENL.AAt;ED SECTIOO. 8*8 ISEE NOTE 3 AND 5l NOTES:

1. DELETED
2.

FILLER ROO OPTIONAL ON All FIELD WELDS UNLESS OTHERWISE SPECIFIED.

3. POSITION & WELD ADJUSTING SCREWS AT INSTALLATION, SUCH THAT WEDGE SEATS WITHIN RANGE SPECIFIED IN SECT 0-0.
4. FOR BEAM BOLT DETAIL SEE PBAPS DRAWING PB SDOC G-OSD-VC-269, SHEET.1.
5. FOR RESTRAINER BRACKET ADJUSTING SET SCREW CONFIGURATION SEE PBAPS DRAWING PB SDOC G-080-VC-273, SHEET 1.
8. FOR JET PUMP SLIP.JOINT CLAMP CONFIGURATION SEE PBAPS DRAWING PB SDOC G..fllO.VC-323.
7. AN llFROVED MAIN WEDGE DESIGN MAY BE UTILIZED FOR SOME JET PUMPS.
8. ECR 06-00213 HAS BEEN APPROVED FOR PBAPS UNITS 2 & 3, WHICH ALLOWS RSTORATION OF THE RESTRAINER BRACKET SURFACE CONT ACTING THE MAIN WEDGE, IF WORN AND THE WEDGE IS REPLACED.
9. ECR 06-00212 HAS BEEN APPROVED FOR PBAPS UNITS 2& 3, WHICH ALLOWS STAKING OF THE ADJUSTING SCREWS.

PEACH BOTTOM ATOMIC POWER STATION UNITS2 AND3 UPDATED ANAL SAFETY ANALYSIS JET PUMP FIGURE 3.3.5 Rev. 21 04/07

FIGURE 3.3.6 Deleted Rev. 25 04/15

LOCATION OF PRESSURE DI?FtatNTIALS (Large arrwhead ia on the side of the higher pressure)

l. Core Plate and Cuide
rub es
2. Shroud Support ling and Lover Shroud (beneath the core plate)
3. Shroud Head (at =arked elevation)
4. Upper Shroud(juat be-lov the cop

&uide) lttDYATE~

LI!?

5.

Core Averaged Pover Fuel !undle (~t boc-tom of channel vall)

6.

~axi=u* Pover Fuel Bundle (only for the g Noraal and Upset Condi tioiu)

7.

Top Cu.ide

8.

Steam Dryers.

9. Fro: points (a) to (b) the I rrcveraible* mcl

.Elevation Preaaur*

Drop* fro* che Shroud Read to Water L&Tel.

Total. Shroud Hud U

  • Su= of Irn'Vu:aible

+ !lcnticm RE:CiltCU'U.TION ~"'E

  • 'Flow cer.:s en Ao,..

~

llC Ill w..a

&ca o:z:
  • =

a:a

c =-
c 11.1

... =

ic

© g

caw 111..a QC CZ *=

en 111s:a en en en

<~

0.

w

0.

w=

IQ...

IQ c u

~

cw r~© 0

IQ

.:=

..a cw a:g

~~

==

oc.:

DC

~*

u u

~

PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT LOCATION OF TABULATED PRESSURE DIFFERENTIALS FIGURE 3.3. 7 REV. 13 01/95

REV. 25 APRIL 2015 UNIT 3 REV. 26 04/17 4030

POWER = 4030 MWt FLOW = 110% RATED COREFLOW PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS RPORT UNIT 2 TRANSIENT PRESSURE DIFFERENTIALS FOLLOWING A STEAM LINE BREAK FIGURE 3.3.8A REV. 25 APRIL 2015

CORE +/-

HIGH IRRADIATION ZONE SHROUD-TO-SHROUD SUPPORT DISCOITllUITY REGION SECTION A-A 20 INCHES (TYPICAL OF 20 HOLES)

REGION OF SHROUD SUPPORT PLATE MAXIMUM STRAIN PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT THERMALSHOCKTRAN~ENT ANALYSIS ZONES FIGURE 3.3.9

ASME Ill DESIGN LIMIT NUMBER OF CYCLES PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT MATERIALS BEHAVIOR GRAPH-CYCLES VERSUS STRESS FOR STAINLESS STEEL FIGURE 3.3.1 0

FUEL ORO GUIDE TUBE SEPARATORS STANDPIPES TOP PLATE BOTTOM PLATE SHROUD HEAD FLANGES DRYER &

VESSEL STABILIZER VESSEL VESSEL VESSEL VESSEL SHROUD SUPPORT TOP OF SKIRT CRD HOUSING SKIRT BOTTOM HEAD PEDESTAL PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT ANALYTICAL MODEL OF THE REACTOR VESSEL INTERNALS FIGURE 3.3.11

. }-

I r-0.1 C=O C*O 4 ________ _,

C*0.15 3

p 2

Peak amplitude Resonant amplitude C*0.3535 1 -

0.5 1.0 1.5 2.0 25 3.0 r

The amplification bclor "as a function ol the frequency r.itio t> for \\*arioua

amounts of viscous dampinl:).

PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT

µ {T)

FOR VARIOUS AMOUNTS OF VISCOUS DAMPING FIGURE 3.3.12

-~-

PBAPS UFSAR Figure 3.4.1 Deleted

\\

I SHEA7H ~

COUPLING AELE~.Sc HANOL~ !LCWE=ll 0

0 0

0 0

0 0

0 iJ 0

\\j 0

\\)

~

()

\\l

~

~

0 0

0 0

NEUTRON ABSORBER HAFNIUM RODS PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT CONTROL ROD -

ISOMETRIC OURALIFE 160 FIGURE 3.4.IA REV. 9 01/91

SHEATi-i 0

a 0

CJ 0

\\)

0 0

0

()

0

()

0

~

(LOWER)

COUFUNG SOCKET

/UPPER HANDLE NEUTRON ABSORB

!IA.FNIUM RODS (D-190}

or NEUTRON ABSORB HAFNIUM STRIPS (D-230)

VELOCITY LIMITER PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER ST A TION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT CONTROL ROD -

ISOMETRIC DURALIFE 190, 230 FIGURE 3.4.18 REV. 9 01/91

LOBE SQUARE TYPE ABSORBER TUBE ABSORBER CAPSULE CROSS*Si::CTION OF 8 41 C ABSORBER TUSE AND CAPSULE SECTION A*A

  • ILLUSTRATION OF ABSORBER TUBE*ANO TIE ROD CONFIGURATION GAP BORON CARBIDE POWDER ABSORBER TUBES COUPLING SCOkET UPPER HANDEL

COUPLING RELEASE rn-~.o.....c;;;.QQ.

HANDLE CLOWER>

ILLUSTRATION OF

---VELOCITY LIMITER TYPICAL MARATHON CONTROL ROD

<BYR/2*-4 D*LATTICE>

PECO ENERGY COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AHO 3 UPOA TED FINAL SAFETY ANALYSIS REPORT F~

3."4.IC CONTROL ROO MAR.tTHON REV. 14 0~/~7

COUPLING RELEASE HANDLE SHOWN RAISED AGAINST SPRING FORCE COUPLING SOCKET COUPLING SPUD CONTROL ROD ASS EMBLY UNLOCKING TUBE INDEX TUBE* DRIVE

/

COUPLED CONDITION ACTUATING SHAFT SPRINGS RETURN (LOCK PLUG)

PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT CONTROL ROD TO CONTROL DRIVE COUPLING -

ISOMETRIC FIGURE 3.4.2

14' in.

3TROKE FUEL SUPl"OllT CASTING COllE SUP'l"OllT P'l.ATE INSERT VELOCITY LIMITER l~I WITHDRAW CONTROL ROD DRIVE HOUSING PECO ENERGY* CCU-ANY PEACH BOTIOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SA,ETY ANALYSIS REPORT CONTROL ROD VELOCITY LIMITER -

ISOMETRIC FIGURE 3.4.3 REV. 14 05/97

BOTTOM Of REACTOR VESSEL DRIVE HOUSING DRIVE CYLINDER DRIVE llSUT Liii( -----'"'\\

BALL CNCCK VALVE COUPLING SPUD llD[I TUIE DRIVE WITMDRH Liii(

ARllOWS SllDW HTU FLOW WHU TffE OlllYE IS II TM( WITNDllAWAL llQDE OF OPEIUIDll P1t

mn vs WITHDRAW LINB PISTON TUBE TO PISTON TUBE HEAD WELD RING FLANGE BOLT GUIDE TUBE

("")

0 r-COTTER PIN 2 COLLET*FINGERSf::

COLLET-SPRING COLLET *PISTON ANO RINGS DRIVE PISTON ANO SEALS HOUSING TO FLANr.F WELD FLANGE_H..;.UB:;.._ ___

v.,."'ILI_ VESSEL PORTS DRIVE INSERT LINE DRIVE MAIN FLANGE WELDED_

PLUG POSITION INDICATOR HOUSING PHILADILPHIA ILICTllC COMPANY PIACH BOTTOM ATOMIC POWIR STATION UNITS 2 AND3 UPDATID PINAL IAPITY ANALYSIS RIPORT CONTROL ROD DRIVE, SCHEMATIC DIAGRAM FIGURI 3.4.5

REV. 23 04/11 PENETRATIONS (INSIDE a OUTSIDE)

CAPPED ------

~

4" CRD RETURN LINE

/

RPV NOZZLE CAPPED _/'

EQUALIZINB VALVES AND FILTERS

: - --- : :.::t:==========

I

[XHAUST l'R ' Spsi H£AD£HOll1PM COOi.iNC PR* 15 HEADER ~-I l p DRIVE PR*2'0 HEADEROZ4....

CHAJIGING l<<J0-1500 p>*

HEADER lllJP" NOH ALL llUIU*!lllNH ARI APPilDXlllAlf RP-REACTORPUS!URl SCRAlll'ILOT AIR i

HEADER VF-1-~i-r-=~"~ m~

--r-...;-cxi---i-1

_3_.31i<ial/Drive l 'i\\:'.,., I I

DRAIN t._ ___________ __;

NOTE : "TH lS IS A S.IMPUFIEb l\\...LUSTftATION. Fott SPECIFIC PEACM SO't\\oM DES IGrN IN~MAT\\Ot-4 REFER TO "l\\-CE S"<STEM P*l.b's PEACH BOTTOM ATOMIC POWER STATION UPDATED FINAL SAFETY ANALYSIS REPORT CONTROL ROD DRIVE HYDRAULIC CONTROL SYSTEM SIMPLIFIED COMPONENT ILLUSTRATION UNITS 2 AND 3 FIGURE 3.4.6

PBAPS UFSAR Figure 3.4.7 thru 3.4.8 Deleted

2 RING ICRD FLANGE FACE 1 3 RING !INSERT ANO WITHDRAW PORTSI 4 -

STRAINER S -

FLAT HEAD SCREW iSTRAINfR-MOUNTINGJ 6 - DOWEL ALIGNMENT PIN 7 -

0-RING SPACER 8 -

NAMEPLATE 9-SOCKET-HEAD CAP SCR[W !RING FLANGE MOUNTING) 11-POSITION INDICATOR PROBl 13 -

FILLISTER-HEAD SCREW !POSITION INDICATOR PROBE MOUNTING!

H - LOCKWASHER !FOR PAR r 131 15 -

PISTON TUBE 16 -

NUT !PISTON TUBE1 17 -

RING FLANGf 18 RING I PISTON TUBE I 19-CYUNOER, TUBE, ANO FLANGE 20- BALL !CHECK VALVE) 21 - BALL RETAINER 22 RING jBALL RETAINERJ 13 -

SET SCREW PLUG !COOLING WATER ORIFICE) 24-DRIVE PISTON 15-BAND 16-INDEX TUBE 11 - SEAL RING !COLLET PISTON -

INTERNAL) 18 - SEAL RING !COLLET PISTON -

EXTERNAL) 19 -

COLLET AND PISTON 30 - SPRING WAS HE RS 31 - COLLET sPRING 31 -

SPLIT BUSHING !STOP PISTON) 33 -

STOP PISTON 34 - SE"L RING !STOP PISTON) 35-BARREL 36 - COTTER PIN !STOP PISTON) 37 -

PLUG !GUIDE CAPJ 38 -

FILLISTER-HEAD SCREW !GUIDE CAP PLUG MOUNTING) 39 -GUIDE CAP 40 - DRILLED FILLISTER-HEAD SCREW IOUTER FILTER MOUNTING) 41-INNER FILTER 41-ROD 43-TUBE 44 -

BAND 4S -

FILTER !OUTER!

46 -

SPUD 50 - SEAL RING HNNER FIL TERI Sl - COLLET HOUSING !PORTION OF OUTER TUBE) 51 - SPACER {PART OF CYLINDER, TUBE, ANO FLANGE I 53 -

BUFFER ORIFICES IN PISTON TUBE (TYPICAL) 54 - POSITION INDICATOR SWITCHES 55 - INDEX TUBE NOTCH 56 - OUTER TUBE !PART OF CYLINDER, TUBE, ANO FLANGE) 57 -

INNER CYLINDER !PART Of CYLINDER, TUBE, ANO FLANGE)

SS-THERMOCOUPLE !PART OF POSITION INDICATOR PROBE)

S9 -

STUD !PORTION OF PISTON TUBE J 60 - COLLET FINGER {PART OF COLLET ANO PISTON!

61 -

INDICATOR TUBE !PART Of PISTON TUBE) 62 -

INNER SEALS {DRIVE PISTON-BUFFER SEALS) 63 -

INTERNAL BUSHING !DRIVE PISTON) 64 - EXTERNAL BUSHING !DRIVE PISTON!

6S - OUTER SEA.LS !DRIVE PISTON) 66 -

INSERT PORT (INSERT ANO SCRAll lllLET/

WITHDRAW OUTLET) 67 -

RING W.GNET (PART Of DRIVE PISTmo 68 -

CABLE IPOSITION INDICATOR) 69 -

PORT TD COLLET PISTON !WITHDRAW PRESWRE TO COLLET PISTON) 70 -

WITHDRAW PORT (WITHDRAW INLET/

INSERT OUTLET AND SCRAll DISCHARGE) 71 -

INNER SEALS (DRIVE PISTON - DRIYE-DOWll SEALS!

72 -

INNER SEALS (DRIVE PISTON - DRIVE-41P SEALS I 73 - WATER PORTS Ill COLLET HOUSlllG 9'

PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT CONTROL ROD DRIVE CUTAWAY ILLUSTRATION FIGURE 3.4.9

~USA"lt!'

SYSTEM

---y------~

HCU~

C~NV* -rt:~ N6f°'~

I

'° -e


..---c:ioo---------.----------=-"--"-.._____;;;;...._-=---------,-o-1----- ~cu*~

'°"H'I ~Art:*l:J('l"A~*-s6-u)*1l0.1l,,1U.,il.~.1tt.,IZ1 <.LOl.LOj

~*a:~***"(* o-..a.t z!E_,

Del/lfr -re-_e #£AO~~

J.J srA"',_,,.,,,.,, Rl!IW~F.eor'.._,,_ ;1r@

l.).STAi.l~~i.£AK~£;r~o- 'w'r""lW?'"w*- ~C$PM"T@

.. ='

.:::.:-:.:-~:. ~"----.......

_...,94..... 'U **

\\. ::.:-::.::,,_.... *---*-*------

c. ~~.\\.,.,~~-*---*"*--"*-Tiii----

,.,.. ___,_II&_..........

,.........,..9....................,,....

... Wlll**K-*G.al**c --..-.. WllCS*n****

.......................... _IT IPUltM9 nat.

.................... _.,_f\\AflUIDn'I.

"* ~fi1~::~~i:~i=~l~

ffi~~~..£t~~~7:'£r,;.

~

~*:.u-:i

"::.,~

,,. M Ml*...

,_..,CIMITlll.. -

  • 'ClollllllllL... *M*M4*111

"* :-:, ':!:~ :::~:.~* a.1'11D VWC* LOCAfl<.t* t\\ *.Ull Otl

......................... :........ f\\W...... ltQlllat

  • . =~ _.,.. Ul'fD 91 'NOi M,_,_ Slll&I *tC lf'!*t*

tf.-.&,Nll'I' __.....,.....,.....

... ~-:.:*:!:*::.::::. *::~ (f?:~m ':'::. *:.:............

lo.........CCDIT*lffllllO

    • con. -

............ tC --......

PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT CONTROLRODD~VEHYDRAULIC SYSTEM, PROCESS DIAGRAM FIGURE 3.4.10

PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT CONTROL ROD HYDRAULIC CONTROL UNIT -

ISOMETRIC FIGURE 3.4.11

GRID PLAT ES :""':::::::::::::::-t+--~.,,.....

GRID CLAMP

*--STEEL

'i FORM LINER CRD HOUSING

~R V:SSEL SU~ORT 1-tr--+--HANGER ROD PEDESTAL PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT CONTROL ROD HOUSING SUPPORT -

ISOMETRIC FIGURE 3.5.1

PBAPS UFSAR Figure 3.6.1 Deleted

The figures listed below are contained in the ref ere need documents and are not reproduced here.

FIGURE NO.

3.6.2 3.6.3 3.6.4 TITLE REFERENCE/

FIGURE Scram Reactivity and CAD Specifications, BOC5 to EOC5*1,000 MWd/t Scram Reactivity and CAD Specifications, EOC5-1,000 MWd/t to EOC5 Unit 2 Scram Reactivity and CAD Specifications unit 3 11/2a 11/2b 19/2 PECO ENERGY COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT SUBSECTION 3.6 FIGURES FIGURES 3.6.2 THROUGH 3.6.4 REV. 12 01/94

PBAPS UFSAR Figure 3.6.5 thru 3.6.35 Deleted

PBAPS UFSAR PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT OPERATING POWER FLOW MAP FIGURE 3.7.1 REV. 26 04/17 Per MELLLA+

PBAPS UFSAR Figure 3.7.1A Deleted Rev. 26 04/17

PBAPS UFSAR Figure 3.8.1 thru 3.8.3 Deleted

100 I

I 128

'60 12l 600 110 500 92 S!WTOOWN MARGIN

  • 73 9

400 l

~

z 0

~

~

I z 0

Xe

  • 55 0

..J 300 0

POWER RANGE I-z SUBCRITICAL RATED POWER ZERO POHER 200 37

~

CRITICAL 100 ~r 18 20°c I

i 0

0.6 0.7 0.8 0.9 1.0 MODERATOR DENSITY {gm/eel PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT BORON REQUIREMENTS OF THE STANDBY LIQUID CONTROL SYSTEM FIGURE 3.8.4 REV. 6 01/88

PBAPS UFSAR Figure 3.8.5 Deleted