Similar Documents at Cook |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] |
Text
r-.-.""'EGUlATOINFORMATION DISTRIBUTiON TEM(RIDS)ACCESSION NBR;8312200494 DOC~DATE::83/12/15NOTARIZED; f30DOCKETFACIL:503i5DonaldCeCookNuclearPower,Plant<
'Un)'t1iIndiana80500031550~316DonaldC,CookNuclearPowerPlantiUnit2iIndiana805000316AUTH~NAf1E,AUTHORAFFILIATION ALEXICHiM,PE Indiana8MichiganElectricCo,RECIPNAI1ERECIPIENT.
AFFILIATION DENTONiH~REOfficeofNuclearReactorRegvlationi DirectorSUBJECTsApplication;to amend.LicensesOPR588DPR74iconsisting, ofproposedadministrative changestoTechSpecs.DI'STRIBUTI NCODE$A001S"COPIESRECEIVEDgLTR.ENCISIZEe.TITLE:ORSubmittal':GeneralDistributionNOTES;RECIPIENT IOCODE/NAME NRROR81BC01.-COPIESL.TTRENCL"77"RECIPIENT IDCODE/NAME-
~COPIESLTiTRENCLINTERNAL!
ElO/HDS3NRR/DLDIRNRR/DSETBILEEXTERNAL!
ACRSNRC,PDRNTIS04090210111166111NRR/DE/MTEB NRR/Dl/ORA8 NRR/OSI/RABRGN3I.P.ORNSIC0305'=1011121TOTALNUMBEROFCOPIESREQUIREDTTR 26ENCL24 1~)tUUlff'<<1<<>1!hi',C<<'I'I}BCUU~>><<U<<C<<rI!<<,f,fIWllIC>i'<<CUWWPUIIvI":<<<<f<<Wo~~U~Wll<<lrI>>',~'<<'}>W<<,',ll'IU}I>I<<UWI+'ll<<)CW,lI~<<U'i>vCI>'C<<iCCWlWCf<<>>'I'<<<<g>t'>>U<<<<IIIU'ljI<<g~U~~fla<<.Il<<C>f'IIIC'I~C,JIjI<<~<<)<')Ill'Ilif11fU<<<<,t>IW't<l'>1>>ti)I,)IfJfVi)IIf<<<<10<<Ulit>,>>>'i'll.1'IlI<<Ut>till1i<<II~'a1U lNDlANA8MICHlGANELECTRICCOMPANYP.O.BOX1663ICOLUMBUS, OHIO43216December15,1983AEP:NRC:0790 DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74TECHNICAL SPECIFICATIONS CHANGEREQUESTSMr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555
DearMr.Denton:
ThisletteranditsAttachments requestchangestotheTechnical Specifications andtheOperating LicensesfortheDonaldC.CookNuclearPlantUnitsNos.1and2.Theserequestshavebeenpreviously discussed withmembersofyourstaff,andarebeingmadetoeithersimplifyorclarifythelicenses.
Attachment Nos.1and2tothisletteraddresstheproposedchangestothelicensesandthereasonsforthechangesforUnitNos.1and2,respectively.
Attachment Nos.3and4tothislettercontaintherevisedTechnical Specification (T/S)pages.Allofthechangesareindicated byverticalbarsdrawnontherighthandmarginofthepage.Becausetheproposedchangesarepurelyadministrative innature/webelievethattheydonotinvolvesignificant hazardsconsiderations, inthattheoperations oftheDonaldC.CookNuclearPlantUnitNos.1and2,inaccordance withtheAmendments, wouldnot:(1)involveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated; or(2)createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated; or(3)involveasignificant reduction inmarginofsafety.Thereisreasonable assurance thatthehealthandsafetyofthepublicwillnotbeendangered byoperation intheproposedmanner.Furthermore, activities relatedtotheamendments willbeconducted incompliance withtheNRC'sregulations andwillnotbeinimicaltothecommondefenseandsecurityortothehealthandsafetyofthepublic.TheseproposedchangeshavebeenreviewedbythePlantNuclearSafetyReviewCommittee (PNSRC)andtheNuclearSafetyandDesignReviewCommittee (NSDRC).8312200494 831215,PDRADOCK05000315P'DR~)
,<<~,E))h<<<<>>.<<f,Ktf p.h'<<tth'h>>.~yg<<,f>>,t"$>>~<<t',"'>>A>>t)~tIihf4It>>>>ftI>>IItI,l,ht",)'>>,l'II,*Ptth-'P,'I'=fII.~+II>gP',P't')'f>>'Il)t)r'~4h)8,Itgh)4I<<]f'I,',h'hh'"nP4h)II,Irf)>>,f.<<<<Ihhih")
i'>4'>>tfttV
'Mr.HaroldR.DenAEP:NRC:0790 Incompliance withtherequirements of10CFR50.91(b)(1),acopyofthisletteranditsattachments havebeentransmitted toMr.R.C.CallenoftheMichiganPublicServiceCommission.
Sincethesechangerequestsareadministrative andeditorial innature,andwiththepurposeofsimplifying orclarifying thelicenseandTechnical Specifications, andweremadeattherequestofyourstaff,weinterpret 10CFR170.22asnotrequiring afeetoaccompany thissubmittal.
Thisdocumenthasbeenpreparedfollowing Corporate procedures whichincorporate areasonable setofcontrolstoinsureitsaccuracyandcompleteness priortosignature bytheundersigned.
Verytrulyyours,P.exichaceresidentMPA/camcc:JohnE.DolanW.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffE.R.Swanson,NRCResidentInspector
-Bridgman AIIt Attachment No.1toAEP:NRC:0790 ProposedLicenseChangestoDonaldC.CookNuclearPlantUnitNo.1 i~.'3fg.'i:)'IPSE',>-'..'.(>~i~'.~~C;~.'+24X.1;t.'i~
~,,.3~>Sf~.,tQ:l)~)
1.ThefirstproposedchangetotheLicenseNo.DPR-58istodeleteLicenseCondition 2.C.(6),whichstates:(6)SentFuelPoolModifications Thelicenseeisauthorized tomodifythespentfuelpoolasdescribed intheapplication datedNovember22,'978assupplemented bylettersdatedJanuary22,January24/April16,June29,July27,andSeptember ll,September 26,andSeptember 27,1979.Sincespentfuelisnowbeingstoredinthespentfuelpool,uponcommencement ofworkoneithertheexistingracksorthenewracksinthespentfuelpoolinconjunction withreplacement oftheexistingrackswithnewracks:(a)the-waterinthespentfuelpoolshallcontainat'least2000ppmboronandshallbemaintained atthisboronconcentration untilcompletion oftherackreplacement,;
and(b)theboroninthespentfuelpoolshallbeverifiedtomeettheconcentration requirement bychemicalanalysisatleast3timesper7days,withamaximumtimeintervalbetweensamplesof72hours.Priortofinalconversion tothemodifiedrackdesign,fuelmaybestored,asneeded,ineitherthemodifiedstorageracksdescribed inTechnical Specification 5.6.2orintheunmodified storageracks(orboth)whicharedesignedandshallbemaintained withacenter-to-center distancebetweenfuelassemblies placedinthestoragerackstoensureaKffof~0.95withthestoragepoolfilledwitRunborated water,including aconservative allowance foruncertainties asdescribed inSection9.7oftheFSAR.Sincealloftheoldrackshavebeenreplacedwithnewracks,andnofurthermodifications areforeseen, webelievethatthisLicenseCondition shouldberemoved.2.ThesecondproposedchangetotheLicenseNo.DPR-58istodeletetheLicenseCondition 2.Ewhichstates:"2.E.Beforeengaginginanoperational activitynotevaluated bytheCommission, thelicensees willevaluatetheenvironmental effectsofsuchactivity.
Whentheevaluation indicates thatsuchactivitymayresultinasignificant adverseenvironmental impactthatwasnotevaluated orthatissignificantly greaterthanthatevaluated intheFinalEnvironmental Statement, thelicensees shallprovideawrittenevaluation ofsuchactivities andobtainpriorapprovaloftheDirector, OfficeofNuclearReactorRegulation fortheactivities."
-)4I~r4)II4tI'I4~4r-(rfw4<<44ilI<<~4h>>r'I(>>f)tt(II"f>>'h)44<<Iw,.1~II4.IhI4l-,)<<4,i<<A44I~'<<I',l44)h4r4t4,4,"-+~r)il4f<>II',4Iwr)
InLicenseAmendment No.54,issuedonMay6,1982,theEnvironmental Technical Specifications (Appendix BtotheLicense)wererevisedtoincludealltheenvironmental considerations contained inthethennewEnvironmental Protection Plan(EPP).InSection5.4.2ofthisAmendment werethe"Nonroutine Reports"requirements whichincludedthefollowing:
5.4.2.2ChanchesWhenachangetothePlantdesign,tothePlantoperation, ortotheprocedures described inSection5.3isplannedwhichinvolvesanenvironmental matterorquestionnotpreviously reviewedandevaluated bytheNRC,areportonthechangeshallbemadetotheOfficeofNuclearReactorRegulation priortoimplementation.
Thereportshallincludeadescription andevaluation ofthechange.Changesoradditions topermitsandcertificates requiredbyFederal,state,localandregionalauthorities fortheprotection oftheenvironment shallbereported.
.Whentherequiredchangesaresubmitted totheconcerned agencyforapproval, theyshallalsobesubmitted totheDirector, OfficeofNuclearReactorRegulation, USNRC,forinformation.
Thesubmittal shallincludeanevaluation oftheenvironmental impactofthechange.Requestforchangesinenvironmental technical specifications shallbesubmitted totheDirector, OfficeofNuclearReactorRegulation, USNRC,forpriorreviewandauthorisation.
Therequestshallincludeanevaluation oftheimpactofthechange,including asupporting benefit-cost analysis.
SincethisEnvironmental Technical Specification addresses thesamerequirements asthosecontained inLicenseCondition 2.E.,wefeelthatthelattercannowbedeleted.3.ThethirdproposedchangetotheLicenseNo.DPR-58istodeletetheLicenseCondition 2.F,whichstates:"2.F.Thisamendedlicenseissub)ecttothefollowing additional condition fortheprotection oftheenvironment:
Thelicensees willcomplywithappropriate waterqualitystandards inaccordance withFederal,State,andlocalregulations (including changesasrequiredbytheFederalWaterPollution ControlActAmendments of1972)."
Irhf'>MMeFap~r~n"J'tLIIF)Mhahhlhl)IaI'MlI"1v*<<.,tMM)I*~~a)haI,I7JIhaI'aeheF~'Lr~)M Asstatedinitem2above,Amendment No.54revisedtheEnvironmental Technical Specifications toincludealltheenvironmental considerations inthethennewEPP.InSection3.1ofthisAmendment, werethe"Radiological Environmental hfonitoring" requirements forthemonitoring ofthelakeandwellwaterqualities intheDonaldC.CookNuclearPlantarea.Fortheabovereasons,wefeelthatLicenseCondition 2.Fcanbedeleted.4.ThefourthproposedchangetotheLicenseNo.DPR-58istodeletethefootnoteonpage3/45-3whichisnolongerapplicable.
Thefootnoteaddresses achangeintheLimitingConditions forOperation fora'giventimeperiodinOctoberof1982.Sincetheeffective periodoftimeforthischangehasexpired,thefootnoteshouldbedeleted.5.ThefifthproposedchangetotheLicenseNo.DPR-58istorequestthere-issuance ofT/Spage3/46-35.Achangewaspreviously requested tothetimedelayaddressed inparagraph 4.6.5.6.a.
Amendment No.63oftheT/SwasissuedonOctober4,1982withoutthechange.TheSafetyEvaluation ReportforbothunitsandtheTechnical Specification forUnit2werecorrectinchangingthe10+1minutedelayin4.6.5.6to9+1minute.However,theUnit1Technical Specification wasissuedwithoutthechange.Thebasisforthechangeremainsvalidaspresented intheAmendment, 63SafetyEvaluation Report.6.ThesixthproposedchangetotheLicenseNo.DPR-58istoremovethe"Amendment No.63"revisionreference atthebottomofpages3/43-50,3/46-36,3/49-9,B3/42-3,and6'-10.OnlythereversesidesofthesepageswereaffectedbyAmendment 63.Therefore, the"Amendment 63"revisionreference oneachofthesepagesshouldberemoved,andthecorrect"Amendment No."shouldbeputinitsplace.Attachment, No.3tothislettercontainstherevisedT/Spageswiththeappropriate "Amendment No."oneachpage.Pleasenotethatseveralofthesepageshaveno"Amendment No.";becausetheyhaveneverbeenrevised.
rr="g>>F,)v1'I*rhf.Iq*rhearhI,hgIhhrI)lI'rIhrI',"hrr$rrh,I'I~I'I~IrhI~,hr.lghI'hh'Slhrl'*"y,l~I.II1Igv,"><l7"h>>'IIf'hIIhI' Attachment No.2toAEP:NRC:0790 ProposedLicenseChangestoDonaldC.CookNuclearPlantUnitNo.2 p1t 1.ThefirstproposedchangetotheLicenseNo.DPR-74istodeletetheLicenseCondition 2.C.3.(h),
whichstates:2.C.(3).(H)
Containment SumpDesignVerification IndianaandMichiganPowerCompanyshallcompleteteststoverifycontainment sumpdesignbeforeNovember1978andsubmittheresultsforCommission reviewandapproval.
InaletterfromMr.S.VargaoftheNRCdatedJuly2,1982/andbytheSafetyEvaluation Reportthatwastransmitted withthat.letter,theNRCdetermined thatwehadadequately responded totherequirements oftheLicenseCondition andthatthetestingwasacceptable.
DeletionofthisLicenseCondition 2.C.3.(h) isconsistent withthatSafetyEvaluation Report.2.ThesecondproposedchangetotheLicenseNo.DPR-74istodeletetheLicenseCondition 2.C.(3)(1),
whichstates:2.C.(3).(1)ResidualHeatRemovalSystemLowFlowAlarmIndianaandMichiganPowerCompanyshallpriortostartup,following thefirstregularly scheduled refueling outage,developandsubmitforCommission reviewandapprovalthecontrollogicforanalarmdesignedtoalertthereactoroperatortopossiblelossofflowintheresidualheatremovalsystem.Following initialstartupandpriortoinstallation ofthealarm,IndianaandMichiganPowerCompanyshallstationanoperatorat.alocalpaneltomonitorcooldownflowwhentheresidualheatremovalsystemisinoperation andthevesselheadisinplace.TheSafetyEvaluation Report(SER)forAmendment 10tothelicensestated:"thelicenseconditions havebeenmetandthelicensecondition 2.C.(3)(1) onResidualHeatRemovalSystemLowFlowAlarmmayberemovedfromtheLicense."
However,thelicensecondition wasnotdeletedfromthelicense.3.ThethirdproposedchangetotheLicenseNo.DPR-74istodeleteLicenseCondition 2.C.(3)(t),
whichstates:2.C.(3)(t)
SentFuelPoolModifications Thelicenseeisauthorized tomodifythespentfuelpoolasdescribed intheapplication datedNovember22,1978assupplemented bylettersdatedJanuary22,January24,April16,June29,July27,andSeptember 11,September 26,andSeptember 27,1979.Sincespentfuelisnowbeingstoredinthespentfuelpool,uponcommencement ofworkoneithertheexistingracksorthenewracksinthespentfuelpoolinconjunction withreplacement oftheexistingrackswithnewracks:
',7I'~7)4IIf~f)I'()Y(fI~-I~(4['.Y~I)4II~f-II'447I'IN(444INhIf}'(g(fIY'ItL'..f}}l'NIN (i)thewaterinthespentfuelpoolshallcontainatleast2000ppmboronandshallbemaintained atthisboronconcentration untilcompletion oftherackreplacement; and(ii)theboroninthespentfuelpoolshallbeverifiedtomeettheconcentration requirement bychemicalanalysisatleast3timesper7days,withamaximumtimeintervalbetweensamplesof72hours.Priortofinalconversion tothemodifiedrackdesign,fuelmaybestored,asneeded,ineitherthemodifiedstorageracksdescribed inTechnical Specification 5.6.2oxintheunmodified storageracks(orboth)whicharedesignedandshallbemaintained withacenter-to-center distancebetweenfuelassembliesplacedinthestoragerackstoensureaKffof~.95withthestoragepoolfilledeffwithunborated water,including aconservative allowance foruncertainties as'described inSection9.7oftheFSAR.'Sincealloftheoldrackshavebeenreplacedwithnewxacks,andnofurthermodifications areforeseen, webelievethatthislicensecondition shouldberemoved.4.ThefourthproposedchangetotheLicenseNo.DPR-74istodeleteLicenseCondition 2.E>whichstates:2E.Thislicenseissub)ecttothefollowing additional conditions fortheprotection oftheenvironment:
(1)Thelicensees willcomplywithappropriate waterqualitystandards, inaccordance withFederal,Stateandlocalregulations (including changesasrequiredbytheFederalWaterPollution ControlActAmendments of1972)~(2)Ifharmfuleffectsorevidenceofunacceptable damagearedetectedbythemonitoring
- programs, thelicensees shallprovidetotheCommission ananalysisofthe'roblem andaplanofactiontobetakentoeliminate orsignificantly reducethedetrimental effectsordamage.(3)Beforeengaginginanoperational activitynotevaluated bytheCommission, thelicensees willprepaxeandrecordanenvironmental evaluation ofsuchactivity.
Whentheevaluation indicates thatsuchactivitymayresultinasignificant adverseenvironmental impactthatwasnotevaluated, orthatissignificantly greaterthanevaluated intheFinalEnvironmental Statement, thelicensees shallprovideawrittenevaluation ofsuchactivities andobtainpriorapprovaloftheDirector, OfficeofNuclearReactorRegulation fortheactivities.
),I")X'>>a~ilI'=I))I'rh*")rI1I>>ihha')!i')tat1-gtiih)"~)XIIIiI'FItr~=.)>>r,I'~t'v*II-)ItIIitI'I*,i))'.'7.t,)b,I,i;.)r)'hII)ar.II'tlbIr~),i'))bII),'<<)h~X'h"I"I,'IVbtih'r'brt'I~'I"Ih~))t'1JhII")ra)htXt~IIh"hiar'i>>
WithregardtoCondition 2.E.(1),Amendment No.40toUnitNo.2licenserevisedtheEnvironmental Technical Specifications toincludealltheenvironmental considerations inthenewEPP.InSection3.1ofthisAmendment, werethe"Radiological Environmental Monitoring" requirements forthemonitoring ofthelakeandwellwaterqualities intheDonaldC.CookNuclearPlantarea.Fortheabovereasons,wefeelthatLicenseCondition 2.E.(1)canbedeleted.WithregardtoCondition 2.E.(2),Section5.4.1(Environmental Technical Specification) ofAmendment No.40totheUnitNo.2Licensestates:"Ifharmfuleffectsorevidenceoftrendstowardsirxeversible damagetotheenvixonment areobserved, thelicenseeshallprovideadetailedanalysisofthedataandaproposedcourseofactiontoalleviate theproblem."
SincethisEnvixonmental Technical Specification addxesses thesamerequirements asthosecontained inLicenseCondition 2.E.(2),wefeelthatthelattercanbedeleted.WithregardtoCondition 2.E.(3),Section5.4.2.2(Environmental Technical Specification) ofAmendment No.40toUnitNo.2Licensestates:5.4.2.2~ChanesWhenachangetothePlantdesign,tothePlantoperation, ortotheprocedures described inSection5.3isplannedwhichinvolvesanenvironmental matterorquestionnotpreviously reviewedandevaluated bytheNRC,areportonthechangeshallbemadetotheOfficeofNuclearReactorRegulation priortoimplementation.
Thereportshallincludeadescription andevaluation ofthechange.Changesoradditions topermitsandcertificates requiredbyFederal,state,localandregionalauthorities fortheprotection oftheenvironment shallbereported.
Whentherequiredchangesaresubmitted totheconcerned agencyforapproval, theyshallalsobesubmitted totheDirector, OfficeofNuclearReactorRegulation, USNRC,forinformation.
Thesubmittal shallincludeanevaluation oftheenvironmental impactofthechange.Requestfor'hanges inEnvironmental Technical Specifications shallbesubmitted totheDirector, OfficeofNuclearReactorRegulation, USNRC,forpriorreviewandauthorization.
Therequestshallincludeanevaluation oftheimpactofthechange,including asupporting benefit-cost analysis.
SincethisEnvironmental Technical Specification addresses thesamex'equirements asthosecontained inLicenseCondition 2.E.(3),wefeelthatthelattercannowbedeleted.
444r.4~r)*)PP>>")4F)PPIPw-WV)~~P4~IP'Il-,II"-*WPIWP'()~I4~~~wvr-I)j,4F)~r)))Fg>'"4IIV))~f~ll)~)f>>>,P~ill>I'IPWrP,I4III 5.ThefifthproposedchangetotheLicenseNo.DPR-74istodeletethefootnoteatthebottomofT/Spage3/46-39,whichstates:"Forthelowerinletdoorinspection intervalscheduled toendJune8,1980,including theextension permitted bySpecification 4.0.2,aonetimeonlydelayisallowedtoextendthisinspection intervalthroughJuly20,1980'Sincetheextension isnolongervalid(i.e.,pastJuly20/1980),werequestdeletionofthefootnote.
6.ThesixthproposedchangetotheLicenseNo.DPR-74isthedeletionofthefootnoteatthebottomofpage3/49-9,whichstates:"Duringtherefueling outagecommencing aboutNovember1982,theContainment PurgeandExhaustIsolation Systemshallbedefinedtoincludearadiation signaltoeithertheinneroroutervalveoraprovision forimmediate manualclosureofthevalveintheeventclosuremayberequired.
Thisdefinition istemporary anditandthisfootnoteshallnolongerapplyfollowing therefueling outagecommencing aboutNovember1982.Forthetemporary reliefperiod,theprovisions ofSpecification 3.0.4arenotapplicable."
Sincetheextension isnolongervalid(i.e.,therefueling outagecommencing aboutNovember1982isover),werequestdeletionofthefootnote.
7.TheseventhproposedchangetotheLicenseNo.DPR-74istherequesttoamendpageB3/46-3bythedeletionofSection3/46.1.7ontheContainment Ventilation System.Amendment No.47issuedonDecember8,1982issuedanewT/SpageB3/46-2awhichincludedaBasesSection3/46.1.7ontheContainment PurgeandExhaustIsolation Valves.ThisnewsectionreplacedtheoldBasesSection3/46.1.7contained onpageB3/46-3,however,thelatterwasnotdeleted.Basedonthis,webelieveBasesSection3/46.1.7onpageB3/46-3shouldbedeleted.8.TheeighthproposedchangetotheLicenseNo.DPR-74istoremovethe"Amendment No.45"revisionreference atthebottomofpages:III;3/41-l~3/42-15~3/43-4g3/43-42;3/44-2;3/44-26;3/45-5~3/46-11;3/46-43;3/49-10;andB3/42-3.OnlythereversesidesofthesepageswereaffectedbyAmendment 45.Therefore, the"Amendment 45"revisionreference oneachofthesepagesshouldberemoved,andthecorrect"Amendment No.."shouldbeputinitsplace.Attachment No.4tothislettercontainstherevisedT/Spageswiththeappropriate "Amendment No."oneachpage.Pleasenoteseveralofthesepageshaveno"Amendment No.";becausetheyhaveneverbeenrevised.
P~*f'g)>>P'h'P)PhP*f',IP>"j'>>!~~I,'(>>S'(iJ)>><<A1"J)>>I)~PP)ijt')ti~~~pqI'-'I~~II)Ql~~*I.IP,u>>IIPI'(
tloeotU,S.NUCLEARREGULATORY COM,aaSSION
~REACTORFACILITYFEEDETERMINATION 1.FEEFORMTTPE(Checaoher PAELIMIHART FINALAMENDEDINSTRUCTIONS.
Fasthllama1throughta,aaaPPllcabre, ahdacheIheorrclhatCOPyIotheUcehsaFeeMshsoemehl Branch.2.DOCKETNUMBERISI 3.ACCESSOHNUMSER Qg0+$ParUCENSEEI".rrx'A.~.se~'~,~ayrrlsoapn'a~L,PLANTNAMEANDUNITISI...
~.'-'sI.C.:C.'rsrd:
- -::i~(.$s~4$DATEOFAPPLSCATIOH i2/-if/gg~~'.FEEREMITTEDYESNO~m~s;.~
A'~e~4.UCENSEEFEEDETERMIHATIQN
~.~-42dp~~.ocLAsavcLAaavlcxsvaTNOH$10.TAONUMBERASQONEg(ifavaaabief KO'S--:"CLASSIEXASS~CLAsa5CIAsaIv~12.NRCFEEDETERMINATION 11~APPROVALLETTshonoaII'VHoplEHTNuuatrvsl 0+5DATEOFISSUANCE0-2-Theaboveapplication hasbeenreviewedInaccordance withSection17022otPart170andIsproperlycategorfsed.
~Theaboveapplication hasbeonreviewodInaccordance withSection170.22ofPerlTTGandIsIncorreclly classified.
Feeshouldbeclasstes):
JUS'TIFFCATIOH FORCLASSIFICATION OAAECLASSIFICATION:
yomallpocallo lssclass~sypeoyacpoo~oleeempllyomleesbacaseIlls:FiledDyanonprofit educational lnslitulion.'iled ItyaGOVernment agenCyandISnOIfOrapOwerreaCtOr.ForaClassI,II,orIIIamendment whichresultsfromanNRCrequestdatedforIheapplication andtheamendment lsloslmplityorclarifyLicenseorTechnical Specificalions; hasonlyminorsafelysignificance; andisbeingissuedtortheconvenience ofNRC(muslmeet~IrofthecriteriaJ.Other(Stalereasonfhereforf ayspysmCr13.SIGNA'IUREISrahch hieirpmDATEIa.FINAl.cEATIFIGATI H:ThereIteedetermlhsrlonhas beeresssessedarydrs herebyarnrmed.
sIGNATURE Ipro(aneSychlerrm'ATE
'tlttoL-C-P..FORFEEMANAGEMENT BRANCHUSEONLY(AIIOtherSdpnOlwr(lebefdpVthf
'nefTheboveerempraon requesthasbeenrevle dIsherebyacceptedasbetheeaempl.rrlUREIChler.
LFMDATERecordsServicesBanchDI.BranchChlelDISTRIBUTION BYLFMBLFMBEaenpbOnFIIeLFLISAeacrorFile}}