MONTHYEARML17241A4441999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld ML17241A3521999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML17229A8421998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 ML17229A7461998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7421998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A4601997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section ML17229A4321997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 ML17229A4211997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A1811996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits. ML17229A1591996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values ML17229A1171996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs ML17339A0431996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel ML17229A1071996-10-28028 October 1996 Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1041996-10-28028 October 1996 Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17228B5621996-07-15015 July 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising Core Alteration Definition ML17228B5021996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl ML17228B3741996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3341995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities ML17228B2861995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS ML17228B2401995-08-16016 August 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 ML17228B2431995-08-16016 August 1995 Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 ML17228B1871995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Revise Action Statements & Certain Surveillances of TS 3/4.5.1 Re Safety Injection Tanks ML17228B1771995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Extend Allowed Outage Time for Inoperable EDGs ML17309A7921995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Allow Up to Seven Days to Restore an Inoperable LPSI Train to Operable Status ML17228B1451995-05-17017 May 1995 Application for Amend to License DPR-67,extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1421995-05-17017 May 1995 Application for Amends to Licenses DPR-67 & NPF-16 Re Administrative & Conforming Update ML17228B0881995-04-0303 April 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Incorporate line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 ML17228B0571995-02-27027 February 1995 Application for Amend to License NPF-16,modifying Surveillance Requirement 4.9.8.1 & 4.9.8.2 to Allow Reduction in Required Min Shutdown Cooling Flow Rate Under Certain Conditions During Operational Mode 6 ML17228B0501995-02-27027 February 1995 Application for Amend to License NPF-16,revising TS Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relay ML17228B0311995-02-22022 February 1995 Application for Amends to Licenses DPR-67 & NPF-16,deleting Refs to Automatic Tester for Containment Personnel Air Lock from TS 4.6.1.3 ML17228A9901995-01-20020 January 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Operability Requirements for Incore Detectors (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillances ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17228A9011994-11-0202 November 1994 Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17309A7511994-10-27027 October 1994 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Encl Administrative Changes ML17228A6501994-07-28028 July 1994 Application for Amends to Licenses DPR-67,revising TS 3/4.4.13 to Incorporate LTOP Requirements Similar to LTOP Requirements Recommended by NRC Via GL 90-06,in Accordance W/Resolution of Generic Issue 94 ML17228A6571994-07-25025 July 1994 Application for Amends to Licenses DPR-67 & NPF-16,revising Ts,Implementing Enhancements Recommended by GL 93-05 Re line-item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6541994-07-25025 July 1994 Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5751994-05-23023 May 1994 Application for Amend to License DPR-67,revising TS 3.5.2 for ECCS by Removing Option That Allows HPSI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-08-18
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17241A4441999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld ML17241A3521999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML17229A8421998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 ML17229A7461998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7421998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A4601997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section ML17229A4321997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 ML17229A4211997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A1811996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits. ML17229A1591996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values ML17229A1171996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs ML17339A0431996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel ML17229A1071996-10-28028 October 1996 Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1041996-10-28028 October 1996 Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17228B5621996-07-15015 July 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising Core Alteration Definition ML17228B5021996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl ML17228B3741996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3341995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities ML17228B2861995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS ML17228B2401995-08-16016 August 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 ML17228B2431995-08-16016 August 1995 Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 ML17228B1871995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Revise Action Statements & Certain Surveillances of TS 3/4.5.1 Re Safety Injection Tanks ML17228B1771995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Extend Allowed Outage Time for Inoperable EDGs ML17309A7921995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Allow Up to Seven Days to Restore an Inoperable LPSI Train to Operable Status ML17228B1451995-05-17017 May 1995 Application for Amend to License DPR-67,extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1421995-05-17017 May 1995 Application for Amends to Licenses DPR-67 & NPF-16 Re Administrative & Conforming Update ML17228B0881995-04-0303 April 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Incorporate line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 ML17228B0571995-02-27027 February 1995 Application for Amend to License NPF-16,modifying Surveillance Requirement 4.9.8.1 & 4.9.8.2 to Allow Reduction in Required Min Shutdown Cooling Flow Rate Under Certain Conditions During Operational Mode 6 ML17228B0501995-02-27027 February 1995 Application for Amend to License NPF-16,revising TS Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relay ML17228B0311995-02-22022 February 1995 Application for Amends to Licenses DPR-67 & NPF-16,deleting Refs to Automatic Tester for Containment Personnel Air Lock from TS 4.6.1.3 ML17228A9901995-01-20020 January 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Operability Requirements for Incore Detectors (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillances ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17228A9011994-11-0202 November 1994 Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17309A7511994-10-27027 October 1994 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Encl Administrative Changes ML17228A6501994-07-28028 July 1994 Application for Amends to Licenses DPR-67,revising TS 3/4.4.13 to Incorporate LTOP Requirements Similar to LTOP Requirements Recommended by NRC Via GL 90-06,in Accordance W/Resolution of Generic Issue 94 ML17228A6571994-07-25025 July 1994 Application for Amends to Licenses DPR-67 & NPF-16,revising Ts,Implementing Enhancements Recommended by GL 93-05 Re line-item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6541994-07-25025 July 1994 Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5751994-05-23023 May 1994 Application for Amend to License DPR-67,revising TS 3.5.2 for ECCS by Removing Option That Allows HPSI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-08-18
[Table view] |
Text
CATEGORY, 1REGULAT+INFORMATION DZSTRIBUTIOYSTEM (RIDE)ACCESSION NBR:9611010285 DOC.DATE:
96/10/28NOTARIZED:
YESFACIL:50-389 St.LuciePlant,Unit2,FloridaPower6LightCo.AU~~H.NAME AUTHOR.AFFILIATION STALLFJ.A.
FloridaPower&LightCo.RECIP.NAME RECIPIENT AFFILIATION DOCKETI05000389
SUBJECT:
Application foramendtolicenseNPF-16,modifying TStoimplement 10CFR50,App J,OptionB,toreviseTStoallowTypeA,BaCcontainment leakageteststobeconducted atextendedintervals detexmined byperformance-based criteria.
DISTRIBUTION CODE:AOOZDCOPIESRECEIVED:LTR jENCL1SIZE:TITLE:ORSubmittal:
GeneralDistribution NOTES:AERECIPIENT IDCODE/NAME PD2-3LAWIENS,L.INTERNAL:
ACRSNRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL:
NOACCOPIESLTTRENCL11111111111111RECIPIENT IDCODE/NAME PD2-3PDILECENTERRCHHICBNRR/DSSA/SRXB OGC/HDS3NRCPDRCOPIESLTTRENCL1~11111111011l4RPjZDF'C@8(I<~~5SSeiSCSS I(IDEN'OTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415>>2083I(,TOTALNUMBEROFCOPIESREQUIRED:
LTTR~ENCL
,~l~~U PALOctober28,1996FloridaPower&LightCompany,P.O.Box128,FortPiorco,FL34954-Ot28 L-96-24510CFR50-3610CFR509010CFR50'2U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Re:St.LucieUnit2DocketNo.50-389ProposedLicenseAmendment Inaccordance with10CFR50.90,FloridaPowerandLightCompany(FPL)requeststhtAd'ofFacilityOperating LicenseNPF-16beamendedtomodifytheSt.appenixLucieUnit2Technical Specifications toimplement 10CFR50,Appendix,pB.Thepurposeofthisamendment istorevisetheTechnical Specifications toallowTypeA,B,andCcontainment leakageteststobeconducted atextendedintervals determined byperformance-based criteria.
FPLhasdetermined thattheproposedlicenseamendment doesnotinvolveasignificant hazardsconsideration pursuantto10CFR50.92.Adescription oftheamendment requestisprovidedinAttachment 1.Thenosignificant hazardsdetermination insupport.oftheproposedTechnical Specification changesisprovidedinAttachment 2.Attachment 3providestheproposedrevisedTechnical Specifications pages.Inaccordance with10CFR50.91(b)(1),
acopyofthisproposedlicenseamendment isbeingforwarded totheStateDesigneefortheStateofFlorida.Theproposedlicenseamendment hasbeenreviewedbyst.LuciePlantFacilityReviewGroupandtheFPLCompanyNuclearReviewBoard.FPLtsreviewandapprovaloftheproposedlicenseamendmenypgtbAril1997tosupportimplementation priortothenextrefueling outage.e.Additionall anYimplementation periodofsixtydaysafterNRCapprovalisrequested.
Shouldtherebeanyquestions onthisrequest,pleasecontactus.Verytrulyyours,J,A.StallVicePresident St.LuciePlantJAS/RENAttachments cc:S.D.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantW.A.Passetti, FloridaDepartment ofHealthandRehabilitative ServicesV61i010285 961028PPDRADGCK05000389U3JlUU1anFPLGroupcompany((qp~j+CQ3~~pg~gp/Qc.5/3 ger/PE/st=8 L-9g-245ProposedLicenseAmendment "STATEOFFLORIDA))COUNTYOFST.LUCIE)SssJ.A.Stallbeingfirstdulysworn,deposesandsaysTThatheisVicePresident, St.LuciePlant,fortheNuclearDivisionofFloridaPower6LightCompany,theLicenseeherein;Thathehasexecutedtheforegoing document; thatthestatements madeinthisdocumentaretrueandcorrecttothebestofhisknowledge, information andbelief,andthatheisauthorized toexecutethedocumentonbehalfofsaidLicensee.
J.A.StallSTATEOFFLORIDACOUNTYOy5~Sworntoandsubscribed beforemethisLKdsyofQCXD4fW,19pipbyJ.A.Stall,whoispersonally knowntome.SgnatureofNotaryPublc-StateofFloridaNameofNotaryPublic(Print,Type,orStamp)KARENWEST'.a=,h1YCOhSISSION NCC3599$EXPIAESApril18,1998"4p'op%"EONOEOTHRUTROYFAANINSURANCE, INC.
St.LucieUnit2DocketNo.50-389L-96-244, Attachment 1Page1of5ATTACHMENT 1Description andPurposeChangesareproposedtoreviseSt.LucieUnit2Technical Specifications (TS)toimplement 10CFR50,AppendixJ,OptionB,forcontainment leaktestingrequirements.
Thesechangesareconsistent withtherecommendations ofNuclearRegulatory Commission (NRC)Regulatory Guide1.163Rev0,Performance BasedContainment Leak-Test Program,andNuclearEnergyInstitute (NEI)94-01,Rev0,IndustryGuideline forImplementing Performance-BasedOptionofZOCFRPart50,AppendixJ.Implementing 10CFR50AppendixJOptionBwillallowFloridaPowerandLightCompany(FPL)toestablish theintervals forcontainment leak-testing basedontheperformance historyandrisksignificance ofthecomponents (containment, penetrations, andvalves).AllTypeA,B,andCtestingrequirements willbeperformed atintervals determined bytheContainment LeakageRateTestingProgramdescribed inthisproposedamendment.
Thecriteriafor,thesenewtestingintervals willbeevaluated basedonindividual performance historyandthepermitted intervals specified inRegulatory Guide1.163andNEI94-01.ChangesarealsoproposedtoremoveTables3.6-1,"Containment LeakagePaths",and3.6-2,"Containment Isolation Valves"inaccordance withGenericLetter91-08,"RemovalofComponent ListsfromTechnical Specifications" andrelocatetheinformation toplantprocedures.
Background
Containment leakagetestingiscurrently requiredby10CFR50,AppendixJatpresetintervals.
Testingisdividedintothreecategories withTypeAgBIandCclassifications, depending onthetypeofcomponent.
TypeAtestingmeasuresthereactorcontainment'overall integrated leakagerate.TypeBtestinginvolvesthemeasuring ofeachpressure-containing orleakage-limitingboundary, e.g.airlockdoorsandelectrical penetrations.
TypeCtestingmeasurestheleakagerateofcontainment isolation valves.
~~Ie~
~~St.LucieUnit2DocketNo.50-389L-96-244, Attachment 1Page2of5Recentregulatory initiatives havefocusedonaperformance-
- oriented, risk-based approachtoestablishing regulatory safetystandards.
Consistent withthisapproach, therevisionof10CFR50,AppendixJ,toaddOptionB,implements thisinitiative toallowlicensees toadoptaperformance-based containment leaktestingprogram.Thisprogramisbasedinpartonthefindingspresented inNUREG1493,"Performance-Based Containment Leak-Test Program,theguidanceofNEI94-01andRegulatory Guide1.163.Discussion andDescription ofProposedChangesThe.following changesintheUnit2Technical Specifications (TS),showninAttachment 3,areproposed:
1~Thedefinition ofcontainment vesselintegrity willberevisedtodeletethereference toTable3.6-2.Astatement regarding administratively controlled valveswillberelocated fromTable3.6-2tothetextofTS1.7.withtherecommendations ofGenericLetter91-08.2~TS4.6.1.1.a willbemodifiedtoaccountfortheremovalofTable3.6-2ofTS3.6.3.Theexception foradministratively controlled valvescurrently contained inTable3.6-2willberelocated toTS3.6.1.1.a.
Therequirements of4.6.1.1.c willberelocated totheContainment LeakageRateTestingProgramandTS4.6'.2.Thespecificrequirements forcontainment leak-testing willbelocatedintheContainment LeakageRateTestingProgramasreferenced byTS4.6.1.2.RemovalofTable3.6-2isinaccordance withtherecommendations ofGenericLetter91-08.3~Thespecificleakagerequirements ofTS3.6.1.2willberelocated totheContainment LeakageRateTestingProgram.TheACTIONstatement willberevisedsuchthattheoverallcontainment leakageratesabovewhichactionmustbetakenreflectthecurrentoverallcontainment leakageratelimitof1.0Landtoincludetheshutdownrequirement whenthemeasuredoverallcontainment leakageratelimitexceeds1.0L.Thesurveillance requirements forcontainment leakagewillberelocated totheContainment LeakageRateTestingProgram.Table3.6-1,"Containment LeakagePaths"willbedeleted.
St.LucieUnit2DocketNo.50-389L-96-244, Attachment 1Page3of5surveillance requirements forcontainment leakagewillberelocated totheContainment LeakageRateTestingPrograminaccordance with10CFR50AppendixJOptionB.Table.3.6-1 willnolongerberequired, becauserevisedTS3/4.6.1.2 willreference theContainment LeakageRateTestingProgramforthisinformation.
4~Therequirements forTS3.6.1.3.b, TS4.6.1.3.a, andTS4.6.1.3.b willbeincorporated intothenewTS4.6.1.3.a andrelocated totheContainment LeakageRateTestingProgram.Thespecificrequirements forcontainment leakagewillberelocated totheContainment LeakageRateTestingPrograminaccordance with10CFR50AppendixJOptionB.5~TS3/4.6.1.6 willberevisedtoreference theContainment LeakageRateTestingProgramastheguidancefor'ontainment visualinspection surveillance intervalandrecording requirements.
Thespecificrequirements forvisualinspection willberelocated totheContainment LeakageRateTestingProgram.6.Reference toTable3.6-2willbedeleted'and Table3.6-2willberemovedfromtheTS.tableisconsistent withtherecommendations ofGenericLetter91-08.Thestroketestingrequirements forthesevalvesarecontained inplantprocedures.
7~TS3/4.6.6.3 willberevisedtoreference theContainment LeakageRateTestingProgramastheguidanceforshieldbuildingvisualinspection surveillance intervalandrecording requirements.
inspection willberelocated totheContainment LeakageRateTestingProgram.8.TheBasessectionforTS3/46.1.1isbeingrevisedtoincludeadiscussion on
~~St.LucieUnit2DocketNo.50-389L-96-244, Attachment 1Page4of5administrative controloflockedorsealedclosedcontainment isolation valvesinaccordance withrecommendations inGenericLetter91-08.TheBasessectionsforTS3/4.6.1.2, TS3/4.6.1.6 andTS3/4.6.6.2 arebeingrevised.to reflect10CFR50AppendixJOptionB,Regulatory Guide1.163,andtheContainment LeakageRateTestingProgram.9.isadded:Thisprogramshallbeestablished, implemented, andmaintained toprovideguidanceandspecificrequirements fortheperformance-based containment leakagetestinginaccordance with10CFR50,AppendixJOptionBandRegulatory Guide1.163.Note:The(h)denotesthat6.8.4.histhecurrentsequential locationforanewadministrative program.Duetootherpendingsubmittals, thislocationcouldchangepriortoissuance.
Currentexemptions and/ordeviations shallbenotedintheprogramcontents.
Theoverallcontainment leakageratecriteria, relocated fromexistingTS3.6.1.2,is1.0Lforintegrated leakage.Leakageratesaretobelessthan8.75Lforintegrated leakage(TypeA)and0.60Lforcombine8TypesBandCleakage,and<0.27Lforsecondary containment bypassleakagepathspriortoincreasing primarycoolanttemperature above200'Fafterleakageratetestinginaccordance withthisprogram.Airlocktestingacceptance criteriaare:1)overall airlockleakagerateis<0.05Lwhentestedat>Pa)2)foreachdoorseal,leakagerat.eis<0.01Lwhenpressurized to>Ppsig.Thestatement applyingtoSpecification
4.0. 2notbeingapplicable
isrelocated fromexistingTS4.6.1.2.programpermitted by10CFR50,AppendixJ,OptionBandRegulatory Guide1.163willbegovernedunderthesenewprogrammatic controls.
Thefollowing exception ordeviation willbeusedintheimplementation ofOptionB:1)TypeAtestsshallbeperformed inaccordance withBechtelTopicalReportBN-TOP-1Revision1,datedNovember1,1972,ortheguidanceofANS56.8-1994, asrecommended byRegulatory Guide1.163.BN-TOP-1wasusedastheinitialmethodofTypeAtesting,anditsuseispermitted by10CFR50,AppendixJ.Thespecificleakagerateacceptance criteriawillbelocatedintheprogramdescription aswellastheimportant administrative references andrequirements.
The St.LucieUnit2DocketNo.50-389L-96-244, Attachment 1Page5of5surveillance intervalrequirements andperformance-based criteriawillresideintheplant-controlled administrative procedure usedtoimplement andmaintaintheContainment LeakageRateTestingProgram,inaccordance withNEI94-01andRegulatory Guide1.163.SummaryTheproposedrevisiontoSt.LucieUnit2TSbyadopting10CFR50,AppendixJ,OptionB,willallowFPLtouseasetof.performance-based criteriatodetermine theleakageratetestingrequirements forcomponents thatcontribute tocontainment leakage..
Thistypeofprogrammatic controlisendorsedandapprovedbytheHRCasstatedinRegulatory Guide1.163.Thecriteriausedbythelicenseewillbeinaccordance withNEZ94-01,asmodifiedbyapprovedexemptions.
St.LucieUnit2DocketNo.50-389L-96-081, Attachment 2Page1of5ATTACHMENT 2NOSIGNIFICANT HAZARDSCONSIDERATION DETERMINATION Description ofProposedLicenseAmendments Theproposedlicenseamendment involveschangestothe'existing Technical Specifications (TS)ofSt.LucieUnit2.Thesechangesareconsistent, withguidanceprovidedbyNuclearRegulatory Commission (NRC)Regulatory Guide1.163,"Performance BasedContainment Leak-Test Program,"
andNuclearEnergyInstitute (NEI)94-01,Rev0,"Industry Guideline forImplementing Performance-Based Optionof10CFRPart50,AppendixJ."Thesechangesdonotaffectplantdesignorthemodesofplantoperation.
Theproposedamendment willimplement 10CFR50,AppendixJOptionB,whichdetailsaperformance-based programforcontainment leakagetesting.Thefollowing proposedchangesarerequested:
1~Thedefinition ofcontainment vesselintegrity willberevisedtodeletethereference toTable3.6-2.Astatement regarding administratively controlled valveswillberelocated fromTable3.6-2tothetextofTS1.7.2~TS4.6.1.1.a willbemodifiedtoaccountfortheremovalofTable3.6-2ofTS3.6.3.Theexception foradministratively controlled valvescurrently contained inTable3.6-2willberelocated toTS3.6.1.1.a.
Therequirements of4.6.1.1.c willberelocated totheContainment LeakageRateTestingProgramandTS4.6.1.2.3.Thespecificleakagerequirements ofTS3.6.1.2willberelocated totheContainment LeakageRateTestingProgram.TheACTIONstatement willberevisedsuchthattheoverallcontainment leakageratesabovewhichactionmustbetakenreflectthecurrentoverallcontainment leakageratelimitof1.0Landtoincludetheshutdownrequirement whenthemeasuredoverallcontainment leakageratelimitexceeds1.0L.Thesurveillance requirements forcontainment leakagewillberelocated totheContainment LeakageRateTestingProgram.Table3.6-1,"Containment LeakagePaths"willbedeleted.Therequirements forTS3.6.1.3.b, TS4.6.1.3.a, andTS4.6.1.3.b willbe St.LucieUnit2DocketNo.50-389L-96-081, Attachment 2Page2of5incorporated intothenewTS4.6.1.3.a andrelocated totheContainment LeakageRateTestingProgram.5~TS3/4.6.1.6 willberevisedtoreference theContainment LeakageRateTestingProgramastheguidanceforcontainment visualinspection surveillance intervalandrecording requirements.
6.Reference toTable3.6-2willbedeletedandTable3.6-2willberemovedfromtheTS.7~TS3/4.6.6.3 willberevisedtoreference theContainment LeakageRateTestingProgramastheguidanceforshieldbuildingvisualinspection surveillance intervalandrecording requirements.
8.TheBasessectionforTS3/46.1.1isbeingrevisedtoincludeadiscussion onadministrative controloflockedorsealedclosedcontainment isolation valvesinaccordance withrecommendations inGenericLetter91-08.ThebasessectionsforTS3/4.6.1.2, TS3/4.6.1.6 andTS3/4.6.6.2 arebeingrevisedtoreflect10CFR50AppendixJOptionB,Regulatory Guide1.163,andtheContainment LeakageRateTestingProgram.9.isadded:Thisprogramshallbeestablished, implemented, andmaintained toprovideguidanceandspecificrequirements fortheperformance-based containment leakagetestinginaccordance with10CFR50,AppendixJOptionBandRegulatory Guide1.163.Note:The(h)denotesthat6.8.4.histhecurrentsequential'ocation foranewadministrative program.Duetootherpendingsubmittals, thislocationcouldchangepriortoissuance.
Currentexemptions and/ordeviations shallbenotedintheprogramcontents.
Theoverallcontainment leakageratecriteria, relocated fromexistingTS3.6.1.2,is1.0Lforintegrated leakage.Leakageratesaretobelessthan5.75Lforintegrated leakage(TypeA)and0.60Lforcombine8TypeBandCleakage,and<0.27Lforsecondary containment bypassleakagepathspriortoincreasing primarycoolanttemperature above.200'F afterleakageratetestingin accordance withthisprogram.Airlocktesting'cceptance criteriaare:1)overall airlockleakagerateis<0.05L St.LucieUnit2DocketNo.50-389L-96-081, Attachment 2Page3of5whentestedat>P;2)foreachdoorseal,leakagerateis<0.01Lwhenpressurized to>Ppsig.Thestatement applyingtoSpecification 4.0.2notbeingapplicabl'e isrelocated fromexistingTS4.6.1.2.Introduction TheNuclearRegulatory Commission hasprovidedstandards fordetermining whetherasignificant hazardsconsideration exists(10CFR50.92(c)).Aproposedamendment toanoperating licensefora.facility involvesnosignificant hazardsconsideration, ifoperation ofthefacilityinaccordance withtheproposed.
amendment wouldnot(1)involveasignificant increaseinthe.probability orconsequences ofanaccidentpreviously evaluated; or(2)createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated; or(3)involveasignificant reduction inamarginofsafety.Eachstandardisdiscussed belowfortheproposedamendments.
Discussion (1)Operation ofthefacilityinaccordance withtheproposedamendments wouldnotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
Theproposedamendments donotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated duetothefollowing reasons:a)Theseproposedchangesareallconsistent withNRCrequirements andguidanceforimplementation of10CFR50,AppendixZOptionB,exceptfortheuseofBechtelTopicalReport.BN-TOP-1fortypeAtesting.BN-TOP-1hasbeenpreviously approvedforuseinaccordance with10CFR50Appendix'.
b)BasedonindustryandNRCevaluations performed insupportofdeveloping OptionB,thesechangespotentially resultinaminorincreaseintheconsequences ofanaccidentpreviously evaluated duetotheincreased testingintervals.
However,theproposedchangesdonotresultinanincreaseinthecoredamagefrequency sincethecontainment systemisusedformitigation purposesonly.
St..LucieUnit2DocketNo.50-389L-96-081, Attachment 2Page4of5c)Thesechangesareexpectedtoresultinincreased attention oncomponents withpoorleakagetesthistoryaspartofthe'performance-based natureofOptionB,suchthatthemarginally increased consequences fromtheexpandedtestingintervals maybefurtherreducedornegated.Therefore, thesechangesdonotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
Operation ofthefacilityinaccordance withtheproposedamendments wouldnotcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated.
Theuseofthemodifiedspecifications cannotcreatethepossibility ofanewordifferent kindofaccidentfromanypreviously evaluated sincetheproposedamendments willnotchangethephysicalplantorthemodesofplantoperation definedinthefacilityoperating license.Nonewfailuremodeisintroduced duetotheimplementation ofaperformance-based programforcontainment leakageratetesting,sincetheproposedchangesdonotinvolvetheadditionormodification ofequipment, nordotheyalterthedesignoroperation ofaffectedplantsystems,structures, orcomponents.
Operation ofthefacilityinaccordance withtheproposedamendments wouldnotinvolveasignificant reduction inamarginofsafety.Theoperating limitsandfunctional capabilities oftheaffectedsystems,structures, andcomponents arebasically unchanged bytheproposedamendments.
Theincreaseinintervals betweenleak-test surveillances willnotsignificantly reducethemarginofsafetyasshownbyfindingsinNUREG1493,"Performance-Based Containment Leak-TestProgram",
whichwasbasedonimplementation oftheperformance-based testingofOptionB.Therefore thesechangesdonotinvolveasignificant reduction inthemarginofsafety.
St.,LucieUnit2DocketNo.50-389L-96-081, Attachment 2Page5of5SummaryBasedontheabove,FPLhasdetermined thattheproposedamendment requestdoesnot(1)involveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated, (2)createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated, (3)involveasignificant reduction inamarginofsafety;andtherefore theproposedchangesdonotinvolveasignificant hazardsconsideration asdefinedin10CFR50.92.