L-96-245, Monthly Operating Repts for Oct 1996 for Point Beach Nuclear Plant,Unit 1 & 2

From kanterella
(Redirected from L-96-245)
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1996 for Point Beach Nuclear Plant,Unit 1 & 2
ML20134G621
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/31/1996
From: Patulski S, Vander Velde B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-96-0245, PBL-96-245, NUDOCS 9611130304
Download: ML20134G621 (9)


Text

i l

Wisconsin 1 Electnc l POWER COMPANY Point Beoch Nuclear Plant 1 6610 Nuclear Rd., Two Rivers, WI 54241 j PBL 96-0245 i 1

November 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of October 1996.

I Sincerely, I '

I S. A. Patulski j General Manager Nuclear Operations i smb Attachments i cc: L. L. Smith, PSCW l NRC Regional Administrator, Reg. 'n III ,,

NRC Resident Inspector l #dL 1 I 9611130304 961031 PDR ADOCK 05000266 R pag _

l 130039 l l

A SubSNfaQ' OfIIEMSN! EIN'fEl' [U'JkVA!KIR

OPERATING DATA REPORT f DOCKET NO. 50-266 ', .

DATE: 11/04/96 COMPLETED BY: B. J. Vander Velde -

TELEPHONE: 414-755-6681  :

. OPERATING STATUS  :

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 [ NbfES .
2. REPORTING PERIOD: October - 1996 .
3. LICENSED THERMAL POWER (MWT): 1518.5 .

. i

4. NAMEPLATE RATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .

. l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .

. l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 ............ ............ ............  !
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:  :

NA I

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA '
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA

  • THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 745.0 7,320.0 227,808.0 I
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6,755.5 191,409.9 -
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 745.0 6,709.6 188,191.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,130,718.0 10,110,106.0 267,326,255.0 t
17. GROSS ELECTRICAL ENERGY GENERATED 386,610.0 3,443,190.0 90,349,560.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 369,977.0 3,292,919.5 86,146,004.0 ,
19. UNIT SERVICE FACTOR 100.0 % 91.7 % 82.6 % j

~

20. UNIT AVAILABILITY FACTOR 100.0 % 91.7 % 83.0 %  !
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.4 % 92.8 % 77.6 %
22. UNIT CAPACITY FACTOR (USING DER NET) 99.9 % 90.5 % 76.1 %
23. UNIT FORCED OUTAGE RATE O.0% 0.0% 1.5%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refuelmg,03/29/97,35 days s

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: i NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

~

~

PORT BEACH NUCLEAR PLANT DOCKET NO. 50-266 .

AVERAGE DAILY UNIT POWER LEVEL _,

UNIT NAME Point Beach. Unit 1 MONTH OCTOBER - 1996 DATE 11/4/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 498 11 496 21 494 2 494 12 497 22 497 3 494 13 497 23 496 4 495 14 497 24 497 5 500 15 496 25 497 i

6 496 16 498 26 497 7 497 17 502 27 517 8 495 18 491 28 497  :

9 496 19 497 29 497 10 497 20 499 30 497 i

31 497 i

I

~

POINT BEACil NUCLEAR PLANT Docket No. 50-266 Unit Name Point Beach. Unit 1.._..

UNIT SHUTDOWNS AND POWER REDUCTIONS Date 11/4/96 Cos+:::,1By . B. J. Vaader Wi _ '.

REPORT MONTil OCTOBER - 1996 Telephone No. 414r155-6681 .

Method of Licensee Evem Duration Reactor Report No. System Component Cause and Corrective Action No. Date Type' (Hours) Reason' Shut Down' Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA i

'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions ,

S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of i B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F- Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain)

PBF-0028b 60-90)

l l .

l DOCKET NO. 50-266 '

UNIT NAME Point Beach Unit 1 >

l DATE 11/4/96  :

COMPLETED BY B. J. Vander Velde TELEPHONE 414n55-6681 l

Unit 1 operated at an average of 497 MWe net for the October,1996 report period.

l l

t The following Licensee Event Report was submitted to the NRC in October,1996:  !

Licensee Event Report 266/96-009, Component Cooling Water Outside Design Basis For Closed System Outside Containment.

Safety-related maintenance included:  !

1. DY-03 white inverter static transfer switch setpoints changed.
2. HX-13 A/B spent fuel pool heat exchanger return throttle valve repaired.

l 3. G-03 emergency diesel generator inspected.

4. C-178 blue computer input mux power supply and central processing unit replaced.
5. MS-2016 steam generator steam header atmospheric steam dump control cam replaced.

l l

l l

l l~

j I

i. .

. i OPERATING DATA REPORT  !

DOCKET NO. 50-266 ,

DATE: 11/04/96 COMPLETED BY: B. J. Vander Velde -

TELEPHONE: 414-755-6681 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 $ Nb TE5 ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '.
2. REPORTING PERIOD: October - 1996 .
3. LICENSED THERMAL POWER (MWT): 1518.5 .
4. NAMEPLATE RATING (GROSS MWE): 523.8 .

[

5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 ............ ............ ............
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MON.H YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745.0 7,320.0 212,593.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 101.0 6,660.5 185,987.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 98.0 6,653.9 183,508.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 130,531.0 9,072,854.0 263,605,007.0 '
17. GROSS ELECTRICAL ENERGY GENERATED 44,610.0 3,100,050.0 89,603,310.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 40,253.0 2,950,348.5 85,414,998.0
19. UNIT SERVICE FACTOR 13.2% 90.9 % 86.3 %
20. UNIT AVAILABILITY FACTOR 13.2% 90.9 % 86.5 % i
21. UNIT CAPACITY FACTOR (USING MDC NET) 11.1 % 83.1 % 82.3 %
22. UNIT CAPACITY FACTOR (USING DER NET) 10.9% 81.1 % 80.8 %
23. UNIT FORCED OUTAGE RATE 0.0% 0.3% 0.9 %
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF O*rtUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

12/25/96 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301

  • AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 MONTH OCTOBER - 1996 DATE 11/4/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAK.Y DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 446 11 -2 21 -2 2 447 12 -2 22 -

3 448 13 -2 23 -2 4 420 14 -2 24 -2 5 -11 15 -2 25 -2 6 -16 16 -2 26 -2 7 -7 17 -2 27 -2 8 -2 18 -2 28 -2 9 -2 19 -2 29 -2 10 -2 20 -2 30 -2 31 -2

_ ___ __~ - . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ - -- - - _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - - - - - _ - - - _ - _ - _ - _ _ _ - _ - _

POINT BEACH NUCLEAR PLANT Docket No. 50-301 ~'

Unit Name Point Beach. Unit 2 ,

UNIT SHUTDOWNS AND POWER REDUCTIONS Date 11/5/96 ,

Completed By B. J. Vander Velde '

REPORT MONTH OCTOBER - 1996 Telephone No. 414/755-6681 ,

Method of Ucensee Evers Duration Reactor Report No. System Congonera Cause and Corrective Action -

No. Date Type' (Hours) Reason

  • Shut Down' Code' Code' To Prevent Recurrence 4 961005 5 647.0 C 1 NA NA NA Scheduled refueling and mairmenance (U2R22). Major work itenne inchsde: Replacing bodi Unit 2 steem. ~..u., main comrol boeid wire separation resoluuoa; replace 8 main scena condenser valves; HP turbine croesunder piping; repair service water west heeder; replace boeie acid and reactor makeup weser toserizers; replace enfety injection oceanulator level tremenueters, modify XO2, XO3, and XO4 transformer nuesenes and relay circuits; and excieer inndification.

'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Imd

, F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain)

PBF-0028b (03-90)

.4 .

l ,

DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 i DATE 11/4/96 '

COMPLETED BY B. J. Vander Velde TELEPHONE 414n55-6681 Unit 2 operated at an average of 54 MWe net for the October,1996 report period.

i Safety-related maintenance included:

1. DPI-02906 containment recirculation fan motor clear differential pressure indicator cleaned. ;

2.- FI-00115 reactor coolant pump seal water injection flow indicator 6tting cleaned.

4 l 3. N-00031 nuclear instrument source range detector replaced.

4. R-1 reactor vessel and assembly inspected.

f i  ;

J l

l l

i 1 i

i i

S

Text

i l

Wisconsin 1 Electnc l POWER COMPANY Point Beoch Nuclear Plant 1 6610 Nuclear Rd., Two Rivers, WI 54241 j PBL 96-0245 i 1

November 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of October 1996.

I Sincerely, I '

I S. A. Patulski j General Manager Nuclear Operations i smb Attachments i cc: L. L. Smith, PSCW l NRC Regional Administrator, Reg. 'n III ,,

NRC Resident Inspector l #dL 1 I 9611130304 961031 PDR ADOCK 05000266 R pag _

l 130039 l l

A SubSNfaQ' OfIIEMSN! EIN'fEl' [U'JkVA!KIR

OPERATING DATA REPORT f DOCKET NO. 50-266 ', .

DATE: 11/04/96 COMPLETED BY: B. J. Vander Velde -

TELEPHONE: 414-755-6681  :

. OPERATING STATUS  :

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 [ NbfES .
2. REPORTING PERIOD: October - 1996 .
3. LICENSED THERMAL POWER (MWT): 1518.5 .

. i

4. NAMEPLATE RATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .

. l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .

. l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 ............ ............ ............  !
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:  :

NA I

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA '
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA

  • THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 745.0 7,320.0 227,808.0 I
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6,755.5 191,409.9 -
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 745.0 6,709.6 188,191.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,130,718.0 10,110,106.0 267,326,255.0 t
17. GROSS ELECTRICAL ENERGY GENERATED 386,610.0 3,443,190.0 90,349,560.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 369,977.0 3,292,919.5 86,146,004.0 ,
19. UNIT SERVICE FACTOR 100.0 % 91.7 % 82.6 % j

~

20. UNIT AVAILABILITY FACTOR 100.0 % 91.7 % 83.0 %  !
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.4 % 92.8 % 77.6 %
22. UNIT CAPACITY FACTOR (USING DER NET) 99.9 % 90.5 % 76.1 %
23. UNIT FORCED OUTAGE RATE O.0% 0.0% 1.5%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refuelmg,03/29/97,35 days s

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: i NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

~

~

PORT BEACH NUCLEAR PLANT DOCKET NO. 50-266 .

AVERAGE DAILY UNIT POWER LEVEL _,

UNIT NAME Point Beach. Unit 1 MONTH OCTOBER - 1996 DATE 11/4/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 498 11 496 21 494 2 494 12 497 22 497 3 494 13 497 23 496 4 495 14 497 24 497 5 500 15 496 25 497 i

6 496 16 498 26 497 7 497 17 502 27 517 8 495 18 491 28 497  :

9 496 19 497 29 497 10 497 20 499 30 497 i

31 497 i

I

~

POINT BEACil NUCLEAR PLANT Docket No. 50-266 Unit Name Point Beach. Unit 1.._..

UNIT SHUTDOWNS AND POWER REDUCTIONS Date 11/4/96 Cos+:::,1By . B. J. Vaader Wi _ '.

REPORT MONTil OCTOBER - 1996 Telephone No. 414r155-6681 .

Method of Licensee Evem Duration Reactor Report No. System Component Cause and Corrective Action No. Date Type' (Hours) Reason' Shut Down' Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA i

'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions ,

S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of i B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F- Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain)

PBF-0028b 60-90)

l l .

l DOCKET NO. 50-266 '

UNIT NAME Point Beach Unit 1 >

l DATE 11/4/96  :

COMPLETED BY B. J. Vander Velde TELEPHONE 414n55-6681 l

Unit 1 operated at an average of 497 MWe net for the October,1996 report period.

l l

t The following Licensee Event Report was submitted to the NRC in October,1996:  !

Licensee Event Report 266/96-009, Component Cooling Water Outside Design Basis For Closed System Outside Containment.

Safety-related maintenance included:  !

1. DY-03 white inverter static transfer switch setpoints changed.
2. HX-13 A/B spent fuel pool heat exchanger return throttle valve repaired.

l 3. G-03 emergency diesel generator inspected.

4. C-178 blue computer input mux power supply and central processing unit replaced.
5. MS-2016 steam generator steam header atmospheric steam dump control cam replaced.

l l

l l

l l~

j I

i. .

. i OPERATING DATA REPORT  !

DOCKET NO. 50-266 ,

DATE: 11/04/96 COMPLETED BY: B. J. Vander Velde -

TELEPHONE: 414-755-6681 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 $ Nb TE5 ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '.
2. REPORTING PERIOD: October - 1996 .
3. LICENSED THERMAL POWER (MWT): 1518.5 .
4. NAMEPLATE RATING (GROSS MWE): 523.8 .

[

5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 ............ ............ ............
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

NA THIS MON.H YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745.0 7,320.0 212,593.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 101.0 6,660.5 185,987.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 98.0 6,653.9 183,508.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 130,531.0 9,072,854.0 263,605,007.0 '
17. GROSS ELECTRICAL ENERGY GENERATED 44,610.0 3,100,050.0 89,603,310.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 40,253.0 2,950,348.5 85,414,998.0
19. UNIT SERVICE FACTOR 13.2% 90.9 % 86.3 %
20. UNIT AVAILABILITY FACTOR 13.2% 90.9 % 86.5 % i
21. UNIT CAPACITY FACTOR (USING MDC NET) 11.1 % 83.1 % 82.3 %
22. UNIT CAPACITY FACTOR (USING DER NET) 10.9% 81.1 % 80.8 %
23. UNIT FORCED OUTAGE RATE 0.0% 0.3% 0.9 %
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF O*rtUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

12/25/96 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301

  • AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 MONTH OCTOBER - 1996 DATE 11/4/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAK.Y DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 446 11 -2 21 -2 2 447 12 -2 22 -

3 448 13 -2 23 -2 4 420 14 -2 24 -2 5 -11 15 -2 25 -2 6 -16 16 -2 26 -2 7 -7 17 -2 27 -2 8 -2 18 -2 28 -2 9 -2 19 -2 29 -2 10 -2 20 -2 30 -2 31 -2

_ ___ __~ - . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ - -- - - _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - - - - - _ - - - _ - _ - _ - _ _ _ - _ - _

POINT BEACH NUCLEAR PLANT Docket No. 50-301 ~'

Unit Name Point Beach. Unit 2 ,

UNIT SHUTDOWNS AND POWER REDUCTIONS Date 11/5/96 ,

Completed By B. J. Vander Velde '

REPORT MONTH OCTOBER - 1996 Telephone No. 414/755-6681 ,

Method of Ucensee Evers Duration Reactor Report No. System Congonera Cause and Corrective Action -

No. Date Type' (Hours) Reason

  • Shut Down' Code' Code' To Prevent Recurrence 4 961005 5 647.0 C 1 NA NA NA Scheduled refueling and mairmenance (U2R22). Major work itenne inchsde: Replacing bodi Unit 2 steem. ~..u., main comrol boeid wire separation resoluuoa; replace 8 main scena condenser valves; HP turbine croesunder piping; repair service water west heeder; replace boeie acid and reactor makeup weser toserizers; replace enfety injection oceanulator level tremenueters, modify XO2, XO3, and XO4 transformer nuesenes and relay circuits; and excieer inndification.

'F: Forced ' Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Imd

, F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain)

PBF-0028b (03-90)

.4 .

l ,

DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 i DATE 11/4/96 '

COMPLETED BY B. J. Vander Velde TELEPHONE 414n55-6681 Unit 2 operated at an average of 54 MWe net for the October,1996 report period.

i Safety-related maintenance included:

1. DPI-02906 containment recirculation fan motor clear differential pressure indicator cleaned. ;

2.- FI-00115 reactor coolant pump seal water injection flow indicator 6tting cleaned.

4 l 3. N-00031 nuclear instrument source range detector replaced.

4. R-1 reactor vessel and assembly inspected.

f i  ;

J l

l l

i 1 i

i i

S