ML17309A773

From kanterella
Revision as of 10:57, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Rev 0 to Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal.
ML17309A773
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/21/1995
From: SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B027 List:
References
L-95-47, NUDOCS 9502270257
Download: ML17309A773 (2)


Text

PR.IVOR.l EY'ACCELERATED RIDSPROCESSING)

REGULATORY INFORMATION DISTRIBUTXON SYSTEM(RIDS)DOCKETI05000335NOTES:ACCESSION NBR:9502270257 DOC.DATE:

95/02/21NOTARIZED:

NOFACIL:50-335 St:LuciePlant,Unit1,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION SAGER,D.A.

FloridaPower6LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)Zpjg

SUBJECT:

ForwardsRev0to"SecondISIIntervalSecondInspPeriodThirdOutage1994SummaryReptSubmittal."

DISTRIBUTION CODE:A047DCOPIESRECEIVED:LTR lENCLLSIZE:P50TXTLE:ORSubmittal:

Xnservice/Testing/Relief fromASMMCode-GL-89-04RECIPIENT IDCODE/NAME PD2-2LANORRIS,JINTERNAL:

CRXLECEXER~OlNRR7DE/EME BOGC/HDS3EXTERNAL:

LITCOBROWN,BNOACCOPIESLTTRENCL1111661111101111RECIPIENT IDCODE/NAME PD2-2PDAEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCORANSOMEICNRCPDRCOPIESLTTRENCL111111111111.11YOTETOALL"RIDS"RECIPIEYTS:

PLEASEHELPUSTOREDUCE~VASTE!COYTACT'I'HE DOCL'MIEN CONTROLDESK,ROON!PI-37IEXT.504-70S3)TOELIXII%ATEYOURXAIIEPRO%IDISTRIBU'I'ION LISTSI'ORDOCI.'4!EX'I'S YOL'OY,"I'LI;D!

TOTALNUMBEROFCOPIESREQUIRED:

LTTR20ENCL19 FloridaPower5LightCompany,P.O.Box128,FortPierce,FL34954-0128 February21,1995L-95-4710CFR50.55a10CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Re:St.LucieUnit1DocketNo.50-3351994FallRefueling OutageIn-Service InsectionSummarReortInaccordance withArticleIWA-6000ofASMESectionXI,enclosedistheIn-Service Inspection (ISI)SummaryReportforSt.LucieUnit11994Fallrefueling outage.IWA-6230requiresthereporttobesubmitted totheauthority havingjurisdiction within90daysofcompleting thein-service inspection conducted duringtheoutage.IncludedwiththeNIS-1Reportareseveralattachments thatincludethe1994EddyCurrentSummaryReport,1994OutageSnubberFunctional TestingSummaryReport,andtheNIS-2Owners'eport forRepairsandReplacements performed sincethepreceding summaryreportsubmittal.

TheEddyCurrentSummaryReportprovidestheinformation requiredbySections4.4.5.5.b and6.9.2oftheSt.LucieUnit1Technical Specifications (TS).TheTSrequiresthesubmittal oftheSteamGenerator TubeIn-Service Inspection SpecialReportwithin12monthsofcompleting thetubeinspection.

Shouldtherebeanyquestions, pleasecontactus.Verytrulyyours,D.A.VicerSt.LersidentePlantDAS/grmEnclosure cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant9502270257 950221PDRADOCK050003359PDRanFPLGroupcompany