ML11308A485
ML11308A485 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 10/28/2011 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
References | |
GNRO-2011/00093 | |
Download: ML11308A485 (1) | |
Similar Documents at Grand Gulf | |
---|---|
Category:Environmental Report
MONTHYEARGNRO-2014/00036, 2013 Annual Radiological Environmental Operating Report (AREOR)2014-04-25025 April 2014
[Table view]2013 Annual Radiological Environmental Operating Report (AREOR) ML11308A2342011-10-28028 October 2011 Appendix E - Applicant'S Environmental Report Operating License Renewal Stage ML11308A1042011-10-28028 October 2011 License Renewal Application - Environmental Report, Cover ML11308A2422011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment a - Threatened and Endangered Species Correspondence, Part 1 of 3 ML11308A2442011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment a - Threatened and Endangered Species Correspondence, Part 2 of 3 ML11308A2512011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment a - Threatened and Endangered Species Correspondence, Part 3 of 3 ML11308A3282011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment B - Historic and Archaeological Properties Correspondence, Part 1 of 2 ML11308A3372011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment B - Historic and Archaeological Properties Correspondence, Part 2 of 2 ML11308A4692011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 1 of 4 ML11308A4712011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 2 of 4 ML11308A4842011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 3 of 4 ML11308A4852011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 4 of 4 ML11308A4922011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment D - Not Used GNRO-2011/00093, Applicants Environmental Report, Operating License Renewal Stage, Attachment E - Severe Accident Mitigation Alternatives Analysis2011-10-28028 October 2011 Applicants Environmental Report, Operating License Renewal Stage, Attachment E - Severe Accident Mitigation Alternatives Analysis GNRO-2009/00041, 2008 Annual Radioactive Effluent Release Report (ARERR) - Corrected Copy2009-07-0909 July 2009 2008 Annual Radioactive Effluent Release Report (ARERR) - Corrected Copy GNRO-2008/00018, Annual Radiological Environmental Operating Report (AREOR) for Period January 1, 2007 Through December 31, 20072008-04-29029 April 2008 Annual Radiological Environmental Operating Report (AREOR) for Period January 1, 2007 Through December 31, 2007 GNRO-2008/00019, Annual Radioactive Effluent Release Report (Arerr), for January 1, 2007 Through December 31, 20072008-04-28028 April 2008 Annual Radioactive Effluent Release Report (Arerr), for January 1, 2007 Through December 31, 2007 GNRO-2007/00024, Annual Radiological Environmental Operating Report (AREOR)2007-04-30030 April 2007 Annual Radiological Environmental Operating Report (AREOR) GNRO-2007/00023, Annual Radioactive Effluent Release Report (ARERR)2007-04-30030 April 2007 Annual Radioactive Effluent Release Report (ARERR) GNRO-2006/00018, Annual Radioactive Effluent Release Report (ARERR)2006-04-27027 April 2006 Annual Radioactive Effluent Release Report (ARERR) GNRO-2006/00017, Annual Radiological Environmental Operating Report (AREOR)2006-04-26026 April 2006 Annual Radiological Environmental Operating Report (AREOR) GNRO-2005/00012, Annual Radioactive Effluent Release Report (ARERR)2005-04-27027 April 2005 Annual Radioactive Effluent Release Report (ARERR) CNRO-2004-00055, (GGNS) - Early Site Permit Application, Part 3 - Environmental Report2004-08-13013 August 2004 (GGNS) - Early Site Permit Application, Part 3 - Environmental Report GNRO-2003/00012, 2002 Annual Environmental Operating Report for January 1, 2002 Through December 31, 20022003-04-0909 April 2003 2002 Annual Environmental Operating Report for January 1, 2002 Through December 31, 2002 2014-04-25 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARML24128A0422024-05-0707 May 2024
[Table view]License Amendment Request to Remove Obsolete License Conditions ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20091M3632020-03-31031 March 2020 Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. ML19072A2812019-03-13013 March 2019 Supplement 1 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00029, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-06-0707 June 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00008, (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62018-04-27027 April 2018 (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-11-0303 November 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass2016-12-29029 December 2016 License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..2016-10-26026 October 2016 Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System.. GNRO-2016/00034, License Renewal Documents to Support Review of Application for Renewal2016-10-10010 October 2016 License Renewal Documents to Support Review of Application for Renewal GNRO-2015/00087, Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By..2015-12-0202 December 2015 Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By.. GNRO-2015/00037, Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing2015-09-15015 September 2015 Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing GNRO-2015/00029, License Amendment Request - Cyber Security Plan Implementation2015-06-29029 June 2015 License Amendment Request - Cyber Security Plan Implementation GNRO-2015/00038, Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment2015-06-11011 June 2015 Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals2015-05-27027 May 2015 Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month2014-12-15015 December 2014 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints GNRO-2013/00090, License Amendment Request - Cyber Security Plan Implementation Schedule2013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel..2013-11-0808 November 2013 LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel.. CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments GNRO-2012/00132, License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.2012-11-0909 November 2012 License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low. GNRO-2012/00125, Final Feedwater Temperature Reduction License Amendment Request2012-10-26026 October 2012 Final Feedwater Temperature Reduction License Amendment Request GNRO-2012/00096, License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 12012-10-0202 October 2012 License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 1 GNRO-2012/00102, Request to Revise the Standby Service Water Passive Failure Methodology2012-09-14014 September 2012 Request to Revise the Standby Service Water Passive Failure Methodology ML12157A1792012-05-23023 May 2012 Attachment 6 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment I Labeled GGNS NPDES Permit Renewal Application (2007) GNRO-2012/00001, License Amendment Request - Standby Liquid Control System2012-01-23023 January 2012 License Amendment Request - Standby Liquid Control System ML11308A4842011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 3 of 4 GNRO-2011/00064, License Amendment Request to Revise Technical Specification 2.1.1.22011-10-28028 October 2011 License Amendment Request to Revise Technical Specification 2.1.1.2 ML11308A0952011-10-28028 October 2011 License Renewal Application Technical Information - Appendix a - Updated Final Safety Analysis Report Supplement 2024-05-07 |
Text
Air & W.ter Pollution Control Commission COMMISSIONERS Re., T,ibtllt C"tltm." Mo"ey Jeme. W. Carr._., VIC. C"."""" Boerd of H .. lth Joe O. 8,ow" M"i", Co" .. rwlion Commillion W. J. o.mot-" Che,l. W. EI. ValDO CII", c;. ..... Fieh Commiuion
.. ,ry O. ,., .. ",," W. E. GuPton JaCkSon STAT. 07 MIUUIlPPI
- GI,n Wood, Jr., bKUtiw Director P. O. 80-.21 . Ro_t E. u. "'"eII". Jackson, Mllllnl .. pI 3.205 Ttltphonel:
Admlnl.., ...... Oltl_ I01-3M-7IU AIr OIwtIlO" IOl-3M .. 7.3 WIIt.r OIvl.lon 101.JM-7Ml February 5, 1974 Hr_ Donald C. Lutken, President Mississippi Power and Light Company P. O. Box 1640 Jackson, Mississippi 39205
Dear Mr. Lutken:
RECEIVED FEB 6 1974 COMMISSIONERS 011
- G .. IIoerd Qulncv R. Hodget H""'iIJil Ja_ e.",_ 8011,d of WII ** , Cornmiui_. ,Nck ASSOCIATE MEMBERS SI ** ' P.d, S."ltm Or. John M. lCi"t A. I Board Plui Bun G.OIOlliCl' Surwy W. H. t.too..rt This certification is issued to the Mississippi Power and Light Company, Jackson, in conformity with the requirements of Section 401 of the Federal Water Pollution Control Act as amended* (33 USC 1341) with respect to the discharge of treated wastewater resulting frOll the operation of the company's proposed Grand Gulf Nuclear Station near Port Gibson, Mississippi.
After publication of notice of the requested certification in The Clarion Ledger, Jackson, on December 6, 1973, and The Reveille, Port Gibson, on Oecember 6, 1973, the Mississippi Air and Water Pollution Control hereby. certifies, after examination of pertinent materials supplied by the company, that no or standard.
have been established pursuant to Sections 301, 302, 306, or 307 and further that there ia reasonable assurance that the proposed activity of the cOIIlpany will be conducted in a manner which will not violate applicable water quality standards.
GWjr:kh A-I cop,