Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification PlanML20132E016 |
Person / Time |
---|
Site: |
Hatch ![Southern Nuclear icon.png](/w/images/1/14/Southern_Nuclear_icon.png) |
---|
Issue date: |
12/13/1996 |
---|
From: |
GEORGIA POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20132E015 |
List: |
---|
References |
---|
NUDOCS 9612200243 |
Download: ML20132E016 (7) |
|
Similar Documents at Hatch |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212J2721999-10-0101 October 1999 Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained ML20073G9631994-09-23023 September 1994 Proposed Improved Ts,Rev E ML20073D3231994-09-20020 September 1994 Proposed Tech Specs Change to Unit 1 TSs Re EDG Operability Requirements During Reactor Shut Down Conditions ML20072V3641994-08-31031 August 1994 Proposed Tech Specs Re Improved Standard Ts,Rev D ML20072H0571994-08-16016 August 1994 Proposed TS 3.9.C,allowing Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys ML20072E4021994-08-0808 August 1994 Proposed Tech Specs Re Rev Insertion Instructions Rev C ML20072B7541994-08-0404 August 1994 Proposed Tech Specs Re Traversing Incore Probe Operability Requirements ML20071H8381994-07-19019 July 1994 Proposed TS 3.3.6.6,allowing Less than Four Traversing in- Core Probe Machines to Be Operable ML20071H6851994-07-0808 July 1994 Proposed Tech Specs Re Improved Std Insertion Instructions, Consistent w/NUREG-1433 ML20069J3101994-06-0707 June 1994 Proposed Tech Specs Allowing Planned Testing at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt ML20059E9231994-01-0606 January 1994 Revised Proposed TS Pages for Increase in Allowable MSIV Leakage Rate & Deletion of MSIV Leakage Control Sys ML20059L2051993-11-0909 November 1993 Proposed Tech Specs Changing Unit 1,Section 4.9 & Unit 2, Section 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20058P8881993-10-19019 October 1993 Proposed Tech Specs Re Time Delay for RPS Electric Power Monitoring Sys Trips ML20046B6061993-07-30030 July 1993 Proposed Tech Specs for Implementation of New 10CFR20 Requirements ML20046B5561993-07-27027 July 1993 Proposed Tech Specs Showing Original & Unrelated Changes Re Removal of Main Steam Line Radiation Monitor Trips ML20045E7281993-06-28028 June 1993 Proposed TS 3.7.A.4 & 3.6.4.1 for Units 1 & 2,respectively, Allowing One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing 1999-07-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212J2721999-10-0101 October 1999 Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20210A4041999-07-15015 July 1999 Ei Hatch Nuclear Plant Unit 1,Extended Power Uprate Startup Test Rept for Cycle 19 ML20204J6031999-03-19019 March 1999 Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15 ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20217A0861998-04-30030 April 1998 Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 181998-02-17017 February 1998 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% HL-5438, Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 141997-07-21021 July 1997 Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant HL-5192, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 171996-07-18018 July 1996 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20212C1491996-05-31031 May 1996 Stability Monitor ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100P1041996-03-0404 March 1996 Ei Hatch Nuclear Plant Unit 2 Power Uprate Startup Test Rept for Cycle 13 ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained 1999-07-29
[Table view] |
Text
.
ATTACHMENT Replacement page 4a of marked-up Unit i Operating License (DPR-57)
Insert Page for Unit 1 Operating License DPR-57 Replacement page 7 of marked-up Unit 2 Operating License (NPF-5)
Insert Page for Unit 2 Operating License NPF-5 Replacement page 4 of revised Unit 1 Operating License (DPR-57) ,
Replacement page 5 of revised Unit 2 Operating License (NPF-5) i 9612200243 PDR 961213 '
ADDCK 05000321 PDR
i l . .
i i
i i . -
I i
4a -
2.C.(4) Physteal Protection b
{ -
%,%ern Noelent- ~
" ..,;e L..
^:_~: shall fully 1splement and estatain in effect a))
t provisions of the Cosmission approved physical security guard tratatng i and qualificatten, and safeguares contingency plans including ameneents l
' e ,e [' asse pursuant to provisions of the Miscellaneous Amenments ans Search
- /
Reestrements revistens to 10 CFR 73.55 (51 FR 27117 ana and 278221 ta the
-amehartty of to cya so.no and to cFR 50.14(a). ;ine yi.u.. unica contain
! . AWL 15,86 e-- a **=
seregu:rus Ints .enen protectee unser av 6ra n.21, are entitled: 'tewin 1..Z;;
match*.0.
Physical Seevrtty Plan " with revisions submitted through kl m l i;
y u G,033 7".a.O. -"- " '.*" 3.' M w"3afwith eguares
- ""; *tewin 1. Hatch Guard Trainta contta==~
revisions submittaa throuanP^;t ';; M, ;" p and Qualification Plan
- an.L eith revistaan "*"ad t ans 'tewin I. Match
+ %= h ' ' - "
n . ..i so tam i v. 2^ 16nanges asse in a s 'r"''
,mereense unn AU Eru n.55 shall be tspleennted 3
y escorsance with t
! Anit is. I398 chedule set forth therein.
dent,heJ as AppeAdix 'D inika 'Epal Mij %
I M M E N49*H,'CN,$WW T*
\ *~
rv w n u a w s a q c. .
FCarorgik Toinar Campany 3 2.C.(5) ' O.; ";;:.;;; shall submit, for the Cossaission's h
review and approval, plans for inspection and/or E modification during the next refueling cutage (following .
' Cycle 7 operation and prior to startup for Cycle 8 E ojieration) of the Recirculation siid Reactor Heat Removal *.
Systess piping. These plans shall be submitted to the
- g Commission at least three months prior to the start of j the next refueling outage, g
- b. Su&arn Nahr skll nd matkai oc b<ake< 'poder er f.nerg3 from EAan I.hhk Nuclear ~ Plant. 041. E R
E' g* This Itcense is effective as of the 4ata of issuance and shall y empire at midnight, August 6, 2014. -
S FOR THE ATOMIC ENERGY COMMISSON .
Orisiaal sismed by T Reser1.Perd j Glambusso, Deputy Director for Reactor Projects Directorate _o(Licensing
Attachment:
Appendix A - Technical Specifications and Appendix B - Environmental Protection Plan g
&{kI
l !
Insen (for Unit 1 Operating License DPR-57) i I The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains j_ Safeguards Information protected under 10 CFR 73.21), with revisions submitted
! through December 13,1996; Edwin I. Hatch Guard Training and Qualification Plan,"
with revisions submitted through April 12,1993; and "Edwin I. Hatch Safeguards Contingency Plan," identified as Appendix D to the Physical Security Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13,1996.
1
)
l l
l l
l l
l l
l l
i 1
l .
}
I i
l 4
i
)
1 2.0. physical Protection
,; h xy shall fully implement and maintain in effect all provisions of the Commission-approved physical security guard training l and qualification, and safeguards contingency plans incIuding amendments a
j sede pursuant to provisions of the Miscellaneous Amendments and Search
-/ C y"'hquirements revisions to 10 CFA 73.55 ($1 FR 2"a17 ad 27a22 and to the
'7 anthority of L0 CFR 50.90 and 10 CFR 50.54(p). J The plans , un' cn w . sin,
! asiwyveren sn ormenen riv.w6 es v..-- M.11, are entitled: "Edwin
- Alu. A. lN6 .. ..a
- 1. Hatch Physical security Plan," with revisions submitted through. [
- ,,,,; ;,;y,2, ' -- - """" "Edwin 1. Hatch Guard Training and Qualification plan" ,::
'q , A n;, W 3 s imr .-m es , , a with revisions submitted throuch ^;; ;c "O, ;"^^; and "Edwin I. Hatch
- i t 3,g,,,,,,,. Contingency PlaLk with revisions submitted throuch 2 h "* _ J j
.'7- 4 11.M ; - p W. rsnanges ==== www w wun av wa ,,.33 sna i s ce imp t _...es
" Ann.15,I3*)B (n.5soraanc e schedule set forth therein. at i
\
ended as A,pendis b 4.h H"W Sacerit.3 ~Pla]n j
! 'V .
c MME eJ,7M 1"his(n.T*
l w rue roueurs9 me, '
.i l
l J
E. This license is subject to the following additional condition for the protection of the environment:
Before engaging in additional construction or operational AtAiv41ts -* eetv4efee which may result in a significant adverse environ.
mental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement (NUREG-04171#.e M;;;;;;s shall provide written notification EAken Nur. lear -- so sne Director, Office of Nuclear Reactor Regulation.
F. This license is subject to the following antitrust conditions:
(1) As used herein: i (a)
- Entity" means any financially responsible person, private or public corporation, municipality, county, cooperative, association, joint stock association or business trust, owning, operating or proposing to own
Insert (for Unit 2 Operating License NPR-5)
( The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains Safeguards Information protected under 10 CFR 73.21), with revi:: ions submitted through December 13,1996; Edwin I. Hatch Guard Training and Qualification Plan,"
with revisions submitted through April 12,1993; and "Edwin I. Hatch Safeguards l Contingency Plan," identified as Appendix D to the Physical Security Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions l submitted through December 13,1996.
l r
l i i
I l
l l
l j
i l
f 1
i e
l b) SRs 3.8.1.8, 3.8.1 10, 3.8.1.12, 3.8.1.13, and 3.8.1.18 shall be successfully demonstrated at their next regularly scheduled performance; c) SRs 3.6.4.1.3 and 3.6.4.1.4 will be met at implementation for the I secondary containment configuration in effect at that time. The SRs shall be successfully demonstrated for the other secondary containment configurations prior to the plant entering the LCO i applicability for the configuration. !
(3) Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Final Safety Analysis Report for the facility, as contained in the updated Edwin I. Hatch Nuclear Plant Units 1 and 2 Fire Hazards Analysis and Fire Protection Program, originally submitted by a letter dated July 22, 1986.
Southern Nuclear may make changes to the fire protection program without prior approval of the Commission only if the changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(4) Physical Protection Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical l security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to l provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted j through December 13, 1996; Edwin I. Hatch Guard Training !
and Qualification Plan," with revisions submitted through April 12, 1993; and "Edwin I. Hatch Safeguards Contingency ,
Plan," identified as Appendix D to the Physical Security l Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13, 1996. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
(5) Georgia Power Company shall submit, for the Commission's review and approval, plans for inspection and/or modification during the next refueling outage (following cycle 7 operation and prior to startup for Cycle 8 operation) of the Recirculation and Reactor Heat Removal Systems piping. These plans shall be submitted to the Commission at least three months prior to the start of the next refueling outage.
l D. Southern Nuclear shall not market or broker power or energy from Edwin I. Hatch Nuclear Plant, Unit 1.
. - . . . _- , .- . . -, -- -- _ . ~ - ~ . - .
I (f) Initial Test Procram Georgia Power Company shall conduct the post-fuel-loading initial test program that has been reviewed and approved by the Commission at the time of issuance of this license without making major changes to this program. Major changes are deemed to involve unreviewed safety questions under Section 50.59 of 10 CFR Part 50 4 and are defined as: )
l (1) Elimination of any test identified in Section 14 of the Final Safety Analysis Report as ;
essential.
(2) Modification of test objectives, methods or ;
acceptance criteria for any test identified j in Section 14 of the Final Safety Analysis l Report as essential. ,
i i
(3) Performance of any test identified in Section 14 of the Final Safety Analysis Report as essential at a power level different by more than five-(5) percent of rated power from that described.
(4) Failure to complete all tests included in the described program (planned or scheduled for power levels up to the authorized power level) prior to exceeding a core burnup of one hundred and twenty (120) effective full power days.
D. Physical Protection Southern Nuclear shall fully implement _and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13, 1996; Edwin I. Hatch Guard Training and Qualification Plan," with revisions submitted through April 12, 1993; and "Edwin I. Hatch Safeguards Contingency Plan," identified as Appendix D to the Physical Security Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13, 1996. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
E. This license is subject to the following additional condition for the protection of the environment:
, Before engaging in additional construction or operational activities which may result in a significant adverse environ-mental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement (NUREG-0417), Southern Nuclear shall provide written notification to the Director, office of Nuclear Reactor Regulation.