Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan
ML20132E016
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/13/1996
From:
GEORGIA POWER CO.
To:
Shared Package
ML20132E015 List:
References
NUDOCS 9612200243
Download: ML20132E016 (7)


Text

.

ATTACHMENT Replacement page 4a of marked-up Unit i Operating License (DPR-57)

Insert Page for Unit 1 Operating License DPR-57 Replacement page 7 of marked-up Unit 2 Operating License (NPF-5)

Insert Page for Unit 2 Operating License NPF-5 Replacement page 4 of revised Unit 1 Operating License (DPR-57) ,

Replacement page 5 of revised Unit 2 Operating License (NPF-5) i 9612200243 PDR 961213 '

ADDCK 05000321 PDR

i l . .

i i

i i . -

I i

4a -

2.C.(4) Physteal Protection b

{ -

%,%ern Noelent- ~

" ..,;e L..

^:_~: shall fully 1splement and estatain in effect a))

t provisions of the Cosmission approved physical security guard tratatng i and qualificatten, and safeguares contingency plans including ameneents l

' e ,e [' asse pursuant to provisions of the Miscellaneous Amenments ans Search

/

Reestrements revistens to 10 CFR 73.55 (51 FR 27117 ana and 278221 ta the

-amehartty of to cya so.no and to cFR 50.14(a). ;ine yi.u.. unica contain

! . AWL 15,86 e-- a **=

seregu:rus Ints .enen protectee unser av 6ra n.21, are entitled: 'tewin 1..Z;;

match*.0.

Physical Seevrtty Plan " with revisions submitted through kl m l i;

y u G,033 7".a.O. -"- " '.*" 3.' M w"3afwith eguares

""; *tewin 1. Hatch Guard Trainta contta==~

revisions submittaa throuanP^;t ';; M, ;" p and Qualification Plan

  • an.L eith revistaan "*"ad t ans 'tewin I. Match

+ %= h ' ' - "

n . ..i so tam i v. 2^ 16nanges asse in a s 'r"''

,mereense unn AU Eru n.55 shall be tspleennted 3

y escorsance with t

! Anit is. I398 chedule set forth therein.

  • 1 ,& E 1

dent,heJ as AppeAdix 'D inika 'Epal Mij %

I M M E N49*H,'CN,$WW T*

\ *~

rv w n u a w s a q c. .

FCarorgik Toinar Campany 3 2.C.(5) ' O.; ";;:.;;; shall submit, for the Cossaission's h

review and approval, plans for inspection and/or E modification during the next refueling cutage (following .

' Cycle 7 operation and prior to startup for Cycle 8 E ojieration) of the Recirculation siid Reactor Heat Removal *.

Systess piping. These plans shall be submitted to the

  • g Commission at least three months prior to the start of j the next refueling outage, g
b. Su&arn Nahr skll nd matkai oc b<ake< 'poder er f.nerg3 from EAan I.hhk Nuclear ~ Plant. 041. E R

E' g* This Itcense is effective as of the 4ata of issuance and shall y empire at midnight, August 6, 2014. -

S FOR THE ATOMIC ENERGY COMMISSON .

Orisiaal sismed by T Reser1.Perd j Glambusso, Deputy Director for Reactor Projects Directorate _o(Licensing

Attachment:

Appendix A - Technical Specifications and Appendix B - Environmental Protection Plan g

&{kI

l  !

Insen (for Unit 1 Operating License DPR-57) i I The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains j_ Safeguards Information protected under 10 CFR 73.21), with revisions submitted

! through December 13,1996; Edwin I. Hatch Guard Training and Qualification Plan,"

with revisions submitted through April 12,1993; and "Edwin I. Hatch Safeguards Contingency Plan," identified as Appendix D to the Physical Security Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13,1996.

1

)

l l

l l

l l

l l

l l

i 1

l .

}

I i

l 4

i

)

1 2.0. physical Protection

,; h xy shall fully implement and maintain in effect all provisions of the Commission-approved physical security guard training l and qualification, and safeguards contingency plans incIuding amendments a

j sede pursuant to provisions of the Miscellaneous Amendments and Search

-/ C y"'hquirements revisions to 10 CFA 73.55 ($1 FR 2"a17 ad 27a22 and to the

'7 anthority of L0 CFR 50.90 and 10 CFR 50.54(p). J The plans , un' cn w . sin,

! asiwyveren sn ormenen riv.w6 es v..-- M.11, are entitled: "Edwin

Alu. A. lN6 .. ..a
1. Hatch Physical security Plan," with revisions submitted through. [
,,,,; ;,;y,2, ' -- - """" "Edwin 1. Hatch Guard Training and Qualification plan" ,::

'q , A n;, W 3 s imr .-m es , , a with revisions submitted throuch ^;; ;c "O, ;"^^; and "Edwin I. Hatch

i t 3,g,,,,,,,. Contingency PlaLk with revisions submitted throuch 2 h "* _ J j

.'7- 4 11.M ; - p W. rsnanges ==== www w wun av wa ,,.33 sna i s ce imp t _...es

" Ann.15,I3*)B (n.5soraanc e schedule set forth therein. at i

\

ended as A,pendis b 4.h H"W Sacerit.3 ~Pla]n j

! 'V .

c MME eJ,7M 1"his(n.T*

l w rue roueurs9 me, '

.i l

l J

E. This license is subject to the following additional condition for the protection of the environment:

Before engaging in additional construction or operational AtAiv41ts -* eetv4efee which may result in a significant adverse environ.

mental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement (NUREG-04171#.e M;;;;;;s shall provide written notification EAken Nur. lear -- so sne Director, Office of Nuclear Reactor Regulation.

F. This license is subject to the following antitrust conditions:

(1) As used herein: i (a)

  • Entity" means any financially responsible person, private or public corporation, municipality, county, cooperative, association, joint stock association or business trust, owning, operating or proposing to own

Insert (for Unit 2 Operating License NPR-5)

( The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains Safeguards Information protected under 10 CFR 73.21), with revi:: ions submitted through December 13,1996; Edwin I. Hatch Guard Training and Qualification Plan,"

with revisions submitted through April 12,1993; and "Edwin I. Hatch Safeguards l Contingency Plan," identified as Appendix D to the Physical Security Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions l submitted through December 13,1996.

l r

l i i

I l

l l

l j

i l

f 1

i e

l b) SRs 3.8.1.8, 3.8.1 10, 3.8.1.12, 3.8.1.13, and 3.8.1.18 shall be successfully demonstrated at their next regularly scheduled performance; c) SRs 3.6.4.1.3 and 3.6.4.1.4 will be met at implementation for the I secondary containment configuration in effect at that time. The SRs shall be successfully demonstrated for the other secondary containment configurations prior to the plant entering the LCO i applicability for the configuration.  !

(3) Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Final Safety Analysis Report for the facility, as contained in the updated Edwin I. Hatch Nuclear Plant Units 1 and 2 Fire Hazards Analysis and Fire Protection Program, originally submitted by a letter dated July 22, 1986.

Southern Nuclear may make changes to the fire protection program without prior approval of the Commission only if the changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(4) Physical Protection Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical l security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to l provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted j through December 13, 1996; Edwin I. Hatch Guard Training  !

and Qualification Plan," with revisions submitted through April 12, 1993; and "Edwin I. Hatch Safeguards Contingency ,

Plan," identified as Appendix D to the Physical Security l Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13, 1996. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

(5) Georgia Power Company shall submit, for the Commission's review and approval, plans for inspection and/or modification during the next refueling outage (following cycle 7 operation and prior to startup for Cycle 8 operation) of the Recirculation and Reactor Heat Removal Systems piping. These plans shall be submitted to the Commission at least three months prior to the start of the next refueling outage.

l D. Southern Nuclear shall not market or broker power or energy from Edwin I. Hatch Nuclear Plant, Unit 1.

. - . . . _- , .- . . -, -- -- _ . ~ - ~ . - .

I (f) Initial Test Procram Georgia Power Company shall conduct the post-fuel-loading initial test program that has been reviewed and approved by the Commission at the time of issuance of this license without making major changes to this program. Major changes are deemed to involve unreviewed safety questions under Section 50.59 of 10 CFR Part 50 4 and are defined as: )

l (1) Elimination of any test identified in Section 14 of the Final Safety Analysis Report as  ;

essential.

(2) Modification of test objectives, methods or  ;

acceptance criteria for any test identified j in Section 14 of the Final Safety Analysis l Report as essential. ,

i i

(3) Performance of any test identified in Section 14 of the Final Safety Analysis Report as essential at a power level different by more than five-(5) percent of rated power from that described.

(4) Failure to complete all tests included in the described program (planned or scheduled for power levels up to the authorized power level) prior to exceeding a core burnup of one hundred and twenty (120) effective full power days.

D. Physical Protection Southern Nuclear shall fully implement _and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans are entitled: "Edwin I. Hatch Physical Security Plan" (which contains safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13, 1996; Edwin I. Hatch Guard Training and Qualification Plan," with revisions submitted through April 12, 1993; and "Edwin I. Hatch Safeguards Contingency Plan," identified as Appendix D to the Physical Security Plan (which contains Safeguards Information protected under 10 CFR 73.21), with revisions submitted through December 13, 1996. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

E. This license is subject to the following additional condition for the protection of the environment:

, Before engaging in additional construction or operational activities which may result in a significant adverse environ-mental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement (NUREG-0417), Southern Nuclear shall provide written notification to the Director, office of Nuclear Reactor Regulation.