Part 21 Rept Re Tension Wires on Titus Grille,Model 272, Not Remaining in Place When Deflection Blades Closed. Affected Job Sites Identified in Encl.Products Being Tested Provide Acceptable Fix for Retention
ML20094Q804
Person / Time
Site: Palo Verde, Clinton, 05000000, Satsop
Issue date: 08/07/1984
From: Stewart Schneider
AFFILIATION NOT ASSIGNED, PHILLIPS INDUSTRIES, INC.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-84-418-000 PT21-84-418, PT21-84-418-000, NUDOCS 8408200332
Download: ML20094Q804 (3)


Text

- - -

5 0 4 .L TITUS PRODUCTS !asa g = m, 214-699-1030 Division of Philips Industries Inc.

Manufacturing Quality Components for Better Building . August 7, 1984 Director, Of fice of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.C. 10555 Sir:

In accordance with requirements of 10 CFR Part 21, Titus Products, located at 990 Security Row, Richardson, Texas 75081, is herewith reporting that we have discovered a deficiency with products fur-nished by Titus Products for Nuclear Power Plant application.

On March 2, 1984, it was determined that some tension wires on Titus Grille (Model 272) would not remain in place when deflec-tion blades were closed. The grilles were galvanized material supplied to The Waldinger Corporation for installation in the containment building at Palo Verde Nuclear Generating Station.

Since Palo Verde was the only jobsite for which galvanized grilles were supplied, Titus notified The Waldinger Corporation of this deficiency, which to the best of our knowledge was reported to the client.

Subsequent to the above notification, a jobsite review was con-ducted which resulted in the discovery of additional deficiencies.

It was determined during this jobsite visit that the tension wire problem was also apparent on aluminum grilles, thus constituting a total a total review of all products furnished for other nuclear sites.

Further review showed that Model 272 grilles were supplied for two additional jobsites. Attachment I identifies the affected jobsites by location.

We are currently testing these products to provide an acceptable fix for retention of tension wires. Upon determination of method of rework, Titus will schedule personnel to complete this activity.

Enclosed is a copy of the letter outlining the situation described in this letter, which will be sent to each affected site.

8408200332 840807 l$

PDR ADOCK 05000461 S pog

  1. h k

l LASCO DIVISION *LAU DIVISIONeMALTA DIVISION. MANUFACTURED HOUSING / RECREATION AL VEHICLE GROUP RUSKIN DIVISIONeTITUS PRODUCTS DIV!SION

T

. United States Nuclear Regulatory Commission Page 2 If -further questions -should arise, please contact us at once.

JSincerely,

)

TITUS~ PRODUCTS DIVISION- J a

S even '. S Lu&

nelder-President SLS:bkm

Enclosures:

- Attachment I Notification Form Letter cc: .Ned Ryan Marv DeHart Richard Yarges NOTE: For further. discussions, questions, or concerns on this matter, please contact: _

. Richard J. Yarges (816) 761-7476

.-*~

. Attachment I.

1. ~ Washington .Public ' Power Supply System .

Unit III -

P.O. Box 1223 Elma, Washington 98541 Attn: Wayne Nutt Construction. Supervisor

2. Palo' Verde Nuclear ' Generating Station .

. Units I, II, and III-P.O. Box 215

' Buckeye,' Arizona 85326 Attn: Robert Strait Project Engineer-

3. Clinton Nuclear Station .

The Zack Company 4600 12th Street Chicago,- Illinois 60650 Attn: Ralph.Usinger Project Engineer-4