ML20079P692
Letter Sequence Request | |
---|---|
Administration Questions
Results Other: ML20079P706, ML20087Q011, ML20092A243, ML20092P177, ML20092P588, ML20095L022, ML20140C660, ML20197H659 | |
MONTHYEARML20079P7061983-08-19019 August 1983
[Table View]Proposed Plant Mods to Be Incorporated Into Analog Transmitter Trip Scram Design. GE Affidavit for Withholding Nede 22154-1, Analog Trip Sys for Engineered Safeguard Sensor Trip Inputs, Encl Project stage: Other ML20079P6921984-01-23023 January 1984 Application to Amend License NPF-5,supporting Mods Associated W/Installation of GE Analog Transmitter Trip Sys. Encl Proprietary Rev 1 to NEDE-22154-1, Analog Trip Sys for Engineered Safeguards Sensor Trip Inputs... Withheld Project stage: Request ML20087Q0111984-04-0303 April 1984 Proposed Tech Specs Adding New Fuel Type MAPLHGR Curve & Changing Min Critical Power Ratio Curves for 8x8R & P8x8R Fuel to Support Reload 4 Core Design & Allowing Hybrid I Control Rod Assembly Operation Project stage: Other ML20087Q0071984-04-0303 April 1984 Application for Amend to License NPF-5,revising Tech Specs to Add New Fuel Type MAPLHGR Curve & Change Min Critical Power Ratio Curves for 8x8R & P8x8R Fuel to Support Reload 4 Core Design & Allow Hybrid I Control Rod Operation Project stage: Request ML20087P9511984-04-0303 April 1984 Forwards Hardware Descriptions & Drawings Submitted in Support of Review of 840206 Application for Amends to Licenses DPR-57 & NPF-5 Re Aprm.Revised Pages 1-4 Encl.W/O Drawings Project stage: Request ML20088A0041984-04-0303 April 1984 Application for Amend to License NPF-5,revising 840123 Request for Tech Spec Changes to Support Analog Transmitter Trip Sys Installation.Methodology for Significant Hazards Reviews Changed.Revised Review Encl Project stage: Request ML20092P1771984-06-0707 June 1984 Forwards Proprietary & Nonproprietary Responses to NRC 840517 Questions Re Analog Transmitter Trip Sys Tech Spec Package Submitted on 840123.Proprietary Responses Withheld. GE Affidavit Encl Project stage: Other ML20091N2871984-06-0707 June 1984 Responds to NRC 840423 Request for Info Re Safety Parameter Display Sys Per Suppl 1 to NUREG-0737.Safety Features,Data Validation,Human Factors & Method of Electrical Isolation Discussed.Description of Foxboro Optical Isolators Encl Project stage: Request ML20140C6601984-06-14014 June 1984 Forwards Revised Response to Question 1-2,incorporating Addl Info Requested by NRC & Corrected Response to Question 1-3 Re Proposed Analog Transmitter Trip Sys Tech Spec Changes, Per 840613 Telcon Project stage: Other ML20092A2431984-06-15015 June 1984 Responds to Generic Ltr 84-11 Re Insp of BWR Stainless Steel Piping.Current Plans for IGSCC & Leakage Detection Insp Encl Project stage: Other ML20197H6591984-06-15015 June 1984 Submits Addl Info Re Proposed Tech Spec Changes,Per NRC Request.Hardware Associated W/Atts & non-ATTS Sys Discussed Project stage: Other ML20092P5881984-06-27027 June 1984 Withdraws Request That Certain Tech Spec Pages Submitted on 840206 Be Treated as Proprietary.Supporting Data Base & Analysis Results Included W/Submittal Should Remain Proprietary Project stage: Other ML20095L0221984-08-23023 August 1984 Informs That During Startup Following Current Recirculation Pipe Replacement Outage,Util Will Invoke Special Test Exception Tech Spec 3.10.4 Re Operability of Recirculation Loop Project stage: Other ML20134E0821985-08-12012 August 1985 Advises That Ambiguous Statement in 840713 Safety Evaluation Re Amend 39 to License NPF-5,concerning Aprm/Rod Block Monitor Tech Spec Improvement Program,Has No Effect on Conclusions of Evaluation Project stage: Approval 1984-06-15 |
ML20079P692 | |
Person / Time | |
---|---|
Site: | Hatch ![]() |
Issue date: | 01/23/1984 |
From: | Beckham J GEORGIA POWER CO. |
To: | Stolz J Office of Nuclear Reactor Regulation |
Shared Package | |
ML19289B797 | List: |
References | |
RTR-NUREG-0661, RTR-NUREG-0737, RTR-NUREG-661, RTR-NUREG-737 NED-84-017, NED-84-17, TAC-54169, TAC-54433, TAC-54607, NUDOCS 8401310309 | |
Download: ML20079P692 (3) | |
Similar Documents at Hatch | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999
[Table view]Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error HL-2231, Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations HL-2225, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....'1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....' HL-1946, Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-091992-02-20020 February 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-09 1999-07-29 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999
[Table view]Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J9351997-10-0606 October 1997 Corrected TS Pps to Amends 208 & 150 for Licenses DPR-57 & NPF-5,respectively,consisting of Pps 3.4-8 & 3.5-6 for Unit 1 & Pps 3.4-8 & 3.5-5 for Unit 2 to Reflect Revised SRV Setpoints HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20137N1751997-04-0404 April 1997 Amends 206 & 147 to Licenses DPR-57 & NPF-5,respectively, Revising Surveillance Requirements Addressing Reactor Vessel Pressure & Temperature HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20059E6831993-10-21021 October 1993 Amends 190 & 129 to Licenses DPR-57 & NPF-5,respectively, Relocating Procedural Details Contained in Radiological Effluent Ts,Incorporating New Part 20 & Revising Frequency of Reporting Radiological Effluent Releases HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error 1999-07-29 |
Text
-
i Georg a Pour Company
-
- 333 Predmort Avenue Attanta, Georg.a 30308 Telephone 404 526 7020 Maang Address Post Otf.ce Bc. 4545 Atlanta Gec<ge 30302 b Georgia Power J. T. Beckham, Jr. IWU*0* 0 0CIDC MOP Vice Pres + dent and deneral Wwger Nuclear Generat.on NED-84-017 January 23, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Oparating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Comtission Washington, D. C. 20555 NRC DOCKPr 50-366 OPFRATING LICENSE NPF-5 EDNIN I. HA'ICH NLICLEAR PIANT UNIT 2 REQUEST FOR TECHNICAL SPECIFICATION GANGES
'IO SUPPORT ANAIOG TRANSMI' ITER TRIP SYSTH4 INSTALLATION Gentl men:
In accordance with the provisions of 10 CFR 50.90 as required by 10 CFR 50.59(c)(1), Georgia Power Cmpany hereby proposes an anendment to the Edwin I. Hatch Unit 2 Technical Specifications (Appendix A to the Operating License) . % ese changes would account for and support the modifications to plant design associated with the installation of a General Electric Canpany (GE) Analog Transmitter Trip Systs (A'ITS) . Installation and licensing of the A'ITS is an integral part of GPC's programs for meeting the rquirments of 10 CFR 50.49, NUREG-0737,10 CFR 50 Appendix R, and NUREG-0661.
We enclosed licensing document entitled "Edwin I. Hatch Nuclear Plant Unit 2, Docket No. 50-366, Proposed Plant Modifications - Analog Transmitter Trip Systs Installation," contains a detailed description of these plant modifications, as well as a couplete safety evaluation (as rquired by 10 CFR 50.59) and a significant hazards review (as rquired by 10 CFR 50.92) .
%is document also contains the proposed enended Technical Specification pages, along with instructions for incorporation of these changes in the section entitled " Proposed Technical Specifications Revisions."
-m gNA %ese proposed changes to the Plant Hatch Unit 2 Technical
- g" ' Specifications have been evaluated by both the Plant Review Board and the
$8 Safety Review Board and both groups have determined that these changes would Un in no way constitute an unreviewed safety question. %e probability of
[ occurrence and the consquences of an accident or malfunction of M
u0 safety-related equipnent would not be increased above those analyzed in the FSAR because no increase in accident probabilities or consquences would be ES introduced by these changes. The probability of ') accident or malfunction om 4
<A ppj )jjre
&, fy){c 9M/T& WW)g JhcO w ns %
Georgia Power d Director of Nuclear _ Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 January 23, 1984 Page 'IWo of a different type than previously evaluated in the FSAR does not result fran these changes because the potential accident scenarios following implenentation of these modifications are bounded by the present FSAR analyses. 'Ibe margin of safety as defined in the Technical Specification is not reduced by these changes because the proposed new operability limits and surveillance rquirenents for plant systens are established in a manner which is consistent with the present safety margins.
Included with this proposal is a determination of m endnent class (Attachnent 1) . We have determined this to be one Class IV amendnent and have enclosed the appropriate payment.
Pursuant to the reluirenants of 10 CFR 50.92, J. L. Ledbetter of the Georgia Deparbnent of Natural Resources will be sent a copy of this letter and all applicable attachnents.
J. T. Beckhan, Jr. states that he is Vice President of Georgia Power Cmpany and is authorized to execute this oath on behalf of Georgia Power Canpany, and that to the best of his knowledge and belief the facts set forth in this letter are true.
GEDRGIA POWER OCMPT'4Y By :-
J. T. Beckhan, Jr.(/
Sworn to and subscribed before me this 23rd day of January,1984.
&S Notary Putnic, Georgia &Ste at t.arge Notary Public My Comm:ssion Expires Aug26,1986 CBS/mb Enclosure xc: H. C. Nix, Jr.
Senior Resident Inspector J. P. O'Reilly, (NRC-Region II)
J. L. Ledbetter 700775
ATT10NENT 1 NIC DOCKET 50-366
-OPERATIN3 LICENSE NPF-5 EIMIN I. HA'ICH NUCLEAR PIANP UNIT 2 REQUEST EOR TECHNICAL SPECIFICATION CHAM;ES
'IO SUPPORP ANAIfG TRANSMITTER TRIP SYSTEM INb7ALLATION
. Pursuant to 10 CFR 170.22, Georgia Power Conpany has evaluated the attached proposed amendment to Operating License NPF-5, and has determined that:
- a. 'Ihe proposed amendment does not require evaluation of a new Safety Analysis Report or rewrite of the facility license;
- b. The proposed amendment does not require evaluation of several complex issues, involve ACRS review, or require an environmental inpact statement;
- b. The proposed amerdment does not require evaluation of several complex issues, involve ACRS review, or require an environmental inpact statement;
- c. The proposed amendment does involve more than one safety issue associated with the installation of the Analog Transmitter Trip System.
- d. The proposed amendment is therefore a Class IV amendment.
I
- - - , , - ,,,-,,..--.,..,w