Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20079P70619 August 1983Southern NuclearProposed Plant Mods to Be Incorporated Into Analog Transmitter Trip Scram Design. GE Affidavit for Withholding Nede 22154-1, Analog Trip Sys for Engineered Safeguard Sensor Trip Inputs, EnclOther
ML20079P69223 January 1984Southern Nuclear
Beckham J
Application to Amend License NPF-5,supporting Mods Associated W/Installation of GE Analog Transmitter Trip Sys. Encl Proprietary Rev 1 to NEDE-22154-1, Analog Trip Sys for Engineered Safeguards Sensor Trip Inputs... WithheldRequest
ML20087Q0113 April 1984Southern NuclearProposed Tech Specs Adding New Fuel Type MAPLHGR Curve & Changing Min Critical Power Ratio Curves for 8x8R & P8x8R Fuel to Support Reload 4 Core Design & Allowing Hybrid I Control Rod Assembly OperationOther
ML20087Q0073 April 1984Southern Nuclear
Beckham J
Application for Amend to License NPF-5,revising Tech Specs to Add New Fuel Type MAPLHGR Curve & Change Min Critical Power Ratio Curves for 8x8R & P8x8R Fuel to Support Reload 4 Core Design & Allow Hybrid I Control Rod OperationRequest
ML20087P9513 April 1984Southern Nuclear
Gucwa L
Forwards Hardware Descriptions & Drawings Submitted in Support of Review of 840206 Application for Amends to Licenses DPR-57 & NPF-5 Re Aprm.Revised Pages 1-4 Encl.W/O DrawingsRequest
ML20088A0043 April 1984Southern Nuclear
Gucwa L
Application for Amend to License NPF-5,revising 840123 Request for Tech Spec Changes to Support Analog Transmitter Trip Sys Installation.Methodology for Significant Hazards Reviews Changed.Revised Review EnclRequest
ML20092P1777 June 1984Southern Nuclear
Gucwa L
Forwards Proprietary & Nonproprietary Responses to NRC 840517 Questions Re Analog Transmitter Trip Sys Tech Spec Package Submitted on 840123.Proprietary Responses Withheld. GE Affidavit EnclOther
ML20091N2877 June 1984Southern Nuclear
Gucwa L
Responds to NRC 840423 Request for Info Re Safety Parameter Display Sys Per Suppl 1 to NUREG-0737.Safety Features,Data Validation,Human Factors & Method of Electrical Isolation Discussed.Description of Foxboro Optical Isolators EnclRequest
ML20140C66014 June 1984Southern Nuclear
Gucwa L
Forwards Revised Response to Question 1-2,incorporating Addl Info Requested by NRC & Corrected Response to Question 1-3 Re Proposed Analog Transmitter Trip Sys Tech Spec Changes, Per 840613 TelconOther
ML20092A24315 June 1984Southern Nuclear
Beckham J
Responds to Generic Ltr 84-11 Re Insp of BWR Stainless Steel Piping.Current Plans for IGSCC & Leakage Detection Insp EnclOther
ML20197H65915 June 1984Southern Nuclear
Gucwa L
Submits Addl Info Re Proposed Tech Spec Changes,Per NRC Request.Hardware Associated W/Atts & non-ATTS Sys DiscussedOther
ML20092P58827 June 1984Southern Nuclear
Gucwa L
Withdraws Request That Certain Tech Spec Pages Submitted on 840206 Be Treated as Proprietary.Supporting Data Base & Analysis Results Included W/Submittal Should Remain ProprietaryOther
ML20095L02223 August 1984Southern Nuclear
Gucwa L
Informs That During Startup Following Current Recirculation Pipe Replacement Outage,Util Will Invoke Special Test Exception Tech Spec 3.10.4 Re Operability of Recirculation LoopOther
ML20134E08212 August 1985Stolz J
Office of Nuclear Reactor Regulation
Advises That Ambiguous Statement in 840713 Safety Evaluation Re Amend 39 to License NPF-5,concerning Aprm/Rod Block Monitor Tech Spec Improvement Program,Has No Effect on Conclusions of EvaluationApproval