Monthly Operating Rept for Jan 1996 for Salem Nuclear Power Plant,Unit 2.W/960215
ML18101B230
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/31/1996
From: Heller R, Phillips R, Warren C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9602220076
Download: ML18101B230 (7)


Text

. '__, .

PS~G -

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit February 15, 1996 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating report for the month of January is

. I b emg sent to you.

Sincerely yours,

~r?t.iuu

~R.'rren General Manager -

Salem Operations RH:vls

  • Enclosures C Mr. Thomas T. Martin Regional Administrator USNRC, Region I 631 Park Avenue King of Prussia, PA 19046 9602220076 960l3l-- --

kDR ADOCK 05000311 PDR 220039 The power is in your hands.

95-2168 REV. 6/94

OPERATING DATA REPORT ~

I I Docket No: 50-311 Date: 02/10/96 Completed by: Robert Phillips Telephone: 339-2735 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period January 1996
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity(Gross MWe) 1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason~~~~~~N'"""'""'A~~~~~~~~~~~~~~~~~~~~-
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any NA This Month Year to Date Cumulative
11. Hours in Reporting Period. 744 744 125377*
12. No. of Hrs. Rx. was Critical 0 0 78083.6
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line 0 0 75229.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 187781005 Gross Elec. Energy Generated (MWH) 0 0 78648898
18. Net Elec. Energy Gen. (MWH) -3185 -3185 74737869
19. Unit Service Factor 0 0 60.0
20. Unit Availability Factor 0 0 60.0
21. Unit Capacity Factor (using MDC Net) 0 0 53.9
22. Unit Capacity Factor (using DER Net) 0 0 53.5
23. Unit Forced Outage Rate 100 100 25.2
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

We are presently forced beyond the scheduled refueling outage.

25. If shutdown at end of Report Period, Estimated Date of Startup:

Under review.

8-1-7.R2

~ERAGE DAILY UNIT POWER LE~

Docket No.: 50-311 Unit Name: Salem #2 Date: 02/10/96 Completed by: Robert Phillips Telephone: 339-2735 Month January 1996 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 P. 8.1-7 Rl

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH January, 1996 DOCKET NO. 50-311 UNIT NAME Salem #2

  • DATE 02-10-96 COMPLETED BY Robert Phillips TELEPHONE: 609-339-2735 -

METHOD OF SHUTTING LICENSE -

DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1 (HOURS) REASON 2 REACTOR REPORT # CODE 4 CODE 5 TO PREVENT RECURRENCE 3859 01-01-96 F 744 Fc 4 ---- .. ----- zz zzzz Refueling Schedule Exceeded 1 2 3 4 5 F: Forced Reason Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipment Failure (explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refuel ing 3-Automatic Scram Event Report CLER) File D-Requlatory Restriction 4-Continuation of (NUREG-0161)

E-Operator Training & License Examination Previous outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther H-Other (Explain)

10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: JANUARY 1996 UNIT NAME: SALEM2 DATE: 02/10/96 COMPLETED BY: R.HELLER TELEPHONE: 609-339-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations.

1. Temporary Modification (TMOD)95-059 "Deenergization Of Both SSPS Trains In Support Of ADFCs" Rev. 0 - This modification allows Containment Radiation Monitoring System (RMS) automatic and manual functions of Containment Verification Isolation terminating the Purge and Pressure/Vacuum Relief System with both SSPS trains in test or deenergized (the 115 VAC to the Output I Test cabinet remains energized) in modes 5 or 6 or when Purge operation is desired. This modification supports the Digital Feedwater design change package, work packages 8.6 and 8.7. As the function, operation and setpoints of Containment RMS automatic and manual Containment Ventilation Isolation actuation have not changed, the margin of safety has not changed.

(SORC 95-013)

.. -*

REFUELING INFORMATION DOCKET NO: 50-311 MONTH: JANUARY 1996 UNIT NAME: SALEM2 DATE: 02/10/96 COMPLETED BY: R. HELLER TELEPHONE: 609-3 3 9-5162 MONTH: JANUARY 1996

1. Refueling information has changed from last month: YES . X . NO ~*-~
2. Scheduled date for next refueling: 11/02/95 Scheduled date for restart following refueling: 09/11/96
3. a. Will Technical Specification changes or other license amendments be required?

YES . . NO "--"---'-

NOT DETERMINED TO DATE . X .

b. Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES. .NO. X .

If no, when is it scheduled? (to be determined)

5. Scheduled date(s) for submitting proposed licensing action: . n/a
6. Important licensing considerations associated with refueling:
7. Number of Fuel Assemblies:
a. Incore 0
b. In Spent Fuel Storage 749
8. Present licensed spent fuel storage capacity: 1632 Future spent fuel storage capacity: 1632
9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March 2012 8-1-7.R4

~--- --- -- -

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT 2 JANUARY 1996 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, the Unit will remain shutdown pending completion of the following actions:

  • Appropriately address long standing equipment reliability and operability issues
  • After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner
  • After the restart review, meet with the NRC and communicate the results of that review