MONTHYEARBYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements BYRON 2023-0022, 2022 Annual Radiological Environmental Operating Report (AREOR)2023-05-0404 May 2023 2022 Annual Radiological Environmental Operating Report (AREOR) BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-04-0606 April 2023 Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements BYRON 2023-0012, Cycle 26 Core Operating Limits Report2023-03-16016 March 2023 Cycle 26 Core Operating Limits Report BYRON 2022-0081, CFR72.48 Evaluation Summary Report2022-12-0909 December 2022 CFR72.48 Evaluation Summary Report BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2022-0069, 2021 Regulatory Commitment Change Summary Report2022-10-13013 October 2022 2021 Regulatory Commitment Change Summary Report BYRON 2022-0071, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment2022-10-13013 October 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment BYRON 2022-0065, Registration of Use of Cask to Store Spent Fuel2022-10-13013 October 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0063, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 20222022-09-29029 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 2022 BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) BYRON 2022-0059, Registration of Use of Cask to Store Spent Fuel2022-09-15015 September 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)2022-07-15015 July 2022 Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) BYRON 2022-0026, Annual Radiological Environmental Operating Report2022-05-0505 May 2022 Annual Radiological Environmental Operating Report BYRON 2022-0030, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report2022-05-0303 May 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report BYRON 2022-0028, Cycle 24 Core Operating Limits Report2022-04-28028 April 2022 Cycle 24 Core Operating Limits Report BYRON 2022-0016, Annual Dose Report for 20212022-04-0707 April 2022 Annual Dose Report for 2021 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline BYRON 2021-0063, Reactor Coolant System Pressure and Temperature Limits Report2021-09-28028 September 2021 Reactor Coolant System Pressure and Temperature Limits Report BYRON 2021-0064, Cycle 25 Core Operating Limits Report2021-09-28028 September 2021 Cycle 25 Core Operating Limits Report BYRON 2021-0032, 2020 Annual Radiological Environmental Operating Report (AREOR)2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report (AREOR) BYRON 2021-0031, 2020 Annual Radioactive Effluent Release Report2021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report BYRON 2021-0027, Annual Dose Report for 20202021-03-30030 March 2021 Annual Dose Report for 2020 BYRON 2021-0023, Registration of Use of Cask to Store Spent Fuel2021-03-25025 March 2021 Registration of Use of Cask to Store Spent Fuel BYRON 2021-0024, 2020 Regulatory Commitment Change Summary Report2021-03-19019 March 2021 2020 Regulatory Commitment Change Summary Report BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)2021-01-13013 January 2021 Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) BYRON 2020-0087, National Pollutant Discharge Elimination System (NPDES) Permit No. IL00483132020-12-16016 December 2020 National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048313 BYRON 2020-0084, 10 CFR 72.48 Evaluation Summary Report2020-12-10010 December 2020 10 CFR 72.48 Evaluation Summary Report BYRON 2020-0085, 10 CFR 50.59 Summary Report2020-12-10010 December 2020 10 CFR 50.59 Summary Report BYRON 2020-0067, Cycle 22 Core Operating Limits Report2020-10-20020 October 2020 Cycle 22 Core Operating Limits Report BYRON 2020-0063, Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo2020-10-0101 October 2020 Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 232020-09-10010 September 2020 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2020-0025, Annual Dose Report 20192020-03-24024 March 2020 Annual Dose Report 2019 BYRON 2020-0015, Cycle 24 Core Operating Limits Report2020-03-17017 March 2020 Cycle 24 Core Operating Limits Report BYRON 2020-0010, Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 172020-02-13013 February 2020 Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 17 BYRON 2020-0008, 2019 Regulatory Commitment Change Summary Report2020-02-0707 February 2020 2019 Regulatory Commitment Change Summary Report BYRON 2019-0105, Post Examination Submittal Letter2019-11-26026 November 2019 Post Examination Submittal Letter BYRON 2019-0095, Registration of Use of Cask to Store Spent Fuel2019-10-10010 October 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0090, Registration of Use of Cask to Store Spent Fuel2019-09-18018 September 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0078, Registration of Use of Cask to Store Spent Fuel2019-08-22022 August 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0041, Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 162019-04-25025 April 2019 Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16 BYRON 2019-0035, Submittal of 2018 Annual Radioactive Effluent Release Report2019-04-18018 April 2019 Submittal of 2018 Annual Radioactive Effluent Release Report BYRON 2019-0040, Cycle 22 Core Operating Limits Report2019-04-15015 April 2019 Cycle 22 Core Operating Limits Report BYRON 2019-0039, Annual Dose Report for 20182019-04-11011 April 2019 Annual Dose Report for 2018 BYRON 2019-0022, 2018 Regulatory Commitment Change Summary Report2019-03-13013 March 2019 2018 Regulatory Commitment Change Summary Report BYRON 2019-0015, Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report2019-03-0707 March 2019 Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)2018-12-20020 December 2018 Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22) 2023-06-01
[Table view] Category:Licensee Response to Notice of Violation
[Table view] |
Text
Byron Generating Station Exeton Generation 4450 North German Church Rd Byron, IL 61010-9794 www.exeloncorp.com August 20, 2015 LTR: BYRON 2015-0097 File: 1.10.0101 (1D.101)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Reply to a Notice of Violation;05000454/2015008-09; 05000455/2015008-09
Reference:
Letter from Christine A. Lipa (U.S. NRC) to Bryan C. Hanson (Exelon Generation Company, LLC), Byron Station, Units 1 and 2, NRC Component Design Basis Inspection Report 05000454/201 5008; 05000455/2015008 and Notice of Violation, dated July 21, 2015.
In the referenced letter, based on the results of an inspection completed on June 16, 2015, the NRC concluded that Byron Station was in violation of 10 CFR 50, Appendix B, Criterion XVI Corrective Action, which requires, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are promptly identified and corrected.
The NRC requested Exelon Generation Company, LLC (EGC) to respond to the Notice of Violation within 30 days of the date of the referenced letter. EGC does not contest the violation. to this letter contains EGCs response to the Notice of Violation. This letter contains a new regulatory commitment which is identified in Attachment 2.
If you have any questions regarding this reply, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800.
Respectful Site Vice President Byron Generating Station FAK/AC/dd r Attachments 1. Reply to Notice of Violation
- 2. Summary of Regulatory Commitments cc: Regional Administrator NRC Region Ill
NRC Senior Resident Inspector Byron Station
AUACHMENT 1 Reply to Notice of Violation In a letter from Christine A Lipa f U.S. NRC) to Bryan C. Hanson (Exelon Generation Company, LLC), dated July 21, 2015, the NRC issued a Notice of Violation. The violation of NRC requirements was identified during an NRC inspection completed on May 22, 2015. The violation is repeated below:
Title 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, states, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are promptly identified and corrected.
Contrary to the above, from June 15, 2012, to May 22, 2015, the licensee failed to correct a condition adverse to quality (CAQ). Specifically, on June 15, 2012, the NRC issued NCV 05000454/2012007-05; 05000455/2012007-05 for the failure to provide means to detect and isolate a leak in the ECCS within 30 minutes for Byron Station, Units 1 and 2, as described in UFSAR Section 6.3.2.5, which is a CAQ. As of May 22, 2015, the licensee had not corrected the CAQ in a reasonable period. Instead, the licensee created action tracking items to develop a plan to correct the CAQ, and the associated due date was extended at least eight times.
This violation is associated with a Green Significance Determination Process finding.
Response
- 1) Reason for the violation Byron Station received a NRC violation in the 2012 CDBI as documented in Issue Report fIR) 1398434. A Corrective Action (CA) was created from IR 1378257 documenting the NRCs initial question. However, the direction of the CA did not resolve the issue and was downgraded to a lower level action tracking item. The action was extended several times with little progress made. In February of 2015, Station Nuclear Oversight (NOS) identified the lack of CA and lack of progress which prompted the creation of a new CA. During the 2015 CDBI, the NRC identified the new CA had the same deficiency as the 2012 CA; i.e., it did not resolve the issue.
The reason for the finding is the Corrective Actions created in 2012 and again in 2015 did not meet the SMARTER criteria (Specific, Measurable, Accountable, Reasonable, Timely, Effective, Reviewed) as documented in Exelon Procedure Pl-AA-125, Corrective Action Program (CAP)
Procedure. The CA created from the 2012 finding stated to develop a plan to address the issue. The CA should have been more specific by stating, revise the UFSAR to match the plants leak detection capabilities or modify the plants leak detection capabilities to match the UFSAR. A contributing reason for the violation was the lack of understanding of the risk significance of the action and the lack of questioning attitude when the actions were created.
- 2) Corrective steps that have been taken and the results achieved Byron Station Operating Procedures 1/2BEP ES-i .3, Transfer to Cold Leg Recirculation, were revised to add a caution reinforcing the importance of the ESF to non-ESF cross-tie in light of
ATtACHMENT 1 Reply to Notice of Violation the need to identify and isolate ECCS leakage into the Auxiliary Building while in the recirculation mode.
The station has also performed an extent of condition to determine whether any other violations have been tracked inappropriately. No other issues were found.
- 3) Corrective stejs that will be taken Byron Station has initiated a revision to the UFSAR under CA 02454767-05 to reflect the plants existing leak detection capabilities. Two calculations and the UFSAR change package have been prepared, reviewed and approved. A 50.59 Evaluation and engineering change have been prepared, reviewed and are awaiting approval. One additional calculation is currently being prepared to support this CA.
- 4) Date when full compliance will be achieved Full compliance will be achieved with implementation of approval of UFSAR change package (DRP)16-018 and supporting documents by November 6, 2015.
ATTACHMENT 2 Summary of Regulatory Commitments The following table identifies those actions committed to by Exelon Generation Company. LLC, (EGC) for the Byron Station in this submittal. Any other actions discussed in the submittal represent intended or planned actions by EGO, are described only for information, and are not regulatory commitments.
Commitment Committed Date or Commitment Type Outage One-Time Action Programmatic (YES/NO) (YES/NO)
Exelon Generation November 6, 2015 Yes No Company, LLC (EGC) will complete the UFSAR change and supporting documents to reflect the plants existing leak detection capabilities and provide to the NRC resident.