Letter Sequence Approval |
---|
|
|
MONTHYEARML1004703982010-02-25025 February 2010 Safety Evaluation Regarding Generic Letter 2006-03, Potentially Nonconforming Hemyc and Mt Fire Barrier Configurations Project stage: Approval 2010-02-25
[Table View] |
|
---|
Category:Letter
MONTHYEARCNL-24-080, Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011)2024-11-20020 November 2024 Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011) IR 05000390/20240032024-11-13013 November 2024 Integrated Inspection Report 05000390/2024003, 05000391/2024003 & 07201048/2024001 CNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) IR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) CNL-24-064, Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R52024-11-0404 November 2024 Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R5 CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) 2024-09-05
[Table view] Category:Safety Evaluation
MONTHYEARML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23233A0042023-08-28028 August 2023 – Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 – Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22293A4082022-11-14014 November 2022 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22070A0022022-03-28028 March 2022 Review of the Fall 2021 Mid Cycle Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Report ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21064A4082021-03-10010 March 2021 Correction of Safety Evaluation for License Amendment Nos. 143 and 50 (EPID L-2020-LLA-0005) (Non-Proprietary) ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants 2024-08-27
[Table view] |
Text
1 February 25, 2010 Mr. Ashok Bhatnagar Senior Vice President Nuclear Generation Development and Construction 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - SAFETY EVALUATION REGARDING GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD6729)
Dear Mr. Bhatnager:
In a letter dated September 7, 2007 (see Agencywide Document Access and Management System Accession No. ML072570676), which references letter dated June 7, 2006 (ML061600208), the Tennessee Valley Authority (TVA) submitted a response to U.S. Nuclear Regulatory Commission (NRC) Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, for Watts Bar Nuclear Plant, Unit 2.
The NRC staff has reviewed TVAs response. Enclosed is the NRC staffs safety evaluation.
This completes the NRC staffs efforts regarding WBN Unit 2 for TAC No. MD6729.
Sincerely,
/RA/
L. Raghavan, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
Mr. Ashok Bhatnagar Senior Vice President Nuclear Generation Development and Construction 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - SAFETY EVALUATION REGARDING GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD6729)
Dear Mr. Bhatnager:
In a letter dated September 7, 2007 (see Agencywide Document Access and Management System Accession No. ML072570676), which references letter dated June 7, 2006 (ML061600208), the Tennessee Valley Authority (TVA) submitted a response to U.S. Nuclear Regulatory Commission (NRC) Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, for Watts Bar Nuclear Plant, Unit 2.
The NRC staff has reviewed TVAs response. Enclosed is the NRC staffs safety evaluation.
This completes the NRC staffs efforts regarding WBN Unit 2 for TAC No. MD6729.
Sincerely,
/RA/
L. Raghavan, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsAcrsAcnw_MailCTR Resource LP-WB R/F RidsNrrDraAfpb RidsNRRDorlLp_WB RidsOgcRp Resource RidsNrrPMWattsBar 2 Resource RidsRgn2mailCenter Resource (RHaag)
RidsNrrLABClayton Resources JLamb, NRR ADAMS ACCESSION NO: ML100470398 OFFICE DORL/LPWB/PM DORL/LPWB/LA DRA/AFPB/BC DORL/LPWB/BC NAME JLamb BClayton AKlein LRaghavan DATE 02/ 17 /10 02/ 17 /10 02/ 23 /10 02 / 25 /10 OFFICIAL RECORDS COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-391
1.0 INTRODUCTION
In a letter dated September 7, 2007 (see Agencywide Document Access and Management System Accession No. ML072570676), which references letter dated June 7, 2006 (ML061600208), the Tennessee Valley Authority (TVA) submitted a response to U.S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2006-03, Potentially Nonconforming HEMYC and MT Fire Barrier Configurations, for Watts Bar Nuclear Plant (WBN), Unit 2.
2.0 REGULATORY EVALUATION
Title 10 of the Code of Federal Regulations (10 CFR), Section 50.48, Fire protection, requires that each operating nuclear power plant have a fire protection plan that satisfies 10 CFR Part 50, Appendix A, General Design Criterion (GDC) 3, Fire Protection. GDC 3 requires that structures, systems, and components (SSCs) important to safety be designed and located to minimize, in a manner consistent with other requirements, the probability and effect of fires and explosions. Fire protection features required to satisfy 10 CFR 50.48 include features to limit fire damage to SSCs important to safety so that the capability to shut down the plant safely is ensured. One means of complying with this requirement includes using rated fire barriers to separate one safe shutdown train from its redundant train. The duration of fire resistance required of the barriers, usually 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, depends on the other fire protection features in the fire area.
3.0 TECHNICAL EVALUATION
GL 2006-03, dated April 10, 2006 (ML053620142), requested licensees determine whether or not Hemyc or MT fire barrier material is installed and relied upon for separation and/or safe shutdown purposes to satisfy applicable regulatory requirements at their facilities. In addition, licensees were asked to describe controls that were used to ensure the adequacy of other fire barrier types, consistent with the assessment requested in GL 1992-08, Thermo-Lag 330-1 Fire Barriers, dated December 17, 1992. TVA provided its response to GL 2006-03 for WBN Unit 1 in a letter dated June 7, 2006 (ML061600208). In a letter, dated January 31, 2007 (ML070250345), the NRC staff acknowledged receipt of TVAs response to GL 2006-03 regarding WBN Unit 1.
Enclosure
In its letters of June 7, 2006, TVA stated that Hemyc or MT fire barrier materials are not used at WBN Unit 1. TVA had also stated that it relies upon Thermo-Lag fire barrier material to protect fire safe shutdown circuits at WBN Unit 1 as approved by the NRC Staff. Further, it stated that the installed configurations are in accordance with the tested configurations or have been evaluated by persons knowledgeable in fire barrier design and installation. These fire barrier configurations, both those specifically tested and unique configurations, are documented in facility design basis documentation that are controlled and maintained in accordance with TVA's Design Control and Quality Assurance Programs.
The TVA responses to GL 1992-08 described the fire barriers used to separate redundant safe shutdown trains located within the same fire area at Watts Bar. In a December 18, 1995, letter, TVA stated that the work associated with the resolution of GL 1992-08 for WBN Unit 1 had been completed. The NRC issued a letter on January 6, 1998, stating that the NRC staff had determined that the actions requested in GL 1992-08 were complete for WBN Unit 1.
In the letter dated September 7, 2007, TVA stated that the GL 2006-03 response of June 7, 2006, also applies to WBN Unit 2 and that it does not rely on Hemyc or MT materials to protect electrical and instrumentation cables or equipment that provide safe shutdown capability during a postulated fire. TVA also provided a similar discussion as for WBN Unit 1 regarding the use of Thermo-Lag fire barrier material used to protect fire safe shutdown circuits at Unit 2. In addition, TVA committed to the following:
The Fire Protection Corrective Action Program will ensure Watts Bar Unit 2 conforms with NRC requirements and applicable guidelines prior to fuel load.
The fire barrier configurations are documented in facility design basis documentation that are controlled and maintained in accordance with TVA's Design Control and Quality Assurance Programs.
The NRC staff has reviewed TVAs response, dated September 7, 2007, and confirmed that the required response for WBN Unit 2 is identical to WBN Unit 1. Since the WBN Unit 1 response was previously accepted by the NRC staff by letter dated January 31, 2007, the staff finds the response for WBN Unit 2 acceptable.
4.0 CONCLUSION
Staff Requirements Memorandum (SRM), dated July 25, 2007 (ML072060688), for SECY-07-0096 - Possible Reactivation of Construction and Licensing Activities for the Watts Bar Nuclear Plant Unit 2, stated:
The Commission supports a licensing review approach that employs the current licensing basis for Unit 1 as the reference basis for the review and licensing of Unit 2.
In accordance with the SRM for SECY-07-0096, the NRC staff finds that TVAs responses for WBN Unit 2 regarding GL 2006-03 are acceptable for the issue of Hemyc and MT fire barriers.
TVAs response for other fire barrier materials is acceptable, subject to TVA completing its commitment stated in its letter, dated September 7, 2007.
Principle Contributor: John G. Lamb Date: February 25, 2010