MONTHYEARML0720606882007-07-25025 July 2007 SRM-SECY-07-0096 - Possible Reactivation of Construction and Licensing Activities for the Watts Bar Nuclear Plant Unit 2 Project stage: Request ML0725703192007-10-22022 October 2007 Possible Completion of Construction Activities Project stage: Other 2007-10-22
[Table View] |
|
---|
Category:Commission Staff Requirements Memo (SRM)
[Table view] Category:Memoranda
MONTHYEARML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21060A9122021-03-17017 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Watts Bar ISFSI ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML18227A5992018-08-23023 August 2018 Request to Use a Later Edition of the Asme Boiler and Pressure Vessel Code, Section XI for Containment Inservice Inspection Activities ML18165A3962018-06-14014 June 2018 Summary of Public Meeting Concerning Annual Assessment of Watts Bar Nuclear Plant - Docket Nos. 50-390 and 391 ML17356A2692017-12-20020 December 2017 Construction Lessons Learned Report ML17332A2012017-11-28028 November 2017 Approval for Exceedance of the Watts Bar Maximum Baseline Inspection Samples ML17192A0312017-06-26026 June 2017 Construction Inspection and Oversight Lessons Learned ML17151A5092017-05-31031 May 2017 Public Meeting Summary - 2016 Annual Assessment Public Meeting Regarding Watts Bar Nuclear Plant ML16252A2042016-09-0909 September 2016 Memo Ico Staff Review of Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 20 (Ns113989) for Verification of ASM Order EA-14-044 Implementation (Cac# L25130) ML16194A2522016-07-12012 July 2016 Memorandum to T. Mossman Technical Assistance Request-Review of Physical Security Plan for the Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (CAC No. L25130) ML16131A6172016-05-10010 May 2016 Summary of Public Meeting with Watts Bar, Units 1 and 2, to Discuss the Annual Assessment ML15259A4172015-10-21021 October 2015 the U.S. Nuclear Regulatory Commission Staff Evaluation of the Final Rule for Continued Storage of Spent Nuclear Fuel for the Operating License Environmental Review for Watts Bar Nuclear Plant, Unit 2 ML15288A3052015-10-15015 October 2015 Readiness of Watts Bar Unit 2 to Receive an Operating License ML15096A2042015-04-23023 April 2015 Reactor Oversight Process Transition Plan for Watts Bar Nuclear Plant, Unit 2 ML15104A2982015-04-10010 April 2015 March 26, 2015, Summary of Public Meeting with Watts Bar, Unit 2, Senior Management ML15104A2392015-04-10010 April 2015 March 26, 2015, Summary of Public Meeting with Watts Bar, Unit 2, EOC Assessment ML15084A4242015-03-25025 March 2015 March 17, 2015, Summary of Public Meeting with Watts Bar, Unit 1, Concerning Annual Assessment ML15015A4772015-02-0202 February 2015 Environmental Protection Plan (Non-Radiological) Technical Specification Review ML14247A4522014-08-28028 August 2014 FEMA Response to NRC for Watts Bar Nuclear Site ML14234A1462014-08-20020 August 2014 Memo to D. Safer Re M141030: Welcome Package for D.Safer for the Briefing on Watts Bar Unit 2 License Application Review ML14231B0102014-08-19019 August 2014 Summary of the Public Meeting to Discuss Aspects of Tva'S Response to 2009 Confirmatory Order, August 18, 2014 ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14364A1682014-06-0202 June 2014 Flowserve Corp., Vermont, Formal Evaluation of Deviations Reported - Notification of Defect - Watts Bar II ML14015A4522014-01-16016 January 2014 Notice of Meeting with Tennessee Valley Authority Regarding Open Items for Watts Bar Unit 2 ML14014A3262014-01-16016 January 2014 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant (WBN) Unit 1 Fire Protection Amendment Request ML13352A4332013-12-19019 December 2013 Notice of Meeting with Tennessee Valley Authority Regarding Status of Construction and Licensing of Watts Bar Nuclear Plant, Unit 2 ML13213A4102013-08-0202 August 2013 Notice of Forthcoming Meeting with Tennessee Valley Authority on Watts Bar Electrical System LAR Review ML13126A2522013-07-25025 July 2013 Request for Additional Information on the 2013 Decommissioning Funding Status Report ML13149A1222013-05-30030 May 2013 Notice of Meeting with Tennessee Valley Authority Regarding Status of Construction and Licensing of Watts Bar Nuclear Plant, Unit 2 ML13105A3942013-04-16016 April 2013 Location Change - Notice of Forthcoming Meeting for Public Meeting with Tennessee Valley Authority (TVA) on 2.1 Response Extension Request, Sequoyah Nuclear Plant and Watts Bar Nuclear Plant ML13078A4212013-03-19019 March 2013 Public Meeting Notice Tennessee Valley Authority, Browns Ferry, Sequoyah, Watts Bar for Commercial Grade Dedication Program ML13072A1212013-03-19019 March 2013 Differing Professional Opinion Involving External Flooding (DPO-2012-003) ML13035A0572013-02-0404 February 2013 2/7/13 Cancellation of Public Meeting with TVA Re 2.1 Response Schedule for Watts Bar Nuclear Plant, Unit 1 ML13025A1742013-01-25025 January 2013 Meeting Notice with TVA to Discuss the Schedule to Respond to Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Da-ichi Accident ML13007A0452013-01-0808 January 2013 1/23/13 Notice of Forthcoming Meeting with Tennessee Valley Authority Proposed Watts Bar Nuclear Plant, Units 1 License Amendment ML12362A1132012-12-27027 December 2012 1/7/2013 Cancellation Notice of Public Meeting with TVA Re Watts Bar Nuclear Plant, Units 1 and 2, Regarding a Proposed License Amendment Request ML12319A1722012-11-14014 November 2012 Meeting Notice with Tennessee Valley Authority to Discuss Hydrology Issues at Watts Bar Nuclear Plant, Unit 1 IR 05000390/20100082012-07-0606 July 2012 Errata for Electronic Closure of Watts Bar Inspection Report 05000390/2010-008 Memo Dated July 21, 2011 (ML 112020591) ML12158A5082012-06-12012 June 2012 Safety Concern Regarding Hydrology/Flooding Subsequent to May 31, 2012, Public Meeting ML12109A4282012-05-17017 May 2012 Final TIA 4 18 12 ML12122A6742012-05-0303 May 2012 Open Door Policy in the Matter of Watts Bar Nuclear Plant, Unit 1-Safety Concern Regarding Hydrology/Flooding ML12115A1652012-04-24024 April 2012 Follow-Up to Safety Concern Regarding Hydrology/Flooding ML1207501092012-03-15015 March 2012 Notice of Meeting with Tennessee Valley Authority to Discuss Pre-submittal Planning for Licensing Basis Change Regarding Hydrology for Watts Bar Nuclear Plant, Unit 1 ML1204610612012-02-0606 February 2012 Minutes of the ACRS Plant Operations and Fire Proctection Subcommittee Meeting December 15, 2011 (Open) IR 05000327/20100082011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar ML1120205912011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar 2024-04-01
[Table view] |
Text
July 25, 2007 MEMORANDUM TO: Luis A. Reyes Executive Director for Operations FROM: Annette L. Vietti-Cook, Secretary /RA/
SUBJECT:
STAFF REQUIREMENTS - SECY-07-0096 - POSSIBLE REACTIVATION OF CONSTRUCTION AND LICENSING ACTIVITIES FOR THE WATTS BAR NUCLEAR PLANT UNIT 2 The Commission has approved the staffs recommendations for the licensing and inspection program approach to be used for Watts Bar, Unit 2 if the Tennessee Valley Authority (TVA) decides to reactivate Unit 2 construction, subject to the comments noted below.
Should TVA decide to reactivate its Operating License application for Watts Bar Unit 2, the staff should issue a further notice of opportunity for hearing on the application.
The staff should keep the Commission informed of any significant issues that arise concerning the implementation of the Commission policy on deferred plants.
The Commission supports a licensing review approach that employs the current licensing basis for Unit 1 as the reference basis for the review and licensing of Unit 2. Further, TVA and the NRC staff should review any exemptions, reliefs, and other actions which were specifically granted for Unit 1 to determine whether the same allowance is appropriate for Unit 2.
Significant changes to that licensing approach would be allowed where the existing backfit rule would be met or as necessary to support dual unit operation. The staff should encourage the licensee to adopt updated standards for Unit 2 where it would not significantly detract from design and operational consistency between Units 1 and 2.
There are current generic safety issues at the resolution stage, such as GSI-191 or security issues, that will be much easier to resolve before plant operation. The staff and TVA should, during the licensing period, look for opportunities to resolve such issues where the unirradiated state of Watts Bar 2 makes the issue easier to resolve than at Watts Bar 1.
cc: Chairman Klein Commissioner McGaffigan Commissioner Jaczko Commissioner Lyons OGC CFO OCA OPA Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)