MONTHYEARML17083A9832017-03-22022 March 2017 Orau Independent Confirmatory Survey Summary, Results, and In-Process Inspection for the Interim On-Site Storage Building and Surrounding Area at the Rancho Seco Nuclear Generating Station ML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML16208A1092016-07-14014 July 2016 Sacramento Municipal Utility District (Smud), Rancho Seco Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Biennial Report for May 2014 - April 2016 ML14310A1972014-10-30030 October 2014 Biennial Update to Rancho Seco License Termination Plan ML14219A3272014-07-24024 July 2014 Biennial Report ML14099A2572014-03-31031 March 2014 Report on Irradiated Fuel Management Funding Status ML12321A0302012-11-0505 November 2012 Radioactive Material Storage and Decommissioning Safety Analysis Report Amendment 1 ML12165A4722012-05-31031 May 2012 and Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2010 Through April 30, 2012 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0912805482009-04-30030 April 2009 Draft Confirmatory Survey Report for the Rancho Seco Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0904805822008-08-29029 August 2008 Confirmatory Survey Results for Activities Performed in April and May 2008 for the Rancho Seco Nuclear Generating Station ML0814903302008-05-19019 May 2008 Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2006 Through April 30, 2008 ML0905100292008-03-12012 March 2008 Confirmatory Survey Results for Activities Performed in December 2007, Rancho Seco Nuclear Generating Station ML0734505732007-12-0707 December 2007 Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Dated December 7, 2007 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0614600982006-04-30030 April 2006 License Termination Plan, Rev 0, Table of Contents ML0614302132006-04-30030 April 2006 Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Chapter 2 - Site Characterization to Chapter 5 - Final Status Survey Plan 2017-03-22
[Table view] Category:Technical
MONTHYEARML17065A0342017-02-28028 February 2017 Final Status Survey Summary Report ML17065A0602017-02-24024 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Embedded Pipe, Survey Unit F8300123 ML17065A0612017-02-0909 February 2017 Final Status Survey Summary Report, January 25, 2017, Iosb Loading Dock, Survey Unit F8300071 ML17065A0712017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Hot Cell Pipe, Survey Unit F8300111 ML17065A0722017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Office Area, Survey Unit F8300133 ML17065A0702017-02-0101 February 2017 Final Status Survey Summary Report, February 1, 2017, Iosb Truck Bay, Survey Unit F8300053 ML17065A0682017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 2, Survey Unit F8300142 ML17065A0632017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Main Sump, Survey Unit F8300103 ML17065A0662017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 3, Survey Unit F8300143 ML17065A0552017-01-30030 January 2017 Final Status Survey Summary Report, December 27, 2016, Iosb Cell Deck, Survey Unit F8300093 ML17065A0652017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017 Iosb Hot Cell Class 2, Survey Unit F8300062 ML17065A0642017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Hot Cell, Survey Unit F8300061 ML17065A0692017-01-30030 January 2017 Final Status Survey Summary Report, January 30, 2017, Iosb Outside Area Class 1, Survey Unit F8300141 ML17065A0472017-01-30030 January 2017 Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 ML17065A0462017-01-26026 January 2017 Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 ML17065A0582017-01-26026 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb Cask Wash Down Area, Survey Unit F8300323 ML17065A0562017-01-24024 January 2017 Final Status Survey Summary Report, December 28, 2016, Iosb DAW Staging Bay, Survey Unit F8300023 ML17065A0592017-01-10010 January 2017 Final Status Survey Summary Report, January 6, 2017, Iosb DAW Staging Bay Class 2, Survey Unit F8300042 ML17065A0572017-01-10010 January 2017 Final Status Survey Summary Report, January 5, 2017, Iosb DAW Staging Bay Class 1, Survey Unit F8300031 ML17065A0482017-01-0404 January 2017 Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 ML17065A0372016-12-30030 December 2016 Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 ML17065A0542016-12-29029 December 2016 Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 ML17065A0532016-12-22022 December 2016 Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 ML17065A0522016-12-15015 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 ML17065A0492016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 ML17065A0512016-12-14014 December 2016 Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 ML17065A0352016-11-23023 November 2016 Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 ML17065A0402016-11-17017 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 ML17065A0412016-11-14014 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 ML17065A0362016-11-10010 November 2016 Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 ML17065A0382016-11-0808 November 2016 Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0622203512006-08-0303 August 2006 Historical Site Assessment, Revision 1 ML0520202442005-07-13013 July 2005 Decommissioning Technical Basis Document ML0233803882002-11-26026 November 2002 Defueled Safety Analysis Report, Amendment 5 NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2017-02-09
[Table view] |
Text
Rancho Seco Final Status Survey Sum*mary Report December 27, 2016 IOSB Cell Deck Survey Unit F8300093 FSS Engineer Lead FSS Engineer Approved By:
Manage:RanhOS:COASsets
-; ___ '.:.,. ::...:..:::-=:..:=
---=---::__.::-
- -_---*_*:-_
--:::
__ -_.:.._-
- -:-.=-,.
.-:=-----
---;::_:,__ :..__:_-:..:--=.-------
--:-_
--=--
FINAL STATUS SURVEY F8300093 Survey Unit: F8300093, Interim Onsite Storage Building (IOSB) Cell Deck Survey Unit
Description:
Operating History: Designed primarily to store packaged radioactive waste containers safely, protected from the elements, and maintain radiological dose as low as reasonably achievable (ALARA), each storage cell possibly stored media of many types, including filters, resins, contaminated chemicals, DAW, activated reactor components, contaminated plant components and other contaminated items. Site Characterization:
Static measurements were made of the walls and ceiling surfaces of the cell deck, to confirm the absence or presence of plant-derived radionuclides.
Static measurements showed an average mean gross activity level of 2,079 dpm/l 00 cm 2 and a maximum value of 2,607 dpm/l 00 cm 2 for the walls and ceiling. Based on the levels of gross activity reported, the area was determined to be a Class 3 area .. Survey Unit Design Information:
The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment
- 1. Static measurement locations were randomly determined and 1 % scan coverage.
The instrumentation used for the survey along with the MDC values are listed in Table 2-1Attachment2.
FSS Cell Deck F8300093 :=...:::-:-:
____
=-----:.= ---=:" .:--.:___
-
FINAL STATUS SURVEY F8300093 Table 1, Survey Unit Design Parameters
'*; * ! ' *.'* * *Eval1.l'atidh'111*p'uf vai'Ues<<,
',,,;." < 'd_".','" ;ci>h1ments . *:* ;*"');;,;:,<., ' ' ,. "* "* *': .. --*------*. .... . *...... ... .. Survey Packaqe: ,f830 Cell Deck Survey Unit: 009 Class 3 SU Area (m2) 460 Evaluator:
JR DCGLw: 43,000 Gross Activity DCGL Area Factor N/A Class 3 Desiqn DCGLemc (dpm/100cm 2): N/A Class 3 DCGLemc: N/A Class 3 LBGR: 21,500 Default = 50% DCGL Siqma: 275 Scopinq Survey Data Type I error: 0.05 Tvoe II error: 0.05 Predominant Nuclide Cs-137 Sample Area (m2) N/A Total Instrument Efficiency:
0.132 Total Area Scanned (m 2): 5.55 Scan Coveraqe (%) ,*/. 1}>Jcl'" Class 3 Choosing 'N/A' sets material Material Tvoe: NIA backqround to "O" . ... :.;
.. ;cBmroent$*_.*
.. .--' : "' :-,_::
- -.* Z1-a: *1.645 Z1-ll: 1.645 Siqn p: 0.99865. Calculated Relative Shift: 1a:1 Relative Shift Used: 3.0 Uses 3.0 if Relative Shift >3 N-Value: 11 N-Value+20%:
14 2 FSS Cell Deck f 8300093 =-*-----=--*-__
FINAL STATUS SURVEY F8300093 Survey Results: A total of 15 direct measurements were made in F8300093.
The results of the static measurements are shown in Table 2. All of the static measurements were less than the DCGL. None of the scan measurements indicated areas of elevated activity.
Swipe data did not indicate elevated activity levels above the MDA. Table 2, Static Measurement Results '
.. 'Beta (cpm)* (dprn)* : t,' 1 F8300093X00001 238 1,803 2 F8300093X00002 310 2,348 3 F8300093X00003 205 1,553 4 F8300093X00004 295 '" 2,235 5 F8300093X00005 270 2,045 6 F8300093X00006 288 2,182 7 F8300093X00007 307 2,326 8 F8300093X00008 284 2,152 9 F8300093X00009 250 1,894 10 F8300093X00010 258 1,955 11 F8300093X00011 269 2,038 12 F8300093X00012 211 1,598 13 F8300093X00013 247 1,871 14 F8300093X00014 254 1,924 15 F8300093X00015 235 1,780 Table 3 contains the statistical summary of the static measurement data for the Cell Deck. Table 3, Beta Summary Statistics Beta Static Cell Deck Mean 1,980 Median 1,955 Standard Deviation 242 Minimum 1,553 Maximum 2,348 Count 15 3 FSS Cell Deck f 8300093 FINAL STATUS SURVEY F8300093 Survey Unit Data Assessment:
The survey design required 14 static measurements for the Sign Test. A total of 15 static measurements were collected.
The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL. Table 4, Data Assessment Results comm'ents . '**,. Number of Samples: 15 Median: 1, 955 Mean: 1,980 Static Data Standard Deviation:
.. * *242 Maximum: 2,
- Adjusted N Value: * -1.A S+ Value:
- 10 Sufficient samples collected:
Pass , .. -. Maximum value <DCGLw: .Pass.* Median value <DCGLw: Pass Mean value <DCGLw: Pas.s Maximum value <DCGLemc:
N/A
- Sign test results: P*ass : .. *?;*.;,;\
'.*Li':. , :*>':F:inaf'staffi's'\:*:\
..
.. , ... * *: .. *
- comroerjts J::. <'>'J1*: The survey unit passes all conditions:
Pass Survey Unit Investigations and Results: No investigations were required for either direct or scan measurements and no investigation results are reported.
ALARA Statement:
As stated in Chapter 4 of the L TP, as long as the residual activity within the survey unit is less than the DCGL, the ALARA criterion has been met. Changes in Initial Survey Unit Assumptions:
The survey unit was designed as a Class 3 survey and the sample results are consistent with that classification.
The variability of the survey results was greater than the characterization data used for survey design. However, based upon the adjustment of the relative shift, the calculated number of samples did not change. No potential areas of elevated activity were detected.
4 FSS Cell Deck f 8300093 . .::.._...:___
.".: --___
FINAL STATUS SURVEY F8300093
Conclusion:
The FSS of this survey unit was properly designed as a Class 3 survey based on the results of the scoping survey. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. All of the static measurements were less than the DCGL. No investigations were required.
The static measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met. It is concluded that survey unit F8300093 meets the release criteria of 1OCFR20.l402.
5 FSS Cell Deck f 8300093
::-::. ---=--.-===----
- -:=: ....
--::.-
--: . -:.: --::--*-=-=-:::-.
:.: -:--*-:: -::::: --
':.. ':" . ..!: * --:-
Attachment 1 Maps December 28, 2016 Survey Unit F8300093.
{ \
F8300093 00010@ 13 = 1 ,955 pm/100 cm 2 ..... r1:-"'"'"" 'SMUD W.3 TIDEWATER INC CELL DECK SMUD Approvod by. Approval dote: Fage 1 . \1l 'F8300093X00004. . . . 13 =
dpm/100 cm 2 .. F !()()r FB300093X00003
@ 13 = 1 ,553 dpm/100 cm:i
$ 13 = 1 ,598 .dpm/100 cm *
- F8300093XQ0007 13 = 2,326 dpin/100
F8300093X00008
- 13. = 2, 152 dpm/100 cm 2 r ...... .CD
... ..' ... \. @ F8300093XOO 06 13 = 2;182 dp 100 cm 2 F8300 93X00001 @ @ 13 = 1, 03 dpm/100 cm 2 F8300093XOO 09 f3 = 1 ,924 dpm 100 cm 2 @ FS300093XO 09 f3 = 1 ,894 dp /100 cm 2 @ F 8300093X00005 F8300093X00011
$ f3 = 2,038 dpin/100 cm 2
@ 8300093X()0013 j3 = 2,348 dpm/100 cri'lz = 1 ,871 dpm/100 cm 2 13 = 2,045 dpm/100 cm 2 F8300093X00015 =
dpm/100 cm 2 Att. 1 Maps F8300093 N Attachment 2 Instrumentation December 27, 2016 Survey Unit F8300093 Beta Static Measurement Swipe Measurements Table 2-1. Survey Unit Instrumentation Ludlum Model 2350-1 Ludlum Model 44-116 B Detector Ludlum Model 2929 Ludlum Model 44-10-1 Beta -543 dpm/I 00 cm 2 Beta -79 dpm/ 100 cm 2 132% 43.4% 317897/33 I 972 2110117 I 82597 /188736 5/13/17
- Minimum detectable activities for the count rate instrumentation were calculated in accordance with NUREG-1507, "Minimum Detectable Concentrations with Typical Radiation Survey Instruments for Various Contaminants and Field Conditions" (U.S. NRC, 1997). b Detectors are required to be calibrated once every 12 months. Calibration due date indicates the date by which the detector must be calibrated again. cm 2 = square centimeters cpm =counts per minute dpm =disintegrations per minute Page 1 Att. 2 Instrumentation F8300093 Static Measurement MDA Variables Beta Survey Type PR331972 Detector Number 218 Background count rate (cpm) 1 Count Time (min) 0.132 Efficiency 100 Area of Detector ( cm2) Constants 60 sec/min 2.54 cm/in Assumptions Background count time and sample count time are equivalent Calculate Static MDA Static MDA =3 + 4.65(Br
- A/100 (NUREG 1507) Where: Static MDA Page 2 Br t E. A Background Countrate Count Time (min) Efficiency Area of detector ( cm 2) 543 dpm/100 cm2 Att. 2 Instrumentation F8300093 Att. 3 Investigation Attachment 3 Investigation December 27, 2016 Survey Unit F8300093 (none required)
F8300093 Attachment 4 Data Assessment December 27, 2016 Survey Unit F8300093 Histogram for Beta Static Activity (dpm/100cm2)
Cell Deck / N ll'l"befo l VoLes 15 """"" ".........., 2 , 3'8.4 8 S D 242.03 s ........ .n1* Katcmt -0.67 {i')Me an 1.900.'Xl BM odon 1.9154.55 G:]No11nalOittri:iufun 0L ett 8n; OMoi tB l'lf 1591 1 670 1 750 18Xl 1 909 1!119 2068 2148 I_ Pa g e 1 Att. 4 Data Assessment F8300093 Q-Q Plot for Beta Static Activity (dpm/100 cm2) Cell Deck 2200 1800 1£0l *1.5 *1.0 -0.5 0.0 n5 Theoretical Quantiles (Standard Nonna!) Page2 Att. 4 Data Assessment .v 1.0 1.5 f 8300093 Aclivl, .. 15 M8M*1SSO Sd*242 Sloi>o*150.9 lnletr-"Pf*
1900 Carelalion.
R
- O.SS Smear_Oat;i_Calculation_Shee\_
101316 I IOSB Final Status Survey I LCl LC2 LC3 LCll f.(6 LCS f\CPM fldpm Date/Time of Count Sample Comments l F830 009 3 c 00001 SM Cell Deck 42 -18 10/12/16 1048 2 FS30 009 3 c 00002 SM Cd\ Deck 37 -29 10/12/16 1018 3 FB30 009 3 c 00003 SM Cell 46 -9 10/12/16 0958 4 F830 009 3 ( 00004 SM Cell Deck 51 3 10/12/16 1042 5 FS30 009 3 c 00005 SM Cell Deck 43 -4 10/12/16 1008 6 FSJO 009 3 c 00006 SM Cell Deck 49 -2 10/12/16 0950 7 F830 009 3 c 00007 SM Deck 62 28 10/12/16 1039 8 F830 009 3 c 00008 SM Cell Deck 49 -2 10/12/06 1033 9 F830 009 3 c 00009 SM Cell Deck 43 -16 10/12/16 1007 10 Fi:\30 009 3 c 00010 SM Cell Deck 53 7 10/12/16 1045 11 Fi:!30 009 3 c 00011 SM Deck 51 3 10/12/16 1025 12 F830 009 3 c 00012 $(\!I Cell Deck 35 -34 10/12/16 1004 13 F830 009 J c 00013 SM Cell Deck 53 19 10/12/16 1030 ----14 F830 009 3 c 00014 SM Cell Deck 37 -29 10/12/16 101.6. 15 F830 009 3 c 00015 5M Cell Deck 42 -18 10/12/16 0957 Comments Oy b>.:>io\'"*
lh*.:* t*:-*q11i1(*ct
-.t)t.1rf" o:ht:*d: ,'JJ"KI IJ,,:::l:f:icund wt;'fe -;;:11i:.l;1c10tily pc1lorm<!d t,.\f't"r (I) Ol lht*
ideoliiit.:!d bt4ow. Ludlum 2929 Benchtop Instrument tkr. cflic:iC'n*:v bkf, count 2929 S/N: 182597 rate 1im:;-MOA 0.364 HDIV/0! Ct. 113-10-1S/N:188736 cprn min dpin ilfC.) Tech A Sign/ D<1te .;/ !--;,. -1 "Jt/jfjlJ IZ.-7.-lfo 49.8 l 78.6 Cal Due Date: 5/13/2017 f.) OA34 Tech B Sign/ Date rJ qun dpm PPf ;irc:i Page 3 Att. 4 Data Assessment F8300093