| Q | CCA | Title |
---|
05000530/FIN-2009010-01 | 2009Q3 | H.10 H.1(c) | Failure to Follow Foreign Material Exclusion Requirements |
05000528/FIN-2009004-03 | 2009Q3 | H.11 H.12 | Failure to Follow Procedures Results in Loss of Ventilation to Safety-Related Equipment |
05000528/FIN-2009008-04 | 2009Q3 | | Inadequate Corrective Actions for Vaults Containing SBO Cables |
05000528/FIN-2009008-01 | 2009Q3 | | Calculations to Support the Graded Voltage Relay Setpoint |
05000528/FIN-2009008-03 | 2009Q3 | P.5 P.2(a) | Failure to Incorporate Vendor Information for Reactor Trip Breakers |
05000528/FIN-2009008-02 | 2009Q3 | P.2 | Failure to Perform an Adequate Operability Evaluation for the Condensate Storage Tank |
05000528/FIN-2009004-02 | 2009Q3 | | Failure to Correct a Condition Adverse to Quality with the Emergency Diesel Generator Train B Fuel Oil Transfer Pump in a Timely Manner |
05000528/FIN-2009004-01 | 2009Q3 | | Failure to Correct a Condition Adverse to Quality with the Emergency Diesel Generator Train A K-4 Relay in a Timely Manner |
05000528/FIN-2009005-05 | 2009Q4 | P.1 P.1(a) | Inadequate Procedures to Diagnose and Mitigate a Loss of Instrument Air to the Containment |
05000528/FIN-2009005-03 | 2009Q4 | H.8 | Failure to Comply with High Radiation Area Entry Requirements |
05000528/FIN-2009005-02 | 2009Q4 | H.4 H.5 | Failure to Maintain Containment Closure Capability |
05000528/FIN-2009005-01 | 2009Q4 | P.3 | Failure to Establish Adequate Procedures to Control Potential Tornado Borne Missile Hazards Near the Essential Spray Ponds |
05000528/FIN-2009005-04 | 2009Q4 | | Failure to Periodically Update the UFSAR |
05000528/FIN-2009403-01 | 2009Q4 | P.3 | Security |
05000528/FIN-2010007-01 | 2010Q1 | | Impact of recent operating experience on Metal-Enclosed Bus program |
05000528/FIN-2010007-02 | 2010Q1 | | Structures monitoring frequency and scope |
05000528/FIN-2010002-04 | 2010Q1 | | Discrepancy with Unplanned Scrams with Complications Performance Indicator |
05000528/FIN-2010002-01 | 2010Q1 | | Failure to Take Adequate Corrective Actions for and Identified Adverse Condition |
05000528/FIN-2010002-03 | 2010Q1 | | ADV Drop Test Failure Due to Foreign Material |
05000528/FIN-2010002-02 | 2010Q1 | H.12 | Mispositioning of Valve Renders Essential Chiller Inoperable |
05000528/FIN-2010003-03 | 2010Q2 | H.9 | Inadequate Emergency Action Leval Declaration |
05000528/FIN-2010003-01 | 2010Q2 | H.12 | Inadequate Postmaintenance Test Results with an Inoperable containment |
05000528/FIN-2010003-02 | 2010Q2 | H.9 | Failure to Establish Procedures to Restore the Required Configurations of 13.8kV Electrical Bus Ducting |