Pages that link to "FLE"
← FLE
Jump to navigation
Jump to search
The following pages link to FLE:
Displayed 50 items.
- ML082170421 (← links)
- ML081620208 (← links)
- NL-08-009, Indian Point Energy Center - Hydrogeologic Site Investigation Report - Appendix H Through I (← links)
- ML080350541 (← links)
- ML080230230 (← links)
- ML18017B809 (← links)
- ML18016A634 (← links)
- ML17304A165 (← links)
- ML17303A546 (← links)
- ML16221A061 (← links)
- ML16218A485 (← links)
- ML18113A453 (← links)
- ML073550689 (← links)
- ML071240285 (← links)
- ML070950200 (← links)
- ML070720675 (← links)
- ML070430065 (← links)
- ML063050122 (← links)
- ML061950670 (← links)
- ML061390297 (← links)
- ML060620500 (← links)
- ML060390372 (← links)
- ML18127B550 (← links)
- L-2014-274, St. Lucie, Units 1 and 2 - Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order (← links)
- L-2014-063, St. Lucie, Units 1 and 2, Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order (← links)
- ML18082A155 (← links)
- NLS2017092, Attachment 2:(Redacted) Mitigating Strategies Assessment for Flooding, Revision 1 (← links)
- ML17047A601 (← links)
- RS-18-037, Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 Through 15 (← links)
- RS-18-010, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events (← links)
- LIC-16-0095, Transmittal of Revised Overall Integrated Plan for Fuel Permanently Removed from the Reactor Vessel to the Spent Fuel Pool in Response to Requirements for Mitigation Strategies for Beyond Design Basis External Events (← links)
- CNL-16-056, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 9, Responses to Requests for Additional Information (← links)
- RS-16-022, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- BYRON 2011-0093, Inservice Inspection Summary Report for Refueling Outage 17 (← links)
- GNRO-2011/00024, Response to Request for Additional Information Regarding Extended Power Uprate (← links)
- RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- L-17-303, Focused Evaluation Regarding Near-Term Task Force Recommendation 2.1 for Flooding (← links)
- RS-16-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- L-2016-068, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of FLEX Final Integrated Plan (← links)
- AEP-NRC-2015-23, Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- MNS-14-097, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review. (← links)
- RS-14-206, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RC-13-0028, Overall Integrated Plan as Required by March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event( Order EA-12-049) (← links)
- NRC 2013-0024, NextEra Energy Point Beach, Llc'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External... (← links)
- RS-09-014, License Amendment Request to Modify Facility Operating License in Support of Bulk Isotope Generation Project (← links)
- NL-08-006, Reply to Request for Additional Information Regarding Environmental Review for License Renewal Application (← links)
- LR-N15-0169, Fifth Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. (← links)
- L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) (← links)
- L-2014-063, Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) (← links)
- L-2012-135, Environmental Protection Plan Report Request for Minor Revision to Iww Permit No. FL0002208 (← links)