Pages that link to "ML17206A395"
Jump to navigation
Jump to search
The following pages link to ML17206A395:
Displayed 50 items.
- JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- JAFP-16-0180, License Amendment Request - Cyber Security Plan Implementation Schedule (← links)
- JAFP-16-0129, License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- JAFP-16-0140, Seventh Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (← links)
- JAFP-16-0130, License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition - Supplement 2 (← links)
- JAFP-16-0096, Supporting Information for Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool.. (← links)
- JAFP-16-0028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- JAFP-16-0012, Attachments 1 - 6: License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition (← links)
- JAFP-15-0143, License Amendment Request Revision to Technical Specification Administrative Controls for Permanently Defueled Condition (← links)
- JAFP-15-0105, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- JAFP-15-0098, License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- JAFP-15-0027, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- JAFP-14-0047, Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (← links)
- JAFP-14-0006, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 (← links)
- JAFP-13-0115, Application to Revise Technical Specifications for Technical Specification Low Pressure Safety Limit (← links)
- JAFP-13-0063, Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (← links)
- JAFP-13-0043, Proposed Change to Renewed Facility Operating License Condition 2.T (← links)
- JAFP-10-0079, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter (← links)
- JAFP-10-0050, Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (← links)
- JAFP-09-0132, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves (← links)
- JAFP-09-0131, Application for Amendment to Modify Technical Specifications Section 5.5.7, Inservice Testing Program, to Reference the Current Code of Record (← links)
- JAFP-09-0087, Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves (← links)
- JAFP-09-0070, Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time (← links)
- JAFP-08-0098, Supplement to the Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent... (← links)
- JAFP-08-0100, License Amendment Request Application for Licensee Name Changes (← links)
- JAFP-08-0034, Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A (← links)
- JAFP-08-0011, License Amendment Request Application for Technical Specification Changes Using the Consolidated Line- Item Improvement Process (CLIIP) (← links)
- JAFP-08-0006, Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil Testing Program Consistent with TSTF-374 (← links)
- JAFP-07-0124, Revision to Application for Technical Specifications (TS) Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) (← links)
- JAFP-07-0091, Application for Technical Specifications Change Based on TSTF-477, Add Action Statement for Two Inoperable Control Room Air Conditioning Subsystems, Using the Consolidated Line Item Improvement Process (CLIIP) (← links)
- JAFP-07-0019, License Renewal Application, Amendment 9 (← links)
- JAFP-07-0023, Application for Amendment to Technical Specifications 3.10.1. Re Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484 (← links)
- JAFP-06-0181, License Renewal Application, Amendment 3 (← links)
- JAFP-06-0015, Application for Technical Specification Amendment to Support Implementation of Arts/Meod (← links)
- JAFP-06-0016, Proposed License Amendment: Changes to the Reactor Vessel Material Surveillance Program (← links)
- ML003743650 (← links)
- ML19157A203 (← links)
- JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads (← links)
- JAFP-19-0083, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation (← links)
- ML19277G085 (← links)
- ML19277D552 (← links)
- ML19276G313 (← links)
- JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers (← links)
- JPN-00-015, Power Authority of the State of New York, Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations1 Inc.James A. FitzPatrick - Transfer of Facility Operating License and Proposed License Amendment (← links)
- JAFP-05-0082, Technical Specification Amendment to DC Electrical System Requirements (← links)
- ML19295G783 (← links)
- JAFP-20-0012, License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line... (← links)
- JAFP-04-0195, Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency (← links)
- JAFP-04-0083, Proposed License Amendment Re Safety Limit Minimum Critical Power Ratio (← links)
- JAFP-03-0108, Proposed License Amendment to Provide a One-time Integrated Leak Rate Test (ILRT) Interval Extension (← links)