Pages that link to "CP-202100225, Plari.T (CPNPP) - 2020 Annual Radiological Environmental Operating Report"
Jump to navigation
Jump to search
The following pages link to CP-202100225, Plari.T (CPNPP) - 2020 Annual Radiological Environmental Operating Report:
Displayed 50 items.
- CP-201200483, Response to Request for Additional Information for Relief Request No. A-2 (← links)
- CP-201200331, Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004) (← links)
- CP-201200354, Response to Request for Additional Information, 2RF12 Steam Generator Tube Inservice Inspection Report - TAC No. ME7345 (← links)
- CP-201200097, Response to Request for Additional Information for Relief Request No. A-1 (← links)
- CP-201200013, Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004) (← links)
- CP-201101429, Twelfth Refueling Outage (2RF12) Steam Generator 180 Day Report (← links)
- CP-201100528, Cycle 13 Core Operating Limits Report, March 2011 (← links)
- CP-201001546, Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) (← links)
- CP-201001544, Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000) (← links)
- CP-201000890, Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) (← links)
- CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) (← links)
- CP-201000157, Response to Request for Additional Information Regarding Request for Delaying the Code of Record Inservice Inspection Program (← links)
- CP-201800311, ECCS Re-Analysis Schedule (← links)
- CP-201701002, Revised Completion Date for the Multiple Spurious Operations Circuit Interactions Resolution Implementation Plan (← links)
- CP-201700886, Relief Request 1/2B3-2 for the Third Ten Year Inservice Inspection Interval (← links)
- CP-201700402, Response to RIS 2017-03 (← links)
- CP-201700255, Transmittal of Year 2016 Radioactive Effluent Release Report (← links)
- CP-201700223, Decommissioning Funding Status Report for Financial Assurance as of 12/31/2016 (← links)
- CP-201700225, Guarantees of Payment of Deferred Premiums (← links)
- CP-201700219, Submittal of Report of Changes Contained in Revision 9 of the Physical Security Plan (← links)
- CP-201600502, Report of Changes to the Physical Security Plan (Revision 8) (← links)
- CP-201600389, Submittal of the Annual Non-Radiological Environmental Operating Report for 2015 (← links)
- CP-201600216, License Amendment Request 16-001, Application to Revise Technical Specifications to Adopt TSF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. (← links)
- CP-201600093, Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 013 (← links)
- CP-201600092, Guarantees of Payment of Deferred Premiums (← links)
- CP-201600048, Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels (← links)
- CP-201501120, Reply to a Notice of Violation; EA-15-207 (← links)
- CP-201501126, License Renewal Application Submittal Schedule Revision (← links)
- CP-201500740, Submittal of Request for Additional Information Regarding Fukushima Lessons Learned - Flooding Hazard Reanalysis Report (← links)
- CP-201500810, Compliance with NRC Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Response to Request for Additional Information (Order Number EA-12-051) (← links)
- CP-201500549, Submittal of Phase 2 Staffing Assessment Regarding Recommendation 9.3 (Staffing) and Updated Commitments Regarding Recommendation 9.3 (Communications and Staffing) (← links)
- CP-201500444, Submittal of Annual Non-Radiological Environmental Operating Report for 2014 (← links)
- CP-201500443, Transmittal of Year 2014 Radiological Environmental Operating Report (← links)
- CP-201500416, Registration of Dry Spent Storage Canister (← links)
- CP-201500445, Transmittal of Year 2014 Radioactive Effluent Release Report (← links)
- CP-201500263, Annual Report of Changes in Peak Cladding Temperature (← links)
- CP-201401055, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- CP-201401051, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- CP-201400942, Submittal of Fukushima Lessons Learned - Flood Hazard Reevaluation Report, Supplement 1 (← links)
- CP-201400443, Transmittal of Year 2013 Radioactive Effluent Release Report (← links)
- CP-201400684, Revised Completion Date for Multiple Spurious Operation Circuit Interactions Resolution Implementation Plan (← links)
- CP-201400736, Submittal of Regulatory Issue Summary (RIS) 2014-07 Requested Information (← links)
- CP-201400565, Annual Report of Changes in Peak Cladding Temperature (← links)
- CP-201400619, License Amendment Request (LAR) 13.01, Spent Fuel Pool Criticality Analysis, Supplemental Information to Requests for Additional Information (← links)
- CP-201400244, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- CP-201400072, Guarantees of Payment of Deferred Premiums (← links)
- CP-201301502, Response to Request for Additional Information for Bulletin 2012-01, Design Vulnerability in Electric Power System. (← links)
- CP-201301252, Request for Enforcement Discretion Regarding Compliance with Technical Specifications 3.8.1, AC Sources - Operating. (← links)
- CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule (← links)
- CP-201300927, Withdrawal of License Amendment Request 12-005, Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation. (← links)