Submittal of Report of Changes Contained in Revision 9 of the Physical Security Plan
ML17086A038
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/23/2017
From: Sewell S
Luminant Power, Vistra Operations Company
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
CP-201700219, TXX-17034
Download: ML17086A038 (2)


Text

SAFEGUARDS INFORMATION Steven K. Sewell Luminant Senior Director P 0Box1002 Engineering and Regulatory Affairs 6322 North FM 56 Steven.Sewell@Luminant.com Glen Rose, TX 76043 Luminant r c

2548976113 817 776 0798 F 254 897 6652 CP-201700219 Ref: 10 CFR 50.54(p)(2)

TXX-17034 10 CFR 50.4(b)(4)

March 23, 2017 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NOS. 50-445, 50-446 AND 72-74 REPORT OF CHANGES TO THE PHYSICAL SECURITY PLAN (REVISION 9)

Dear Sir or Madam:

Vistra Operations Company LLC (Vistra OpCo) hereby submits as specified in 10 CFR 50.4(b)(4) a report of changes contained in Revision 9 of the Comanche Peak Nuclear Power Plant (CPNPP) Units 1 and 2 Physical Security Plan (PSP). The changes were assessed per 10 CFR 50.54(p) and were determined not to reduce the safeguards effectiveness of the PSP. The Plan revision was made effective on January 27, 2017.

A CD-ROM titled "CPNPP Security Plan Rev. 9" is included with this submittal. File 001 of the CD-ROM contains the Comanche Peak PSP which is sensitive information that has intrinsic security value designated as safeguards information (SGI) and should be protected against unauthorized disclosure in accordance with 10 CFR 73.21 and 10 CFR 73.22. File 002 of the CD-ROM contains the summary of changes to the PSP and is also designated as SGI and should be protected accordingly. The CD-ROM contains the following two (2) files:

001 Comanche Peak Units 1and2 PSP Rev 9.pdf, 959 kilobytes (kB), Non-Publicly Available (SGI) 002 CPNPP PSP Rev 9 54(p) Summary.pd£, 189 kB, Non-Publicly Available (SGI)

The enclosed CD-ROM contains SGI. When separated from the CD-ROM, this document is decontrolled.

~001-t.J~~SL~

SAFEGUARDS INFORMATION NfC-rc Ntv\SS

U. S. Nuclear Regulatory Commission TXX-17034 Page 2 of 2 03/23/2017 This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2 and the Independent Spent Fuel Storage Facility.

Should you have any questions regarding this submission, please contad Mr. Jim Barnette Games.barnette@luminant.com), Consulting Licensing Technologist, at (254) 897-5866.

Sincerely, Vistra Operations Company LLC Steven K. Sewell