Pages that link to "ML20154J986"
Jump to navigation
Jump to search
The following pages link to ML20154J986:
Displayed 50 items.
- CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam (← links)
- CY-98-051, Provides Final Response to RAI on Beyond Design Basis Event of Loss of Water from Spent Fuel Pool at Plant.Changes to Licensee 980318 Submittal Are Shown by Marking in Margin (← links)
- CY-98-018, Provides Estimated Final Dose of Record for Two Workers Involved in 961102,airborne Radioactivity Event,Along W/Bases for Determination,Per Insp Rept 50-213/97-10 (← links)
- CY-97-065, Requests Exemptions from Insurance Coverage & Financial Protection Requirement Limits of 10CFR50.54(w) & 10CFR140.11 for Hnp,Effective 980101 (← links)
- CY-97-106, Informs NRC That HNP Simulator Located at Millstone Station Training Ctr Is Considered No Longer to Be Certified (← links)
- CY-97-081, Provides Clarification of Status of Onsite Haddam Neck Plant Nuclear Organization (← links)
- CY-98-052, Provides NRC W/Addl Info W/Respect to Proposed Defueled Emergency Plan for Haddam Neck Plant.Updated & Revised Pages to Plan Which Reflect Proposed Enhancements Suggested by Both NRC & Util,Encl (← links)
- CY-98-053, Forwards Rev 2 to Calculation RAB98-01620-RY, Scatter Dose Rates Due to Cy Spent Fuel Pool Draindown. Loss of All Spent Fuel Pool Water Regarded as non-mechanistic,beyond Design Basis Event (← links)
- CY-98-039, Provides NRC W/Revised Distribution Lists for Correspondence from NRC to Util (← links)
- CY-98-065, Provides Util Comments on NRC Historical Review Team Rept. Comments Correct And/Or Clarify Statements in Rept,Util Believe Not Accurately Stated or Need Clarification (← links)
- CY-98-042, Forwards Monthly Operating Rept for Haddam Neck Plant for Feb 1997.Ltr Is Being Reissued to Correct Info on Cover Ltr Which Stated That Period of Operations Was for Mar Instead of Feb 1998 (← links)
- CY-98-044, Provides Info on Beyond Design Basis Event of Loss of Water from Spent Fuel Pool at Plant Per NRC RAI (← links)
- CY-97-084, Informs NRC of Implementation of Rev 36 to HNP Emergency Plan.Util Reviewed Rev IAW 10CFR50.54(q) & Determined That Revs Do Not Decrease Effectiveness of Plan (← links)
- CY-97-092, Informs That Phase 1 Corrective Actions Have Been Completed in Response to CAL 1-97-07 (← links)
- CY-98-061, Forwards MOR for Mar 1998 for Haddam Neck Plant.Encl Will Be Plant'S Last MOR Submittal Due to NRC Approval of License Amend Deleting TS 6.9.1.8 Which Required Submission of MOR (← links)
- CY-98-060, Provides Response to Violations Noted in Insp Rept 50-213/97-06.Corrective Actions:During Jul 1997,senior Station Mgt Held Meetings W/Health Physics Technicians to Stress Procedure Adherence (← links)
- B12569, Forwards Addendum 1 to NUSCO-152, Physics Methodology for PWR Reload Design, Summarizing Comparison of at-power Measurements to Predictions for Cycle 14.Requests Review & Approval by 870720 to Support Cycle 15 Operations (← links)
- CY-98-014, Responds to Confirmatory Action Ltr CAL-1-97-07,dtd 970304, Re Radiation Protection Improvement plan-Phase Ii.Phase II of Plan Now Complete.Program Is Now Capable of Supporting RCS Decontamination & Subsequent Decommissioning Activities (← links)
- CY-98-063, Forwards Haddam Neck Plant Annual Radioactive Effluents Rept & Rev 8 to ODCM for Haddam Neck Plant. Rept Includes Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents (← links)
- B12307, Clarifies 860312 Request for Exemption from Type C Testing Requirements of 10CFR50,App J for Reactor Coolant Charging Penetration P-8.Util Intends to Evaluate Mods to P-8 Pending Results of Integrated Assessment (← links)
- B12244, Forwards Reviews for Isap Topics 1.29, Flooding Evaluation, 1.53, Containment Emergency Sump Performance & 1.62, Feed & Bleed Sys Mod (← links)
- B12248, Forwards Reviews for Isap 1.04, Seismic Qualification of Safety-Related Piping, Isap 1.50, Fracture Toughness of Supports & Isap 1.56, Bolting Degradation, in Accordance W/Jf Opeka (← links)
- B12295, Forwards Review for Isap 2.17, Zircaloy Clad Conversion, Per 850731 Request (← links)
- B12250, Forwards Reviews for Isap Topics 1.24, Tech Spec Surveillance for Hydraulic Snubbers, 1.25, Tech Spec Surveillance for Mechanical Snubbers & 1.46, Inservice Testing for Diesel Generator Auxiliaries (← links)
- A06149, Forwards Fee for Request for Relief from Insp of Longitudinal & Circumferential Pipe Welds for Facility (← links)
- A06070, Requests That Portion of 850510 Amend Request Re Movement of Fuel within Reactor Pressure Vessel Be Retracted,Per Fm Akstulewicz 860903 Request That Util Reconsider Amend Request (← links)
- B12270, Forwards Reviews of Listed Isap Topics Re Generic Ltr 83-28, Including Topic 1.32, Item 2.1,Equipment Classification & Vendor Interface... & Topic 1.41, Item 4.5.1,Reactor Trip Sys Functional Testing, Per Util 850517 Commitment (← links)
- A06472, Forwards Response to NRC 870402 Request for Addl Info Re Nusco 140-1, Nusco Thermal Hydraulic Model Qualifcation Vol 1 (Retran). Util Staff Available to Hold Meeting During Wk of 870518 (← links)
- A05457, Forwards Results of RCS Seismic Reevaluations & Final Plans for Mods Identified in NRC Safety Evaluation of SEP Topic III-6.All Outstanding Issues Re Generic Ltr 84-04 & SEP Topic III-6 Resolved (← links)
- A05041, Forwards Review of Isap Topic 1.21, Reg Guide 1.97 Instrumentation, Per 850517 Commitment.Nrc 850703 Concerns Re Status of Compliance W/Rev 2 to Reg Guide 1.97 Also Addressed (← links)
- B12249, Forwards Reviews of Isap Topics 1.59, Addl Low Temp Overpressure Protection & 1.60, Rcs/Rhr Suction Line Valve Interlock, Per 850517 Commitment (← links)
- B12193, Forwards Reviews for Listed Isap Topics,Including Topics 1.08, Seimic Mods to RCS & 1.13, Inadequate Core Cooling Instrumentation, Per 850517 Commitment (← links)
- B12192, Forwards Reviews for Listed Isap Topics,Including Topic 1.44, Diesel Generator Reliability, Per 850517 Commitment (← links)
- B12245, Forwards Reviews for Listed Isap Topics,Including Topic 1.43, Tech Specs from Generic Ltr 83-37, Per 850517 Commitment (← links)
- B12289, Updates Status of Evaluation,Within Context of Isap,Of Proposed Plant Mod to Reduce Oxygen in Demineralized Water Storage Tank. Failure of Breather Valves on Sys Could Cause Unavailability of Feedwater Sys & Raise Core Melt Frequency (← links)
- B12246, Forwards Reviews of Isap 1.14.2, Install New 480-Volt Load Ctr & Rearrange Equipment in Fire Area S-8, 1.14.4, Install Remote Shutdown Instrumentation Panel & 1.61, Pressurized Thermal Shock, Per 850517 Commitment (← links)
- B12360, Requests Temporary Waiver of Compliance from Tech Spec 3.11, Item B, Containment Integrity, to Allow Neutron Shield Tank Fill Valve CC-V-884 to Be Open Under Listed Conditions. Amend Request Will Be Submitted by 861223.Fee Paid (← links)
- B12262, Clarifies Commitment Made in Util Re Startup Physics Rept.Review of Safety Analysis,Amend & Rev to Startup Rept Required to Resolve Issue.Amend Request Will Be Submitted During Fourth Quarter 1986 (← links)
- B12207, Submits Summary of Facility PORV Setpoint Issue & Addl Info Supporting Conclusion That Evaluation Unnecessary to Assure Public Safety or Conform to NRC Requirements (← links)
- A06102, Forwards Application Fee for Review & Approval of Interim Acceptance Criteria for Steam Generator Tubes,Per 860724 Submittal,In Response to 860922 Request (← links)
- B11652, Discusses Status of Resolution of Unresolved Item 50-213/85-08-04.Inservice Date of 871201 Planned (← links)
- B12279, Forwards Major Milestone Schedule for Const & Implementation Phases of Erecting New Switchgear Bldg,Per NRC Approval of Exemption from Schedular Requirements of 10CFR50.48 (← links)
- A05951, Suppls Response to Violations Noted in Insp Rept 50-213/86-17,per 860903 Mgt Meeting.Info Consisting of Review of Actual Tank Levels & Annunciator Response Procedures for Tank Low Level Alarms Forwarded on 860908-12 (← links)
- B12219, Requests Extension of 860428 Single Failure Exemption to Respond to Small Break Locas.Plant Mods Cannot Be Completed Until End of Cycle 15 Outage.Probabilistic Safety Study for Permanent Small Break LOCA Response Measures Encl.Fee Paid (← links)
- B12558, Withdraws 860312 Request for Exemption from 10CFR50,App J, Section III.A.4.(a) to Allow Continued Integrated Leak Rate Testing (ILRT) at Reduced Pressure of 15 Psig.Ilrt Will Be Conducted at Test Pressure of 40 Psig (← links)
- B12258, Clarifies 860819 Response to Potential Violation Item 86-17-08 Re Inadequate Emergency Lighting,Radio Communications & Breakers for Stated Valves Action Items, Per App R Insp During Wk of 860616 (← links)
- A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps (← links)
- B12501, Proposes Rev to Bases Section 2.4, Max Safety Settings - Protective Instrumentation. Rev Increases PORV Setpoint Above High Pressure Trip Setpoint (← links)
- B12198, Forwards Reviews of Isap Topic 2.06, Evaluation of RCS Loop Isolation Valves to Mitigate Steam Generator Tube Rupture & Isap Topic 2.07, Auxiliary Pressurizer Spray Nozzle (← links)
- B12194, Forwards Reviews of Isap Topics 1.18,1.26 & 1.42, Reactor Coolant Pump Seal Cooling Mods, Relief Valve & Safety Valve Testing & RCS Vents Tech Specs, Respectively (← links)