Pages that link to "PNO-V-87-016, on 870221,shutdown Commenced Due to Train B of Solid State Protection Sys Not Returning to Svc within 2 H. Caused by High Steam Generator Level on Generator 1-4 & Feedwater Flow Instabilities & Valve Position Problem"
Jump to navigation
Jump to search
The following pages link to PNO-V-87-016, on 870221,shutdown Commenced Due to Train B of Solid State Protection Sys Not Returning to Svc within 2 H. Caused by High Steam Generator Level on Generator 1-4 & Feedwater Flow Instabilities & Valve Position Problem:
Displayed 36 items.
- ML20234E807 (← links)
- IR 05000275/1998008 (← links)
- PNO-V-86-075, on 861029,during Followup Insp of Accumulator Drain Fittings,Pin Hole Leaks Discovered in Accumulators 2-2 & 2-4 in Nonwelded Portion of Fitting.Cause Not Stated.Leaks Repaired (← links)
- PNO-V-86-074, on 861028,main Steam Valves Found W/Missing & Loosened Nuts That Secure Valve Disc to Hinge Arm. Deficiencies Discovered During Visual Exam as Part of Inservice Testing Exam (← links)
- IR 05000275/1986022 (← links)
- PNO-V-87-030, on 870410,RHR Sys Capability Lost for Approx 90 Minutes.Caused by Entrainment of Air within RHR Pumps When RCS Water Level Dropped Due to Water Leakage Through Two Valves.Augmented Insp Team Dispatched (← links)
- IR 05000275/1987001 (← links)
- ML20215G302 (← links)
- ML20215F900 (← links)
- PNO-V-86-070, on 861004,discovered Two Snubbers on Charging Sys Mistakenly Removed.Charging Sys Required by Tech Specs for Refueling Boration Flow Path.Snubbers Reinstalled within Hour of Discovery (← links)
- PNO-V-87-041, on 870602,engineer in Containment Noted Weepage from RHR Sys Line While RHR in Svc.Cause of Effect Undetermined.Licensee Preparing Work Orders to Isolate, Examine & Repair Weld (← links)
- PNO-V-87-030A, on 870415,Region V Augmented Insp Team Commenced Insp Activities Re 870410 Loss of Suction to RHR While at Half Loop.Team Expects to Stay Onsite Through 870421.Summary of Sequence of Event Encl (← links)
- ML20211Q440 (redirect page) (← links)
- PNO-V-87-016 (redirect page) (← links)
- IR 05000275/1987006 (← links)
- ML20211M170 (← links)
- PNO-V-86-089, on 861207,plant Seismic Monitor Detected Ground Motion Which Triggered Ripplemental Seismic Monitoring Sys.Ground Motion Measured 2.9 on Richter Scale (← links)
- ML20211L269 (← links)
- PNO-V-87-014, on 870217,slow Shutdown from 100% Power Initiated to Investigate & Repair Main Generator Hydrogen Coolant Leak.Caused by Cracking in Stator Water Cooling Vent Line Due to Vibration.Outage Expected to Last Approx 1 Wk (← links)
- IR 05000275/1987005 (← links)
- IR 05000275/1987003 (← links)
- IR 05000275/1986032 (← links)
- IR 05000275/1999007 (← links)
- ML20210B344 (← links)
- IR 05000275/1982024 (← links)
- IR 05000275/1982023 (← links)
- IR 05000275/1982021 (← links)
- IR 05000275/1982022 (← links)
- IR 05000275/1982012 (← links)
- IR 05000275/1990017 (← links)
- ML20055J200 (← links)
- IR 05000275/1982020 (← links)
- IR 05000275/1982016 (← links)
- IR 05000275/1982019 (← links)
- IR 05000275/1982018 (← links)
- IR 05000275/1982015 (← links)