Pages that link to "05000254/LER-2006-001"
Jump to navigation
Jump to search
The following pages link to 05000254/LER-2006-001:
Displayed 37 items.
- 05000254/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B),stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Ts.Commitment Made by Ltr Provided (← links)
- 05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed (← links)
- 05000254/LER-1994-002, Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr (← links)
- 05000254/LER-1997-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-029, Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr Listed (← links)
- 05000254/LER-1997-012, Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed (← links)
- 05000254/LER-1997-024, Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed (← links)
- 05000254/LER-1998-007, Forwards LER 98-007-00,re Condition That Was Outside Design Basis of Plant,Per 10CFR50.73(a)(2)(ii)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-004, Forwards LER 98-004-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-025, Forwards LER 98-025-00,IAW 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1999-001, Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions (← links)
- 05000254/LER-1998-011, Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-006, Forwards LER 98-006-01,re RB Post LOCA Temps.Actions Listed Are Required for Closure of Issue But Are Not Required Prior to Startup (← links)
- 05000254/LER-1998-012, Forwards LER 98-012-01,which Describes Unit 1 Reactor Bottom Head Drain Line Developed Leak.No New Commitments Made within Submittal (← links)
- 05000254/LER-1987-025, Forwards Addl Info Re Control Room Habitability to Support Narrative Contained in LER 87-025 (Rev 1),including Control Room Habitability Study,Updated FSAR (Rev 88),inplace Charcoal Absorber Leak Rate Testing & Calculations (← links)
- 05000254/LER-1997-015, Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 990528 (← links)
- 05000254/LER-1998-015, Forwards LER 98-015-00 Re CREVS Declared Inoperable.Listed Commitments Being Made by Ltr (← links)
- 05000254/LER-1989-009, Effluent & Waste Disposal Semiannual Rept,Jan-June 1989.Unit 1 Svc Water Gross Activity Monitor Out of Svc for Total of 77 Days During Reporting Period.One Unplanned Liquid Release Documented in LER 89-009 (← links)
- 05000254/LER-1998-018, Forwards LER 98-018-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-017, Forwards LER 98-017-00 for Quad Cities Nuclear Power Station.Rept Submitted IAW Requirements of Code of Federal Regulations,Title 10CFR50.73(a)(2)(v)(D).QCOS 5750-02 Will Be Revised to Clarify Sequence & Preference by 980825 (← links)
- 05000254/LER-1997-030, Forwards LER 97-030-01 Re Instrument Line Excess Flow Valves Testing Performed at Less than Nominal Reactor Pressure Due to Inadequate Procedures.Ler Provides Addl Info Re Root Cause Analysis.Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures (← links)
- 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action (← links)
- 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee (← links)
- 05000254/LER-1998-010, Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000254/LER-1998-008, Forwards LER 98-008-00,re Event Which Took Place at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1998-014, Forwards LER 98-014-00,stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tss.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-019, Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1997-016, Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented (← links)
- 05000254/LER-1998-005, Forwards LER 98-005-00 Re Event Which Occurred at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1986-007, Responds to NRC Re Violations Noted in Insp Repts 50-254/87-09 & 50-265/87-09 on 870407-09.Corrective Actions: LER 86-007-00 for Unit 2 Will Be Supplemented to Describe More Fully Root Cause,Investigation & Corrective Actions (← links)
- 05000254/LER-1997-021, Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-017, Forwards LER 97-017-00.Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed (← links)
- 05000254/LER-1986-001, Responds to NRC Re Violations Noted in Insp Repts 50-254/86-06 & 50-265/86-06.Corrective Actions:Response to Repetitive Local Leak Rate Failures Provided in Encl Rev 1 to LER 86-001 (← links)