ML14017A041: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Attachment 10 Page 1 of 3 OBDI 202  
{{#Wiki_filter:Attachment 10 Page 1 of 3 OBDI 202 - I OLE Process GG-2013-11 DRAFT OPERATING TEST COMMENTS ADMIN JPM S JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes
- IOLE Process GG-2013-11 DRAFT OPERATING TEST COMMENTS ADMIN JPM S JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes
: 4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)
: 4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)
IC Focus Cues  Critical Steps Scope (N/B) Over- lap Job-Link Minutia                                                SRO (AS1) S 3        S No comments.
IC Focus Cues  Critical Steps Scope (N/B) Over- lap Job-Link Minutia                                                SRO (A S 1) S 3        S No comments.
SRO (AS2) S 3        S Please send procedure 01
SRO (A S2) S 3        S Please send procedure 01
-S-18-6 so I can evaluate this JPM.
-S-18-6 so I can evaluate this JPM.
JPM is sat.
JPM is sat.
SRO (AS3) S 3        S No comments.
SRO (A S3) S 3        S No comments.
SRO (AS4) S 2        E Add a third operator to the list of candidates. Also, the JPM should ask the candidate for the basis on why he/she selected the operator SRO (AS5) S 3        S We need to make sure we administer this JPM on a day that all the candidates are in the scenario.
SRO (A S4) S 2        E Add a third operator to the list of candidates. Also, the JPM should ask the candidate for the basis on why he/she selected the operator SRO (A S5) S 3        S We need to make sure we administer this JPM on a day that all the candidates are in the scenario.               Instructions for Completing Matrix This form is not contained in or required by NUREG
Instructions for Completing Matrix This form is not contained in or required by NUREG
-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
Line 43: Line 41:
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.


Attachment 10 Page 2 of 3 OBDI 202  
Attachment 10 Page 2 of 3 OBDI 202 - I OLE Process GG-2013-11 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN
- IOLE Process GG-2013-11 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN
-PLANT SYSTEM S JPM S JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes
-PLANT SYSTEMS JPMS JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes
: 4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)
: 4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)
IC Focus Cues  Critical Steps Scope (N/B) Over- lap Job-Link Minutia CR1 D 3        S No comments.
IC Focus Cues  Critical Steps Scope (N/B) Over- lap Job-Link Minutia CR 1 D 3        S No comments.
CR2 D 3        S No comments.
CR 2 D 3        S No comments.
CR3 D 3  E      E Step 2; Change the cue for the CRS to concur with the candidate to place the vacuum bypass switch in bypass (not direct)
CR3 D 3  E      E Step 2; Change the cue for the CRS to concur with the candidate to place the vacuum bypass switch in bypass (not direct)
. CR4 S 3        S No comments.
. CR 4 S 3        S No comments.
CR5 D 3        S No comments.
CR 5 D 3        S No comments.
CR6 D 3        S No comments.
CR 6 D 3        S No comments.
CR7 S 3        S No comments.
CR 7 S 3        S No comments.
PS1 S 3        S No comments. PS2 S 3        S No comments.
P S 1 S 3        S No comments. P S 2 S 3        S No comments.
PS3 S 3        S No comments.
P S 3 S 3        S No comments.
Instructions for Completing Matrix This form is not contained in or required by NUREG
Instructions for Completing Matrix This form is not contained in or required by NUREG
-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
Line 75: Line 72:
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.


Attachment 10 Page 3 of 3 OBDI 202  
Attachment 10 Page 3 of 3 OBDI 202 - I OLE Process GG-2013-11 DRAFT OPERATING TE ST COMMENTS SCENARIO S Scenario Set 1. ES 2. TS 3. Crit 4. IC 5. Pred 6. TL 7. L/C 8. Eff 9. U/E/S 10. Explanation (See below for instructions) 1        S No comments.
- IOLE Process GG-2013-11 DRAFT OPERATING TEST COMMENTS SCENARIOS Scenario Set 1. ES 2. TS 3. Crit 4. IC 5. Pred 6. TL 7. L/C 8. Eff 9. U/E/S 10. Explanation (See below for instructions) 1        S No comments.
2  E      E I don't see any discriminatory value in events 6 or 7.
2  E      E I don't see any discriminatory value in events 6 or 7.
Replace with events requiring operator actions.
Replac e with events requiring operator actions.
3        S No comments.
3        S No comments.
Instructions for Completing Matrix This form is not contained in or required by NUREG
Instructions for Completing Matrix This form is not contained in or required by NUREG
Line 90: Line 86:
: 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
: 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
: 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions. 9. Based on the reviewer
: 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions. 9. Based on the reviewer
=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement),
=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
in need of (E)ditorial enhancement, or (S)atisfactory.
: 10. Provide a brief description of problem in the explanation column.
: 10. Provide a brief description of problem in the explanation column.
: 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.}}
: 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.}}

Revision as of 17:55, 13 July 2018

Grand Gulf-2013-11-Draft Operating Test Comments
ML14017A041
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 11/15/2013
From: Garchow S
Operations Branch IV
To:
Entergy Operations
laura hurley
References
Download: ML14017A041 (3)


Text

Attachment 10 Page 1 of 3 OBDI 202 - I OLE Process GG-2013-11 DRAFT OPERATING TEST COMMENTS ADMIN JPM S JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes

4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)

IC Focus Cues Critical Steps Scope (N/B) Over- lap Job-Link Minutia SRO (A S 1) S 3 S No comments.

SRO (A S2) S 3 S Please send procedure 01

-S-18-6 so I can evaluate this JPM.

JPM is sat.

SRO (A S3) S 3 S No comments.

SRO (A S4) S 2 E Add a third operator to the list of candidates. Also, the JPM should ask the candidate for the basis on why he/she selected the operator SRO (A S5) S 3 S We need to make sure we administer this JPM on a day that all the candidates are in the scenario. Instructions for Completing Matrix This form is not contained in or required by NUREG

-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1

-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.

3. Check the appropriate box when an attribute weakness is identified:

The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.

The JPM does not contain sufficient cues that are objective (not leading).

All critical steps (elements) have not been properly identified.

Scope of the task is either too narrow (N) or too broad (B).

Excessive overlap with other part of operating test or written examination.

4. Check the appropriate box when a job content error is identified:

Topics not linked to job content (e.g., disguised task, not required in real job).

Task is trivial and without safety significance.

5. Based on the reviewer

=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?

6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.

Attachment 10 Page 2 of 3 OBDI 202 - I OLE Process GG-2013-11 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN

-PLANT SYSTEM S JPM S JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes

4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)

IC Focus Cues Critical Steps Scope (N/B) Over- lap Job-Link Minutia CR 1 D 3 S No comments.

CR 2 D 3 S No comments.

CR3 D 3 E E Step 2; Change the cue for the CRS to concur with the candidate to place the vacuum bypass switch in bypass (not direct)

. CR 4 S 3 S No comments.

CR 5 D 3 S No comments.

CR 6 D 3 S No comments.

CR 7 S 3 S No comments.

P S 1 S 3 S No comments. P S 2 S 3 S No comments.

P S 3 S 3 S No comments.

Instructions for Completing Matrix This form is not contained in or required by NUREG

-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1

-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.

3. Check the appropriate box when an attribute weakness is identified:

$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.

$ The JPM does not contain sufficient cues that are objective (not leading).

$ All critical steps (elements) have not been properly identified.

$ Scope of the task is either too narrow (N) or too broad (B).

$ Excessive overlap with other part of operating test or written examination.

4. Check the appropriate box when a job content error is identified:

Topics not linked to job content (e.g., disguised task, not required in real job).

Task is trivial and without safety significance.

5. Based on the reviewer

=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?

6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.

Attachment 10 Page 3 of 3 OBDI 202 - I OLE Process GG-2013-11 DRAFT OPERATING TE ST COMMENTS SCENARIO S Scenario Set 1. ES 2. TS 3. Crit 4. IC 5. Pred 6. TL 7. L/C 8. Eff 9. U/E/S 10. Explanation (See below for instructions) 1 S No comments.

2 E E I don't see any discriminatory value in events 6 or 7.

Replac e with events requiring operator actions.

3 S No comments.

Instructions for Completing Matrix This form is not contained in or required by NUREG

-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. ES: ES-301 checklists 4, 5, & 6 satisfied.
2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES

-D-2. 4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions.

5. Pred: Scenario sequence and other factors avoid predictability issues.
6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions. 9. Based on the reviewer

=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.

10. Provide a brief description of problem in the explanation column.
11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.