{{#Wiki_filter:~Entergy Nuclear Operations, Inc.
{{#Wiki_filter:~Entergy Nuclear Operations, Inc.
Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth.
Nuclear Power Station-E nte--y 600 Rocky Hill Road Plymouth.
MA 02360February 24, 2016U.S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-0001
MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
 
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014  
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements.
,Inspection (ISI/I WE) Program Plan" for the fifth ten-year  
If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely, Manager," Reguilatory'Assurnc EPP/mw  
: interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g),
Inservice Inspection requirements as conditioned by 10 CFR50.55a(b),
Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z),
Alternatives to codes andstandards requirements.
If you have questions concerning this letter, please contact me at (508) 830-8323.
There are no regulatory commitments contained in this letter.Sincerely, Manager,"
Reguilatory'Assurnc EPP/mw


==Enclosure:==
==Enclosure:==


PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project ManagerOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2AWashington, DC 20555NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan(132 Pages)  
Program Plan (132 Pages)  
~Entergy Nuclear Operations, Inc.
~Entergy Nuclear Operations, Inc.
Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth.
Nuclear Power Station-E nte--y 600 Rocky Hill Road Plymouth.
MA 02360February 24, 2016U.S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-0001
MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
 
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014  
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements.
,Inspection (ISI/I WE) Program Plan" for the fifth ten-year  
If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely, Manager," Reguilatory'Assurnc EPP/mw  
: interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g),
Inservice Inspection requirements as conditioned by 10 CFR50.55a(b),
Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z),
Alternatives to codes andstandards requirements.
If you have questions concerning this letter, please contact me at (508) 830-8323.
There are no regulatory commitments contained in this letter.Sincerely, Manager,"
Reguilatory'Assurnc EPP/mw


==Enclosure:==
==Enclosure:==


PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project ManagerOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2AWashington, DC 20555NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan(132 Pages)}}
Program Plan (132 Pages)}}

Revision as of 14:43, 8 July 2018

Pilgrim, Submittal of Fifth Ten-Year Interval Inservice Inspection (Isi/Iwe) Program Plan
ML16067A142
Person / Time
Site: Pilgrim
Issue date: 02/24/2016
From: Perkins E P
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.16.014
Download: ML16067A142 (3)


Text

~Entergy Nuclear Operations, Inc.

Nuclear Power Station-E nte--y 600 Rocky Hill Road Plymouth.

MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014

Dear Sir or Madam:

Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements.

If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely, Manager," Reguilatory'Assurnc EPP/mw

Enclosure:

PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)

Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)

Program Plan (132 Pages)

~Entergy Nuclear Operations, Inc.

Nuclear Power Station-E nte--y 600 Rocky Hill Road Plymouth.

MA 02360 February 24, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.014

Dear Sir or Madam:

Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, Pilgrim Nuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year Interval Inservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began on July 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR 50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007 Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes and standards requirements.

If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely, Manager," Reguilatory'Assurnc EPP/mw

Enclosure:

PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)

Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014 Pilgrim Nuclear Power Station Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014 PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)

Program Plan (132 Pages)