ML18032A066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY ORMATIONDISTRIBUTION SYS1(RIDS)AGCESSION NBR:8302030403 DOC~DATE:83/01/31NOTARIZED:
{{#Wiki_filter:REGULATORY ORMATION DISTRIBUTION SYS 1 (RIDS)AGCESSION NBR:8302030403 DOC~DATE: 83/01/31 NOTARIZED:
YESDOCKETFAOIL:50-387 Susquehanna SteamElectricStation~Uni,tiiPennsylva 05000387AUTHBYNAMEAUTHORAFFILIATION CURTISiNt1'lePennsylvania Power8LightCo~tRECIP~NAMERECIPIENT AFFILIATION
YESDOCKET FAOIL:50-387 Susquehanna Steam Electric Station~Uni,t ii Pennsylva 05000387 AUTH BYNAME AUTHOR AFFILIATION C U R T I S i N t 1'l e Pennsylvania Power 8 Light Co~tREC IP~NAME RECIPIENT AFFILIATION
'SCHKENCEReA, Licensing Branch2
'SCHKENCEReA, Licensing Branch 2


==SUBJECT:==
==SUBJECT:==
Application,to amendLicenseNPF-14~consisting of;proposed Amend18inevisii>g Items2.Ag2,8.(2)82~Co(9)repost".fir edloadinginitialtestprogram,DISTRIBUTION
Application,to amend License NPF-14~consisting of;proposed Amend 18inevisii>g Items 2.Ag2,8.(2)8 2~Co(9)re post".fir ed loading initial test pr ogram, DISTRIBUTION
'CODE:A046SCOPIESRECEIVED:LTR ENCLSIZE~,.llTITLE:ORSubmittal'.
'CODE: A046S COPIES RECEIVED:LTR ENCL SIZE~,.l l TITLE: OR Submittal'.
TblIActionPlanRgmtNUREG-0737 8NUREG0660'OTES 1cyNMSS/FCAF/PM
TblI Action Plan Rgmt NUREG-0737 8 NUREG 0660'OTES 1cy NMSS/FCAF/PM
~RECIPIENT COPIESIDCODE/NAME L'TTRENCLNRRL82BC0177RECIPIENT ID'CODE/NAME
~RECIPIENT COPIES ID CODE/NAME L'TTR ENCL NRR L82 BC 01 7 7 RECIPIENT ID'CODE/NAME
:COPIESLTTRENCL05000387INTERNAL:
:COPIES LTTR ENCL 05000387 INTERNAL: ELD/HDS4 IE/DEP EPDS NRR PANLSON NRR/DL DIR 10 NRR/DL/ADOR 15 NRR/DL/DRAB 18 NRR/DS I/AF8 AB R FI 0$EXTERNAL'CRS 30 INPOgJ,STARNES NRC PDR 02 NT?8 NOTE'S: 1 0 1 1 1 1 1 1 1 1 3"3 1 1 1 1 1 10 10 1 1 1 1 1 1 IE/DEP DIR 33 IE/DEP/EPLB NRR/DHFS/DEPY29 NRR/DL/ADL 16 NRR/DL/ADSA 17 NRR/DSI/ADRS 27 NRR/DS I/ASB NRR/DST DIR 30 RGN1 FEMA REP DIV LPDR 03 NSIC 05 1 1"3 1 1 1 j 1 1 1 1 j 1 1 1 1 2 2 1 1 ,TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 06 Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 I 770-5151 f Norman W.Curtis Vice President-Engineering 8 Construction-Nuclear 215/770-5381 p JAN 31 1983 Director of Nuclear Reactor Regulation Attention:
ELD/HDS4IE/DEPEPDSNRRPANLSONNRR/DLDIR10NRR/DL/ADOR 15NRR/DL/DRAB 18NRR/DSI/AF8ABRFI0$EXTERNAL'CRS 30INPOgJ,STARNES NRCPDR02NT?8NOTE'S:10111111113"3111111010111111IE/DEPDIR33IE/DEP/EPLB NRR/DHFS/DEPY29 NRR/DL/ADL 16NRR/DL/ADSA 17NRR/DSI/ADRS 27NRR/DSI/ASBNRR/DSTDIR30RGN1FEMAREPDIVLPDR03NSIC0511"3111j1111j11112211,TOTALNUMBEROFCOPIESREQUIRED:
Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 Docket No.50-387 FILE 841 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO.18 TO LICENSE NO.NPF-14 ER 100450 PLA-1501  
LTTR47ENCL06 Pennsylvania Power8LightCompanyTwoNorthNinthStreet~Allentown, PA18101~215I770-5151fNormanW.CurtisVicePresident-Engineering 8Construction-Nuclear 215/770-5381pJAN311983DirectorofNuclearReactorRegulation Attention:
Mr.A.Schwencer, ChiefLicensing BranchNo.2DivisionofLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555DocketNo.50-387FILE841SUSQUEHANNA STEAMELECTRICSTATIONPROPOSEDAMENDMENT NO.18TOLICENSENO.NPF-14ER100450PLA-1501


==DearMr.Schwencer:==
==Dear Mr.Schwencer:==


ThepurposeofthisletteristorequestachangetoItems2.A,2.B.2and2.Cs9ofLicenseNo.NPF-14.TheseLicenseConditions shouldreadasfollows:2.AThislicenseappliestotheSusquehanna SteamElectricStation,Unit1,aboilingwaternuclearreactorandassociated equipment (thefacility),
The purpose of this letter is to request a change to Items 2.A, 2.B.2 and 2.Cs9 of License No.NPF-14.These License Conditions should read as follows: 2.A This license applies to the Susquehanna Steam Electric Station, Unit 1, a boiling water nuclear reactor and associated equipment (the facility), owned by the licenses.The facility is located in Luzerne County, Pennsylvania, and is described in the licensees'inal Safety Analysis Report as supplemented and amended through Amendment 53, and the licensees'nvironmental Report as supplemented and amended through Amendment 53.2.B.(2)PP&L, pursuant to the Act of 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as s'upplemented and amended through Amendment 53;2.C.(9)Initial Test Pro ram (Section 14 SER SSER/I1 pp&L shall oonduot the post-fuel-loading initial test pxogram jgd/Gd.st (set forth in Section 14 of the licensee's Final Safety yO Analysis Report, as amended through Amendment 53)without~y300'aking any major modifications of this program unless modifications have been identified and have received prior NRC approval.Major modifications are defined as: 8302030403 830i3i PDR ADOCK 05000387 P , PDR JAN 31 1983 (a)Elimination of any test identified as essential in Section 14 of the licensees'inal Safety Analysis Report, as amended through Amendment 53;(b)Modifications of test objectives, methods or acceptance criteria for any test identified as essential in Section 14 of the Licensee's Final Safety Analysis Report, as amended through Amendment 53;(c)Performance of any test at a power level different from that described in the program;and (d)Failure to complete any tests included in the described program (planned or scheduled for power levels up to the authorized power level).The justification for these changes are contained in the letters which transmitted the amendments to the staff.The letters are as follows: Amendment No.49-PLA-1183, dated 7/9/82 contains Revision No.31 to the FSAR.Amendment No.50-PLA-1196, dated 7/13/82 contains Revision No.L to the Security Plan.Amendment No.51-PLA-1355, dated 10/25/82 contains Revision No.M to the Security Plan.Amendment No.52-dated ll/2/82 contains Revision No.6 to the Emergency Plan.*Amendment No.53-PLA-1434, dated 12/17/82 contains Revision No.32 to the FSAR.The proposed change has been'etermined to be Class IV in nature and the appropriate fee is enclosed.Very truly yours, N.W.Curtis Vice President-Engineering and Construction
ownedbythelicenses.
-Nuclear cc: R.L.Perch-NRC BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of PENNSYLVANIA POWER&LIGHT COMPANY Docket No.50-387 AMENDMENT NO.18 FACILITY OPERATING LICENSE NO.NPF-14 SUSQUEHANNA STEAM ELECTRIC STATION UNIT NO.1 Licensee, Pennsylvania Power&Light Company, hereby files Amendment No.18 to its Facility Operating License No.NPF-14 dated July 17, 1982.This amendment contains revisions to Items 2.A, 3.B.2 and 2.C.9 of the Facility Operating License.PENNSYLVANIA POWER&LIGHT COMPANY BY: N.W.Curtis Vice President-Engineering and Construction
ThefacilityislocatedinLuzerneCounty,Pennsylvania, andisdescribed inthelicensees'inal SafetyAnalysisReportassupplemented andamendedthroughAmendment 53,andthelicensees'nvironmental Reportassupplemented andamendedthroughAmendment 53.2.B.(2)PP&L,pursuanttotheActof10CFRPart70,toreceive,possess,anduseatanytimespecialnuclearmaterialasreactorfuel,inaccordance withthelimitations forstorageandamountsrequiredforreactoroperation, asdescribed intheFinalSafetyAnalysisReport,ass'upplemented andamendedthroughAmendment 53;2.C.(9)InitialTestProram(Section14SERSSER/I1pp&Lshalloonduotthepost-fuel-loading initialtestpxogramjgd/Gd.st(setforthinSection14ofthelicensee's FinalSafetyyOAnalysisReport,asamendedthroughAmendment 53)without~y300'aking anymajormodifications ofthisprogramunlessmodifications havebeenidentified andhavereceivedpriorNRCapproval.
-Nuclear dworg,g.e sobscrdbed before me this+f, 1983.w.g r Notary'.Public MAATHA C.'-BAR/0; Notary Pubfid AIlentow'n, Lehiph County, Pa.My Commission Expires Jan,13,198ti}}
Majormodifications aredefinedas:8302030403 830i3iPDRADOCK05000387P,PDR JAN311983(a)Elimination ofanytestidentified asessential inSection14ofthelicensees'inal SafetyAnalysisReport,asamendedthroughAmendment 53;(b)Modifications oftestobjectives, methodsoracceptance criteriaforanytestidentified asessential inSection14oftheLicensee's FinalSafetyAnalysisReport,asamendedthroughAmendment 53;(c)Performance ofanytestatapowerleveldifferent fromthatdescribed intheprogram;and(d)Failuretocompleteanytestsincludedinthedescribed program(plannedorscheduled forpowerlevelsuptotheauthorized powerlevel).Thejustification forthesechangesarecontained intheletterswhichtransmitted theamendments tothestaff.Thelettersareasfollows:Amendment No.49-PLA-1183, dated7/9/82containsRevisionNo.31totheFSAR.Amendment No.50-PLA-1196, dated7/13/82containsRevisionNo.LtotheSecurityPlan.Amendment No.51-PLA-1355, dated10/25/82containsRevisionNo.MtotheSecurityPlan.Amendment No.52-datedll/2/82containsRevisionNo.6totheEmergency Plan.*Amendment No.53-PLA-1434, dated12/17/82containsRevisionNo.32totheFSAR.Theproposedchangehasbeen'etermined tobeClassIVinnatureandtheappropriate feeisenclosed.
Verytrulyyours,N.W.CurtisVicePresident
-Engineering andConstruction
-Nuclearcc:R.L.Perch-NRC BEFORETHEUNITEDSTATESNUCLEARREGULATORY COMMISSION IntheMatterofPENNSYLVANIA POWER&LIGHTCOMPANYDocketNo.50-387AMENDMENT NO.18FACILITYOPERATING LICENSENO.NPF-14SUSQUEHANNA STEAMELECTRICSTATIONUNITNO.1Licensee, Pennsylvania Power&LightCompany,herebyfilesAmendment No.18toitsFacilityOperating LicenseNo.NPF-14datedJuly17,1982.Thisamendment containsrevisions toItems2.A,3.B.2and2.C.9oftheFacilityOperating License.PENNSYLVANIA POWER&LIGHTCOMPANYBY:N.W.CurtisVicePresident
-Engineering andConstruction
-Nucleardworg,g.e sobscrdbed beforemethis+f,1983.w.grNotary'.PublicMAATHAC.'-BAR/0; NotaryPubfidAIlentow'n, LehiphCounty,Pa.MyCommission ExpiresJan,13,198ti}}

Revision as of 03:03, 6 July 2018

Application to Amend License NPF-14,consisting of Proposed Amend 18,revising Items 2.A,2.B.(2) & 2.C.(9) Re post-fuel Loading Initial Test Program
ML18032A066
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/31/1983
From: CURTIS N W
PENNSYLVANIA POWER & LIGHT CO.
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
PLA-1501, NUDOCS 8302030403
Download: ML18032A066 (4)


Text

REGULATORY ORMATION DISTRIBUTION SYS 1 (RIDS)AGCESSION NBR:8302030403 DOC~DATE: 83/01/31 NOTARIZED:

YESDOCKET FAOIL:50-387 Susquehanna Steam Electric Station~Uni,t ii Pennsylva 05000387 AUTH BYNAME AUTHOR AFFILIATION C U R T I S i N t 1'l e Pennsylvania Power 8 Light Co~tREC IP~NAME RECIPIENT AFFILIATION

'SCHKENCEReA, Licensing Branch 2

SUBJECT:

Application,to amend License NPF-14~consisting of;proposed Amend 18inevisii>g Items 2.Ag2,8.(2)8 2~Co(9)re post".fir ed loading initial test pr ogram, DISTRIBUTION

'CODE: A046S COPIES RECEIVED:LTR ENCL SIZE~,.l l TITLE: OR Submittal'.

TblI Action Plan Rgmt NUREG-0737 8 NUREG 0660'OTES 1cy NMSS/FCAF/PM

~RECIPIENT COPIES ID CODE/NAME L'TTR ENCL NRR L82 BC 01 7 7 RECIPIENT ID'CODE/NAME

COPIES LTTR ENCL 05000387 INTERNAL: ELD/HDS4 IE/DEP EPDS NRR PANLSON NRR/DL DIR 10 NRR/DL/ADOR 15 NRR/DL/DRAB 18 NRR/DS I/AF8 AB R FI 0$EXTERNAL'CRS 30 INPOgJ,STARNES NRC PDR 02 NT?8 NOTE'S: 1 0 1 1 1 1 1 1 1 1 3"3 1 1 1 1 1 10 10 1 1 1 1 1 1 IE/DEP DIR 33 IE/DEP/EPLB NRR/DHFS/DEPY29 NRR/DL/ADL 16 NRR/DL/ADSA 17 NRR/DSI/ADRS 27 NRR/DS I/ASB NRR/DST DIR 30 RGN1 FEMA REP DIV LPDR 03 NSIC 05 1 1"3 1 1 1 j 1 1 1 1 j 1 1 1 1 2 2 1 1 ,TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 06 Pennsylvania Power 8 Light Company Two North Ninth Street~Allentown, PA 18101~215 I 770-5151 f Norman W.Curtis Vice President-Engineering 8 Construction-Nuclear 215/770-5381 p JAN 31 1983 Director of Nuclear Reactor Regulation Attention:

Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 Docket No.50-387 FILE 841 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO.18 TO LICENSE NO.NPF-14 ER 100450 PLA-1501

Dear Mr.Schwencer:

The purpose of this letter is to request a change to Items 2.A, 2.B.2 and 2.Cs9 of License No.NPF-14.These License Conditions should read as follows: 2.A This license applies to the Susquehanna Steam Electric Station, Unit 1, a boiling water nuclear reactor and associated equipment (the facility), owned by the licenses.The facility is located in Luzerne County, Pennsylvania, and is described in the licensees'inal Safety Analysis Report as supplemented and amended through Amendment 53, and the licensees'nvironmental Report as supplemented and amended through Amendment 53.2.B.(2)PP&L, pursuant to the Act of 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as s'upplemented and amended through Amendment 53;2.C.(9)Initial Test Pro ram (Section 14 SER SSER/I1 pp&L shall oonduot the post-fuel-loading initial test pxogram jgd/Gd.st (set forth in Section 14 of the licensee's Final Safety yO Analysis Report, as amended through Amendment 53)without~y300'aking any major modifications of this program unless modifications have been identified and have received prior NRC approval.Major modifications are defined as: 8302030403 830i3i PDR ADOCK 05000387 P , PDR JAN 31 1983 (a)Elimination of any test identified as essential in Section 14 of the licensees'inal Safety Analysis Report, as amended through Amendment 53;(b)Modifications of test objectives, methods or acceptance criteria for any test identified as essential in Section 14 of the Licensee's Final Safety Analysis Report, as amended through Amendment 53;(c)Performance of any test at a power level different from that described in the program;and (d)Failure to complete any tests included in the described program (planned or scheduled for power levels up to the authorized power level).The justification for these changes are contained in the letters which transmitted the amendments to the staff.The letters are as follows: Amendment No.49-PLA-1183, dated 7/9/82 contains Revision No.31 to the FSAR.Amendment No.50-PLA-1196, dated 7/13/82 contains Revision No.L to the Security Plan.Amendment No.51-PLA-1355, dated 10/25/82 contains Revision No.M to the Security Plan.Amendment No.52-dated ll/2/82 contains Revision No.6 to the Emergency Plan.*Amendment No.53-PLA-1434, dated 12/17/82 contains Revision No.32 to the FSAR.The proposed change has been'etermined to be Class IV in nature and the appropriate fee is enclosed.Very truly yours, N.W.Curtis Vice President-Engineering and Construction

-Nuclear cc: R.L.Perch-NRC BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of PENNSYLVANIA POWER&LIGHT COMPANY Docket No.50-387 AMENDMENT NO.18 FACILITY OPERATING LICENSE NO.NPF-14 SUSQUEHANNA STEAM ELECTRIC STATION UNIT NO.1 Licensee, Pennsylvania Power&Light Company, hereby files Amendment No.18 to its Facility Operating License No.NPF-14 dated July 17, 1982.This amendment contains revisions to Items 2.A, 3.B.2 and 2.C.9 of the Facility Operating License.PENNSYLVANIA POWER&LIGHT COMPANY BY: N.W.Curtis Vice President-Engineering and Construction

-Nuclear dworg,g.e sobscrdbed before me this+f, 1983.w.g r Notary'.Public MAATHA C.'-BAR/0; Notary Pubfid AIlentow'n, Lehiph County, Pa.My Commission Expires Jan,13,198ti