ML15099A580: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UFUNIVERSITY ofUFFLRDCollege of EngineeringUF Training Reactor FacilityPO Box 118300Gainesville, FL 32611-8300352-294-2104bshea@ufl.eduMarch 25, 2015U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D.C. 20555-0001
{{#Wiki_filter:UFUNIVERSITY ofUFFLRDCollege of Engineering UF Training Reactor FacilityPO Box 118300Gainesville, FL 32611-8300 352-294-2104 bshea@ufl.edu March 25, 2015U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, D.C. 20555-0001


==Subject:==
==Subject:==
Security Plan Change,10 CFR 50.54(p)UFTR Operating License R-56, Docket 50-83s Performed Under 10 CFR 50.54(p)NOTICE: When separated from Safeguards Information designated as SafeguardsInformation -Modified Handling attachment, this document is decontrolledprovided the transmittal document does not otherwise warrant protection fromunauthorized disclosure.The UFTR has revised its Security Plan. A report of the changes is attached.The revisions have been reviewed and approved by UFTR management and by the ExecutiveCommittee of the Reactor Safety Review Subcommittee.The changes have been evaluated for impact on security effectiveness and the determinationmade that no loss of security effectiveness results from these changes.I declare under penalty of perjury that the foregoing and attached are true and correct to myknowledge.Executed on March 25, 2015.-EiýBrian SheaReactor Managercc: Dean -College of EngineeringReactor Safety Review SubcommitteeUFTR Facility DirectorUFTR Reactor ManagerUFTR Licensing CoordinatorThe Foundation for The Gator NationAn Equal Opportunity Institution~~c~cI}}
 
Security Plan Change,10 CFR 50.54(p)UFTR Operating License R-56, Docket 50-83s Performed Under 10 CFR 50.54(p)NOTICE: When separated from Safeguards Information designated as Safeguards Information
-Modified Handling attachment, this document is decontrolled provided the transmittal document does not otherwise warrant protection fromunauthorized disclosure.
The UFTR has revised its Security Plan. A report of the changes is attached.
The revisions have been reviewed and approved by UFTR management and by the Executive Committee of the Reactor Safety Review Subcommittee.
The changes have been evaluated for impact on security effectiveness and the determination made that no loss of security effectiveness results from these changes.I declare under penalty of perjury that the foregoing and attached are true and correct to myknowledge.
Executed on March 25, 2015.-EiýBrian SheaReactor Managercc: Dean -College of Engineering Reactor Safety Review Subcommittee UFTR Facility DirectorUFTR Reactor ManagerUFTR Licensing Coordinator The Foundation for The Gator NationAn Equal Opportunity Institution
~~c~cI}}

Revision as of 03:03, 1 July 2018

Security Plan Changes Performed Under 10 CFR 50.54(P)
ML15099A580
Person / Time
Site: 05000083
Issue date: 03/25/2015
From: Shea B C
Univ Of Florida, Gainesville
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML15099A580 (1)


Text

UFUNIVERSITY ofUFFLRDCollege of Engineering UF Training Reactor FacilityPO Box 118300Gainesville, FL 32611-8300 352-294-2104 bshea@ufl.edu March 25, 2015U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, D.C. 20555-0001

Subject:

Security Plan Change,10 CFR 50.54(p)UFTR Operating License R-56, Docket 50-83s Performed Under 10 CFR 50.54(p)NOTICE: When separated from Safeguards Information designated as Safeguards Information

-Modified Handling attachment, this document is decontrolled provided the transmittal document does not otherwise warrant protection fromunauthorized disclosure.

The UFTR has revised its Security Plan. A report of the changes is attached.

The revisions have been reviewed and approved by UFTR management and by the Executive Committee of the Reactor Safety Review Subcommittee.

The changes have been evaluated for impact on security effectiveness and the determination made that no loss of security effectiveness results from these changes.I declare under penalty of perjury that the foregoing and attached are true and correct to myknowledge.

Executed on March 25, 2015.-EiýBrian SheaReactor Managercc: Dean -College of Engineering Reactor Safety Review Subcommittee UFTR Facility DirectorUFTR Reactor ManagerUFTR Licensing Coordinator The Foundation for The Gator NationAn Equal Opportunity Institution

~~c~cI