ML16067A142: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~Entergy Nuclear Operations, Inc.Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth. MA 02360February 24, 2016U.S. Nuclear Regulatory | {{#Wiki_filter:~Entergy Nuclear Operations, Inc. | ||
Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth. | |||
MA 02360February 24, 2016U.S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014 | |||
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | |||
Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes andstandards requirements.If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely,Manager," Reguilatory' | Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice | ||
,Inspection (ISI/I WE) Program Plan" for the fifth ten-year | |||
: interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g), | |||
Inservice Inspection requirements as conditioned by 10 CFR50.55a(b), | |||
Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), | |||
Alternatives to codes andstandards requirements. | |||
If you have questions concerning this letter, please contact me at (508) 830-8323. | |||
There are no regulatory commitments contained in this letter.Sincerely, Manager," | |||
Reguilatory'Assurnc EPP/mw | |||
==Enclosure:== | ==Enclosure:== | ||
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory | |||
~Entergy Nuclear Operations, Inc.Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth. MA 02360February 24, 2016U.S. Nuclear Regulatory | PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | ||
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project ManagerOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2AWashington, DC 20555NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | |||
Program Plan(132 Pages) | |||
~Entergy Nuclear Operations, Inc. | |||
Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth. | |||
MA 02360February 24, 2016U.S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014 | |||
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | |||
Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice ,Inspection (ISI/I WE) Program Plan" for the fifth ten-year interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g), Inservice Inspection requirements as conditioned by 10 CFR50.55a(b), Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), Alternatives to codes andstandards requirements.If you have questions concerning this letter, please contact me at (508) 830-8323.There are no regulatory commitments contained in this letter.Sincerely,Manager," Reguilatory' | Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice | ||
,Inspection (ISI/I WE) Program Plan" for the fifth ten-year | |||
: interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g), | |||
Inservice Inspection requirements as conditioned by 10 CFR50.55a(b), | |||
Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z), | |||
Alternatives to codes andstandards requirements. | |||
If you have questions concerning this letter, please contact me at (508) 830-8323. | |||
There are no regulatory commitments contained in this letter.Sincerely, Manager," | |||
Reguilatory'Assurnc EPP/mw | |||
==Enclosure:== | ==Enclosure:== | ||
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory | |||
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | |||
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project ManagerOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2AWashington, DC 20555NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) | |||
Program Plan(132 Pages)}} |
Revision as of 12:15, 30 June 2018
ML16067A142 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 02/24/2016 |
From: | Perkins E P Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2.16.014 | |
Download: ML16067A142 (3) | |
Text
~Entergy Nuclear Operations, Inc.
Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth.
MA 02360February 24, 2016U.S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-0001
SUBJECT:
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014
Dear Sir or Madam:
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice
,Inspection (ISI/I WE) Program Plan" for the fifth ten-year
- interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g),
Inservice Inspection requirements as conditioned by 10 CFR50.55a(b),
Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z),
Alternatives to codes andstandards requirements.
If you have questions concerning this letter, please contact me at (508) 830-8323.
There are no regulatory commitments contained in this letter.Sincerely, Manager,"
Reguilatory'Assurnc EPP/mw
Enclosure:
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project ManagerOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2AWashington, DC 20555NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan(132 Pages)
~Entergy Nuclear Operations, Inc.
Nuclear Power Station-E nte--y 600 Rocky Hill RoadPlymouth.
MA 02360February 24, 2016U.S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-0001
SUBJECT:
Submittal of PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program PlanPilgrim Nuclear Power StationDocket No. 50-293Renewed License No. DPR-35LETTER NUMBER: 2.16.014
Dear Sir or Madam:
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a, Codes and Standards, PilgrimNuclear Power Station (PNPS) hereby submits the enclosed "PNPS Fifth Ten-Year IntervalInservice
,Inspection (ISI/I WE) Program Plan" for the fifth ten-year
- interval, which began onJuly 1, 2015.Pursuant to 10 CFR 50.55a(g),
Inservice Inspection requirements as conditioned by 10 CFR50.55a(b),
Use and conditions on the use of standards, the PNPS plan will comply with theAmerican Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 2007Edition through the 2008 Addenda as altered by 10 CFR 50.55a(z),
Alternatives to codes andstandards requirements.
If you have questions concerning this letter, please contact me at (508) 830-8323.
There are no regulatory commitments contained in this letter.Sincerely, Manager,"
Reguilatory'Assurnc EPP/mw
Enclosure:
PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan Entergy Nuclear Operations, Inc. Letter No. 2.16.014Pilgrim Nuclear Power Station Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project ManagerOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2AWashington, DC 20555NRC Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure Letter Number 2.16.014PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE)
Program Plan(132 Pages)