{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Chawla, MaheshSent:Monday, March 21, 2016 4:49 PMTo:Woyak, Bryan (Bryan.Woyak@nexteraenergy.com); michael.millen@nexteraenergy.com; Locke, Kim (Kim.Locke@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com)Cc:Nold, David; Dennig, Robert; Hardgrove, Matthew; Oesterle, Eric; Edmonds, Shavon; Zimmerman, Jacob; West, Khadijah; Elliott, Robert; Sweat, Tarico; Casto, Greg; Oliver, David; Barclay, Kevin; Cameron, Jamnes; Rutkowski, John; Wrona, David; Bloom, Steven; Parillo, John; Shoop, Undine
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Chawla, Mahesh Sent:Monday, March 21, 2016 4:49 PM To:Woyak, Bryan (Bryan.Woyak@nexteraenergy.com); michael.millen@nexteraenergy.com; Locke, Kim (Kim.Locke@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com)
Cc:Nold, David; Dennig, Robert; Hardgrove, Matthew; Oesterle, Eric; Edmonds, Shavon; Zimmerman, Jacob; West, Khadijah; Elliott, Robert; Sweat, Tarico; Casto, Greg; Oliver,  
 
David; Barclay, Kevin; Cameron, Jamnes; Ru tkowski, John; Wrona, David; Bloom, Steven; Parillo, John; Shoop, Undine


==Subject:==
==Subject:==
LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353By letter dated February 12, 2016 (ADAMS Accession No. ML16043A217), NextEra Energy Point Beach, LLC (the licensee) submitted a license amendment request for Point Beach Nuclear Point Units 1 and 2 (PBNP). The proposed amendment requests to revise the facility operating licenses and the technical specifications (TS) for Point Beach Units 1 and 2. The proposed changes remove license conditions that have been completed and are no longer in effect and revise a charcoal testing criterion for the control room emergency filtration system.  
LIC-109 Acceptance Review - Point Beach Un its 1 and 2 - License Amendment Request 280, Removal of Completed License Conditio ns and Change to the Ventilation Filter Testing Program - MF7352/7353By letter dated February 12, 2016 (ADAMS Accession No. ML16043A217), NextEra Energy Point Beach, LLC (the licensee) submitted a license amendment request for Point Beach Nuclear Point Units 1 and 2 (PBNP). The proposed amendment requests to revise the facility operating licenses and the technical specifications (TS) for Point Beach Units 1 and 2. The proposed changes remove license conditions that have been completed and are no longer in effect and revise a charcoal testing criterion for the control room emergency filtration system.  


The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  


Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me @ (301) 415-8371 or Mahesh.chawla@nrc.gov Thanks  Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov  
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me @ (301) 415-8371 or Mahesh.chawla@nrc.gov Thanks  Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov  


Hearing Identifier:  NRR_PMDA Email Number:  2723  Mail Envelope Properties  (Mahesh.Chawla@nrc.gov20160321164900)  
Hearing Identifier:  NRR_PMDA Email Number:  2723  Mail Envelope Properties  (Mahesh.Chawla@nrc.gov20160321164900)


==Subject:==
==Subject:==
LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353 Sent Date:  3/21/2016 4:49:16 PM  Received Date:  3/21/2016 4:49:00 PM From:    Chawla, Mahesh Created By:  Mahesh.Chawla@nrc.gov Recipients:    "Nold, David" <David.Nold@nrc.gov>  Tracking Status: None  "Dennig, Robert" <Robert.Dennig@nrc.gov>  Tracking Status: None "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov>  Tracking Status: None  "Oesterle, Eric" <Eric.Oesterle@nrc.gov>
LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353 Sent Date:  3/21/2016 4:49:16 PM  Received Date:  3/21/2016 4:49:00 PM From:    Chawla, Mahesh Created By:  Mahesh.Chawla@nrc.gov  
 
Recipients:    "Nold, David" <David.Nold@nrc.gov>  Tracking Status: None  "Dennig, Robert" <Robert.Dennig@nrc.gov>  Tracking Status: None "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov>  Tracking Status: None  "Oesterle, Eric" <Eric.Oesterle@nrc.gov>
Tracking Status: None  "Edmonds, Shavon" <Shavon.Edmonds@nrc.gov>  Tracking Status: None "Zimmerman, Jacob" <Jacob.Zimmerman@nrc.gov>  Tracking Status: None  "West, Khadijah" <Khadijah.West@nrc.gov>
Tracking Status: None  "Edmonds, Shavon" <Shavon.Edmonds@nrc.gov>  Tracking Status: None "Zimmerman, Jacob" <Jacob.Zimmerman@nrc.gov>  Tracking Status: None  "West, Khadijah" <Khadijah.West@nrc.gov>
Tracking Status: None  "Elliott, Robert" <Robert.Elliott@nrc.gov>  Tracking Status: None  "Sweat, Tarico" <Tarico.Sweat@nrc.gov>  Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>  Tracking Status: None  "Oliver, David" <David.Oliver@nrc.gov>
Tracking Status: None  "Elliott, Robert" <Robert.Elliott@nrc.gov>  Tracking Status: None  "Sweat, Tarico" <Tarico.Sweat@nrc.gov>  Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>  Tracking Status: None  "Oliver, David" <David.Oliver@nrc.gov>
Tracking Status: None  "Barclay, Kevin" <Kevin.Barclay@nrc.gov>  Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>  Tracking Status: None  "Rutkowski, John" <John.Rutkowski@nrc.gov>
Tracking Status: None  "Barclay, Kevin" <Kevin.Barclay@nrc.gov>  Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>  Tracking Status: None  "Rutkowski, John" <John.Rutkowski@nrc.gov>
Tracking Status: None  "Wrona, David" <David.Wrona@nrc.gov>  Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>  Tracking Status: None  "Parillo, John" <John.Parillo@nrc.gov>
Tracking Status: None  "Wrona, David" <David.Wrona@nrc.gov>  Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>  Tracking Status: None  "Parillo, John" <John.Parillo@nrc.gov>
Tracking Status: None  "Shoop, Undine" <Undine.Shoop@nrc.gov>  Tracking Status: None  "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com>  Tracking Status: None "michael.millen@nexteraenergy.com" <michael.millen@nexteraenergy.com>
Tracking Status: None  "Shoop, Undine" <Undine.Shoop@nrc.gov>  Tracking Status: None  "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com>  Tracking Status: None
Tracking Status: None  "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com>  Tracking Status: None  "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2365      3/21/2016 4:49:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
 
1NRR-PMDAPEm ResourceFrom:Chawla, MaheshSent:Monday, March 21, 2016 4:49 PMTo:Woyak, Bryan (Bryan.Woyak@nexteraenergy.com); michael.millen@nexteraenergy.com; Locke, Kim (Kim.Locke@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com)Cc:Nold, David; Dennig, Robert; Hardgrove, Matthew; Oesterle, Eric; Edmonds, Shavon; Zimmerman, Jacob; West, Khadijah; Elliott, Robert; Sweat, Tarico; Casto, Greg; Oliver, David; Barclay, Kevin; Cameron, Jamnes; Rutkowski, John; Wrona, David; Bloom, Steven; Parillo, John; Shoop, Undine
"michael.millen@nexteraene rgy.com" <michael.millen@nexteraenergy.com>
Tracking Status: None  "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com>  Tracking Status: None  "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2365      3/21/2016 4:49:00 PM
 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
1NRR-PMDAPEm Resource From:Chawla, Mahesh Sent:Monday, March 21, 2016 4:49 PM To:Woyak, Bryan (Bryan.Woyak@nexteraenergy.com); michael.millen@nexteraenergy.com; Locke, Kim (Kim.Locke@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com)
Cc:Nold, David; Dennig, Robert; Hardgrove, Matthew; Oesterle, Eric; Edmonds, Shavon; Zimmerman, Jacob; West, Khadijah; Elliott, Robert; Sweat, Tarico; Casto, Greg; Oliver,  
 
David; Barclay, Kevin; Cameron, Jamnes; Ru tkowski, John; Wrona, David; Bloom, Steven; Parillo, John; Shoop, Undine


==Subject:==
==Subject:==
LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353By letter dated February 12, 2016 (ADAMS Accession No. ML16043A217), NextEra Energy Point Beach, LLC (the licensee) submitted a license amendment request for Point Beach Nuclear Point Units 1 and 2 (PBNP). The proposed amendment requests to revise the facility operating licenses and the technical specifications (TS) for Point Beach Units 1 and 2. The proposed changes remove license conditions that have been completed and are no longer in effect and revise a charcoal testing criterion for the control room emergency filtration system.  
LIC-109 Acceptance Review - Point Beach Un its 1 and 2 - License Amendment Request 280, Removal of Completed License Conditio ns and Change to the Ventilation Filter Testing Program - MF7352/7353By letter dated February 12, 2016 (ADAMS Accession No. ML16043A217), NextEra Energy Point Beach, LLC (the licensee) submitted a license amendment request for Point Beach Nuclear Point Units 1 and 2 (PBNP). The proposed amendment requests to revise the facility operating licenses and the technical specifications (TS) for Point Beach Units 1 and 2. The proposed changes remove license conditions that have been completed and are no longer in effect and revise a charcoal testing criterion for the control room emergency filtration system.  


The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  


Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me @ (301) 415-8371 or Mahesh.chawla@nrc.gov Thanks  Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov  
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me @ (301) 415-8371 or Mahesh.chawla@nrc.gov Thanks  Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov  


Hearing Identifier:  NRR_PMDA Email Number:  2723  Mail Envelope Properties  (Mahesh.Chawla@nrc.gov20160321164900)  
Hearing Identifier:  NRR_PMDA Email Number:  2723  Mail Envelope Properties  (Mahesh.Chawla@nrc.gov20160321164900)


==Subject:==
==Subject:==
LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353 Sent Date:  3/21/2016 4:49:16 PM  Received Date:  3/21/2016 4:49:00 PM From:    Chawla, Mahesh Created By:  Mahesh.Chawla@nrc.gov Recipients:    "Nold, David" <David.Nold@nrc.gov>  Tracking Status: None  "Dennig, Robert" <Robert.Dennig@nrc.gov>  Tracking Status: None "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov>  Tracking Status: None  "Oesterle, Eric" <Eric.Oesterle@nrc.gov>
LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353 Sent Date:  3/21/2016 4:49:16 PM  Received Date:  3/21/2016 4:49:00 PM From:    Chawla, Mahesh Created By:  Mahesh.Chawla@nrc.gov  
 
Recipients:    "Nold, David" <David.Nold@nrc.gov>  Tracking Status: None  "Dennig, Robert" <Robert.Dennig@nrc.gov>  Tracking Status: None "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov>  Tracking Status: None  "Oesterle, Eric" <Eric.Oesterle@nrc.gov>
Tracking Status: None  "Edmonds, Shavon" <Shavon.Edmonds@nrc.gov>  Tracking Status: None "Zimmerman, Jacob" <Jacob.Zimmerman@nrc.gov>  Tracking Status: None  "West, Khadijah" <Khadijah.West@nrc.gov>
Tracking Status: None  "Edmonds, Shavon" <Shavon.Edmonds@nrc.gov>  Tracking Status: None "Zimmerman, Jacob" <Jacob.Zimmerman@nrc.gov>  Tracking Status: None  "West, Khadijah" <Khadijah.West@nrc.gov>
Tracking Status: None  "Elliott, Robert" <Robert.Elliott@nrc.gov>  Tracking Status: None  "Sweat, Tarico" <Tarico.Sweat@nrc.gov>  Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>  Tracking Status: None  "Oliver, David" <David.Oliver@nrc.gov>
Tracking Status: None  "Elliott, Robert" <Robert.Elliott@nrc.gov>  Tracking Status: None  "Sweat, Tarico" <Tarico.Sweat@nrc.gov>  Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>  Tracking Status: None  "Oliver, David" <David.Oliver@nrc.gov>
Tracking Status: None  "Barclay, Kevin" <Kevin.Barclay@nrc.gov>  Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>  Tracking Status: None  "Rutkowski, John" <John.Rutkowski@nrc.gov>
Tracking Status: None  "Barclay, Kevin" <Kevin.Barclay@nrc.gov>  Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>  Tracking Status: None  "Rutkowski, John" <John.Rutkowski@nrc.gov>
Tracking Status: None  "Wrona, David" <David.Wrona@nrc.gov>  Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>  Tracking Status: None  "Parillo, John" <John.Parillo@nrc.gov>
Tracking Status: None  "Wrona, David" <David.Wrona@nrc.gov>  Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>  Tracking Status: None  "Parillo, John" <John.Parillo@nrc.gov>
Tracking Status: None  "Shoop, Undine" <Undine.Shoop@nrc.gov>  Tracking Status: None  "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com>  Tracking Status: None "michael.millen@nexteraenergy.com" <michael.millen@nexteraenergy.com>
Tracking Status: None  "Shoop, Undine" <Undine.Shoop@nrc.gov>  Tracking Status: None  "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com>  Tracking Status: None
Tracking Status: None  "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com>  Tracking Status: None  "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2365      3/21/2016 4:49:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}
 
"michael.millen@nexteraene rgy.com" <michael.millen@nexteraenergy.com>
Tracking Status: None  "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com>  Tracking Status: None  "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2365      3/21/2016 4:49:00 PM
 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 11:46, 30 June 2018

2016/03/21 NRR E-mail Capture - LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353
ML16082A030
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/21/2016
From: Chawla M L
Plant Licensing Branch III
To: Woyak B
Point Beach
References
MF7352, MF7353
Download: ML16082A030 (3)


Text

1NRR-PMDAPEm Resource From:Chawla, Mahesh Sent:Monday, March 21, 2016 4:49 PM To:Woyak, Bryan (Bryan.Woyak@nexteraenergy.com); michael.millen@nexteraenergy.com; Locke, Kim (Kim.Locke@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com)

Cc:Nold, David; Dennig, Robert; Hardgrove, Matthew; Oesterle, Eric; Edmonds, Shavon; Zimmerman, Jacob; West, Khadijah; Elliott, Robert; Sweat, Tarico; Casto, Greg; Oliver,

David; Barclay, Kevin; Cameron, Jamnes; Ru tkowski, John; Wrona, David; Bloom, Steven; Parillo, John; Shoop, Undine

Subject:

LIC-109 Acceptance Review - Point Beach Un its 1 and 2 - License Amendment Request 280, Removal of Completed License Conditio ns and Change to the Ventilation Filter Testing Program - MF7352/7353By letter dated February 12, 2016 (ADAMS Accession No. ML16043A217), NextEra Energy Point Beach, LLC (the licensee) submitted a license amendment request for Point Beach Nuclear Point Units 1 and 2 (PBNP). The proposed amendment requests to revise the facility operating licenses and the technical specifications (TS) for Point Beach Units 1 and 2. The proposed changes remove license conditions that have been completed and are no longer in effect and revise a charcoal testing criterion for the control room emergency filtration system.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me @ (301) 415-8371 or Mahesh.chawla@nrc.gov Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 2723 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20160321164900)

Subject:

LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353 Sent Date: 3/21/2016 4:49:16 PM Received Date: 3/21/2016 4:49:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov

Recipients: "Nold, David" <David.Nold@nrc.gov> Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov> Tracking Status: None "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov> Tracking Status: None "Oesterle, Eric" <Eric.Oesterle@nrc.gov>

Tracking Status: None "Edmonds, Shavon" <Shavon.Edmonds@nrc.gov> Tracking Status: None "Zimmerman, Jacob" <Jacob.Zimmerman@nrc.gov> Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov>

Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov> Tracking Status: None "Sweat, Tarico" <Tarico.Sweat@nrc.gov> Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov> Tracking Status: None "Oliver, David" <David.Oliver@nrc.gov>

Tracking Status: None "Barclay, Kevin" <Kevin.Barclay@nrc.gov> Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov> Tracking Status: None "Rutkowski, John" <John.Rutkowski@nrc.gov>

Tracking Status: None "Wrona, David" <David.Wrona@nrc.gov> Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov> Tracking Status: None "Parillo, John" <John.Parillo@nrc.gov>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov> Tracking Status: None "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com> Tracking Status: None

"michael.millen@nexteraene rgy.com" <michael.millen@nexteraenergy.com>

Tracking Status: None "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com> Tracking Status: None "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2365 3/21/2016 4:49:00 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

1NRR-PMDAPEm Resource From:Chawla, Mahesh Sent:Monday, March 21, 2016 4:49 PM To:Woyak, Bryan (Bryan.Woyak@nexteraenergy.com); michael.millen@nexteraenergy.com; Locke, Kim (Kim.Locke@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com)

Cc:Nold, David; Dennig, Robert; Hardgrove, Matthew; Oesterle, Eric; Edmonds, Shavon; Zimmerman, Jacob; West, Khadijah; Elliott, Robert; Sweat, Tarico; Casto, Greg; Oliver,

David; Barclay, Kevin; Cameron, Jamnes; Ru tkowski, John; Wrona, David; Bloom, Steven; Parillo, John; Shoop, Undine

Subject:

LIC-109 Acceptance Review - Point Beach Un its 1 and 2 - License Amendment Request 280, Removal of Completed License Conditio ns and Change to the Ventilation Filter Testing Program - MF7352/7353By letter dated February 12, 2016 (ADAMS Accession No. ML16043A217), NextEra Energy Point Beach, LLC (the licensee) submitted a license amendment request for Point Beach Nuclear Point Units 1 and 2 (PBNP). The proposed amendment requests to revise the facility operating licenses and the technical specifications (TS) for Point Beach Units 1 and 2. The proposed changes remove license conditions that have been completed and are no longer in effect and revise a charcoal testing criterion for the control room emergency filtration system.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me @ (301) 415-8371 or Mahesh.chawla@nrc.gov Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 2723 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20160321164900)

Subject:

LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353 Sent Date: 3/21/2016 4:49:16 PM Received Date: 3/21/2016 4:49:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov

Recipients: "Nold, David" <David.Nold@nrc.gov> Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov> Tracking Status: None "Hardgrove, Matthew" <Matthew.Hardgrove@nrc.gov> Tracking Status: None "Oesterle, Eric" <Eric.Oesterle@nrc.gov>

Tracking Status: None "Edmonds, Shavon" <Shavon.Edmonds@nrc.gov> Tracking Status: None "Zimmerman, Jacob" <Jacob.Zimmerman@nrc.gov> Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov>

Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov> Tracking Status: None "Sweat, Tarico" <Tarico.Sweat@nrc.gov> Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov> Tracking Status: None "Oliver, David" <David.Oliver@nrc.gov>

Tracking Status: None "Barclay, Kevin" <Kevin.Barclay@nrc.gov> Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov> Tracking Status: None "Rutkowski, John" <John.Rutkowski@nrc.gov>

Tracking Status: None "Wrona, David" <David.Wrona@nrc.gov> Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov> Tracking Status: None "Parillo, John" <John.Parillo@nrc.gov>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov> Tracking Status: None "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com> Tracking Status: None

"michael.millen@nexteraene rgy.com" <michael.millen@nexteraenergy.com>

Tracking Status: None "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com> Tracking Status: None "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2365 3/21/2016 4:49:00 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: