ML17013A250: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:From:Parrott, JackTo:chris.recchia@state.vt.us; Brian.Monson@deq.idaho.govCc:anthony.leshinskie@state.vt.us; william.irwin@state.vt.us; Tifft, Doug; Watson, Bruce; Powell, Raymond; Maier,Bill
{{#Wiki_filter:From:Parrott, Jack To:chris.recchia@state.vt.us
; Brian.Monson@deq.idaho.gov Cc:anthony.leshinskie@state.vt.us
; william.irwin@state.vt.us
; Tifft, Doug
; Watson, Bruce
; Powell, Raymond
; Maier,Bill


==Subject:==
==Subject:==
Vermont Yankee request to NRC for alternate disposal of wasteDate:Monday, December 12, 2016 4:46:00 PMAttachments:Draft final EA.pdfDraft final SER.pdf
Vermont Yankee request to NRC for alternate disposal of waste Date:Monday, December 12, 2016 4:46:00 PM Attachments:
Draft final EA.pdf Draft final SER.pdf


==Dear Mr. Recchia and Mr. Monson,==
==Dear Mr. Recchia and Mr. Monson,==


By letter dated January 14, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16029A071), Entergy Nuclear Operators, Inc (ENO) submitted a request for NRC approval of alternate disposal of waste from the Vermont Yankee Power Station (VY) at the U.S. Ecology Idaho (USEI) facility in accordance with 10 CFR 20.2002. The USEI facility is a Resource Conservation and Recovery Act Subtitle C hazardous waste disposal facility permitted by the State of Idaho. The USEI facility is not an NRC-licensed disposal facility. By letter dated March 22, 2016 (ML16077A345), NRCstaff requested additional information from ENO to complete review of the request. On June 28, 2016, ENO submitted responses to the NRC staff's request for information (ML16182A035), and on August 11, 2016, ENO provided additional information to the NRC (ML16231A028).
By letter dated January 14, 2016 (Agencywide Documents Access and Management


The waste included in this 20.2002 request consists of approximately 200,000 gallons of water associated with the decommissioning of VY and contains low concentrations of fission and activation products resulting from VY operations. The waste will be transported from VY to USEI in tanker trucks, and the water will be solidified with clay at USEI prior to disposal.
System (ADAMS) Accession No. ML16029A071), Entergy Nuclear Operators, Inc (ENO)


To obtain approval for 20.2002 alternate disposals, the NRC requires the licensee to demonstrate that doses will be maintained as low as reasonably achievable (ALARA). The NRC has determined that for 20.2002 alternate disposal approvals this limit requires a licensee to demonstrate that the dose to a member of the public (including all exposure groups) is no more than "a few millirem per year."
submitted a request for NRC approval of alternate disposal of waste from the Vermont


USEI also submitted a letter on January 14, 2016 (ML16021A173), requesting an exemption from the licensing requirements of 10 CFR 30.3 to allow for the transfer of the waste containing byproduct material to USEI and disposal of the byproduct material at the USEI facility. Specific exemptions to the licensing requirements of 10 CFR 30.3 are provided for under 10 CFR 30.11. When evaluating 10 CFR 30.11 exemption requests in conjunction with 20.2002 alternative disposal requests, the NRC has applied a similar standard to both reviews. As discussed above, the NRC applies a dose standard of "not more than a few millirem per year" to any member of the public to its 20.2002 alternate disposal reviews.
Yankee Power Station (VY) at the U.S. Ecology Idaho (USEI) facility in accordance with 10


Our internal guidance on processing such requests indicates that as part of enhanced outreach we send a draft of the final EA and SER to the State where the disposal will take place, as well as the State where the licensee is located, for a 30-day comment period.
CFR 20.2002.
The USEI facility is a Resource Conservation and Recovery Act Subtitle C


Please see the attached draft final NRC EA and SER for your review. Let me know if you have any questions.
hazardous waste disposal facility permitted by the State of Idaho.
Sincerely, Jack D. ParrottSenior Project Manager US Nuclear Regulatory Commission 301-415-6634}}
The USEI facility is not
 
an NRC-licensed disposal facility.
By letter dated March 22, 2016 (ML16077A345), NRC staff requested additional information from ENO to complete review of the request.
On June 28, 2016, ENO submitted responses to the NRC staff's request for information
 
(ML16182A035), and on August 11, 2016, ENO provided additional information to the NRC
 
(ML16231A028).
 
The waste included in this 20.2002 request consists of approximately 200,000 gallons of
 
water associated with the decommissioning of VY and contains low concentrations of
 
fission and activation products resulting from VY operations.
The waste will be transported
 
from VY to USEI in tanker trucks, and the water will be solidified with clay at USEI prior to
 
disposal.
 
To obtain approval for 20.2002 alternate disposals, the NRC requires the licensee to
 
demonstrate that doses will be maintained as low as reasonably achievable (ALARA).
The NRC has determined that for 20.2002 alternate disposal approvals this limit requires a
 
licensee to demonstrate that the dose to a member of the public (including all exposure
 
groups) is no more than "a few millirem per year."
 
USEI also submitted a letter on January 14, 2016 (ML16021A173), requesting an
 
exemption from the licensing requirements of 10 CFR 30.3 to allow for the transfer of the
 
waste containing byproduct material to USEI and disposal of the byproduct material at the
 
USEI facility.
Specific exemptions to the licensing requirements of 10 CFR 30.3 are
 
provided for under 10 CFR 30.11.
When evaluating 10 CFR 30.11 exemption requests in
 
conjunction with 20.2002 alternative disposal requests, the NRC has applied a similar
 
standard to both reviews.
As discussed above, the NRC applies a dose standard of "not
 
more than a few millirem per year" to any member of the public to its 20.2002 alternate
 
disposal reviews.
 
Our internal guidance on processing such requests indicates that as part of enhanced
 
outreach we send a draft of the final EA and SER to the State where the disposal will take
 
place, as well as the State where the licensee is located, for a 30-day comment period.
 
Please see the attached draft final NRC EA and SER for your review.
Let me know if you
 
have any questions.
Sincerely, Jack D. Parrott Senior Project Manager
 
US Nuclear Regulatory Commission
 
301-415-6634}}

Revision as of 00:11, 30 June 2018

Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste
ML17013A250
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/12/2016
From: Jack Parrott
Reactor Decommissioning Branch
To: Monson B, Recchia C
State of VT
J. Parrott NMSS/DUWP/RDB 415-6634 T-8E47
Shared Package
ML17013A249 List:
References
Download: ML17013A250 (2)


Text

From:Parrott, Jack To:chris.recchia@state.vt.us

Brian.Monson@deq.idaho.gov Cc
anthony.leshinskie@state.vt.us
william.irwin@state.vt.us
Tifft, Doug
Watson, Bruce
Powell, Raymond
Maier,Bill

Subject:

Vermont Yankee request to NRC for alternate disposal of waste Date:Monday, December 12, 2016 4:46:00 PM Attachments:

Draft final EA.pdf Draft final SER.pdf

Dear Mr. Recchia and Mr. Monson,

By letter dated January 14, 2016 (Agencywide Documents Access and Management

System (ADAMS) Accession No. ML16029A071), Entergy Nuclear Operators, Inc (ENO)

submitted a request for NRC approval of alternate disposal of waste from the Vermont

Yankee Power Station (VY) at the U.S. Ecology Idaho (USEI) facility in accordance with 10

CFR 20.2002.

The USEI facility is a Resource Conservation and Recovery Act Subtitle C

hazardous waste disposal facility permitted by the State of Idaho.

The USEI facility is not

an NRC-licensed disposal facility.

By letter dated March 22, 2016 (ML16077A345), NRC staff requested additional information from ENO to complete review of the request.

On June 28, 2016, ENO submitted responses to the NRC staff's request for information

(ML16182A035), and on August 11, 2016, ENO provided additional information to the NRC

(ML16231A028).

The waste included in this 20.2002 request consists of approximately 200,000 gallons of

water associated with the decommissioning of VY and contains low concentrations of

fission and activation products resulting from VY operations.

The waste will be transported

from VY to USEI in tanker trucks, and the water will be solidified with clay at USEI prior to

disposal.

To obtain approval for 20.2002 alternate disposals, the NRC requires the licensee to

demonstrate that doses will be maintained as low as reasonably achievable (ALARA).

The NRC has determined that for 20.2002 alternate disposal approvals this limit requires a

licensee to demonstrate that the dose to a member of the public (including all exposure

groups) is no more than "a few millirem per year."

USEI also submitted a letter on January 14, 2016 (ML16021A173), requesting an

exemption from the licensing requirements of 10 CFR 30.3 to allow for the transfer of the

waste containing byproduct material to USEI and disposal of the byproduct material at the

USEI facility.

Specific exemptions to the licensing requirements of 10 CFR 30.3 are

provided for under 10 CFR 30.11.

When evaluating 10 CFR 30.11 exemption requests in

conjunction with 20.2002 alternative disposal requests, the NRC has applied a similar

standard to both reviews.

As discussed above, the NRC applies a dose standard of "not

more than a few millirem per year" to any member of the public to its 20.2002 alternate

disposal reviews.

Our internal guidance on processing such requests indicates that as part of enhanced

outreach we send a draft of the final EA and SER to the State where the disposal will take

place, as well as the State where the licensee is located, for a 30-day comment period.

Please see the attached draft final NRC EA and SER for your review.

Let me know if you

have any questions.

Sincerely, Jack D. Parrott Senior Project Manager

US Nuclear Regulatory Commission

301-415-6634