ML17320A564: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULA' | {{#Wiki_filter:REGULA'YINFORMATION OISTRISUTI(YSTEM (RIOS)IACCESSION NBR:8307120400 DOC.DATE: | ||
83/07/08NOTARIZED: | |||
YESDOCKETFACIL:50315DonaldC.CookNuclearPowerPlantsUnjtls"Indiana80500031550316DonaldC.CookNuclearPowerP1antFUnit2sIndiana805000316AUTHNAME,AUTHORAFFILIATION ALEXICH~M.P.Indiana8MichiaanElectticCoRECIP.NAMERECIPIENTAFFILIATION DENTONsHROfficeofNuclearReactorReaulation.Director | |||
==SUBJECT:== | ==SUBJECT:== | ||
Aoolication foramendtoLicensesDPR588.DPR74changingTechSoecTable4,31rereactortriosvsinstrumentation surveillance reauirements. | |||
INDIANALMICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004July8,1983AEP:NRC: | DISTRIBUTION CODE:A001SCOPI/SR/CEI)ED:LTR | ||
'ENCL~SIZE;'ITLE:ORSubmittal: | |||
GeneralDistribution NOTES:RECIPIENT IDCODE/NAME NRRORB1BC01INTERNAL: | |||
ELD/HDS3NRR/DLDIRNRR/DSI/METB G04COPIESLTTRENCL7710111111RECIPIENT IDCODE/NAME NRR/DE/MTEB NRR/DI/ORABNRR/DSI/RAB RGN3COPIESLTTRENCL1101111EXTERNAL: | |||
ACRSNRCPDRNTIS0902661111LPDRNSIC03,'205'1TOTALNUMBEROFCOPIESREQUIRED>> | |||
.LTTR26ENCL24 Igtllf-I"ilil1tll,~P,hk'Ijl'xI'i~'i'<kf)tuIIIIr'pli~4'>>IIxC'<NittIIA>isisIl'j~1ll,II'\ | |||
INDIANALMICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004July8,1983AEP:NRC:0591A DonaldC.'CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74AMENDMENT TOTECHNICAL SPECIFICATION CHANGEREQUESTMr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555 | |||
==Reference:== | ==Reference:== | ||
LetterNo.AEP: | |||
LetterNo.AEP:NRCc0591 datedJanuary22,1982 | |||
==DearMr.Denton:== | ==DearMr.Denton:== | ||
ThisletteranditsAttachments amendtheabovereferenced January22,1982letterasaresultofdiscussions withmembersofyourstaff.Thesubjectmatterattachedisidentical tothatassociated withtheJanuary22,1982,letter;theonlyitemsweareproposing tochangeare:1)thecontentoftheindividual Technical Specifications associated withChangeNo.1,and2)weareherebywithdrawing theTechnical Specification changerequestcontained inChangeNo.3.ChangeNo.2remainsasproposedinthereferenced January22,1982/letter.ChangeNo.4hasalreadybeenincorporated inTechnical Specification Amendment Nos.59and42>forUnitsNos.1and2respectively. | |||
~'AI | Attachment No.1tothislettercontainsadescription oftheproposedchangesandourjustification. | ||
'I | Attachment No.2tothislettercontainstheproposedchangestoUnitNos.1and2Technical Specifications. | ||
8SOZZaoeoo: | |||
aaOZ0S.-'PDRADQCK050003i5"''," | |||
,,P.-''"'PDR | |||
~'AI Ourevaluation ofthecontentofthisamendedTechnical Specification changerequestshowsthatnosignificant hazardsconsiderations areinvolved, sincetheamendedresponsedoesnotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated> | |||
doesnotcreatethepossibility ofanewaccident, oronedifferent fromanypreviously evaluatedt anddoesnotinvolveasignificant reduction inthemarginofsafety.TheseproposedchangeshavebeenreviewedandapprovedbythePlantNuclearSafetyReviewCommittee (PNSRC)andwillbereviewedbytheAEPSCNuclearSafetyandDesignReviewCommittee atitsnextmeeting.Sincethislicenseamendment changeproposalismadeattherequestofyourstafftosimplifyandclarifyouroriginalrequestofJanuary22,1982,weinterpret that,inaccordance withtheprovisions of10CFRPart170,thischangedoesnotrequireanyfee.Thisdocumenthasbeenpreparedfollowing Corporate Procedures whichincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned. | |||
Verytrulyyours,MPA/osM.P.AlexchVicePresident cc:JohnE.Dolan-ColumbusR.S.HunterR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.Callen-StateRepresentative G.CharnoffNRCResident, Inspector atCookPlant-Bridgman | |||
'I Attachment No.1toAEP:NRC:0591A DonaldC.CookNuclearPlantUnitNos.1and2Justificatio'n oftheProposedTechnical Specification Changes | |||
Discussed belowaretwogroupsofproposedTechnical Specification (T/S)changes.Forconvenience, eachchangeisdiscussed asaseparatepart.ThefirstgroupofproposedchangesistoTable4.3-1'oftheUnitNo.1T/S;thesecondistoTable4.3-1oftheUnit.No.2T/S.Asstatedinthecoverletter,thesechangesarebeing-proposedtomnendourpreviousT/Schangeproposalcontained inChangeNo.1ofAttachment No.1totheJanuary22,1982letter(AEP:NRC:0591). | |||
Inaddition, whentheproposedchangesareissued,theyT/SforUnitNos.1and2willbethesamewithregardtotheseparticular T/S.GROUP1:ObangestoTable4.3-1ofUnitRo.1Tecbnical Specifications: | |||
PART1Thefirstproposedchangeisthemodification ofthesurveillance requirements fortheSourceRange,NeutronFluxChannels(Item6),sothatthesurveillances arerequiredinNODES2and3onlywhentheplantisbelowtheP-6permissive setpoint. | |||
Aspreviously discussed withmembersofyourstaff,thischangewillmake,oursurveillance requirements closertothosepresented intheStandardTechnical Specifications f'rWestinghouse Pressurized WaterReactors; NUREG-0452, RevisionNo.4.PART2Thesecondproposedchangeistheadditionofa12-hour(Shiftly) | |||
CHANNELCHECKrequirement totheSourceRange,NeutronFluxChannel(Item6)..ThischangewillmaketheT/SclosertotheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors; NUREG-0452, RevisionNo.4.:PART3Thethirdproposedchangeistheadditionofarequirement toperformaCHANNELCALIBRATION ontheIntermediate RangeandSourceRange,NeutronFluxChannels(Items5and6)at,leastonceper549days.ThischangewillmaketheUnitNo.1T/SthesameastheUnitNo.2T/SandclosertotheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors; NUREG-0452, RevisionNo.4.'PART4Thefourthproposedchangeistheadditionofarequirement toperformaCHANNELFUNCTIONAL TESTontheSourceRange,NeutronFluxChannels(Item6)atleastoncepermonth.ThischangewillmaketheUnitNo.1T/SthesameastheUnitNo.2T/Sandclosertothe StandardTechnical Specifications forWestinghouse Pressurized WaterReactorsJ NUREG-0452, RevisionNo.4.PART3Thefifthproposedchangeisthemodification ofthesurveillance requirements fortheHighPositiveRateandHighNegativeRate,PowerRange,NeutronFluxChannels(Items3and4),sothat'theneutrondetectors maybeexcludedfromCHANNELCALIBRATION. | |||
Thischangewillmakeoursurveillance requirements consistent withthosepresen'ted intheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors; NUREG-0452, Revisions No.4.GROUP2:ChangestoTable4,3-1oftheUnitNo.2Technical Specifications: | |||
PART1Thefirstproposedchangeisthemodification ofthesurveillance requirements fortheSourceRange,NeutronFluxChannelssothatthesurveillances arerequiredinMODES2and3onlywhentheplantisbelowtheP-6permissive setpoint. | |||
Thejustification forthischangeisthesameasthatproposedforUnitNo.1.PART2Thesecondproposedchangeistheadditionofa12-hour(Shiftly) | |||
CHANNELCHECKrequirement totheSourceRange,NeutronFluxChannel(Item6).Thejustification forthischangeisthesameasthatproposedforUnitNo.1,'PART3Thethirdproposedchangeisthedeletionoftherequirement toperformsurveillances oftheSourceRange,NeutronFluxChannel(Item6)whileinMode6.Asperpreviousdiscussions withyourstaff,ithasbeenagreeduponthatthejustification submitted inourJanuary22,1982letterisadequate. | |||
'PART4Thefourthproposedchangeisthemodification ofthesurveillance requirements fortheHighPositiveRateanQHighNegativeRate,PowerRange,NeutronFluxChannels(Items3and4),sothat.theneutrondetectors maybeexcludedfromCHANNELCALIBRATION. | |||
Thischangewillmakeoursurveillance requirements consistent withthosepresented intheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors, NUREG-0452, RevisionNo.4.}} |
Revision as of 08:52, 29 June 2018
ML17320A564 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 07/08/1983 |
From: | ALEXICH M P INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
To: | DENTON H R Office of Nuclear Reactor Regulation |
Shared Package | |
ML17320A566 | List: |
References | |
AEP:NRC:0591A, AEP:NRC:591A, NUDOCS 8307120400 | |
Download: ML17320A564 (10) | |
Text
REGULA'YINFORMATION OISTRISUTI(YSTEM (RIOS)IACCESSION NBR:8307120400 DOC.DATE:
83/07/08NOTARIZED:
YESDOCKETFACIL:50315DonaldC.CookNuclearPowerPlantsUnjtls"Indiana80500031550316DonaldC.CookNuclearPowerP1antFUnit2sIndiana805000316AUTHNAME,AUTHORAFFILIATION ALEXICH~M.P.Indiana8MichiaanElectticCoRECIP.NAMERECIPIENTAFFILIATION DENTONsHROfficeofNuclearReactorReaulation.Director
SUBJECT:
Aoolication foramendtoLicensesDPR588.DPR74changingTechSoecTable4,31rereactortriosvsinstrumentation surveillance reauirements.
DISTRIBUTION CODE:A001SCOPI/SR/CEI)ED:LTR
'ENCL~SIZE;'ITLE:ORSubmittal:
GeneralDistribution NOTES:RECIPIENT IDCODE/NAME NRRORB1BC01INTERNAL:
ELD/HDS3NRR/DLDIRNRR/DSI/METB G04COPIESLTTRENCL7710111111RECIPIENT IDCODE/NAME NRR/DE/MTEB NRR/DI/ORABNRR/DSI/RAB RGN3COPIESLTTRENCL1101111EXTERNAL:
ACRSNRCPDRNTIS0902661111LPDRNSIC03,'205'1TOTALNUMBEROFCOPIESREQUIRED>>
.LTTR26ENCL24 Igtllf-I"ilil1tll,~P,hk'Ijl'xI'i~'i'<kf)tuIIIIr'pli~4'>>IIxC'<NittIIA>isisIl'j~1ll,II'\
INDIANALMICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004July8,1983AEP:NRC:0591A DonaldC.'CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74AMENDMENT TOTECHNICAL SPECIFICATION CHANGEREQUESTMr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555
Reference:
LetterNo.AEP:NRCc0591 datedJanuary22,1982
DearMr.Denton:
ThisletteranditsAttachments amendtheabovereferenced January22,1982letterasaresultofdiscussions withmembersofyourstaff.Thesubjectmatterattachedisidentical tothatassociated withtheJanuary22,1982,letter;theonlyitemsweareproposing tochangeare:1)thecontentoftheindividual Technical Specifications associated withChangeNo.1,and2)weareherebywithdrawing theTechnical Specification changerequestcontained inChangeNo.3.ChangeNo.2remainsasproposedinthereferenced January22,1982/letter.ChangeNo.4hasalreadybeenincorporated inTechnical Specification Amendment Nos.59and42>forUnitsNos.1and2respectively.
Attachment No.1tothislettercontainsadescription oftheproposedchangesandourjustification.
Attachment No.2tothislettercontainstheproposedchangestoUnitNos.1and2Technical Specifications.
8SOZZaoeoo:
aaOZ0S.-'PDRADQCK050003i5","
,,P.-"'PDR
~'AI Ourevaluation ofthecontentofthisamendedTechnical Specification changerequestshowsthatnosignificant hazardsconsiderations areinvolved, sincetheamendedresponsedoesnotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated>
doesnotcreatethepossibility ofanewaccident, oronedifferent fromanypreviously evaluatedt anddoesnotinvolveasignificant reduction inthemarginofsafety.TheseproposedchangeshavebeenreviewedandapprovedbythePlantNuclearSafetyReviewCommittee (PNSRC)andwillbereviewedbytheAEPSCNuclearSafetyandDesignReviewCommittee atitsnextmeeting.Sincethislicenseamendment changeproposalismadeattherequestofyourstafftosimplifyandclarifyouroriginalrequestofJanuary22,1982,weinterpret that,inaccordance withtheprovisions of10CFRPart170,thischangedoesnotrequireanyfee.Thisdocumenthasbeenpreparedfollowing Corporate Procedures whichincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned.
Verytrulyyours,MPA/osM.P.AlexchVicePresident cc:JohnE.Dolan-ColumbusR.S.HunterR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.Callen-StateRepresentative G.CharnoffNRCResident, Inspector atCookPlant-Bridgman
'I Attachment No.1toAEP:NRC:0591A DonaldC.CookNuclearPlantUnitNos.1and2Justificatio'n oftheProposedTechnical Specification Changes
Discussed belowaretwogroupsofproposedTechnical Specification (T/S)changes.Forconvenience, eachchangeisdiscussed asaseparatepart.ThefirstgroupofproposedchangesistoTable4.3-1'oftheUnitNo.1T/S;thesecondistoTable4.3-1oftheUnit.No.2T/S.Asstatedinthecoverletter,thesechangesarebeing-proposedtomnendourpreviousT/Schangeproposalcontained inChangeNo.1ofAttachment No.1totheJanuary22,1982letter(AEP:NRC:0591).
Inaddition, whentheproposedchangesareissued,theyT/SforUnitNos.1and2willbethesamewithregardtotheseparticular T/S.GROUP1:ObangestoTable4.3-1ofUnitRo.1Tecbnical Specifications:
PART1Thefirstproposedchangeisthemodification ofthesurveillance requirements fortheSourceRange,NeutronFluxChannels(Item6),sothatthesurveillances arerequiredinNODES2and3onlywhentheplantisbelowtheP-6permissive setpoint.
Aspreviously discussed withmembersofyourstaff,thischangewillmake,oursurveillance requirements closertothosepresented intheStandardTechnical Specifications f'rWestinghouse Pressurized WaterReactors; NUREG-0452, RevisionNo.4.PART2Thesecondproposedchangeistheadditionofa12-hour(Shiftly)
CHANNELCHECKrequirement totheSourceRange,NeutronFluxChannel(Item6)..ThischangewillmaketheT/SclosertotheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors; NUREG-0452, RevisionNo.4.:PART3Thethirdproposedchangeistheadditionofarequirement toperformaCHANNELCALIBRATION ontheIntermediate RangeandSourceRange,NeutronFluxChannels(Items5and6)at,leastonceper549days.ThischangewillmaketheUnitNo.1T/SthesameastheUnitNo.2T/SandclosertotheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors; NUREG-0452, RevisionNo.4.'PART4Thefourthproposedchangeistheadditionofarequirement toperformaCHANNELFUNCTIONAL TESTontheSourceRange,NeutronFluxChannels(Item6)atleastoncepermonth.ThischangewillmaketheUnitNo.1T/SthesameastheUnitNo.2T/Sandclosertothe StandardTechnical Specifications forWestinghouse Pressurized WaterReactorsJ NUREG-0452, RevisionNo.4.PART3Thefifthproposedchangeisthemodification ofthesurveillance requirements fortheHighPositiveRateandHighNegativeRate,PowerRange,NeutronFluxChannels(Items3and4),sothat'theneutrondetectors maybeexcludedfromCHANNELCALIBRATION.
Thischangewillmakeoursurveillance requirements consistent withthosepresen'ted intheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors; NUREG-0452, Revisions No.4.GROUP2:ChangestoTable4,3-1oftheUnitNo.2Technical Specifications:
PART1Thefirstproposedchangeisthemodification ofthesurveillance requirements fortheSourceRange,NeutronFluxChannelssothatthesurveillances arerequiredinMODES2and3onlywhentheplantisbelowtheP-6permissive setpoint.
Thejustification forthischangeisthesameasthatproposedforUnitNo.1.PART2Thesecondproposedchangeistheadditionofa12-hour(Shiftly)
CHANNELCHECKrequirement totheSourceRange,NeutronFluxChannel(Item6).Thejustification forthischangeisthesameasthatproposedforUnitNo.1,'PART3Thethirdproposedchangeisthedeletionoftherequirement toperformsurveillances oftheSourceRange,NeutronFluxChannel(Item6)whileinMode6.Asperpreviousdiscussions withyourstaff,ithasbeenagreeduponthatthejustification submitted inourJanuary22,1982letterisadequate.
'PART4Thefourthproposedchangeisthemodification ofthesurveillance requirements fortheHighPositiveRateanQHighNegativeRate,PowerRange,NeutronFluxChannels(Items3and4),sothat.theneutrondetectors maybeexcludedfromCHANNELCALIBRATION.
Thischangewillmakeoursurveillance requirements consistent withthosepresented intheStandardTechnical Specifications forWestinghouse Pressurized WaterReactors, NUREG-0452, RevisionNo.4.