{{#Wiki_filter:Plant Performance Update Meeting June 6, 2002
{{#Wiki_filter:Plant Performance Update Meeting June 6, 2002
';011   11'1 151!i! 1jj 1II1l1]III.I IIl11,11 i
';011 11'1 151!i!
                      ~II.     ' III ' III l j linli%!17W1!III iii,''              il 1:tI I il
I I 1 jj
                                                                        !\I1ll'I!''
~II. 1II 1l1' III ' III l jjlinli%!17W1!1:tII
1IIII Enclosure 2
!\\I1ll'I!''
1 IIII
]III.I III I l11,11 i
iii,''
il il


Agenda
Agenda
* Introduction- Brew Barron
* Introduction-Brew Barron
* Operational Performance-         Dhiaa Jamil
* Operational Performance-Dhiaa Jamil
  - Generation Status Trending
- Generation Status Trending
  - 2EOC14 Refueling Outage
- 2EOC14 Refueling Outage
  - ALARA Performance
- ALARA Performance
  - Correct Component Verification
- Correct Component Verification
* Miscellaneous-       Bryan Dolan
* Miscellaneous-Bryan Dolan
  - Corrective Action Program
- Corrective Action Program
  - Special Nuclear Material
- Special Nuclear Material
  - Security 2
- Security 2


Operational Performance 3
Operational Performance 3


McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o
McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o
0 LL.
LL.0 M
C-)
C-)
100%
Cu
90%
:tf Q
M C.
CD 0
L-0 C-)
Cu E)
~0 wi ID-a 100% -
90% -
80% -
80% -
                -              rv==Unit 2 (2.8 days)
Main Steam Unit 2 (0.44 days)
Add Oil to 2B NCP Cu                            Pressure Trip
:tf M
70% -
70% -
Q C.
60%
CD    60%
50%
0M L-                           1EOC14 (38.2 days) 50%                    Cond. Boost Pmp Mtrs.
40%
0                            Busline Relay Mod                                                                                                                               2EOC15 (30 days)
30% -
Non-vital Spare Inverter 40%                      (KXS to KXA) 1EOC15 (25 days)                                  Rx Vessel 10-year ISI C-)                           Vital Inverters Replace.
20% -
Main Gen. Volt Reg.                               Main Gen. Volt Reg No S/G Work                                   No S/G Work Cu                            Rx Vessel 10-year ISI                                   Unit. (3133 days) 30% -                  CA Tank Tie-in                                          SG Main FW Reg Valv -
10% -
10W% Vessel Head Bare Metal Inspection E) failed capacitor
rv==
  ~0      20% -                                                                         2EOC14 (32.3 days)
Unit 2 (2.8 days)
TARGET REACTOR C.F. ('M                              CA Tank Tlein.
Main Steam Pressure Trip Unit 2 (0.44 days)
wi                      -                                                      l 10% -                                                                          Cond. Boost Prmp MI. 2C ID                      -WELYACTUAL                                          I      1D% Vessel Head
Add Oil to 2B NCP 1EOC14 (38.2 days)
  -a                                                                                    Bare Metal Inspection 0% I.
Cond. Boost Pmp Mtrs.
_-  II111    ] I   rI1 1 II T T ITI 111-111 ........ 111    IT    ....7.... 1..11...1........
Busline Relay Mod Non-vital Spare Inverter (KXS to KXA)
I II II  I FTT I-
Vital Inverters Replace.
                                                                                                    .0 a                                          Q          (0    0        a              C)        0. >. a (U M 0)0a M 0)                                . w
Rx Vessel 1 0-year ISI CA Tank Tie-in 1 EOC15 (25 days)
                                                                                                                                                                            >, 3    I so>
Main Gen. Volt Reg.
ClM 0w
No S/G Work 10W% Vessel Head Bare Metal Inspection 2EOC15 (30 days)
                                                                                                                                                                                                >    0 0
Rx Vessel 10-year ISI Main Gen. Volt Reg No S/G Work Unit. (3133 days)
1UI      :f    ;      -7      -7 O?                          2                    IL          I5  M  7 <: Q                      N  r-N  7u      0.<
SG Main FW Reg Valv -
il' tD    OOW4
failed capacitor TARGET REACTOR C.F. ('M l
                          - 0          N N              '            (L      I-                      a)r7 N1 .q M ) to            N                      tanu N4                                    r N 2001                                             II II                             -20022                            i                   -2003                      1 Generation Status Trending                                                                                                                                                                               4
-WELYACTUAL I
2EOC14 (32.3 days)
CA Tank Tlein.
Cond. Boost Prmp MI. 2C 1 D% Vessel Head Bare Metal Inspection 0%
I.
a 1U il' II 111 rI
] I 1 1 II T T ITI I :f
; 7 tD O -
N 0
OW4 N
Q (0
O?
(L 0
2 I-N4
....7..
a
.0C)
IL a) r7 I-0.
I5 N1 a
0)0a (U
M M
0)
M 7 <: Q
.q M )
to N
r N
-20022 N
r-N I II II I
FTT w
7u 0.<
tanu 11 1-111 111 IT
.. 1..11...1........
3 I
ClM 0
s 0w o>
0
-2003 1
2001 II II i 
Generation Status Trending 4


2EOC14 Refueling Outage 5
2EOC14 Refueling Outage 5
Line 78: Line 122:
No Corrosion or Boron Found 8
No Corrosion or Boron Found 8


r-. .
r-..
9
9


Line 91: Line 135:
ALARA Performance
ALARA Performance
* Changes
* Changes
  - Step change in ALARA planning and scheduling
- Step change in ALARA planning and scheduling
  - Radiation Work Permit setpoint adjusted down to more effectively use dosimetry as ALARA tool
- Radiation Work Permit setpoint adjusted down to more effectively use dosimetry as ALARA tool
  - Focused on radiation worker desired behavior prior to and during the outage
- Focused on radiation worker desired behavior prior to and during the outage
  - PIP threshold changes 11
- PIP threshold changes 11


ALARA Performance                 (continued)
ALARA Performance (continued)
* Results
* Results
  - Desired worker behavior demonstrated
- Desired worker behavior demonstrated
  - Desired increase of PIPs at lower threshold was obtained
- Desired increase of PIPs at lower threshold was obtained
  - Comprehensive self-assessment of outage radiation practices - complete 12
- Comprehensive self-assessment of outage radiation practices - complete 12


2EOC1 4 Refueling Outage
2 EOC1 4 Refueling Outage
* Zero LERs
* Zero
* Zero events
* Zero
* Zero injuries
* Zero
* 32 dcjys 13
* 32 dc LERs events injuries jys 13


Correct Component Verification (CCV)
Correct Component Verification (CCV)
Line 113: Line 157:
* Conducted classroom and flow loop scenario training
* Conducted classroom and flow loop scenario training
* Targeted observations with CCV focus
* Targeted observations with CCV focus
* 2EOC14 was co mpleted without a CCV event
* 2EOC14 was completed without a CCV event
* Similar focus on CCV is now underway in operations and chemistry 14
* Similar focus on CCV is now underway in operations and chemistry 14


Line 122: Line 166:
Corrective Action Program
Corrective Action Program
* PIP Action Codes
* PIP Action Codes
  - Corrective Actions to Prevent Recurrence (CAPR)
- Corrective Actions to Prevent Recurrence (CAPR)
* Directed at the Root Cause of Category I and 2 PIPS
* Directed at the Root Cause of Category I and 2 PIPS
  - Corrective Actions (CA)
- Corrective Actions (CA)
* Directed at CAQ
* Directed at CAQ
  - Elective / Enhancement Actions (ELEC)
- Elective / Enhancement Actions (ELEC)
  - Structure helps focus corrective action effectiveness reviews on highest priority actions (CAPRs) 17
- Structure helps focus corrective action effectiveness reviews on highest priority actions (CAPRs) 17


Special Nuclear Materials
Special Nuclear Materials
Line 133: Line 177:
* No discrepancies 18
* No discrepancies 18


Security m
Security
m
* No concerns about schedule for compliance with NRC order.
* No concerns about schedule for compliance with NRC order.
19
19


Questions 20}}
Questions 20}}

Latest revision as of 17:56, 16 January 2025

Plant Performance Update Meeting, McGuire Nuclear Station
ML021680568
Person / Time
Site: McGuire, Mcguire  
Issue date: 06/06/2002
From: Barron H
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation
Shared Package
ML021680561 List:
References
Download: ML021680568 (20)


Text

Plant Performance Update Meeting June 6, 2002

';011 11'1 151!i!

I I 1 jj

~II. 1II 1l1' III ' III l jjlinli%!17W1!1:tII

!\\I1ll'I!

1 IIII

]III.I III I l11,11 i

iii,

il il

Agenda

  • Introduction-Brew Barron
  • Operational Performance-Dhiaa Jamil

- Generation Status Trending

- 2EOC14 Refueling Outage

- ALARA Performance

- Correct Component Verification

  • Miscellaneous-Bryan Dolan

- Corrective Action Program

- Special Nuclear Material

- Security 2

Operational Performance 3

McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o

LL.0 M

C-)

Cu

tf Q

M C.

CD 0

L-0 C-)

Cu E)

~0 wi ID-a 100% -

90% -

80% -

70% -

60%

50%

40%

30% -

20% -

10% -

rv==

Unit 2 (2.8 days)

Main Steam Pressure Trip Unit 2 (0.44 days)

Add Oil to 2B NCP 1EOC14 (38.2 days)

Cond. Boost Pmp Mtrs.

Busline Relay Mod Non-vital Spare Inverter (KXS to KXA)

Vital Inverters Replace.

Rx Vessel 1 0-year ISI CA Tank Tie-in 1 EOC15 (25 days)

Main Gen. Volt Reg.

No S/G Work 10W% Vessel Head Bare Metal Inspection 2EOC15 (30 days)

Rx Vessel 10-year ISI Main Gen. Volt Reg No S/G Work Unit. (3133 days)

SG Main FW Reg Valv -

failed capacitor TARGET REACTOR C.F. ('M l

-WELYACTUAL I

2EOC14 (32.3 days)

CA Tank Tlein.

Cond. Boost Prmp MI. 2C 1 D% Vessel Head Bare Metal Inspection 0%

I.

a 1U il' II 111 rI

] I 1 1 II T T ITI I :f

7 tD O -

N 0

OW4 N

Q (0

O?

(L 0

2 I-N4

....7..

a

.0C)

IL a) r7 I-0.

I5 N1 a

0)0a (U

M M

0)

M 7 <: Q

.q M )

to N

r N

-20022 N

r-N I II II I

FTT w

7u 0.<

tanu 11 1-111 111 IT

.. 1..11...1........

3 I

ClM 0

s 0w o>

0

-2003 1

2001 II II i 

Generation Status Trending 4

2EOC14 Refueling Outage 5

Completed Auxiliary Feedwater Storage Tank Tie In 6

Repaired CRDM K-8 Intermediate Canopy Seal Weld Intermediate Canopy Seal Approx. 6 ft.

Reactor Head 7

Performed 100% Bare Metal Head Inspection -

No Corrosion or Boron Found 8

r-..

9

Shutdown/Startup Performance Improvements

  • Tuning of process control system
  • Tuning of valve actuators
  • Sequencing of steam dump valves
  • Procedural improvements
  • Simulator and training improvements

ALARA Performance

  • Changes

- Step change in ALARA planning and scheduling

- Radiation Work Permit setpoint adjusted down to more effectively use dosimetry as ALARA tool

- Focused on radiation worker desired behavior prior to and during the outage

- PIP threshold changes 11

ALARA Performance (continued)

  • Results

- Desired worker behavior demonstrated

- Desired increase of PIPs at lower threshold was obtained

- Comprehensive self-assessment of outage radiation practices - complete 12

2 EOC1 4 Refueling Outage

  • Zero
  • Zero
  • Zero
  • 32 dc LERs events injuries jys 13

Correct Component Verification (CCV)

  • Defined specific behaviors associated with CCV
  • Created a CCV flag
  • Conducted classroom and flow loop scenario training
  • Targeted observations with CCV focus
  • 2EOC14 was completed without a CCV event
  • Similar focus on CCV is now underway in operations and chemistry 14

Miscellaneous 15

Corrective Action Program PIP Significance Categories ACA No Cause Analysis 16

Corrective Action Program

  • PIP Action Codes

- Corrective Actions to Prevent Recurrence (CAPR)

  • Directed at the Root Cause of Category I and 2 PIPS

- Corrective Actions (CA)

  • Directed at CAQ

- Elective / Enhancement Actions (ELEC)

- Structure helps focus corrective action effectiveness reviews on highest priority actions (CAPRs) 17

Special Nuclear Materials

  • Completed comprehensive inventory
  • No discrepancies 18

Security

m

  • No concerns about schedule for compliance with NRC order.

19

Questions 20