ML021680568: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Plant Performance Update Meeting June 6, 2002 | {{#Wiki_filter:Plant Performance Update Meeting June 6, 2002 | ||
';011 | ';011 11'1 151!i! | ||
I I 1 jj | |||
~II. 1II 1l1' III ' III l jjlinli%!17W1!1:tII | |||
!\\I1ll'I!'' | |||
1 IIII | |||
]III.I III I l11,11 i | |||
iii,'' | |||
il il | |||
Agenda | Agenda | ||
* Introduction- Brew Barron | * Introduction-Brew Barron | ||
* Operational Performance- | * Operational Performance-Dhiaa Jamil | ||
- Generation Status Trending | |||
- 2EOC14 Refueling Outage | |||
- ALARA Performance | |||
- Correct Component Verification | |||
* Miscellaneous- | * Miscellaneous-Bryan Dolan | ||
- Corrective Action Program | |||
- Special Nuclear Material | |||
- Security 2 | |||
Operational Performance 3 | Operational Performance 3 | ||
McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o | McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o | ||
LL.0 M | |||
C-) | C-) | ||
100% | Cu | ||
90% | :tf Q | ||
M C. | |||
CD 0 | |||
L-0 C-) | |||
Cu E) | |||
~0 wi ID-a 100% - | |||
90% - | |||
80% - | 80% - | ||
70% - | 70% - | ||
60% | |||
50% | |||
40% | |||
30% - | |||
Non-vital Spare Inverter | 20% - | ||
Main Gen. Volt Reg. | 10% - | ||
rv== | |||
Unit 2 (2.8 days) | |||
Main Steam Pressure Trip Unit 2 (0.44 days) | |||
Add Oil to 2B NCP 1EOC14 (38.2 days) | |||
Cond. Boost Pmp Mtrs. | |||
Busline Relay Mod Non-vital Spare Inverter (KXS to KXA) | |||
I | Vital Inverters Replace. | ||
Rx Vessel 1 0-year ISI CA Tank Tie-in 1 EOC15 (25 days) | |||
Main Gen. Volt Reg. | |||
No S/G Work 10W% Vessel Head Bare Metal Inspection 2EOC15 (30 days) | |||
Rx Vessel 10-year ISI Main Gen. Volt Reg No S/G Work Unit. (3133 days) | |||
SG Main FW Reg Valv - | |||
failed capacitor TARGET REACTOR C.F. ('M l | |||
-WELYACTUAL I | |||
2EOC14 (32.3 days) | |||
CA Tank Tlein. | |||
Cond. Boost Prmp MI. 2C 1 D% Vessel Head Bare Metal Inspection 0% | |||
I. | |||
a 1U il' II 111 rI | |||
] I 1 1 II T T ITI I :f | |||
; 7 tD O - | |||
N 0 | |||
OW4 N | |||
Q (0 | |||
O? | |||
(L 0 | |||
2 I-N4 | |||
....7.. | |||
a | |||
.0C) | |||
IL a) r7 I-0. | |||
I5 N1 a | |||
0)0a (U | |||
M M | |||
0) | |||
M 7 <: Q | |||
.q M ) | |||
to N | |||
r N | |||
-20022 N | |||
r-N I II II I | |||
FTT w | |||
7u 0.< | |||
tanu 11 1-111 111 IT | |||
.. 1..11...1........ | |||
3 I | |||
ClM 0 | |||
s 0w o> | |||
0 | |||
-2003 1 | |||
2001 II II i | |||
Generation Status Trending 4 | |||
2EOC14 Refueling Outage 5 | 2EOC14 Refueling Outage 5 | ||
| Line 78: | Line 122: | ||
No Corrosion or Boron Found 8 | No Corrosion or Boron Found 8 | ||
r-. . | r-.. | ||
9 | 9 | ||
| Line 91: | Line 135: | ||
ALARA Performance | ALARA Performance | ||
* Changes | * Changes | ||
- Step change in ALARA planning and scheduling | |||
- Radiation Work Permit setpoint adjusted down to more effectively use dosimetry as ALARA tool | |||
- Focused on radiation worker desired behavior prior to and during the outage | |||
- PIP threshold changes 11 | |||
ALARA Performance | ALARA Performance (continued) | ||
* Results | * Results | ||
- Desired worker behavior demonstrated | |||
- Desired increase of PIPs at lower threshold was obtained | |||
- Comprehensive self-assessment of outage radiation practices - complete 12 | |||
2 EOC1 4 Refueling Outage | |||
* Zero | * Zero | ||
* Zero | * Zero | ||
* Zero | * Zero | ||
* 32 | * 32 dc LERs events injuries jys 13 | ||
Correct Component Verification (CCV) | Correct Component Verification (CCV) | ||
| Line 113: | Line 157: | ||
* Conducted classroom and flow loop scenario training | * Conducted classroom and flow loop scenario training | ||
* Targeted observations with CCV focus | * Targeted observations with CCV focus | ||
* 2EOC14 was | * 2EOC14 was completed without a CCV event | ||
* Similar focus on CCV is now underway in operations and chemistry 14 | * Similar focus on CCV is now underway in operations and chemistry 14 | ||
| Line 122: | Line 166: | ||
Corrective Action Program | Corrective Action Program | ||
* PIP Action Codes | * PIP Action Codes | ||
- Corrective Actions to Prevent Recurrence (CAPR) | |||
* Directed at the Root Cause of Category I and 2 PIPS | * Directed at the Root Cause of Category I and 2 PIPS | ||
- Corrective Actions (CA) | |||
* Directed at CAQ | * Directed at CAQ | ||
- Elective / Enhancement Actions (ELEC) | |||
- Structure helps focus corrective action effectiveness reviews on highest priority actions (CAPRs) 17 | |||
Special Nuclear Materials | Special Nuclear Materials | ||
| Line 133: | Line 177: | ||
* No discrepancies 18 | * No discrepancies 18 | ||
Security m | Security | ||
m | |||
* No concerns about schedule for compliance with NRC order. | * No concerns about schedule for compliance with NRC order. | ||
19 | 19 | ||
Questions 20}} | Questions 20}} | ||
Latest revision as of 17:56, 16 January 2025
| ML021680568 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 06/06/2002 |
| From: | Barron H Duke Energy Corp |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML021680561 | List: |
| References | |
| Download: ML021680568 (20) | |
Text
Plant Performance Update Meeting June 6, 2002
';011 11'1 151!i!
I I 1 jj
~II. 1II 1l1' III ' III l jjlinli%!17W1!1:tII
!\\I1ll'I!
1 IIII
]III.I III I l11,11 i
iii,
il il
Agenda
- Introduction-Brew Barron
- Operational Performance-Dhiaa Jamil
- Generation Status Trending
- 2EOC14 Refueling Outage
- ALARA Performance
- Correct Component Verification
- Miscellaneous-Bryan Dolan
- Corrective Action Program
- Security 2
Operational Performance 3
McGuire Nuclear Station GENERATION STATUS TRENDING 2001 - 2003 Actual vs. Target o
LL.0 M
C-)
Cu
- tf Q
M C.
CD 0
L-0 C-)
Cu E)
~0 wi ID-a 100% -
90% -
80% -
70% -
60%
50%
40%
30% -
20% -
10% -
rv==
Unit 2 (2.8 days)
Main Steam Pressure Trip Unit 2 (0.44 days)
Add Oil to 2B NCP 1EOC14 (38.2 days)
Cond. Boost Pmp Mtrs.
Busline Relay Mod Non-vital Spare Inverter (KXS to KXA)
Vital Inverters Replace.
Rx Vessel 1 0-year ISI CA Tank Tie-in 1 EOC15 (25 days)
Main Gen. Volt Reg.
No S/G Work 10W% Vessel Head Bare Metal Inspection 2EOC15 (30 days)
Rx Vessel 10-year ISI Main Gen. Volt Reg No S/G Work Unit. (3133 days)
failed capacitor TARGET REACTOR C.F. ('M l
-WELYACTUAL I
2EOC14 (32.3 days)
CA Tank Tlein.
Cond. Boost Prmp MI. 2C 1 D% Vessel Head Bare Metal Inspection 0%
I.
a 1U il' II 111 rI
] I 1 1 II T T ITI I :f
- 7 tD O -
N 0
OW4 N
Q (0
O?
(L 0
2 I-N4
....7..
a
.0C)
IL a) r7 I-0.
I5 N1 a
0)0a (U
M M
0)
M 7 <: Q
.q M )
to N
r N
-20022 N
r-N I II II I
FTT w
7u 0.<
tanu 11 1-111 111 IT
.. 1..11...1........
3 I
ClM 0
s 0w o>
0
-2003 1
2001 II II i
Generation Status Trending 4
2EOC14 Refueling Outage 5
Completed Auxiliary Feedwater Storage Tank Tie In 6
Repaired CRDM K-8 Intermediate Canopy Seal Weld Intermediate Canopy Seal Approx. 6 ft.
Reactor Head 7
Performed 100% Bare Metal Head Inspection -
No Corrosion or Boron Found 8
r-..
9
Shutdown/Startup Performance Improvements
- Tuning of process control system
- Tuning of valve actuators
- Sequencing of steam dump valves
- Procedural improvements
- Simulator and training improvements
- Manual reactor / turbine trip from low power 10
ALARA Performance
- Changes
- Step change in ALARA planning and scheduling
- Radiation Work Permit setpoint adjusted down to more effectively use dosimetry as ALARA tool
- Focused on radiation worker desired behavior prior to and during the outage
- PIP threshold changes 11
ALARA Performance (continued)
- Results
- Desired worker behavior demonstrated
- Desired increase of PIPs at lower threshold was obtained
- Comprehensive self-assessment of outage radiation practices - complete 12
2 EOC1 4 Refueling Outage
- Zero
- Zero
- Zero
- 32 dc LERs events injuries jys 13
Correct Component Verification (CCV)
- Defined specific behaviors associated with CCV
- Created a CCV flag
- Conducted classroom and flow loop scenario training
- Targeted observations with CCV focus
- 2EOC14 was completed without a CCV event
- Similar focus on CCV is now underway in operations and chemistry 14
Miscellaneous 15
Corrective Action Program PIP Significance Categories ACA No Cause Analysis 16
Corrective Action Program
- PIP Action Codes
- Corrective Actions to Prevent Recurrence (CAPR)
- Directed at the Root Cause of Category I and 2 PIPS
- Corrective Actions (CA)
- Directed at CAQ
- Elective / Enhancement Actions (ELEC)
- Structure helps focus corrective action effectiveness reviews on highest priority actions (CAPRs) 17
- Completed comprehensive inventory
- No discrepancies 18
Security
m
- No concerns about schedule for compliance with NRC order.
19
Questions 20