Information Notice 2005-07, Results of Hemyc Electrical Raceway Fire Barrier System Full Scale Fire Testing: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | ===NUCLEAR REGULATORY COMMISSION=== | ||
OFFICE OF NUCLEAR REACTOR REGULATION | OFFICE OF NUCLEAR REACTOR REGULATION | ||
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS | ===OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS=== | ||
WASHINGTON D.C. 20555-0001 | |||
===April 1, 2005=== | |||
INFORMATION NOTICE 2005-07: | |||
===RESULTS OF HEMYC ELECTRICAL RACEWAY FIRE=== | |||
BARRIER SYSTEM FULL SCALE FIRE TESTING | BARRIER SYSTEM FULL SCALE FIRE TESTING | ||
| Line 38: | Line 40: | ||
addressees of the results of Hemyc electrical raceway fire barrier system (ERFBS) full-scale fire | addressees of the results of Hemyc electrical raceway fire barrier system (ERFBS) full-scale fire | ||
tests. The Hemyc ERFBS did not perform for one hour as designed because shrinkage of the | tests. The Hemyc ERFBS did not perform for one hour as designed because shrinkage of the | ||
Hemyc ERFBS occurred during the testing. It is expected that recipients will review the | Hemyc ERFBS occurred during the testing. It is expected that recipients will review the | ||
information for applicability to their facilities and consider actions as appropriate to avoid similar | information for applicability to their facilities and consider actions as appropriate to avoid similar | ||
problems. However, suggestions contained in this information notice are not NRC | problems. However, suggestions contained in this information notice are not NRC | ||
requirements; therefore, no specific action or written response is required. | requirements; therefore, no specific action or written response is required. | ||
| Line 59: | Line 61: | ||
power stations due to questions raised regarding the fire resistance capability of the Hemyc | power stations due to questions raised regarding the fire resistance capability of the Hemyc | ||
ERFBS (Reference 2). The Office of Nuclear Reactor Regulation (NRR) performed a review of | ERFBS (Reference 2). The Office of Nuclear Reactor Regulation (NRR) performed a review of | ||
the Hemyc ERFBS (Reference 3) and requested the NRCs Office of Nuclear Regulatory | the Hemyc ERFBS (Reference 3) and requested the NRCs Office of Nuclear Regulatory | ||
Research (RES) to perform confirmatory testing of this ERFBS. RES performed the testing at | Research (RES) to perform confirmatory testing of this ERFBS. RES performed the testing at | ||
the Omega Point Laboratories in Elmendorf, Texas. | the Omega Point Laboratories in Elmendorf, Texas. | ||
| Line 70: | Line 72: | ||
This information notice describes the results of the investigation of the fire resistance capability | This information notice describes the results of the investigation of the fire resistance capability | ||
of the Hemyc ERFBS (Attachment 1). The NRC performed two ASTM E 119 furnace tests on a | of the Hemyc ERFBS (Attachment 1). The NRC performed two ASTM E 119 furnace tests on a | ||
number of cable raceway types that are protected by the Hemyc ERFBS (with and without air | number of cable raceway types that are protected by the Hemyc ERFBS (with and without air | ||
| Line 76: | Line 78: | ||
gaps) in accordance with the Hemyc ERFBS test plan (see ADAMS Accession No. | gaps) in accordance with the Hemyc ERFBS test plan (see ADAMS Accession No. | ||
ML043210141 for a preliminary version of the test plan). The test plan provides | ML043210141 for a preliminary version of the test plan). The test plan provides | ||
a detailed discussion of the assemblies and the thermocouple positions. The Hemyc ERFBS | a detailed discussion of the assemblies and the thermocouple positions. The Hemyc ERFBS | ||
tests were performed for a period of 60-minutes each, followed by a hose stream test and post- test visual inspection of the ERFBS. | tests were performed for a period of 60-minutes each, followed by a hose stream test and post- test visual inspection of the ERFBS. | ||
| Line 90: | Line 92: | ||
specimens and along the length of both side rails of the cable tray test specimens at 6-inch | specimens and along the length of both side rails of the cable tray test specimens at 6-inch | ||
intervals. All results in Attachment 1 refer to the additional thermocouples attached to the outer | intervals. All results in Attachment 1 refer to the additional thermocouples attached to the outer | ||
surfaces of the conduits and cable trays unless otherwise stated. | surfaces of the conduits and cable trays unless otherwise stated. | ||
| Line 97: | Line 99: | ||
The Hemyc ERFBS is constructed of Hemyc mats consisting of Kaowool insulation inside an | The Hemyc ERFBS is constructed of Hemyc mats consisting of Kaowool insulation inside an | ||
outer covering of Siltemp high-temperature fabric. The mats are machine-stitched at the | outer covering of Siltemp high-temperature fabric. The mats are machine-stitched at the | ||
factory to fit each electrical raceway installation. Hemyc mats that are directly wrapped around | factory to fit each electrical raceway installation. Hemyc mats that are directly wrapped around | ||
the electrical raceway use 2-inch-thick Kaowool. Hemyc mats that are installed over spaced | the electrical raceway use 2-inch-thick Kaowool. Hemyc mats that are installed over spaced | ||
frames to provide a 2-inch air gap between the Hemyc and the electrical raceway (for cable tray | frames to provide a 2-inch air gap between the Hemyc and the electrical raceway (for cable tray | ||
| Line 111: | Line 113: | ||
generically in this information notice, the material originally known as Siltemp is not now | generically in this information notice, the material originally known as Siltemp is not now | ||
available commercially. The Promatec vendor manual references either Siltemp, Refrasil, or | available commercially. The Promatec vendor manual references either Siltemp, Refrasil, or | ||
Alpha 600 as equivalent materials for the outer covering of the Hemyc ERFBS mats. This | Alpha 600 as equivalent materials for the outer covering of the Hemyc ERFBS mats. This | ||
testing used the Refrasil brand fabric. The term Siltemp is most commonly used in the | testing used the Refrasil brand fabric. The term Siltemp is most commonly used in the | ||
nuclear industry to describe the outer covering fabric of the Hemyc ERFBS mats. The NRCs | nuclear industry to describe the outer covering fabric of the Hemyc ERFBS mats. The NRCs | ||
preliminary testing indicates that the material density, thickness, and fabric weave are identical | preliminary testing indicates that the material density, thickness, and fabric weave are identical | ||
| Line 125: | Line 127: | ||
During the fire testing, the outer layer of Siltemp consistently showed thermal shrinkage and | During the fire testing, the outer layer of Siltemp consistently showed thermal shrinkage and | ||
change of color from tan to white. This shrinkage led to some gaps opening between the | change of color from tan to white. This shrinkage led to some gaps opening between the | ||
Hemyc ERFBS mats. NRCs preliminary findings indicate that the color change and shrinkage | Hemyc ERFBS mats. NRCs preliminary findings indicate that the color change and shrinkage | ||
of both Siltemp and Refrasil materials are spatially uniform. Based on preliminary testing both | of both Siltemp and Refrasil materials are spatially uniform. Based on preliminary testing both | ||
Siltemp and Refrasil shrink approximately 8 percent during the ASTM E 119 furnace exposure. | Siltemp and Refrasil shrink approximately 8 percent during the ASTM E 119 furnace exposure. | ||
| Line 139: | Line 141: | ||
(3) using minimum 2-inch overlapping of the mats, and (4) using through bolts with fender | (3) using minimum 2-inch overlapping of the mats, and (4) using through bolts with fender | ||
washers. The Siltemp shrinkage led to the opening of each of the joint systems, which exposed | washers. The Siltemp shrinkage led to the opening of each of the joint systems, which exposed | ||
the assembly (conduit, cable tray, junction box, air drop cable) to the furnace environment. For | the assembly (conduit, cable tray, junction box, air drop cable) to the furnace environment. For | ||
method (1), the shrinkage led to the seams being torn open. For method (2), the mats also | method (1), the shrinkage led to the seams being torn open. For method (2), the mats also | ||
experienced shrinkage, causing openings in the Hemyc ERFBS. It appeared that the 6-inch | experienced shrinkage, causing openings in the Hemyc ERFBS. It appeared that the 6-inch | ||
collar contracted and moved with one side of the material. For method (3), the 2-inch | collar contracted and moved with one side of the material. For method (3), the 2-inch | ||
overlapping joints also opened. For method (4), the through-bolting of the Hemyc mats on the | overlapping joints also opened. For method (4), the through-bolting of the Hemyc mats on the | ||
cable tray designs using the 2-inch air gap appeared to provide the most robust resistance to | cable tray designs using the 2-inch air gap appeared to provide the most robust resistance to | ||
Siltemp shrinkage. However, due to this rigid fixed mounting of the Hemyc mats, the Siltemp experienced tearing of the machine sewn seams and tearing of the Siltemp fabric. All but one | Siltemp shrinkage. However, due to this rigid fixed mounting of the Hemyc mats, the Siltemp experienced tearing of the machine sewn seams and tearing of the Siltemp fabric. All but one | ||
assembly (conduit or cable tray) experienced temperatures capable of damaging plant cables | assembly (conduit or cable tray) experienced temperatures capable of damaging plant cables | ||
| Line 160: | Line 162: | ||
===Supports and Intervening Item Protection=== | ===Supports and Intervening Item Protection=== | ||
With only the 3-inch thick Kaowool protection on supports as required by the vendor manual, the single point temperature rise of 325 oF was exceeded in 13 to 32 minutes. To prevent | With only the 3-inch thick Kaowool protection on supports as required by the vendor manual, the single point temperature rise of 325 oF was exceeded in 13 to 32 minutes. To prevent | ||
corruption of the thermal measurement data for the raceways because of potential thermal | corruption of the thermal measurement data for the raceways because of potential thermal | ||
| Line 166: | Line 168: | ||
short-circuiting from structural supports, this program did not test the raceway and the structural | short-circuiting from structural supports, this program did not test the raceway and the structural | ||
supports together. Intervening metallic items would also be expected to permit the same | supports together. Intervening metallic items would also be expected to permit the same | ||
temperature rise. | temperature rise. | ||
| Line 173: | Line 175: | ||
The significance of the test results is that the Hemyc ERFBS did not perform for one hour as | The significance of the test results is that the Hemyc ERFBS did not perform for one hour as | ||
designed. Observations made during the testing, such as mat shrinkage and thermal shorts | designed. Observations made during the testing, such as mat shrinkage and thermal shorts | ||
through the support protection, were not identified during previous testing of the material. | through the support protection, were not identified during previous testing of the material. | ||
| Line 182: | Line 184: | ||
==CONTACT== | ==CONTACT== | ||
This information notice requires no specific action or written response. Please direct any | This information notice requires no specific action or written response. Please direct any | ||
questions about this matter to the technical contact(s) listed below or the appropriate NRR | questions about this matter to the technical contact(s) listed below or the appropriate NRR | ||
| Line 189: | Line 191: | ||
/RA/ | /RA/ | ||
===Patrick L. Hiland, Chief=== | |||
Reactor Operations Branch | Reactor Operations Branch | ||
Division of Inspection Program Management | ===Division of Inspection Program Management=== | ||
Office of Nuclear Reactor Regulation | Office of Nuclear Reactor Regulation | ||
| Line 201: | Line 202: | ||
301-415-2280 | 301-415-2280 | ||
E-mail: dxf1@nrc.gov | |||
Attachment 1: Hemyc 1-Hour Fire-Rated Test Results | Attachment 1: Hemyc 1-Hour Fire-Rated Test Results | ||
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. experienced tearing of the machine sewn seams and tearing of the Siltemp fabric. All but one | Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. experienced tearing of the machine sewn seams and tearing of the Siltemp fabric. All but one | ||
assembly (conduit or cable tray) experienced temperatures capable of damaging plant cables | assembly (conduit or cable tray) experienced temperatures capable of damaging plant cables | ||
| Line 212: | Line 213: | ||
===Supports and Intervening Item Protection=== | ===Supports and Intervening Item Protection=== | ||
With only the 3-inch thick Kaowool protection on supports as required by the vendor manual, the single point temperature rise of 325 oF was exceeded in 13 to 32 minutes. To prevent | With only the 3-inch thick Kaowool protection on supports as required by the vendor manual, the single point temperature rise of 325 oF was exceeded in 13 to 32 minutes. To prevent | ||
corruption of the thermal measurement data for the raceways because of potential thermal | corruption of the thermal measurement data for the raceways because of potential thermal | ||
| Line 218: | Line 219: | ||
short-circuiting from structural supports, this program did not test the raceway and the structural | short-circuiting from structural supports, this program did not test the raceway and the structural | ||
supports together. Intervening metallic items would also be expected to permit the same | supports together. Intervening metallic items would also be expected to permit the same | ||
temperature rise. | temperature rise. | ||
| Line 225: | Line 226: | ||
The significance of the test results is that the Hemyc ERFBS did not perform for one hour as | The significance of the test results is that the Hemyc ERFBS did not perform for one hour as | ||
designed. Observations made during the testing, such as mat shrinkage and thermal shorts | designed. Observations made during the testing, such as mat shrinkage and thermal shorts | ||
through the support protection, were not identified during previous testing of the material. | through the support protection, were not identified during previous testing of the material. | ||
| Line 234: | Line 235: | ||
==CONTACT== | ==CONTACT== | ||
This information notice requires no specific action or written response. Please direct any | This information notice requires no specific action or written response. Please direct any | ||
questions about this matter to the technical contact(s) listed below or the appropriate NRR | questions about this matter to the technical contact(s) listed below or the appropriate NRR | ||
| Line 241: | Line 242: | ||
/RA/ | /RA/ | ||
===Patrick L. Hiland, Chief=== | |||
Reactor Operations Branch | Reactor Operations Branch | ||
Division of Inspection Program Management | ===Division of Inspection Program Management=== | ||
Office of Nuclear Reactor Regulation | Office of Nuclear Reactor Regulation | ||
| Line 253: | Line 253: | ||
301-415-2280 | 301-415-2280 | ||
E-mail: dxf1@nrc.gov | |||
Attachment 1: Hemyc 1-Hour Fire-Rated Test Results | Attachment 1: Hemyc 1-Hour Fire-Rated Test Results | ||
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. | Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. | ||
ADAMS ACCESSION #: ML050890089 OFFICE | |||
DSSA:SPLB | |||
Tech Editor | |||
DSSA:SPLB | |||
BC:DSSA:/SPLB | |||
D:DSSA | |||
NAME | |||
DFrumkin | |||
PKleene | |||
SWeerakkody | |||
JHannon | |||
SBlack | |||
DATE | |||
04/01/2005 | |||
04/01/2005 | |||
04/01/2005 | |||
04/01/2005 | |||
/ /2005 OFFICE | |||
NMSS | |||
OES:IROB:DIPM | |||
A:SC:OES:IROB:DIPM | |||
C:IROB:DIPM | |||
NAME | |||
RPierson | |||
DATE | CVHodge | ||
EJBenner /RLaura for/ | |||
PLHiland | |||
DATE | |||
04/01/2005 | |||
04/01/2005 | |||
04/01/2005 | |||
04/01/2005 | |||
===OFFICIAL RECORD COPY=== | |||
References: | References: | ||
1. Title 10 of the Code of Federal Regulations, Part 50, Appendix R, Section III.G.2 | 1. Title 10 of the Code of Federal Regulations, Part 50, Appendix R, Section III.G.2 | ||
2. NRC Inspection Report 50-400/1999-13 (ADAMS Accession No. ML003685341); NRC | 2. NRC Inspection Report 50-400/1999-13 (ADAMS Accession No. ML003685341); NRC | ||
| Line 281: | Line 329: | ||
Issues, dated August 1, 2000 (ADAMS Accession No. ML003736721) | Issues, dated August 1, 2000 (ADAMS Accession No. ML003736721) | ||
4. Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination | 4. Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination | ||
Process, Attachment 7, page F7-2 | Process, Attachment 7, page F7-2 | ||
| Line 289: | Line 337: | ||
Conduit , Supports & Junction Box | Conduit , Supports & Junction Box | ||
Time to | Raceway | ||
Time to | |||
Tave > 250oF | |||
(minutes) | |||
Time to | |||
===Single Point=== | |||
T > 325oF | |||
(minutes) | |||
Max. Temp. | |||
1 | Bare #8 | ||
@ 1 hour1 (oF) | |||
===Joint Opening2=== | |||
Yes/No | |||
1" Conduit (1E) | |||
(Empty) | (Empty) | ||
46 | |||
42 | |||
1013 Yes | |||
1" Conduit (1F) | |||
1.02 lb./linear foot (lin.ft.) Cable Fill | 1.02 lb./linear foot (lin.ft.) Cable Fill | ||
44 | |||
34 | |||
1177 Yes | |||
2 1/2 " Conduit (1C) | |||
(Empty) | (Empty) | ||
48 | |||
41 | |||
709 Yes | |||
2 1/2 " Conduit (1D) | |||
5.85 lb./lin.ft. Cable Fill | 5.85 lb./lin.ft. Cable Fill | ||
51 | |||
38 | |||
446 Yes | |||
4" Conduit (1A) | |||
(Empty) | (Empty) | ||
49 | |||
33 | |||
865 Yes | |||
4" Conduit (1B) | |||
14.84 lb./lin.ft. Cable Fill | 14.84 lb./lin.ft. Cable Fill | ||
57 | |||
43 | |||
199 Yes | |||
18 x 24 x 8 | ===Junction Box=== | ||
18 x 24 x 8 | |||
17 | |||
15 NA | |||
2" Tube Steel Support3 | Yes | ||
===Unistrut Support3=== | |||
NA | |||
22 - 32 NA | |||
NA | |||
2" Tube Steel Support3 NA | |||
13 - 25 NA | |||
NA | |||
IN 2005-07 Attachment 1 Hemyc 1-Hour Fire-Rated Test Results | IN 2005-07 Attachment 1 Hemyc 1-Hour Fire-Rated Test Results | ||
| Line 322: | Line 421: | ||
Cable Tray, Junction Box, & Airdrop | Cable Tray, Junction Box, & Airdrop | ||
Raceway | |||
Right Side | |||
Tray Rail | |||
Tave > | |||
250oF | |||
(minutes) | |||
Right Side | |||
Tray Rail | |||
===Single Point=== | |||
T > 325oF | |||
(minutes) | |||
Left Side | |||
Tray Rail | |||
Tave > | |||
250oF | |||
(minutes) | |||
Left Side | |||
Tray Rail | |||
===Single Point=== | |||
T > 325oF | |||
(minutes) | |||
Bare #8 Tave > | |||
250oF | |||
(minutes) | |||
Bare #8 | |||
===Single Point=== | |||
T > 325oF | |||
(minutes) | |||
Bare #8 Max. | |||
Temp. | |||
@ 1 hour | |||
(oF) | |||
Joint | |||
Opening2 Yes/No | |||
12" Cable Tray Empty, | |||
(2A) Direct Attachment | (2A) Direct Attachment | ||
36 | |||
34 | |||
27 | |||
18 | |||
32 | |||
32 | |||
1260 | |||
Yes | |||
12" Cable Tray Empty, | |||
(2B) 2" Air Gap | (2B) 2" Air Gap | ||
37 | |||
35 | |||
38 | |||
35 | |||
33 | |||
34 | |||
1002 Yes | |||
36" Cable Tray Empty, | |||
(2C) Direct Attachment | (2C) Direct Attachment | ||
41 | |||
39 | |||
34 | |||
33 | |||
35 | |||
35 | |||
1330 | |||
Yes | |||
36" Cable Tray Empty, | |||
(2D) 2" Air Gap | (2D) 2" Air Gap | ||
Air Drop, (2E) | 32 | ||
31 | |||
33 | |||
32 | |||
28 | |||
27 | |||
1117 Yes | |||
Air Drop, (2E) | |||
===Direct Attachment=== | ===Direct Attachment=== | ||
NA | |||
NA | |||
NA | |||
NA | |||
35 | |||
32 | |||
1712 Yes | |||
Air Drop, (2F) | |||
2" Air Gap | 2" Air Gap | ||
NA | |||
NA | |||
NA | |||
NA | |||
32 | |||
28 | |||
1411 Yes | |||
18 x24 x 8Junction | |||
Box,(2G) | Box,(2G) | ||
| Line 359: | Line 558: | ||
===Direct Attachment with=== | ===Direct Attachment with=== | ||
Bands 4 | Bands 4 | ||
31 | |||
32 NA | |||
NA | |||
NA | |||
for two reasons. First, to insure the integrity of the thermocouples jacket and insulation during installation, the instrumented | NA | ||
NA | |||
Yes | |||
IN 2005-07 Attachment 1 Notes: | |||
1. | |||
The temperatures recorded on the Bare No. 8 conductor may not be indicative of the actual temperature inside the assembly | |||
for two reasons. First, to insure the integrity of the thermocouples jacket and insulation during installation, the instrumented | |||
Bare No. 8 conductor was located in the center of the cable; therefore it may not have been exposed to the highest | Bare No. 8 conductor was located in the center of the cable; therefore it may not have been exposed to the highest | ||
temperature within the conduit. The second reason was that the joints opened during the testing, producing local hot spots | temperature within the conduit. The second reason was that the joints opened during the testing, producing local hot spots | ||
on the interior of the raceway that may or may not have been picked up by the Bare No. 8 conductor. | on the interior of the raceway that may or may not have been picked up by the Bare No. 8 conductor. | ||
2. | 2. | ||
All Hemyc ERFBSs experienced some thermal shrinkage of the outer Siltemp covering. As a result, some joints opened and | |||
exposed the conduits or cable trays to the furnace environment at various points during the test. | exposed the conduits or cable trays to the furnace environment at various points during the test. | ||
3. | 3. | ||
The time provided for the structural supports was determined to be the time when the single point temperature rise (T ) | |||
exceeded 325 oF at a distance 3 inches into the Hemyc insulation protecting the structural steel. Three inches is the | |||
minimum structural support protection recommended in the vendor manual. | minimum structural support protection recommended in the vendor manual. | ||
4. | 4. | ||
The junction box average temperature is the average across all thermocouples mounted on the outside of the boxs surface. | |||
The single-point temperature is also measured on the external surface of the junction box.}} | The single-point temperature is also measured on the external surface of the junction box.}} | ||
{{Information notice-Nav}} | {{Information notice-Nav}} | ||
Latest revision as of 20:59, 15 January 2025
| ML050890089 | |
| Person / Time | |
|---|---|
| Issue date: | 04/01/2005 |
| From: | Hiland P NRC/NRR/DIPM/IROB |
| To: | |
| frumkin d, 415-2280, NRR/DSSA/SAPLB | |
| References | |
| IN-05-007 | |
| Download: ML050890089 (8) | |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS
WASHINGTON D.C. 20555-0001
April 1, 2005
RESULTS OF HEMYC ELECTRICAL RACEWAY FIRE
BARRIER SYSTEM FULL SCALE FIRE TESTING
ADDRESSEES
All holders of operating licenses for nuclear power reactors, except those who have
permanently ceased operations and have certified that fuel has been permanently removed
from the reactor vessel, and fuel facilities licensees.
PURPOSE
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform
addressees of the results of Hemyc electrical raceway fire barrier system (ERFBS) full-scale fire
tests. The Hemyc ERFBS did not perform for one hour as designed because shrinkage of the
Hemyc ERFBS occurred during the testing. It is expected that recipients will review the
information for applicability to their facilities and consider actions as appropriate to avoid similar
problems. However, suggestions contained in this information notice are not NRC
requirements; therefore, no specific action or written response is required.
BACKGROUND
The Hemyc ERFBS, manufactured by Promatec, Inc., has been installed at nuclear power
plants (NPPs) to protect circuits in accordance with regulatory requirements (Reference 1) and
plant-specific commitments.
As a result of fire protection inspections, unresolved items (URIs) were opened at some nuclear
power stations due to questions raised regarding the fire resistance capability of the Hemyc
ERFBS (Reference 2). The Office of Nuclear Reactor Regulation (NRR) performed a review of
the Hemyc ERFBS (Reference 3) and requested the NRCs Office of Nuclear Regulatory
Research (RES) to perform confirmatory testing of this ERFBS. RES performed the testing at
the Omega Point Laboratories in Elmendorf, Texas.
DISCUSSION
This information notice describes the results of the investigation of the fire resistance capability
of the Hemyc ERFBS (Attachment 1). The NRC performed two ASTM E 119 furnace tests on a
number of cable raceway types that are protected by the Hemyc ERFBS (with and without air
gaps) in accordance with the Hemyc ERFBS test plan (see ADAMS Accession No.
ML043210141 for a preliminary version of the test plan). The test plan provides
a detailed discussion of the assemblies and the thermocouple positions. The Hemyc ERFBS
tests were performed for a period of 60-minutes each, followed by a hose stream test and post- test visual inspection of the ERFBS.
A bare No. 8 stranded copper conductor, instrumented with thermocouples every 6 inches
along its length, was routed through each of the conduit and cable tray test specimens.
Additional thermocouples were mechanically attached to the outer surfaces of the conduit test
specimens and along the length of both side rails of the cable tray test specimens at 6-inch
intervals. All results in Attachment 1 refer to the additional thermocouples attached to the outer
surfaces of the conduits and cable trays unless otherwise stated.
Shrinkage of the Outer Covering
The Hemyc ERFBS is constructed of Hemyc mats consisting of Kaowool insulation inside an
outer covering of Siltemp high-temperature fabric. The mats are machine-stitched at the
factory to fit each electrical raceway installation. Hemyc mats that are directly wrapped around
the electrical raceway use 2-inch-thick Kaowool. Hemyc mats that are installed over spaced
frames to provide a 2-inch air gap between the Hemyc and the electrical raceway (for cable tray
protection) use 11/2-inch-thick Kaowool.
While Siltemp is a frequently used descriptor for the outer covering, and thus is used
generically in this information notice, the material originally known as Siltemp is not now
available commercially. The Promatec vendor manual references either Siltemp, Refrasil, or
Alpha 600 as equivalent materials for the outer covering of the Hemyc ERFBS mats. This
testing used the Refrasil brand fabric. The term Siltemp is most commonly used in the
nuclear industry to describe the outer covering fabric of the Hemyc ERFBS mats. The NRCs
preliminary testing indicates that the material density, thickness, and fabric weave are identical
for both Siltemp and Refrasil.
During the fire testing, the outer layer of Siltemp consistently showed thermal shrinkage and
change of color from tan to white. This shrinkage led to some gaps opening between the
Hemyc ERFBS mats. NRCs preliminary findings indicate that the color change and shrinkage
of both Siltemp and Refrasil materials are spatially uniform. Based on preliminary testing both
Siltemp and Refrasil shrink approximately 8 percent during the ASTM E 119 furnace exposure.
Opening of the Joints
This testing examined the four most common methods of joining the Hemyc material into a
complete ERFBS: (1) using stitched joints, (2) using minimum 6-inch collars over a joint,
(3) using minimum 2-inch overlapping of the mats, and (4) using through bolts with fender
washers. The Siltemp shrinkage led to the opening of each of the joint systems, which exposed
the assembly (conduit, cable tray, junction box, air drop cable) to the furnace environment. For
method (1), the shrinkage led to the seams being torn open. For method (2), the mats also
experienced shrinkage, causing openings in the Hemyc ERFBS. It appeared that the 6-inch
collar contracted and moved with one side of the material. For method (3), the 2-inch
overlapping joints also opened. For method (4), the through-bolting of the Hemyc mats on the
cable tray designs using the 2-inch air gap appeared to provide the most robust resistance to
Siltemp shrinkage. However, due to this rigid fixed mounting of the Hemyc mats, the Siltemp experienced tearing of the machine sewn seams and tearing of the Siltemp fabric. All but one
assembly (conduit or cable tray) experienced temperatures capable of damaging plant cables
(Reference 4).
Supports and Intervening Item Protection
With only the 3-inch thick Kaowool protection on supports as required by the vendor manual, the single point temperature rise of 325 oF was exceeded in 13 to 32 minutes. To prevent
corruption of the thermal measurement data for the raceways because of potential thermal
short-circuiting from structural supports, this program did not test the raceway and the structural
supports together. Intervening metallic items would also be expected to permit the same
temperature rise.
Significance of Results
The significance of the test results is that the Hemyc ERFBS did not perform for one hour as
designed. Observations made during the testing, such as mat shrinkage and thermal shorts
through the support protection, were not identified during previous testing of the material.
Consequently, the Hemyc ERFBS does not provide the level of protection expected for a rated
1-hour fire barrier.
CONTACT
This information notice requires no specific action or written response. Please direct any
questions about this matter to the technical contact(s) listed below or the appropriate NRR
project manager.
/RA/
Patrick L. Hiland, Chief
Reactor Operations Branch
Division of Inspection Program Management
Office of Nuclear Reactor Regulation
Technical Contact:
Daniel Frumkin, NRR/DSSA
301-415-2280
E-mail: dxf1@nrc.gov
Attachment 1: Hemyc 1-Hour Fire-Rated Test Results
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. experienced tearing of the machine sewn seams and tearing of the Siltemp fabric. All but one
assembly (conduit or cable tray) experienced temperatures capable of damaging plant cables
(Reference 4).
Supports and Intervening Item Protection
With only the 3-inch thick Kaowool protection on supports as required by the vendor manual, the single point temperature rise of 325 oF was exceeded in 13 to 32 minutes. To prevent
corruption of the thermal measurement data for the raceways because of potential thermal
short-circuiting from structural supports, this program did not test the raceway and the structural
supports together. Intervening metallic items would also be expected to permit the same
temperature rise.
Significance of Results
The significance of the test results is that the Hemyc ERFBS did not perform for one hour as
designed. Observations made during the testing, such as mat shrinkage and thermal shorts
through the support protection, were not identified during previous testing of the material.
Consequently, the Hemyc ERFBS does not provide the level of protection expected for a rated
1-hour fire barrier.
CONTACT
This information notice requires no specific action or written response. Please direct any
questions about this matter to the technical contact(s) listed below or the appropriate NRR
project manager.
/RA/
Patrick L. Hiland, Chief
Reactor Operations Branch
Division of Inspection Program Management
Office of Nuclear Reactor Regulation
Technical Contact:
Daniel Frumkin, NRR/DSSA
301-415-2280
E-mail: dxf1@nrc.gov
Attachment 1: Hemyc 1-Hour Fire-Rated Test Results
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.
ADAMS ACCESSION #: ML050890089 OFFICE
DSSA:SPLB
Tech Editor
DSSA:SPLB
BC:DSSA:/SPLB
D:DSSA
NAME
DFrumkin
PKleene
SWeerakkody
JHannon
SBlack
DATE
04/01/2005
04/01/2005
04/01/2005
04/01/2005
/ /2005 OFFICE
OES:IROB:DIPM
A:SC:OES:IROB:DIPM
C:IROB:DIPM
NAME
RPierson
CVHodge
EJBenner /RLaura for/
PLHiland
DATE
04/01/2005
04/01/2005
04/01/2005
04/01/2005
OFFICIAL RECORD COPY
References:
1. Title 10 of the Code of Federal Regulations, Part 50, Appendix R,Section III.G.2
2. NRC Inspection Report 50-400/1999-13 (ADAMS Accession No. ML003685341); NRC
Inspection Reports 50-369/2000-09 and 50-370/2000-09 (ADAMS Accession No.
3. NRR Response to Task Interface Agreement (TIA)99-028, Shearon Harris Nuclear Power
Plant, Unit 1 - Resolution of Pilot Fire Protection Inspection Fire Barrier Qualification
Issues, dated August 1, 2000 (ADAMS Accession No. ML003736721)
4. Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination
Process, Attachment 7, page F7-2
IN 2005-07 Attachment 1 Hemyc 1-Hour Fire-Rated Test Results
Conduit , Supports & Junction Box
Raceway
Time to
Tave > 250oF
(minutes)
Time to
Single Point
T > 325oF
(minutes)
Max. Temp.
Bare #8
@ 1 hour1 (oF)
Joint Opening2
Yes/No
1" Conduit (1E)
(Empty)
46
42
1013 Yes
1" Conduit (1F)
1.02 lb./linear foot (lin.ft.) Cable Fill
44
34
1177 Yes
2 1/2 " Conduit (1C)
(Empty)
48
41
709 Yes
2 1/2 " Conduit (1D)
5.85 lb./lin.ft. Cable Fill
51
38
446 Yes
4" Conduit (1A)
(Empty)
49
33
865 Yes
4" Conduit (1B)
14.84 lb./lin.ft. Cable Fill
57
43
199 Yes
Junction Box
18 x 24 x 8
17
15 NA
Yes
Unistrut Support3
NA
22 - 32 NA
NA
2" Tube Steel Support3 NA
13 - 25 NA
NA
IN 2005-07 Attachment 1 Hemyc 1-Hour Fire-Rated Test Results
Cable Tray, Junction Box, & Airdrop
Raceway
Right Side
Tray Rail
Tave >
250oF
(minutes)
Right Side
Tray Rail
Single Point
T > 325oF
(minutes)
Left Side
Tray Rail
Tave >
250oF
(minutes)
Left Side
Tray Rail
Single Point
T > 325oF
(minutes)
Bare #8 Tave >
250oF
(minutes)
Bare #8
Single Point
T > 325oF
(minutes)
Bare #8 Max.
Temp.
@ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
(oF)
Joint
Opening2 Yes/No
12" Cable Tray Empty,
(2A) Direct Attachment
36
34
27
18
32
32
1260
Yes
12" Cable Tray Empty,
(2B) 2" Air Gap
37
35
38
35
33
34
1002 Yes
36" Cable Tray Empty,
(2C) Direct Attachment
41
39
34
33
35
35
1330
Yes
36" Cable Tray Empty,
(2D) 2" Air Gap
32
31
33
32
28
27
1117 Yes
Air Drop, (2E)
Direct Attachment
NA
NA
NA
NA
35
32
1712 Yes
Air Drop, (2F)
2" Air Gap
NA
NA
NA
NA
32
28
1411 Yes
18 x24 x 8Junction
Box,(2G)
Direct Attachment with
Bands 4
31
32 NA
NA
NA
NA
NA
Yes
IN 2005-07 Attachment 1 Notes:
1.
The temperatures recorded on the Bare No. 8 conductor may not be indicative of the actual temperature inside the assembly
for two reasons. First, to insure the integrity of the thermocouples jacket and insulation during installation, the instrumented
Bare No. 8 conductor was located in the center of the cable; therefore it may not have been exposed to the highest
temperature within the conduit. The second reason was that the joints opened during the testing, producing local hot spots
on the interior of the raceway that may or may not have been picked up by the Bare No. 8 conductor.
2.
All Hemyc ERFBSs experienced some thermal shrinkage of the outer Siltemp covering. As a result, some joints opened and
exposed the conduits or cable trays to the furnace environment at various points during the test.
3.
The time provided for the structural supports was determined to be the time when the single point temperature rise (T )
exceeded 325 oF at a distance 3 inches into the Hemyc insulation protecting the structural steel. Three inches is the
minimum structural support protection recommended in the vendor manual.
4.
The junction box average temperature is the average across all thermocouples mounted on the outside of the boxs surface.
The single-point temperature is also measured on the external surface of the junction box.