ML081330603: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:w
{{#Wiki_filter:* -
  *- Appendix C                     Job Performance Measure                    Form ES-C-1 WORKSt-i EET Facility:     Oyster Creek--                   Task No.:       COO00030             __-
Appendix C w
Task
Form ES-C-1 Job Performance Measure WORKS t-i E ET Facility:
Oyster Creek--
Task No.:
COO00030 Task


==Title:==
==Title:==
_Review
_ _ _ - _ _ ~ - ~
_ _ - a_Shift
Review a Shift Turnover
_ ~Turnover
_____ Checklist  
                                                ~    Checklist
~  
                                                        ~         ~ -            ___.      -
~
Job Performance Measure No.:           NRC JF'M. ADMIN SROl
Job Performance Measure No.:
_      _ __  [SRO)
                                                                            -_ -~
WA  
WA  


==Reference:==
==Reference:==
Generic 2.1,3(SRO
Generic 2.1,3(SRO 3.4) __
                        --                      3.4)   __
Examinee:
Examinee:       ~          ~      ~
Examiner:
Examiner:         _                      -~
Facility Evaluator:  
Facility Evaluator:   ~   -  -              - [late:         _ - __~______    -    _-  -
~  
- [late:
Method of Testing:
Method of Testing:
Simulated Performance                   - ~   - Actual Performance           ~
NRC JF'M. ADMIN SROl
X Classroom             X Simulator        ~   ___ - ~   Plant         ~ ~ -~
[SRO)
Read to the Examinee:
-_ -~
-~
~
~
~
_ - _ _ ~ _ _ _ _ _ _ - _- -
X Simulated Performance  
~  
- Actual Performance  
~
Classroom  
~  
~
Plant  
~  
~ -~
X Simulator Read to the Examinee:
1 will explain the initial conditions, which stieps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
1 will explain the initial conditions, which stieps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
Line 54: Line 72:
: 1. OP-OC-100-1002, Main Control Room Turnover Checklist (Operating Mode), revision 5.
: 1. OP-OC-100-1002, Main Control Room Turnover Checklist (Operating Mode), revision 5.
: 2. Technical Specifications 3.7, Auxiliary Electrical Power.
: 2. Technical Specifications 3.7, Auxiliary Electrical Power.
: 3. Procedure OP-OC-108-104-1001,(Guidancefor Limiting and Administrative Conditions for Operations, revision 0.
: 3. Procedure OP-OC-108-104-1001, (Guidance for Limiting and Administrative Conditions for Operations, revision 0.
: 4. Procedure 324, Thermal Dilution Pumps, revision 69.
: 4. Procedure 324, Thermal Dilution Pumps, revision 69.
NRC JPM ADMlN SROl                                                             Page 1 of 15
NRC JPM ADMlN SROl Page 1 of 15  


*' Appendix C                 Job Performance Measure               Form ES-C-1 WORKSHEET Initiating Cue: As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions. Provide any responses on the handout.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions. Provide any responses on the handout.
Time Critical Task: No.
Time Critical Task: No.
Validation Time:     22 minutes NRC JPM ADMIN SRO1                                                 Page 2 of 15
Validation Time:
22 minutes NRC JPM ADMIN SRO1 Page 2 of 15  


c Appendix C                         Job Performance Measure                 Form ES-C-1 WORKSHEET
c Appendix C Job Performance Measure WORKSHEET Form ES-C-1
            -    _ _ ~-
_ _ ~ -
Performance lriformation Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Performance lriformation Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the1 completed Turnover Sheet.
Standard:
Comment:
Comment:
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the1 completed Turnover Sheet.
Note: The following steps may be performed in any order.
Note: The following steps may be performed in any order.
J           Performance Step: 2 Procedure Step: Reviews thle Turnover Checklist.
J Performance Step: 2 Procedure Step: Reviews thle Turnover Checklist.
Standard:       Reviews the Turnover Checklist and notes the following:
Standard:
Reviews the Turnover Checklist and notes the following:
The TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 2 switch position is not annotated. (The switch should be in NORMAL.)
The TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 2 switch position is not annotated. (The switch should be in NORMAL.)
Comment:
Comment:  
                ~   - _ _ _ __ _ _      -        - _ _ _ _ - - ~ - - ______   - - ~-   -
~  
                ~       ~ _ _ _ -_-    -_     _ - - _-___~-~~             -  . -_ _
- _ _ _ _ - - ~ - - ______  
                  -                -  ~       -~                 -___          _ _ ._ _
- - ~- -  
SAT/UNSAT NRC JPM ADMIN SRO1                                                         Page 3 of 15
~
~
_ - - _ - _ _ _ ~ - ~ ~  
~  
-~
SAT/UNSAT NRC JPM ADMIN SRO1 Page 3 of 15  


c Appendix C             Job Performance Measure                   Form ES-C-I WORKSHEET Performance Information J     Performance Step: 3
c Appendix C Job Performance Measure Form ES-C-I WORKSHEET Performance Information J
  ~-     ~-
Performance Step: 3  
~-  
~-
Procedure Step: Reviews the Turnover Checklist.
Procedure Step: Reviews the Turnover Checklist.
Standard: Reviews the Turnover Checklist and notes the following:
Standard:
Reviews the Turnover Checklist and notes the following:
Technical Specification 3.7.C.2 states that if one diesel generator becomes inoperable during power operation, repairs shall be initiated immediately and the other diesel shall be operated at least one hour every 24 hours at greater than 80% rated load until repairs are completed.
Technical Specification 3.7.C.2 states that if one diesel generator becomes inoperable during power operation, repairs shall be initiated immediately and the other diesel shall be operated at least one hour every 24 hours at greater than 80% rated load until repairs are completed.
Procedure OP-OC-I08-104-1001, Guidance for Limiting and Administrative Conditions for Operations, states that EDG 2 shall be satisfactorily tested by 2000 on April 19, 2008. This is 24 hours from when EGD 1 was declared inoperable - not 24 hours from when EDG 1 was tagged out for repair. To comply with Technical Specifications, EDG 2 needs to be tested (636.4.013, EDG 2 Load Test) by 2000 on April 19, 21008.
Procedure OP-OC-I 08-1 04-1001, Guidance for Limiting and Administrative Conditions for Operations, states that EDG 2 shall be satisfactorily tested by 2000 on April 19, 2008. This is 24 hours from when EGD 1 was declared inoperable - not 24 hours from when EDG 1 was tagged out for repair. To comply with Technical Specifications, EDG 2 needs to be tested (636.4.013, EDG 2 Load Test) by 2000 on April 19, 21008.
Comment:
Comment:  
              ~-                 ~
~-  
SAT/UNSAT NRC JPM ADMIN SRO1                                               Page 4 of 15
~
* Appendix C             Job Performance Measure                       Form ES-C-1 WORKSHEET performance lriformation J     Performance Step: 4 Procedure Step: Reviews the Turnover Checklist.
SAT/UNSAT NRC JPM ADMIN SRO1 Page 4 of 15  
Standard: Reviews the Reactor Core State Parameters printout and notes the following:
 
0   IAW Core Thermal Limits Verification of Procedure 202.1, Power Operation, the thermal limits shall be reviewed and compared against Column C of Attachment 202.1-5. This comparison shows that MAPLHGR (currently at 100.01) is above the limiting value of 100. The actions from Column C include the following:
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET performance lriformation J
o Follow the requirements of TS 3.10 as applicable; During POWER OPERATION the maximum AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHlGR) for each fuel type as a function of exposure shall not exceed the limits specified in the CORE OPERATING LIMITS REPORT (COLR)
Performance Step: 4 Procedure Step: Reviews the Turnover Checklist.
Standard:
Reviews the Reactor Core State Parameters printout and notes the following:
0 IAW Core Thermal Limits Verification of Procedure 202.1, Power Operation, the thermal limits shall be reviewed and compared against Column C of Attachment 202.1 -5. This comparison shows that MAPLHGR (currently at 100.01) is above the limiting value of 100. The actions from Column C include the following:
o Follow the requirements of TS 3.1 0 as applicable;  
. During POWER OPERATION the maximum AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHlGR) for each fuel type as a function of exposure shall not exceed the limits specified in the CORE OPERATING LIMITS REPORT (COLR)
If any time during POWER OPERATION it is determined b y normal surveillance that the limiting value for APL-HGR is being exceeded, action shall be initiated to restore operation to within the prescribed limits. If the APLHGR is not returned to within the prescribed limits within two hours, action shall initiated to bring the reactor to the COLD SHUTDOWN CONDITION within 36 hours. During this period surveillance and corresponding action shall continue until reactor operation is within the prescribed limits at which time POWER OPERATION may be continued.
If any time during POWER OPERATION it is determined b y normal surveillance that the limiting value for APL-HGR is being exceeded, action shall be initiated to restore operation to within the prescribed limits. If the APLHGR is not returned to within the prescribed limits within two hours, action shall initiated to bring the reactor to the COLD SHUTDOWN CONDITION within 36 hours. During this period surveillance and corresponding action shall continue until reactor operation is within the prescribed limits at which time POWER OPERATION may be continued.
o Notify Manager Reactor Engineering and Director Operat ions.
o Notify Manager Reactor Engineering and Director Ope rat ions.
Comment:
Comment:  
                      -    -            -    ~-   -       ~   -~   -       ~     -
~- -
JPM Stop Time:
~
NRC JPM ADMIN SRO1                                                    Page 5 of 15
~
-~
NRC JPM ADMIN SRO1 JPM Stop Time:
Page 5 of 15  


rcI Appendix C                 Job Performance Measure           Form ES-C-1 WORKSHEET Validation of Completion JPM Number:         _NRC
rcI Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number:
                          - ~   J P Y P(DM!!!-SR!-_-._
NRC
Examinees Name:                         ~       - _ _ _
~
Examiners Name:               _ _              _    - _
JPY P(DM!!!-SR!-_-._
Date Performed:       _                    ~     . __ - _
Examinees Name:  
Facility Evaluator:     ~_   __
~
Number of Attempts:       _._____          -~  _~
Examiners Name:
    -rime to Complete:               __            _____
Date Performed:  
Question:
~
Facility Evaluator:  
~_
Number of Attempts:
_. _ _ _ _ _ _ ~
-~  
-rime to Complete:
Question:  


===Response===
===Response===
Result:               SatisfactoryAJnsatisfactory Examiners Signature and Date:               ~_ __   _- - ~ - -
Result:
NRC JPM ADMIN SRO1                                             Page 6 of 15
SatisfactoryAJnsatisfactory Examiners Signature and Date:  
~_ __ _- -  
~ - -
NRC JPM ADMIN SRO1 Page 6 of 15  


I . Appendix C               Job Performance Measure                 Form ES-C-1 WORKSI-I1EET Sim ulato r Set up
I.
Appendix C Job Performance Measure Form ES-C-1 WORKSI-I1 EET Si m u lat o r Set up
: 1. None.
: 1. None.
: 2. Include a cope of Core State Parameters Admin SROl along with the Student Handout and the Turnover sheet to the candidate at the start of this JPM.
: 2. Include a cope of Core State Parameters Admin SROl along with the Student Handout and the Turnover sheet to the candidate at the start of this JPM.
NRC JPM ADMIN SROl                                               Page 7 of 15
NRC JPM ADMIN SROl Page 7 of 15  
* AppendixC                     Job Performance Measure               Form ES-C-1 WORKSHIEET STUDENT HANDOUT Initial Conditions:
 
AppendixC Job Performance Measure Form ES-C-1 WORKSHIEET STUDENT HANDOUT Initial Conditions:
: 1. The plant is at rated power with all Recirculation Pumps on.
: 1. The plant is at rated power with all Recirculation Pumps on.
: 2. You are the oncoming Unit Supervisor after being off for the last 12 hours.
: 2. You are the oncoming Unit Supervisor after being off for the last 12 hours.
Line 123: Line 172:
Task Cue:
Task Cue:
As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) arid note any discrepancies and/or any required actions. Provide any responses on the handout.
As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) arid note any discrepancies and/or any required actions. Provide any responses on the handout.
NRC JPM ADMlN SROl                                                   Page 8 of 15
NRC JPM ADMlN SROl Page 8 of 15  


0P-0c-100-1002 Revision 5 DCC FILE if 20.70.01.01.03 MAIN CONTROL ROOM 'TURNOVER CHECKLIST (0PERAT1PJ G MODE)
MAIN CONTROL ROOM 'TURNOVER CHECKLIST (0 P E RAT1 PJ G MOD E) 0P-0c-100-1002 Revision 5 DCC FILE if 20.70.01.01.03 i
_ _ _ _ ~         _-                   __.-    _ _ _ ~ _     ___            _ _ _ - -__ -        -
I i
i Reactor Hi/Lo Level Bistable Test and Calibration, 619.3 113 I
_ _ _ _ ~ _-
Survetllance(s) in progress 1 Stack RAGEMS Sample
_ _ _ ~ _
                                                              --   -                  - and-Effluent
Reactor Hi/Lo Level Bistable Test and Calibration, 619.3 113 Survetllance(s) in progress I
                                                                                          -              Flow - Functional Test, 621 3 024 i
1 Stack  
I
-- RAGEMS Sample and-Effluent Flow -
                                            -          1 1    _                    _ _ _ . _ _ _ _7 I
Functional Test, 621 3 024 1
Main Generator
4 7.-
                                                                      - _ _Exciter Brush Inspection 4
1 Main Generator Exciter Brush
FireHose Station, Plose House and Fire Hydrant Inspection, 645 6.003,-
- Inspection FireHose Station, Plose House and Fire Hydrant Inspection, 645 6.003,-
Activities in progress
I Activities in progress  
                                                                                                                                        ---LA I
---LA Safety System Status I
1   -___-________                                           Safety System Status                                    -___________
1 -___-________  
Identify \y\tem or component\ that are in a degraded mode of' o p e r a h pcrnizted by the 1echiiic:ll Specificationr. For each \y$tem, compare the length of time it is degraded with the Technical Specification Action Statcmenl. Specifj the frequency of redundant sj\tem verification or testing and
, thcdate/tk o f i w ! % E -  
, APRM 1 is in BYPASS due to failure of the APRM Surveillar.lce Test - Front Panel Check (620.4 002) All other thcdate/tk o f i w ! % E -        ~    ~    - _                              --_ _                              _____
~
I APRMs
~
      -        operable.                                                           --_                                        -      -        -    -  -
Identify \\y\\tem or component\\ that are in a degraded mode of' o p e r a h pcrnizted by the 1echiiic:ll Specificationr. For each \\y$tem, compare the length of time it is degraded with the Technical Specification Action Statcmenl. Specifj the frequency of redundant sj\\tem verification or testing and APRM 1 is in BYPASS due to failure of the APRM Surveillar.lce Test - Front Panel Check (620.4 002) All other I
, EDG 1 tagged     - outofservice
APRMs operable.  
_-        at53E-on
, EDG 1 tagged  
                                          -  -    -      4/18/08.
- outofservice at53E-on 4/18/08.  
                                                          - - ._ 7- - d a y C--O . EDG - 2 testixevery__- 24 hours           - - - . __  --    -  -
-._ 7-dayCO.
Compensatory Comments                                                             __--
-- EDG  
k a n y compenmtory action\ in effect as a result of'l'rocedure CC-AA-112 ('I enip Mod), Procedure WC-AA-101 (On-Line Maintenance). out of wrvice plant eqnipment or components, or as directed by the SM or OS.                                                                 _____
- 2 testixevery
k D G 2 and associated systems               -are --
__ - 24 hours - - -. _ _ - -
protected IAW---  Procedure
Compensatory Comments k
                                                                            - _ _ 341 due to -EDG     _ _1 inoperable.
a n
t                                                           - -  -                  - - -      -  -                                    -
y compenmtory action\\ in effect as a result of'l'rocedure CC-AA-112 ('I enip Mod), Procedure WC-AA-101 (On-Line Maintenance). out of wrvice plant eqnipment or components, or as directed by the SM or OS.
Recording Offgas Radiation Monitor levels every hour due to AOG
k D G 2 and associated systems are protected IAW Procedure 341 due to EDG 1 inoperable.
                                            - -                                    --      trip. No adverse
t Recording Offgas Radiation Monitor levels every hour due to AOG trip. No adverse trends noted-Turnover Comments 1
                                                                                                  -  - - -      trends. noted-1                                      ___-..__
EDG 1 declared inoperable at 2000 on 4/18/08, and tagged :)ut for repair at 2300 on 4/18/08 Electrical Maintenance  
Turnover Comments     _____                _____ __.__                          ______
~ reports a ground in the control system and is continuing to investigate. There IS currently no estimate on the return-to-service time IAW Technical Specifications, EDG 2 must complete a satisfactory surveillance by 2300 on 411 9/08 I (AnnuncJators T4bLT5bJ I AOG tripped 1600 4/18/08 and remains outofserice -41 required actions completed. (Annunciators 10F3b. 1 OXF3d 1 1 OXF4d).
EDG 1 declared inoperable at 2000 on 4/18/08, and tagged :)ut for repair at 2300 on 4/18/08 Electrical Maintenance
NRC JPM ADMIN SRO1 Page 9 of 15  
~ reports a ground in the control system and is continuing to investigate. There IS currently no estimate on the return-to-service time IAW Technical Specifications, EDG 2 must complete a satisfactory surveillance by 2300 on 4119/08 I (AnnuncJators T4bLT5bJ                   - --              . -    - -            -    -_-      -      -      -    --_                      __
I                                   --  --    -                                    ---              -  -- - - -                  -    - -
AOG tripped 1600 4/18/08 and remains outofserice -41required actions completed. (Annunciators 10F3b. 1OXF3d 1 1OXF4d).
NRC JPM ADMIN SRO1                                                                                                                 Page 9 of 15


OP -0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 1         ~
OP -0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Shift
Shift I
* Shift Unit Supervisor
* i 1
I osfi slsul(
~
__J--
__J--
osfi slsul(
* Signature acknowledges all qualifications to stand watch are current and any changes in medical status have been reported IAW OP-AA-I 05-1 01.
Shift *          '      Unit Supervisor
NRC JPM ADMIN SROl Page 10 of 15  
* i
* Signature acknowledges all qualifications to stand watch are current and any changes in medical status have been reported IAW OP-AA-I05-101.
N R C JPM ADMIN SROl                                                                           Page 10 of 15


I
I MAIN CON'I'ROL ROOM TURNOVER CHECKLIST
          .                                                                                  0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.010 3 MAIN CON'I'ROL ROOM TURNOVER CHECKLIST
((IONTIN IJEI))
((IONTIN IJEI))
                              -~
0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01 0 3
I .
-~
EDG2satus
I.
                                      -  -          ~-_.__-         _______
EDG2satus  
V-24-29 isolationIsTgnal bypass switch in n o r - a l V-24-30 isolation sigEl bypass switch in normal TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 1 in normal TORUSIDW VENT &PURGE ISOLVLVS H I R BYP CHAN 2 in normal --
~- _.__- _______
                                                        - ._-      _    ~-    -  _ - -  -~
V-24-29 isolationIsTgnal bypass switch in nor-al V-24-30 isolation sigEl bypass switch in normal TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 1 in normal BYP CHAN
2anel11R EF 1-8control switch in auto EF 1-9control switch in auto Panel 13R Pond Pump select switch One pump -  - in auto,
_ - 2 in normal --
                          - one - - - pump in manual-
2anel11R EF 1-8 control switch in auto EF 1 -9control switch in auto Panel 13R Pond Pump select switch TORUSIDW VENT &PURGE ISOL VLVS H I R
                                                  -                    ~                -          -    -
- -~
Panel I       ~XR                                                                                                - 1 CNTMT VENT AND PURGE isolATloN X
~- -
BYPASS in normal Panel
One pump in auto, one pump in manual -
    -          11XR                 ___.
Panel I ~ X R 1
Main Generator Digital Protective Re1 (DPRS A and 8) operating with n indications                             ___---____
~
Panels 12XR, Confirm
CNTMT VENT AND PURGE isolATloN BYPASS in normal Panel 11XR Main Generator Digital Protective Re1 (DPRS A and 8) operating with n indications Confirm fans on rear of panels operating I
              ~
7-7x  
              ~-
- l Y j i - ---E _I_--  
                  ~
!NO Panels
13R714R (rear fans on rear of panels
~
_~
: 12XR,
                                          - _ _ of panels)__
_ 13R7 14R
                                                    ~
_~ (rear of panels)__
operating
~
                                                              -_  7-7x - l Y j i - ---E_I_--
~-  
                                                                              --              _        !NO   -
~
I NRC JPM ADMIN SROl                                                                             Page 11 of 15
X NRC JPM ADMIN SROl Page 11 of 15  


0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 General
0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 General  
- - - Turnover
- - - Turnover
__ -       Checks Core Maneuvering Daily instruction Sheet, Attachment 1001.22-3 and reflectsplant_operati_ngconditions. - -
__ - Checks Core Maneuvering Daily instruction Sheet, Attachment 1001.22-3 and reflects plant_operati_ng conditions.
Control room panel walkdown_perfofmed_neat-end ofshift.
Control room panel walkdown_perfofmed_neat-end  
                  ---  ~
~
Reviewed reasons for annun-ciated-alarms with all operators   - _    -- _
ofshift.
Control room panel walkdown performed withoncoming shift_                     - ~-        Yes Performed light test on alarm windows.
Reviewed reasons for annun-ciated-alarms with all operators Control room panel walkdown performed withoncoming shift_
-   _                              -  -   ~-   ~
Yes Performed light test on alarm windows.  
Yes NRC JPM ADMlN SROl                                                               Page 12 of 15
~-  
~
Yes
- ~-
NRC JPM ADMlN SROl Page 12 of 15  


a :                                                       0P-0c-100-1002 Revision 5 DCC FILE 11 20.70.01.01.03 Control Room ,Alarm Sheet                      Page 1 Shift 0000 - 1200 Date 41 19/08 A 13 C 1) E I' i r- I   1p-r-r   1 x i t t ; ' I I A 13 C I)  E I+'
a :
NRC JPM ADMlN SROl                                              Page 13 of 15
Control Room,Alarm Sheet Shift 0000 - 1200 Date 41 19/08 A
13 C I) E I+'
NRC JPM ADMlN SROl 0P-0c-100-1002 Revision 5 DCC FILE 11 20.70.01.01.03 A
13 C
: 1)
E I'
i r-I 1 p - r - r 1
Page 1 x
i t
t I
I Page 13 of 15  


0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Control Room Alarm Sheet                             Page2 A I3 C D E 17   A I3 C I) E F 9XF A 13 C 1) E F A R C D E F G H K M 1
Control Room Alarm Sheet A I3 C D E 17 A 13 C 1) E F A R C D E F G H K M F
1 2 3 4 10 11' 1
2 3
2 3
4 1011'            5 6
4 5
7 8
6 7
9 F
8 9
10 1 2 3 4                                11 12 12F R0 Remarks Reviewed By:                               -
10 11 12 0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Page2 A I3 C I) E F 9XF 12F R 0 Remarks Reviewed By:
NRC JPM ADMIN SROl                                     Page 14 of 15
NRC JPM ADMIN SROl Page 14 of 15  


STUDENT HANDOUT Name:                      Date:
STUDENT HANDOUT Name:
NRC JPM ADMlN SRO1                 Page 15 of 15
NRC JPM ADMlN SRO1 Date:
Page 15 of 15  


VI I
I VI e e k
eeI k
u e
Y u
I Y
e I_
I_  


I Appendix C                     Job Performance Measure                   Form ES-C-1 WORKSHEET Job Performance Measure No.:           NRC JFM ADMIN_SR02/SBFl
I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Job Performance Measure No.:
                                          ~
NRC  
WA  
~
JFM ADMIN_SR02/SBFl WA  


==Reference:==
==Reference:==
Generic 2.1.141SRO
Generic  
                              ~-  . __        3.31_ _ __
~- 2.1.141SRO 3.31 _ _
Facility Evaluator:                           Date:       _________        ---_ --
Facility Evaluator:
Date:
Method of Testing:
Method of Testing:
Simulated Performance               -      -  Actual Performance               X Classroom             _X        Simulator     -              Plant Read to the Examinee:
Simulated Performance Actual Performance X
Classroom
_ X Simulator Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Init ial Conditions:
In it ial Conditions:
: 1. A plant startup is in progress.
: 1. A plant startup is in progress.
: 2. The REACTOR MODE SELECTOR switch is in STARTUP
: 2. The REACTOR MODE SELECTOR switch is in STARTUP
Line 252: Line 316:
Task Standard: The Candidate completes the Shift Managers Notification Worksheet IAW OP-AA-106-101, Significant Event Reporting, and determines notification is required due to an unexpected /2 scram and entry into a 5 72-hour shutdown LCO.
Task Standard: The Candidate completes the Shift Managers Notification Worksheet IAW OP-AA-106-101, Significant Event Reporting, and determines notification is required due to an unexpected /2 scram and entry into a 5 72-hour shutdown LCO.
Required Materials: None.
Required Materials: None.
NRC JPM ADMlN SR02                                                         Page 1 of 14
NRC JPM ADMlN SR02 Page 1 of 14  


Appendix C                   Job Performance Measure               Form ES-C-1 WORKSHEET General  
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General  


==References:==
==References:==
: 1. Technical Specifications. (have available)
: 1.
: 2. Procedure OP-AA-106-101, Significant Event Reporting, revision 8.
: 2.
: 3.
: 4.
: 5.
: 6.
Technical Specifications. (have available)
Procedure OP-AA-106-101, Significant Event Reporting, revision 8.
(handout)
(handout)
: 3. Procedure RAP-SXF7d, 24 VDC PP-A LOST, revision 0. (handout)
Procedure RAP-SXF7d, 24 VDC PP-A LOST, revision 0. (handout)
: 4. Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Operations, revision 0.
Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Operations, revision 0.
: 5. EP-AA-1010, Exelon Nuclear Radiollogical Emergency Plan Annex for Oyster Creek Station, revision 0 (have available)
EP-AA-1010, Exelon Nuclear Radiollogical Emergency Plan Annex for Oyster Creek Station, revision 0 (have available)
: 6. Exelon Reportability Manual Initiating Cue: Complete Attachment 2, Shift Manager's Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator. Determine who the Shift Manager notifies of this event and why. Determining the requirement for i i written report and LER will be performed by another Operator.
Exelon Reportability Manual Initiating Cue: Complete Attachment 2, Shift Manager's Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator. Determine who the Shift Manager notifies of this event and why. Determining the requirement for ii written report and LER will be performed by another Operator.
Time Critical Task:   No.
Time Critical Task: No.
Validation Time:       22 minutes NRC JPM ADMIN SR02                                                   Page 2 of 14
Validation Time:
22 minutes NRC JPM ADMIN SR02 Page 2 of 14  


Appendix C                 Job Performance Measure                   Form ES-C-1 WORKStIEET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Appendix C Job Performance Measure WORKStIEET Form ES-C-1 Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Standard:
Comment:
Provides repeat back of initiating the repeat back.
JPM Start Time:
JPM Start Time:
Standard:      Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
cue. Evaluator acknowledges Performance Step: 2 Procedure Step: Record datehime of the event on Attachment 2.
Standard:
Records datehime of the event on Attachment 2 as 4/19/08 1000.
Note:
Comment:
Comment:
Performance Step: 2 Procedure Step: Record datehime of the event on Attachment 2.
Completion of the Attachment may be performed in any order
Standard:      Records datehime of the event on Attachment 2 as 4/19/08 1000.
__ ~-
Note:          Completion of the Attachment may be performed in any order Comment:
NRC JPM ADMIN SR02 Page 3 of 14  
__ ~-   - __-          _  _    ___ _ -  -_
NRC JPM ADMIN SR02                                                   Page 3 of 14


Appendix C           Job Performance Measure                 Form ES-C-1 WORKSHEET Performance lriformation
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance lriformation  
              ~       - ~~   ~
~  
Performance Step: 3
~~  
~- ___-~
~
Procedure Step: Records current power/mode on Attachment 2.
Performance Step: 3 Procedure Step: Records current power/mode on Attachment 2.  
Standard: Records current power/mode on Attachment 2 as 1%, Startup, or midscale on Range 8 of the IRMs, Startup.
~-
Note:     Only Performance Step 3 or performance Step 4 is critical, with STARTUP mode listed.
-~
Standard:
Records current power/mode on Attachment 2 as 1 %, Startup, or midscale on Range 8 of the IRMs, Startup.
Note:
Only Performance Step 3 or performance Step 4 is critical, with STARTUP mode listed.
Comment:
Comment:
SAT/U NSAT Performance Step: 4 Procedure Step: Records prior power/mode on Attachment 2.
SAT/U NSAT Performance Step: 4 Procedure Step: Records prior power/mode on Attachment 2.
Standard: Records prior power/mode on Attachment 2 as 1%, Startup, or midscale on Range 8 of the IRMs, Startup.
Standard:
Comment:
Comment:
NRC JPM ADMIN SR02                                             Page 4 of 14
Records prior power/mode on Attachment 2 as 1 %, Startup, or midscale on Range 8 of the IRMs, Startup.
NRC JPM ADMIN SR02 Page 4 of 14  


Appendix C               Job Performance Measure                   Form ES-C-1 WORKSHEET Performance lriformation Performance Step: 5
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance lriformation Performance Step: 5 Procedure Step: Records description.
~
~
Procedure Step: Records description.
Standard:
Standard:  Records a short description of the event: receipt of annunciator 24 VDC PP-A LOST, or loss of 24 VDC PP-A, or similar wording. The description may contain the plant impact of YZ scram as well.
Records a short description of the event: receipt of annunciator 24 VDC PP-A LOST, or loss of 24 VDC PP-A, or similar wording. The description may contain the plant impact of YZ scram as well.
Comment:
Comment:
Performance Step: 6 Procedure Step: Determines, if the event requires an EP declaration.
Performance Step: 6 Procedure Step: Determines, if the event requires an EP declaration.
Standard:   Determines that the event does not require an EP declaration.
Standard:
Comment:
Comment:
_        -          . ~~~-             _    - _ ~ _ - . ~
Determines that the event does not require an EP declaration.
NRC JPM ADMIN SR02                                                 Page 5 of 14
. ~~~-  
~
  -. ~
NRC JPM ADMIN SR02 Page 5 of 14  


Appendix C             Job Performance Measure                 Form ES-C-1 WORKS ti EET Performance Information Performance Step: 7 Procedure Step: Determines if the event requires reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.
Appendix C Job Performance Measure Form ES-C-1 WORKS ti EET Performance Information Performance Step: 7 Procedure Step: Determines if the event requires reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.
Standard: Determines that the event does not require reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.
Standard:
Comment:
Determines that the event does not require reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.
            ~ - -  . ~           ~     -           -  ~ _ - - ~-_  -_ --
Comment:  
~  
~  
~  
- ~ _ - - ~ _
Performance Step: 8 Procedure Step: Determines if an oil discharge intohpon waters or adjoining shoreline.
Performance Step: 8 Procedure Step: Determines if an oil discharge intohpon waters or adjoining shoreline.
Standard: Determines there is no oil discharge intohpon waters or adjoining shoreline.
Standard:
Comment:
Comment:
NRC JPM ADMIN SR02                                               Page 6 of 14
Determines there is no oil discharge intohpon waters or adjoining shoreline.
NRC JPM ADMIN SR02 Page 6 of 14  


Appendix C                 Job Performance Measure                 Form ES-C-1 WORKS ti EET Performance Information Performance Step: 9 Procedure Step: Determines if a leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or upon surface waters, groundwater, or onto the ground.
Appendix C Job Performance Measure Form ES-C-1 WORKS ti EET Performance Information Performance Step: 9 Procedure Step: Determines if a leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or upon surface waters, groundwater, or onto the ground.
Standard:    Determines there is no leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or iupon surface waters, groundwater, or onto the ground.
Determines there is no leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or iupon surface waters, groundwater, or onto the ground.
Standard:
Comment:
Comment:
Performance Step: 10
Performance Step: 10 Procedure Step: Determines if a release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.  
        - ~-
- ~-
Procedure Step: Determines if a release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.
Standard:
Standard:   Determines no release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.
Determines no release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.
NRC JPM ADMIN SR02                                                 Page 7 of 14
NRC JPM ADMIN SR02 Page 7 of 14  


Appendix C           Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: Determines if any of the following occurred:
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: Determines if any of the following occurred:
RCRA Program Exception Fieport submitted, or Environmental Noncompliance endangering health or environment.
RCRA Program Exception Fieport submitted, or Environmental Noncompliance endangering health or environment.
Standard: Determines none of the following occurred: RCRA Program Exception Report submitted, or Environmental Noncompliance endangering health or environment.
Standard:
Determines none of the following occurred: RCRA Program Exception Report submitted, or Environmental Noncompliance endangering health or environment.
Comment:
Comment:
Performance Step: 12 Procedure Step: Determines if the event is threatening health or environment or release equal to or in excess of EPA reportable quantity.
Performance Step: 12 Procedure Step: Determines if the event is threatening health or environment or release equal to or in excess of EPA reportable quantity.
Standard: Determines the event is not threatening health or environment or release equal to or in excess of EPA reportable quantity.
Standard:
Determines the event is not threatening health or environment or release equal to or in excess of EPA reportable quantity.
Comment:
Comment:
NRC JPM ADMIN SR02                                               Page 8 of 14
NRC JPM ADMIN SR02 Page 8 of 14  


Appendix C               Job Performance Measure                     Form ES-C-1 WORKSHEET Performance Information Performance Step: 13
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 13 Procedure Step: Determines' if any of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.  
          ~
~
Procedure Step: Determines' if any of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.
Standard:
Standard:   Determines none of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.
Determines none of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.
Comment:
Comment:
SAT/UNSAT J       Performance Step: 14 Procedure Step: Determines if any of the following occurred:
SAT/UNSAT J
Performance Step: 14 Procedure Step: Determines if any of the following occurred:
reactivity management event; hazardous material incident; fitness for duty; injury resulting in olfsite medical attention; major enforcement action; non-routine communication to/from the NRC; reactor water condition above EPRl Action Level II; any event outside the plant design basis; any event proceeds differently than expected: unexpected '/2 scram, unexpected and significant plant transient, LCO action that will not be met within deadline, initiation of a prompt investigation, or, an unexplained risk change.
reactivity management event; hazardous material incident; fitness for duty; injury resulting in olfsite medical attention; major enforcement action; non-routine communication to/from the NRC; reactor water condition above EPRl Action Level II; any event outside the plant design basis; any event proceeds differently than expected: unexpected '/2 scram, unexpected and significant plant transient, LCO action that will not be met within deadline, initiation of a prompt investigation, or, an unexplained risk change.
Standard:   Determines that an unexpected '/2 scram has occurred. Checks YES to perform notifications and notifies the SOS/OD, DSM, and NRC Resident Inspector. The candidate may also determine that an unexplained risk change has occurred.
Standard:
Determines that an unexpected '/2 scram has occurred. Checks YES to perform notifications and notifies the SOS/OD, DSM, and NRC Resident Inspector. The candidate may also determine that an unexplained risk change has occurred.
Comment:
Comment:
NRC JPM ADMIN SR02                                                     Page 9 of 14
NRC JPM ADMIN SR02 Page 9 of 14  


Appendix C               Job Performance Measure                 Form ES-C-1 WORKS HIEET Performance Information J       Performance Step: 15
Appendix C Job Performance Measure Form ES-C-1 WORKS HI EET Performance Information J
          ~~
Performance Step: 15  
~~
Procedure Step: Determines if any of the following occurred: the event forced entry into a 5 72 hour shutdown LCO; the event forced a plant shutdown or unplanned power reduction; the event involved a significant breakdown of plant radiological or environmental controls.
Procedure Step: Determines if any of the following occurred: the event forced entry into a 5 72 hour shutdown LCO; the event forced a plant shutdown or unplanned power reduction; the event involved a significant breakdown of plant radiological or environmental controls.
Standard:   Procedure Step: Determines that the event forced entry into a 5 72 hour shutdown LCO (loss of this Bus is a 30 hour shutdown IAW TS 3.7.6. Checks YES to perform notifications and notifies the SOWOD, DSM, and NRC Resident Inspector.
Standard:
Comment:
Procedure Step: Determines that the event forced entry into a 5 72 hour shutdown LCO (loss of this Bus is a 30 hour shutdown IAW TS 3.7.6. Checks YES to perform notifications and notifies the SOWOD, DSM, and NRC Resident Inspector.
                      .~ .
Comment:  
SAT/U NSAT NRC JPM ADMIN SR02                                               Page 10 of 14
.~.
SAT/U NSAT NRC JPM ADMIN SR02 Page 10 of 14  


Appendix C             Job Performance Measure               Form ES-C-1 WORKSHEET Performance Information Performance Step: 16 Procedure Step: Determines if any of the TS 6.9.3 Unique Reportability Requirements (occurred.
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Standard:
Standard:  Determines that none of the TS 6.9.3 Unique Reportability Requirements occurred.
Performance Step: 16 Procedure Step: Determines if any of Reportability Requirements (occurred.
Comment:
Determines that none of the TS 6.9.3 Requirements occurred.
the TS 6.9.3 Unique Unique Reportability Comment:
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMlN SR02                                           Page 11 of 14
NRC JPM ADMlN SR02 Page 11 of 14  


Appendix C                     Job Performance Measure       Form ES-C-1 W 0R KSkil EET Va Iidat ion of Comp Iet ion JPM Number:              NRC JPM ADMIN SR02 Examinees Name:
Appendix C Job Performance Measure Form ES-C-1 W 0 R KS kil E ET Va I i d at io n of Co m p I et io n NRC JPM ADMIN SR02 JPM Number:
Date Performed:       ~~     ~ -- ._
Examinees Name:
Date Performed:  
~~  
~
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question:
Question:
 
Response :
===Response===
Result:
Result:                 Satisfactory/Unsatisfactory Examiners Signature and Date:           -      -    - _  --
Satisfactory/Unsatisfactory Examiners Signature and Date:
NRC JPM ADMlN SR02                                           Page 12 of 14
NRC JPM ADMlN SR02 Page 12 of 14  


_ __ _ ~ _ _. -
_ __ _ ~ _ _. -
Appendix C                   Job Performance Measure             Form ES-C-1 WORKSHEET Simulato r Setup
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Si m u lato r Setup
: 1. None.
: 1. None.
: 2. Have a clean copy of Procedure OP-AA-106-101, Significant Event Reporting, and RAP-SXF7d, 24 VDC; PP-A LOST as handouts to the Candidate.
: 2. Have a clean copy of Procedure OP-AA-106-101, Significant Event Reporting, and RAP-SXF7d, 24 VDC; PP-A LOST as handouts to the Candidate.
NRC JPM ADMIN SR02                                               Page 13 of 14
NRC JPM ADMIN SR02 Page 13 of 14  


Appendix C                     Job Performance Measure                 Form ES-C-1 WORKS I- EET
Appendix C Job Performance Measure Form ES-C-1 WORKS I-E ET
__  ~~~
~~~
STUDENT HANDOUT Initial Conditions:
STUDENT HANDOUT Initial Conditions:
1 . A plant startup is in progress.
1. A plant startup is in progress.
2 . The REACTOR MODE SELECTOR switch is in STARTUP.
: 2. The REACTOR MODE SELECTOR switch is in STARTUP.
: 3. All IRMs indicate midscale on Range 8 .
: 3. All IRMs indicate midscale on Range 8.
: 4. All APRMs indicate 1%.
: 4. All APRMs indicate 1%.
: 5. Annunciator 9XF7d, 24 VDC PP-A PWR LOST alarmed 20 minutes.
: 5. Annunciator 9XF7d, 24 VDC PP-A PWR LOST alarmed 20 minutes.
: 6. Electrical maintenance suspects a short circuit.
: 6. Electrical maintenance suspects a short circuit.
: 7. The current datehime is April 19, 2008 at 1000.
: 7. The current datehime is April 19, 2008 at 1000.
8 . A recovery plan has not been established.
: 8. A recovery plan has not been established.
Task Cue:
Task Cue:
Complete Attachment 2, Shift Managers Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator.
Complete Attachment 2, Shift Managers Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator.
Determine who the Shift Manager notifies of this event and why.
Determine who the Shift Manager notifies of this event and why.
Determining the requirement for a written report and LER will be performed by another Operator.
Determining the requirement for a written report and LER will be performed by another Operator.
NRC JPM ADMlN S R 0 2                                                  Page 14 of 14
NRC JPM ADMlN SR02 Page 14 of 14  


OP-AA-106-101 Revision 8 Page 8 of 14 Attachment 2
OP-AA-106-101 Revision 8 Page 8 of 14 1 the NRC via ENS or to an outside agency per Exelon Reportability Reference Manual?
                                                                - Notification Worksheet Shift Manager's Page 1 of 5 rD&TE/TLME of Event                     I EVENT DESCRIPTION (use additional paper as necessary)
1 1 YES, Perform the following 3 Shift Manager's Notification Worksheet Page 1 of 5 rD&TE/TLME of Event I EVENT DESCRIPTION (use additional paper as necessary)
I                   J 1
I J
_ ~ _ ____
_ ~ _ _ _ ___
Does the event / condition require an EP Declaration?
Does the event / condition require an EP Declaration?
YES, Perform required communications after completing notifications required per site specific EP procedures Notify:
1 YES, Perform required communications after completing notifications required per site specific EP procedures Does the event I condition require reporting to I
1
: 1.
~..
Notify:
SOS I OD NRC Operations Center Duty Station Manager (DSM)
SOS I OD NRC Operations Center Duty Station Manager (DSM)
PM SVP NDO
PM SVP NDO Manager, Reg. Assurance Group ANI and INPO (Alert or higher EAL)
                                                                                          ~..  -
NRC Senior Resident Inspector If time permits Independent SRO peer check completed NRC Form 361 SRO Signature Notify sos / OD NRC Operations Center DSM 9
* Time Date and Time all notification:
PM 1
have been completed by DSW Manager, Reg. Assurance Group ANI and INPO (Alert or higher EAL)
SVP NDO  
N R C Senior Resident Inspector Does the event I condition require reporting to  If time permits Independent SRO peer check                     Time 1    the NRC via ENS or to an outside agency per      completed NRC Form 361 Exelon Reportability Reference Manual?
. Manager, Nuclear Oversight Group  
SRO Signature Notify 1 1 YES, Perform the following 3                  sos / OD                                   Date and Time all notification:
=
N R C Operations Center                   have been completed by DSPu DSM 9     PM 1     SVP NDO I
Communication (as required)
                                                        =
Environmental (as required)
Manager, Reg Assurance Group Manager, Nuclear Oversight Group Communication (as required)
Manager, Reg Assurance Group NRC Senior Resident Inspector Time
Environmental (as required) 1
* Date and Time all notification:
: 1.                                                  NRC Senior Resident Inspector
have been completed by DSW Time Date and Time all notification:
have been completed by DSPu


OP-AA-106-101 Revision 8 Page 9 of 14 Att a c PIrnent 2 Shift Mana cj- er's N cltifi cat ion Worksheet
OP-AA-106-101 Revision 8 Page 9 of 14 Did the following eventsicondition occur?
_________                            ____-      P N-e~    of _
Oil discharge intoiupon navigable waters o adjoining shoreline I ] YES, Perform notifications +
2_  5_              __.
Oyster Creek Only Att a c PI rn e n t 2 Shift Man a cj e r's N cl tifi ca t ion Worksheet NOTE Refer to Attachment 3 for additional notification and reporting iristructionb Oyster Creek Only -
                                                                                                        ?
N I
Notify                                                            Time Did the following eventsicondition occur?
D b
Oil discharge intoiupon navigable waters o               sos / OD adjoining shoreline                                     National Response Center (EPA)
Did any of the following events/conditions xcur?
EPA I   ] YES, Perform notifications         +             N R C Operations (3enter DSM
A leak or discharge of petroleum prod or hazardous substance from the warehouse drop tank Spill or discharge of hazardous mater in a quantity that constitutes a reporta discharge into or upon surface waters groundwater, or onto the ground (incl Petroleum products) 1 YES, Perform notifications 3 NOTE Relcr to Attachment 3 for additional notification and reportinq iristructions I
                                                        =    PM                                        Date and Time all notifications Oyster Creek Only 1    SVP                                      have been completed by D S M NOTE Refer to Attachment 3 for additional notification and reporting iristructionb
1  
                                                          '  NDO Manager, Reg Assurance Group First Energy (,JCP&L) (Oyster Creek Only)
N R C Senior Resident Inspector Oyster Creek Only                                  Notify.                                          Date N I D b               SOS / O D Did any of the following events/conditions               State DEP xcur?
Ocean County Hecilth Department NRC Operations Center A leak or discharge of petroleum prod or hazardous substance from the                 DSM                                                      -L--
Date and Time all notifications warehouse drop tank                             9    PM have been completed by D S M 1    SVP
* Spill or discharge of hazardous mater in a quantity that constitutes a reporta discharge into or upon surface waters groundwater, or onto the ground (incl
                                                        .'  NDO Manager, Reg. Assurance Group First Energy (..ICP&L)
Petroleum products) 1 YES, Perform notifications 3 NOTE Relcr to Attachment 3 for additional notification and reportinq iristructions           NRC Senior Resident Inspector I                                             1
~.
~.
3id the following eventskondition o c c F               Notify                                        T---                Time A
3id the following eventskondition o c c F ielease of designated hazardous substant n amounts equal to or in excess of a EPA eportable quantity 1 YES. Perform notifications 3 Oyster Creek Only licfcr to Attachmenl 3 for additional notitication and reporting instructions P N e 2 of 5
ielease of designated hazardous substant                 S O S / OD n amounts equal to or in excess of a EPA                 National Response Center (EPA) eportable quantity State DEP 1 YES. Perform notifications 3                      Lacey Twp Police (Oyster Creek Only)
____- - ~ _ _ _
Oyster Creek Only                              NRC Operations Center DSM                                           Date and Time all notifications PM 1   SVP                                       have been completed by D S M licfcr to Attachmenl 3 for additional notitication and reporting instructions              NDO
Notify sos / OD National Response Center (EPA)
                                                        '   Manager, Reg Assurance Group First Energy (JCP&L) (Oyster Creek Only)
E PA NRC Operations (3enter DSM
N R C Senior Residcbnt Inspector
=
PM 1
SVP
' NDO
. Manager, Reg Assurance Group First Energy (,JCP&L) (Oyster Creek Only)
NRC Senior Resident Inspector Notify.
SOS / OD State DEP Ocean County Hecilth Department NRC Operations Center DSM 9
PM 1
SVP NDO
. Manager, Reg. Assurance Group
' First Energy (..ICP&L)
NRC Senior Resident Inspector Notify SOS / OD National Response Center (EPA)
State DEP Lacey Twp Police (Oyster Creek Only)
NRC Operations Center DSM PM 1
SVP NDO  
' Manager, Reg Assurance Group  
. First Energy (JCP&L) (Oyster Creek Only)
NRC Senior Residcbnt Inspector Time
?
Date and Time all notifications have been completed by DSM Date
-L--
Date and Time all notifications have been completed by DSM T---
Time
. A Date and Time all notifications have been completed by DSM


OP-AA-106-101 Revision 8 Page 10 of 14 Attachment 2 Shift Managers Ncitification Worksheet Page 3 of 5
OP-AA-106-101 Revision 8 Page 10 of 14 Date Did any of the following events / conditions-occur?
______                                                - - _ - _- I _. _ _          __._
RCRA Program Exception Report Environmental Noncompliance Submitted endangering health or Environment 1 1 YES, Perform notifications 3 Hcfer to Attdchrncnt 3 lor additional nclifiLdticn dnd reporting Instructions Did any of the following events / conditions-occur?
Did any of the following events / conditions-       Notify.                              Date          Time occur?
Incident threatening health or environment or release equal lo or in excess of EPA reportable quantity j 1 YES, Perform notifications 3 Oyster Creek Only Time Shift Managers Ncitification Worksheet Page 3 of 5 1
SOS / OD RCRA Program Exception Report               State DEP Submitted Environmental Noncompliance                 NRC Operations Center endangering health or Environment             DSM 1    PM
NOTt Hcfer to Atlachrnerit 3 lor additional notification and reporling instructions Oyster Creek Only Did the following eventsicondition occur?
                                                                                                  -t----I 1 1 YES, Perform notifications 3 1    SVP NDO Manager, Reg Assurance Group have been completed by D S M NRC Senior Resident InsDector Hcferto Attdchrncnt 3 lor additional nclifiLdticndnd reporting Instructions Did any of the following events / conditions-       Notify                              Date            Time occur?
[ ] YES, Perform notifications 3 Loss of ? O or more sirens Spurious activation signal with 1 or more sirens still sounding Rcler to Attachrncnt 3 for additional notification and reporting instructions
SOS / OD Incident threatening health or environment or       National Response Center release equal lo or in excess of EPA reportable quantity                                 State DEP NRC Operations Center j 1 YES, Perform notifications 3                   3SM 1    PM                          have been completed by DSM Oyster Creek Only                             SVP NOTt 1          NDO Manager, Reg Assurance Group Hcfer to Atlachrnerit 3 lor additional notification and reporling instructions VRC Senior Resident Inspector Votlfy.                                            Time Oyster Creek Only 30s I OD 3cean County Police Dispatcher
--_-_-I_.__
                                                                                                  +--*
Notify.
Did the following eventsicondition occur?
SOS / OD State DEP NRC Operations Center DSM 1
* Loss of ? O or more sirens                   I R C Operations Ccnter Spurious activation signal with 1 or more     ISM sirens still sounding                         I    PM
PM 1
[ ] YES, Perform notifications 3                      SVP NDO Manager, Reg Assurance Group Rcler to Attachrncnt 3 for additional notification and reporting instructions        I R C Senior Resident Inspector
SVP
. NDO Manager, Reg Assurance Group NRC Senior Resident InsDector Notify SOS / OD National Response Center State DEP NRC Operations Center 3SM 1
PM SVP NDO Manager, Reg Assurance Group VRC Senior Resident Inspector Votlfy.
30s I OD 3cean County Police Dispatcher I R C Operations Ccnter I S M I
PM SVP NDO Manager, Reg Assurance Group I R C Senior Resident Inspector Date Time
-t----I have been completed by DSM have been completed by DSM Time
+--*


OP-AA-106-101 Revision 8 Page 11 of 14 Attachment 2 Shift Managers Notification Worksheet Page 4 of 5 Did any of the following events/conditions occur7 Nutify 1   Reactivity management event per OP-AA-300 1540                 SOS I OD 2    HaLardous material incident                                                                          Date and Time all 3    Sentinal / Oram Risk level is / or is planned to be ORANGE     D:;M I/
OP-AA-106-101 Revision 8 Page 11 of 14 Shift Managers Notification Worksheet Page 4 of 5 Did any of the following events/conditions occur7 1
notifications have been or RED 4    Fitness-for-duty event                                          . PM SVP completed by DSM 5    Injury resulting in offsite medical attention                   1    NDO 6    Major enforcement action fine. or other sanction, serious operating event that could result in such action, including           Manager, Nuclear Oversighr 7
2 HaLardous material incident 3
events which have been or maybe brought to NRC upper management attention Non-routine communications to / from NRC
4 Fitness-for-duty event 5
                                                                      -    Group Communication (as required)
6 Reactivity management event per OP-AA-300 1540 Sentinal / Oram Risk level is / or is planned to be ORANGE or RED Injury resulting in offsite medical attention Major enforcement action fine. or other sanction, serious operating event that could result in such action, including events which have been or maybe brought to NRC upper management attention Non-routine communications to / from NRC Reactor Water Chemistry above or at EPRI Action Level II Any event or operation condition outside plant design basis  
Environmental (as required) 8    Reactor Water Chemistry above or at EPRI Action Level II 4
@ Unexpected Y2 scram b Unexpected, significant plant transient c LCO action that will not be met within deadline d Initiation of a prompt investigation e
Any event or operation condition outside plant design basis
Unplanned Risk Change I ~ E s.
                                                                                                          ----I----
Perform notifications 3 7
9                                                                    NKC Semor Resident Inspector 10  Any event that proceeds differently than expected
8 9
    @ Unexpected Y2 scram b Unexpected, significant plant transient c LCO action that will not be met within deadline d Initiation of a prompt investigation e   Unplanned Risk Change I ~ E s Perform
10 Any event that proceeds differently than expected i l Did the eventkondition force entry into a (72hour 2
          .          notifications 3 i l Did the eventkondition force entry into a     (72hour Notify                                              - Time shutdown LCO7                                                   SO!; / OD 2  Did the eventlcondition force a plant shutdown or unplanned power reduction7 le Power reductions required due to high discharge DSM J Work Week Manager Director Work Mgmt (via WWM) notifications have been completed by DSM temperature or required to perform an activity such as main           Eng Duty Manager condenser backwashing Did the eventicondition involve a significant breakdown of plant radiological or environmental controls7 PM SVP NDO Manager Nuclear Oversight Group
shutdown LCO7 Did the eventlcondition force a plant shutdown or unplanned power reduction7 le Power reductions required due to high discharge temperature or required to perform an activity such as main condenser backwashing Did the eventicondition involve a significant breakdown of plant radiological or environmental controls7 3
/YES,    Perform notifications URI: Senior Resident Inspector J
/YES, Perform notifications Nutify SOS I OD D:;M I/
                                                                    -                _ _ ~ - _ _ - -
PM  
. SVP 1
NDO Manager, Nuclear Oversighr Communication (as required)
Environmental (as required)
NKC Semor Resident Inspector 4 Group Notify SO!;
/ OD DSM J Work Week Manager Director Work Mgmt (via WWM)
Eng Duty Manager PM SVP NDO URI: Senior Resident Inspector J Manager Nuclear Oversight Group
_ _ ~ - _ _ - -
Date and Time all notifications have been completed by DSM
----I---- _.
Time notifications have been completed by DSM


OP-AA-106-101 Revision 8 Page 12 of 14 Attachment 2 Shift Manager's Ncltification Worksheet Page 5 of 5 Notify:                                                Time Oyster Creek Only SOS OD                              Date and Time all notifications Did any of the following TS 6 9 3 Unique Reportability                                             have been completed by D S M Requirement events occur7 Leak test on a sealed source that yielded 20 005 pCi of removable contamination A reportable event pursuant to the ODCM EMRV or Safety Valve challenge or failure (non LER DSM 9
OP-AA-106-101 Revision 8 Page 12 of 14 REPORT DUE WITHIN U
Work Week Manager Director ,Work Mgmt. (via reportable)
30DAYS Shift Manager's Ncltification Worksheet Page 5 of 5 CHECK ONE U
WWM) a   A challenge is an automatic actuation outside         1    Eng Duty Manager (via purposeful surveillance or testing                         VdWM)
REQUIRED Oyster Creek Only Did any of the following TS 6 9 3 Unique Reportability Requirement events occur7 Leak test on a sealed source that yielded 20 005 pCi of removable contamination A reportable event pursuant to the ODCM EMRV or Safety Valve challenge or failure (non LER reportable) a A challenge is an automatic actuation outside purposeful surveillance or testing A special reporl is to be sent to the NRC within 60 days b
PM b    A special reporl is to be sent to the NRC within 60   '    SVP days                                                 1    hDO Manager, Nuclear Oversight Any of the following SLC (Liquid Poison) Technical Group Specification conditions a   .32C3(b) b   32C3(e)(i) c   42E5 Inoperable high-range radioactive noble gas effluent monitor         (TS 3 13 H)
Any of the following SLC (Liquid Poison) Technical Specification conditions a  
[ ] YES, Perform notifications 3 NRC Senior Resident Inspector REQUIRED WRITTEN REPORT I                 LICENSEE EVENT REPORT CHECK ONE                               REPORT DUE WITHIN                CHECK ONE                  REPORT DUE WITHIN
.32C3(b) b 3 2 C 3 ( e ) ( i )
-1   REQUIRED                           U    30DAYS                    U  REQUIRED              U  30DAYS
c 4 2 E 5 Inoperable high-range radioactive noble gas effluent monitor (TS 3 13 H)
-I   NOT REQUIRED                                                     I L1 NOTREQUIRED           U   60DAYS OTHER           _.
[ ] YES, Perform notifications 3 Notify:
SOS OD DSM Work Week Manager 9
Director,Work Mgmt. (via 1
Eng Duty Manager (via PM
' SVP 1
hDO Manager, Nuclear Oversight WWM)
VdWM)
Group NRC Senior Resident Inspector Time
* Date and Time all notifications have been completed by DSM REQUIRED WRITTEN REPORT I
LICENSEE EVENT REPORT CHECK ONE  
-1 REQUIRED  
-I NOT REQUIRED I L1 NOTREQUIRED REPORT DUE WITHIN U
30DAYS U
60DAYS OTHER  


3 . AppendixC                     Job Performance Measure                           Form ES-C-1 WORKSHEET Facility:     Oyster Creek                         Task No.:         2260201402 Task
3 AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility:
Oyster Creek Task No.:
2260201402 Task


==Title:==
==Title:==
-~~
Review Acceptance
Review Acceptance
                      -~~              _ - --     Criteria_ _ for
_ - -- Criteria
_ _a- -Completed
_ _ _ _ - - ~
                                                                        ~        Surveillance Test Job Performance Measure No.:             _NRC JPlM ADMIN SR03 WA  
for a Completed Surveillance Test Job Performance Measure No.:
_NRC JPlM ADMIN SR03 WA  


==Reference:==
==Reference:==
Generic 2.2.12.(SRO - - 3.4)
Generic 2.2.1 2. (SRO  
Examinee:       -    -      -    _ _                Examiner:             _. - .        __  -
- - 3.4)
Facility Evaluator:                       -      -
Examinee:
Examiner:
Facility Evaluator:
Method of Testing:
Method of Testing:
Simulated Performance                     _~ - .~     Actual Performance         __      X-Classroom            X        Simulator            ~   -    __-      Plant           ~
X Si m u lat ed Performance
Read to the Examinee:
_ ~.
- ~
Actual Performance  
~
Plant  
~
Classroom X
Simulator Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. The plant is at rated power.
: 1.
: 2. Surveillance test, 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and C:omprehensive/Preservice/Post-Maintenance Inservice Test, has just belen completed.
: 2.
: 3. The test was a normally scheduled test.
: 3.
The plant is at rated power.
Surveillance test, 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and C:omprehensive/Preservice/Post-Maintenance Inservice Test, has just belen completed.
The test was a normally scheduled test.
Task Standard: The Candidate reviews the surveillance test Acceptance Criteria, recognizes the component discrepancies, and states the required action for each component discrepancy.
Task Standard: The Candidate reviews the surveillance test Acceptance Criteria, recognizes the component discrepancies, and states the required action for each component discrepancy.
Required Materials: None.
Required Materials: None.
Line 483: Line 648:


==References:==
==References:==
 
: 1. Procedure 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Cornprehensive/Preservice/Post-Maintenance Inservice Test, revision 62.
1 . Procedure 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Cornprehensive/Preservice/Post-Maintenance Inservice Test, revision 62.
: 2. AD-AA-101, Processing of Procedures and T&RMs, revision 18.
: 2. AD-AA-101, Processing of Procedures and T&RMs, revision 18.
NRC JPM ADMlN SR03                                                                 Page 1 of 10
NRC JPM ADMlN SR03 Page 1 of 10  


I . AppendixC                     Job Performancle Measure             Form ES-C-1 WORKSHEET Initiating Cue: Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets.
I  
. AppendixC Job Performancle Measure Form ES-C-1 WORKSHEET Initiating Cue: Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets.
State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions Time Critical Task: No.
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions Time Critical Task: No.
Validation Time:       20 minutes.
Validation Time:
NRC JPM ADMIN SR03                                                   Page 2 of 10
20 minutes.
NRC JPM ADMIN SR03 Page 2 of 10  


Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:         ~-
JPM Start Time:  
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate with the section of the completed procedure and the attached sheets.
~-
Standard:
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate with the section of the completed procedure and the attached sheets.
Comment:
Comment:
NRC JPM ADMIN SR03                                                   Page 3 of 10
NRC JPM ADMIN SR03 Page 3 of 10  


Appendix C           Job Performance Measure                   Form ES-C-1 WORKSHEET ACCEPTANCE CRITERIA Step  SATNNSAT            Required Action if UNSAT/Reason 7.1.1 7.1.2
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Step 7.1.1 7.1.2 7.1.3 7.1.4 SATNNSAT ACCEPTANCE CRITERIA Required Action if UNSAT/Reason NOTEKUE: IF the Candidates do not state TS requirements, tell them to list the most limiting TS requirement.
Incorrect use of temporary procedure change for TS surveillance acceptance criteria of ESW flow > 3000 gpm. Declare ESW Pump 52A inoperable and apply TS 3.4.C.4 due to low flow (1 5 day LCO from this inoperable component alone).
UNSAT CRITICAL 7.1.5 SAT 7.1.6 SAT 7.2.1 SAT None None NRC JPM ADMIN SR03 Page 4 of 10


====7.1.3 NOTEKUE====
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Step SATWNSAT 7.2.2 SAT 7.2.3 UNSAT CRITICAL 7.2.4 UNSAT C R lTlC AL 7.3 SAT 7.4 SAT NRC JPM ADMIN SR03 ACCEPTANCE CRITERIA R eq u ired Act ion if U N S AT/R ea so n Containment Spray Pump 51 6 vibration 4A is above the action range. Declare Containment Spray Pump 51 6 inoperable and apply TS 3.4.C.4 { 15 day LCO from this inoperable component alone). But, since more than 1 pump is inoperable in the same loop, the loop must be considered inoperable. IAW TS 3.4.C.3, a 7 day LCO now applies.
IF the Candidates do not state TS requirements, tell them to list the most limiting TS requirement.
Valve V-21-17 strokes outside the accept range but less than the limiting value. Retest immediately or declare inoperable and apply TS.  
7.1.4   UNSAT  Incorrect use of temporary procedure change for TS CRITICAL surveillance acceptance criteria of ESW flow > 3000 gpm. Declare ESW Pump 52A inoperable and apply TS 3.4.C.4 due to low flow (15 day LCO from this inoperable component alone).
- - - ~- - -
7.1.5    SAT    None 7.1.6    SAT 7.2.1    SAT    None NRC JPM ADMIN SR03                                              Page 4 of 10
-~
~
None Page 5 of 10  


, AppendixC            Job Performance Measure                 Form ES-C-1 WORKSHEET ACCEPTANCE CRITERIA Step  SATWNSAT              R equired Act ion if UNSAT/R ea son 7.2.2      SAT 7.2.3    UNSAT    Containment Spray Pump 51 6 vibration 4A is above the action range. Declare Containment Spray Pump CRITICAL 51 6 inoperable and apply TS 3.4.C.4 { 15 day LCO from this inoperable component alone). But, since more than 1 pump is inoperable in the same loop, the loop must be considered inoperable. IAW TS 3.4.C.3, a 7 day LCO now applies.
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 JPM Number:
7.2.4    UNSAT    Valve V-21-17 strokes outside the accept range but C R lTlCAL less than the limiting value. Retest immediately or declare inoperable and apply TS.
Validation of Completion NRC JPM ADMIN SIR03  
__  - -  - -  -~  ~  -  - --  ~- - -    -  -
-~~  
7.3        SAT    None 7.4        SAT NRC JPM ADMIN SR03                                              Page 5 of 10
~  
 
~~
Appendix C                  Job Performance Measure          Form ES-C-1 WORKSHEET Validation of Completion JPM Number:          NRC JPM ADMIN SIR03
Examinees Name:
                    -~~     ~   ~~   _      -
Examiners Name:
Examinees Name:     - - _ _        -    - __- - __ - - -
Examiners Name:       _ _            - --  -    -    - --
Date Performed:
Date Performed:
Facility Evaluator:           ~     -~                 _~~
Facility Evaluator:  
Number of Attempts:   __                        ______
~  
-rime to Complete:                             ~
-~
_~~
Number of Attempts:  
-rime to Complete:  
~
Question:
Question:
Response :
Response :
Result:               Satisfactory/Unsatisfactory Examiners Signature and Date:                   ~- -             ._
Result:
NRC JPM ADMIN SR03                                           Page 6 of 10
Satisfactory/Unsatisfactory Examiners Signature and Date:  
~- -
NRC JPM ADMIN SR03 Page 6 of 10  


. AppendixC                 Job Performance Measure                 Form ES-C-1 WORKSI-IEET Simulator Setup
. AppendixC Job Performance Measure Form ES-C-1 WORKSI-IEET Simulator Setup
: 1. None.
: 1. None.
: 2. Provide pages 45 through E4-4 ONLY of 607.4.004. (Include a good page E2-1 since this page has been modiiied in the handout)
: 2. Provide pages 45 through E4-4 ONLY of 607.4.004. (Include a good page E2-1 since this page has been modiiied in the handout)
Line 533: Line 709:
: c. On the vibration table for point 4A for Containment Spray Pump 51 6, insert a value greater than the ACTION limit. Mark all other vibrations below the ALERT values. (0.26 in/sec)
: c. On the vibration table for point 4A for Containment Spray Pump 51 6, insert a value greater than the ACTION limit. Mark all other vibrations below the ALERT values. (0.26 in/sec)
: d. In the valve stroke summary table, make the OPENING time for V-21-18 greater than the ACCEPT RANGE, but less than the LIMITING VALUE. Mark all others in the ACCEPT RANGE (37.4 seconds)
: d. In the valve stroke summary table, make the OPENING time for V-21-18 greater than the ACCEPT RANGE, but less than the LIMITING VALUE. Mark all others in the ACCEPT RANGE (37.4 seconds)
: e. In the IST Valve Summary Sheet, lineout 3100 gpm and insert 3000 gpm for ESW Pump 52A flow. Initial and date.
: e. In the IST Valve Summary Sheet, lineout 31 00 gpm and insert 3000 gpm for ESW Pump 52A flow. Initial and date.
NRC JPM ADMIN SR03                                                 Page 7 of 10
NRC JPM ADMIN SR03 Page 7 of 10  


~
~  
  . AppendixC                     Job Performance Measure               Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
: 1. The plant is at rated power.
: 1. The plant is at rated power.
: 2. Surveillance test, 607.4.004, Containment Spray and Emergency Service Water Sys tem 1 Pump Operability and Comprehens ive/Preserv ice/Post-Maintenance lnservice Test, has just been completed.
: 2. Surveillance test, 607.4.004, Containment Spray and Emergency Service Water S ys tem 1 Pump Operability and Com pre he n s ive/P reserv ice/Post-Maintenance lnservice Test, has just been completed.
: 3. The test was a normally scheduled test.
: 3. The test was a normally scheduled test.
Task Cue:
Task Cue:
Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets. State any test discrepancies and any required actions lor any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets. State any test discrepancies and any required actions lor any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions NRC JPM ADMIN SR03                                                   Page 8 of 10
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions NRC JPM ADMIN SR03 Page 8 of 10  


Appendix C         Job Performance Measure             Form ES-C-1 WORKSHEET STUDENT biANDOUT ACCEPTANCE CRITERIA Step   SATNNSAT         Required Act ion if UNSAT/Reason 7.1.1     SAT 7.1.2     SAT 7.1.3     SAT 7.1.4 NRC JPM ADMlN SR03                                     Page 9 of 10
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Step SATNNSAT 7.1.1 SAT 7.1.2 SAT 7.1.3 SAT 7.1.4 STUDENT biANDOUT ACCEPTANCE CRITERIA Required Act ion if U N S AT/Reason NRC JPM ADMlN SR03 Page 9 of 10  


. AppendixC         Job Performance Measure           Form ES-C-1 WORKSHEET STUDENT HANDOUT ACCEPTANCE CRITERIA Step SATNNSAT         Required Action if UNSAT/Reason 7.2.2 7.2.4 NRC JPM ADMIN SR03                                   Page 10of 10
. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT ACCEPTANCE CRITERIA Step SATNNSAT Required Action if UNSAT/Reason 7.2.2 7.2.4 NRC JPM ADMIN SR03 Page 10of 10  


AmerGen An Exelon Company      1    OYSTER CREEK GENERATING STATION F'ROCEDURE Number 607.4.004 Title                                                                          Revision No.
OYSTER CREEK GENERATING 1
Containment Spray and Emergency Service Water System I                     62 Pump Operability and Comprehensive I Presiervice I Post-Maintenance
STATION F'ROCEDURE AmerGen An Exelon Company Revision No.
            - ~ __ - -lnservice
62 cv Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive I Presiervice I Post-Maintenance lnservice Test
                          -  ~~
~  
Test cv InitiaIIVerifv 6.56   ALIGN heat exchanger instrument valves in accordance with Attachment 607.4.004-6.                                                     BB I 6.57 CONFIRM OPEN ESW Flow Gauge DPI-532-5 Isolation Valves V-3-569 and V-3-570.                                                         BB
~~
____    I 6.58   RESTORE drywell pressure IAW Procedure 312.                                 BB I 6.59 NOTIFY Chemistry Technician to check and adjust the injection rate of chlorine IAW Procedure 326.                                         BB I 6.60 TRANSFER all pertinent data to Attachment 607.4.004-4.                         BB I 6.61   REVIEW the results of this test against Section 7.0 Acceptance Criteria.                                                                   $23 I 6.62   RECORD commentsldiscrepancies on the Surveillance Review Form.                                                                       BB I 7.0     ACCEPTANCE CRITERIA 7.1   The components tested by this procledure meet Tech. Spec.
Number 607.4.004 In itia IIVerifv 6.56 ALIGN heat exchanger instrument valves in accordance with 07.4.004-6.
operability requirements if the following criteria are met. If any are
BB I 6.57 CONFIRM OPEN ESW Flow Gauge DPI-532-5 Isolation Valves V-3-569 and V-3-570.
                -not met, consider the affected component inoperable and follow the requirements of Tech. Spec. Section 3.4.C and Procedure LS-AA-120:
BB I 6.58 RESTORE drywell pressure IAW Procedure 31 2.
7.1.1           Containment Spray System Discharge Pressure is 160 psig.
BB I 6.59 NOTIFY Chemistry Technician to check and adjust the injection rate of chlorine IAW Procedure 326.
7.1.2           The Containment Spray and Emergency Service Water Pumps start and stop when given appropriate signals.
BB I 6.60 TRANSFER all pertinent data to Attachment 607.4.004-4.
7.1.3           Each Containment Spray Heat Exchanger total differential pressure is (40 psid.
BB I 6.61 REVIEW the results of this test against Section 7.0 Acceptance Criteria.  
TPC 4231
$23 I 6.62 RECORD commentsldiscrepancies on the Surveillance Review Form.
' V 4/24/u8        1.4          Emergency service water flow rate as indicated on Plant
BB I 7.0 ACCEPTANCE CRITERIA 7.1 The components tested by this procledure meet Tech. Spec.
-7. Sisa&                        Process Computer Point ESW-12 is 2       m     .
operability requirements if the following criteria are met. If any are not met, consider the affected component inoperable and follow the requirements of Tech. Spec. Section 3.4.C and Procedure LS-AA-120:
Today 30@%Pm I .1.5         Containment Spray water fliow rate is 24000 gpm.
7.1.1 Containment Spray System Discharge Pressure is 160 psig.
45.8
7.1.2 The Containment Spray and Emergency Service Water Pumps start and stop when given appropriate signals.
7.1.3 TPC 4231
'V 4/24/u8 1.4
-7. Sisa&
Today Each Containment Spray Heat Exchanger total differential pressure is (40 psid.
Emergency service water flow rate as indicated on Plant Process Computer Point ESW-12 is 2 m
Containment Spray water fliow rate is 24000 gpm.
30@%Pm I.1.5 45.8  


AmerGen
OYSTER CREEK GENERATING STATION F'ROCEDURE AmerGen I  
              ~n i x c l o i ( u r n p a r y I
~n ixcloi (urnpar y Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preslervice / Post-Maintenance lnservice Test
                                                      !  OYSTER CREEK GENERATING STATION F'ROCEDURE Number 607.4.004 I
__ _ _ _ _ -~  
Title                                                                                             Revision No.
~  
Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preslervice / Post-Maintenance
~
_ _ - - lnservice    __ _ _ _         Test
Number 607.4.004 7.2 I Revision No.
_ -~               -    ~   -    ~
62 7.1.6 All motor operated valves operate as specified and all valve stroke times do not exceed the Limiting Value listed on Attachment 607.4.004-4.
                                                                                                  !  62 7.1.6                         All motor operated valves operate as specified and all valve stroke times do not exceed the Limiting Value listed on Attachment 607.4.004-4.
NOTE When a component is Preservice (baseline) tested per the 1ST Program, new alert and action level values are established for that component. The alert/action levels associated with the old component (Attachment 607.4.004-4) should not be used to determine operability of the new component.
NOTE When a component is Preservice (baseline) tested per the 1ST Program, new alert and action level values are established for that component. The alert/action levels associated with the old component (Attachment 607.4.004-4) should not be used to determine operability of the new component.
7.2    The components tested by this procedure meet In-Service Test (IST) requirements for operability if the following criteria are met. If any are not met, consider the component inoperable and follow the requirements of Tech Spec Section 3.4.C and Procedure LS-Ab,-120.
The components tested by this procedure meet In-Service Test (IST) requirements for operability if the following criteria are met. If any are not met, consider the component inoperable and follow the requirements of Tech Spec Section 3.4.C and Procedure LS-Ab,-120.
7.2.1                         Containment Spray Pump flows are between the high and low action ranges as listed on the IST Pump Summary Sheet and IST Valve Summary Sheet (Attachment 607.4.004-4).
7.2.1 Containment Spray Pump flows are between the high and low action ranges as listed on the IST Pump Summary Sheet and IST Valve Summary Sheet (Attachment 607.4.004-4).
7.2.2                         ESW pump flow values are between the high and low action ranges as listed on the IST Pump Summary Sheet and IST Valve Summary Sheet (Attachment 607.4.004-4).
7.2.2 ESW pump flow values are between the high and low action ranges as listed on the IST Pump Summary Sheet and IST Valve Summary Sheet (Attachment 607.4.004-4).
7.2.3                         ESW and Containment Spray Pump vibration readings are below the action range as listed on the Vibration Data Sheet (Attachment 607.4.004-4).
7.2.3 ESW and Containment Spray Pump vibration readings are below the action range as listed on the Vibration Data Sheet (Attachment 607.4.004-4).
7.2.4                         All valves on Attachment 607.4.004-4 meet the acceptance criteria 7.2.4.1     E     a valve fails to stroke to the required position OR if its stroke time exceeds the limiting value of full stroke time specified in Attachment 607.4.004-2, THEN it shall be immediately declared inoperable and the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be followed.
7.2.4 All valves on Attachment 607.4.004-4 meet the acceptance criteria 7.2.4.1 E
46.0
a valve fails to stroke to the required position OR if its stroke time exceeds the limiting value of full stroke time specified in Attachment 607.4.004-2, THEN it shall be immediately declared inoperable and the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be followed.
46.0  


AmerGen                    I OYSTER CREEIK GENERATING                     Number Ai' ixelon Conipany             STATION PROCEDURE                        607.4.004 Title                                                                                 Revision No.
OYSTER CREEIK GENERATING STATION PROCEDURE AmerGen I
Containment Spray and Emergency Service Water System I 62 Pump Operability and Comprehensive / Presiervice / Post-Maintenance         lnservice Test~ _ _ - -
Ai' ixelon Conipany Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Presiervice / Post-Maintenance lnservice Test  
      - - - - _ _ - - __ - -__                    --  - -  __ -- -    - -- - - _.I.       .-
~
7.2.4.2       a valve fails to stroke to the required position within its acceptable range as specified in Attachment 607.4.OQ4-2, U T   does @t exceed the limiting value of full stroke time specified in Attachment 607.4.004-2, THEN it shall ble immediately retested or declared inoperable, at the direction of the US.
Number 607.4.004 Revision No.
: 1.     -
62
IF     the valve is declared inoperable, THEN the requirements of Technical Specification 3 4C and Procedure LS-AA-120 shall be followed.
.I 7.2.4.2 a valve fails to stroke to the required position within its acceptable range as specified in Attachment 607.4.OQ4-2, U
: 2.   -
T does @t exceed the limiting value of full stroke time specified in Attachment 607.4.004-2, THEN it shall ble immediately retested or declared inoperable, at the direction of the US.
IF     ttie valve is retested AND it fails to stroke       exceeds the limiting value of full stroke time, THEN it shall be immediately declared inoperable AND the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be followed.
: 1.
: 3. IF
IF the valve is declared inoperable, THEN the requirements of Technical Specification 3 4C and Procedure LS-AA-120 shall be followed.
                                                -      the valve is retested AND again fails to stroke within its acceptable range K T does not exceed the limiting value of full stroke tirne, THEN the data shall be analyzed within 96 hours to verify that the new stroke time represents acceptable operation, AND the requirements of Procedure LS-AA-120 shall be followed.
: 2.
47.0
IF ttie valve is retested AND it fails to stroke exceeds the limiting THEN it shall be immediately declared inoperable AND the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be followed.
value of full stroke time,
: 3.
IF the valve is retested AND again fails to stroke within its acceptable range K
T does not exceed the limiting value of full stroke
: tirne, THEN the data shall be analyzed within 96 hours to verify that the new stroke time represents acceptable operation, AND the requirements of Procedure LS-AA-120 shall be followed.
47.0  


AmerGen, An txelon ( m i n a n y      1  OYSTER CREEK GENERATING STATION F'ROCEDURE Number 607.4.004 Title                                                                                 Revision No.
OYSTER CREEK GENERATING 1
Containment Spray and Emergency Service 'Water System I                               62 Pump Operability and Comprehensive / Preservice / Post-Mai ntenance
STATION F'ROCEDURE
          ~ _ _ _I_nse    _ _ _~rvice Test                                  -- __
: AmerGen, An txelon (minany Title Containment Spray and Emergency Service 'Water System I Pump Operability and Comprehensive / Preservice / Post-M ai n tenance I nse rvice Test
N0TE:If such verification is not performed within the 96 hour limit, the valve shall be declared inoperable aind the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be met.
~
: 4.   -
~
IF     the valve is retested AND strokes within its acceptable range, THEN the cause of the initial deviation shall be analyzed and the results documented AND the requirements of Procedure LS-AA-120 shall be followed.
Number 607.4.004 Revision No.
7.2.4.3   E     excessive flow is observed from V-3-698, AND operating ESW Pump flow is 13100 gpm THEN the ESW system is operable and the keepfill line is not required to be isolated.
62 N0TE:If such verification is not performed within the 96 hour limit, the valve shall be declared inoperable aind the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be met.
: 4.
IF the valve is retested AND strokes within its acceptable range, THEN the cause of the initial deviation shall be analyzed and the results documented AND the requirements of Procedure LS-AA-120 shall be followed.
7.2.4.3 E
excessive flow is observed from V-3-698, AND operating ESW Pump flow is 131 00 gpm THEN the ESW system is operable and the keepfill line is not required to be isolated.
If the following criterion is not met, check the calibration of the affected Containment Spray Heat Exchanger Pressure gauges. If calibration checks are satisfactory, schedule the affected heat exchanger(s) for tube side cleaning as soon as practical.
If the following criterion is not met, check the calibration of the affected Containment Spray Heat Exchanger Pressure gauges. If calibration checks are satisfactory, schedule the affected heat exchanger(s) for tube side cleaning as soon as practical.
7.3.1                   The Containment Spray Heat Exchanger total AP 520 psid.
7.3.1 The Containment Spray Heat Exchanger total AP 520 psid.
If any alert threshold is exceeded, or if the following criteria are               met, or if any other deviation from proper operation is noted, initiate a CAP in accordance with Procedure LS-AA-120 (unless i3 CAP was issued previously):
If any alert threshold is exceeded, or if the following criteria are any other deviation from proper operation is noted, initiate a CAP in accordance with Procedure LS-AA-120 (unless i3 CAP was issued previously):
7.4.1                 Corner Room cooling fans start on appropriate signals.
7.4.1 7.4.2 7.4.3 met, or if Corner Room cooling fans start on appropriate signals.
7.4.2                  All Heat Exchanger tube to shell AP's are 1 5 psid.
All Heat Exchanger tube to shell AP's are 1 5 psid.
7.4.3                  There is no leakage from Heat Exchanger Thermal Relief valves V-3-82, V-3-83, V-21-21 and V-21-22.
There is no leakage from Heat Exchanger Thermal Relief valves V-3-82, V-3-83, V-21-21 and V-21-22.
48.0
48.0  


AmerGen                            OYSTER CREEK GENERATING     Number A n ixelun rorripdn)             STATION PROCEDURE          607.4.004 ~-
OYSTER CREEK GENERATING STATION PROCEDURE AmerGen A n ixelun rorripdn)  
                                                                                ~     -
~  
Title                                                                Revision No.
~-
Containment Spray and Emergency Service Water System I 62 Pump Operability and Comprehensive / Preservice I Post-Maintenance lnservice       -~ Test   ~    ~ -~   -~     .~               - -- -
Revision No.
8.0   ATTACHMENT 8.1   607.4.004-1, ESW Pump Vibration Locations 8.2   607.4.004-2, Cont. Spray Pump Vibration Locations 8.3   607.4.004-3, Test Equipment 8.4   607.4.004-4, IST Pump Summary Sheet and IST Valve Summary Sheets 8.5   607.4.004-5, Cont. Spray and ESW Initial Instrumentation Valving.
62
8.6   607.4.004-6, Cont. Spray and ESW Final Instrumentation Valving 8.7   607.4.004-7, Heat Exchanger Differential Pressure Verification.
~
8.8   607.4.004-8, IST Valves 8.9   607.4.004-9, Preserv ice/BaseIine/Comp rehe nsive Test Inst ruments 49.0
Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice I Post-Maintenance lnservice  
-~ Test  
~  
-~ -~  
.~
Number 607.4.004 8.0 ATTACHMENT 8.1 607.4.004-1, ESW Pump Vibration Locations 8.2 607.4.004-2, Cont. Spray Pump Vibration Locations 8.3 607.4.004-3, Test Equipment 8.4 607.4.004-4, IST Pump Summary Sheet and IST Valve Summary Sheets 8.5 607.4.004-5, Cont. Spray and ESW Initial Instrumentation Valving.
8.6 607.4.004-6, Cont. Spray and ESW Final Instrumentation Valving 8.7 607.4.004-7, Heat Exchanger Differential Pressure Verification.
8.8 607.4.004-8, IST Valves 8.9 607.4.004-9, P rese rv ice/Base I in e/Com p re h e n sive Test I n st ru m en ts 49.0  


merven                                    OYSTER CREfiK GENERATING             Iuel 1                                1 I\UII I
OYSTER CREfiK GENERATING I\\UII Iuel merven I
An t d n n C o v p d n b               STATION PROCEDURE             607.4.004 Title                                                                           Revision No.
An t d n n C o v p d n b 1
Containment Spray and Emergency Service Water System I 62 Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice Test        ~~     ~
STATION PROCEDURE 1
                                                                ~-
607.4.004 Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice  
ATTACH MENT 607.4.004- 1 ESW PUMP VIBRATION LOCATIONS Note: Accelerometer probe locations are the same for all (4) ESW Pumps.
~~
1A 1H (probe faces north-south)                           (probe faces east-west)
Test
E l -1
~  
~-
ATTACH MEN T 607.4.004-1 Revision No.
62 ESW PUMP VIBRATION LOCATIONS Note: Accelerometer probe locations are the same for all (4) ESW Pumps.
1A 1H (probe faces north-south)
(probe faces east-west)
E l -1  


merven                             OYSTER CREEK GENERATING 1                            1 I \ U I I luel An txeloti Cornpany STATION PROCEDURE               607.4.004 Title                                                                   Revision No.
merven OYSTER CREEK GENERATING I\\UI I luel 1
Containment Spray and Emergency Service Water System I 62 Pump Operability and Comprehensive / Preservice / Post-Maintenance
STATION PROCEDURE 1
      ~~  __ -            lnservice._Test
607.4.004 An txeloti Cornpany Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice
                                    -   - ~
._ - - ~
                                          ~
Test ~  
                                                - ~-~   ~-          -            _.... ..
~-  
ATTACHMENT 607.4.004-2 CONT. SPRAY PUMP AND MOTCIR VIBRATION LOCATIONS NOTE: HORIZONTAL POINTS MAY BE TAKEN FROM EITHER SIDE OF THE BEARING HOUSING E2-1
~-~  
~~
Revision No.
62 ATTACHMENT 607.4.004-2 CONT. SPRAY PUMP AND MOTCIR VIBRATION LOCATIONS NOTE: HORIZONTAL POINTS MAY BE TAKEN FROM EITHER SIDE OF THE BEARING HOUSING E2-1  


I \ UI 1 Iuel OYSl EH C R t k K t i E N t H A l l N G STATION PROCEDURE                                 607.4.004 Title                                                                                     Revision No.
OYSl EH C R t k K tiENtHAllNG STATION PROCEDURE Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Presiervice / Post-Maintenance lnservice Test
Containment Spray and Emergency Service Water System I                                   62 Pump Operability and Comprehensive / Presiervice / Post-Maintenance
-~
            -~
ATTACH MEN T 607.4.004-3 TEST EQUIFMENT I\\ UI 1 Iuel 607.4.004 Revision No.
lnservice Test ATTACH MENT 607.4.004-3 TEST EQUIFMENT Preferred Controlled / Calibrated Test Equipment CSI Model 2120 Vibration Instrument 1a-2120 6/2008 I
62 Preferred Controlled / Calibrated Test Equipment 6/2008 I
Wilcoxon AE793 Transducer                       1                2A-AE793 I-CSI Model A0760GP Transducer                                     3A-aO760GT CSI Model A0220HF Transducer
1a-2120 CSI Model 21 20 Vibration Instrument Wilcoxon AE793 Transducer CSI Model A0760GP Transducer CSI Model A0220HF Transducer  
        -Wilcoxon Model
-Wilcoxon Model Wilcoxon
                    -~
-~
_~     -
Model
Wilcoxon Model 793R Transducer
_~
                                        . -   ...  ~
793R  
I        ~ . ..-
~
I-       - -
Transducer 1
6/2008 tt-I.
2A-AE793 3A-aO760GT I -  
                                                                                        -     I-              _ _
~...-
Engineering Alternates - Complete as Necessary Evaluation by:                                             Date:
I I-  
- - 6/2008  
- I -
t ----
t-I.
Engineering Alternates - Complete as Necessary Evaluation by:
Date:  


meruen                                 OYSTER CREE:.K GENERA rlNG 1                                  I IVUlllUt;I I * -.          An t x e oil Conpar y               STATION PROCEDURE             607.4.004 Title                                                                        Revision No.
meruen OYSTER CREE:.K GENERA rlNG IVUlllUt;I An t x e oil Conpar y 1
Containment Spray and Emergency Service Water System I 62 Pump Operability and Comprehensive / Preservice / Post-Maintenance
STATION PROCEDURE I
          -~                 lnservice -- Test
607.4.004 I
                                            - .      -~     ~    ~    ~.
52A (6.24.1.2) 528 (6.44.1.2)
ATTACHMENT 607.4.004-4 IST PUMP  
Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-  
~
~
~.
Maintenance  
-~
lnservice  
-- Test  
-~
2994 3058 3034 3099 Revision No.
62 ATTACHMENT 607.4.004-4 IST PUMP  


==SUMMARY==
==SUMMARY==
SHEET Date of Test CONTAINMENT SPRAY FLOW Comprehensive          Measured        Comprehensive Lower Limit Pump (Step)                   Action        Alert      Flow (GPM)                      Action 51A (6.14.2 or 6.14.6.2 (4) 3800    1  3948          ,4100      N/A              4326
SHEET Date of Test CONTAINMENT SPRAY FLOW Pump (Step) 51 A (6.1 4.2 or 6.14.6.2 (4) 51 B (6.35.2 or 6.35.6.2 (4)
_I 51 B (6.35.2 or                                             4100 6.35.6.2 (4) 4326 ESW Fj-OW Comprehensive I
Comprehensive Lower Limit Action Alert 3800 1
Comprehensive PPC Measured Pump (Step)             I   Action   1   Alert     Flow (GPM)     Alert         1 Action 52A (6.24.1.2)                  2994        3058          3050        N/A           I   3316 528 (6.44.1.2)                  3034        3099                      N/A           1   3360 E4-1
3948 Comprehensive Pump (Step)
I Action 1 Alert Measured Flow (GPM)  
,4100 41 00 ESW Fj-OW PPC Measured Flow (G PM) 3050 Comprehensive Action N/A 4326
_I 4326 I
Comprehensive Alert 1
Action N/A I
3316 N/A 1
3360 E4-1  


. *. -. cunerven                         OYSTER CHEt:K GENERAIING             I\IUIIIUt?I Ar Lxelor orrip~r y              STATION P ROCEDU RE                  607.4.004 Revision No.
cunerven Ar Lxelor orrip~r y OYSTER CHEt:K GENERAIING STATION P ROCEDU RE I\\IUIIIUt?I 607.4.004 Revision No.
62 i
62 i
Measured Overall Reading, in/sec Action 51A (6.19.               II 3H 3v II    0.22 0.21     I
Overall Reading, in/sec Measured -
                                                                    .26
Action  
                                                                    .24
.624 0.22 I
                                                                                          .624
3H I
                                                                                          .576 I 4H     I     0.18     I       .205                   ,492
.26 51 A (6.19.
                                                                                          ,492
I 3 v I 0.21 I  
                                                                                          .306 51 B (6.19.1)               I I 3H 0.18      1      .223                   .534 I 3v      I     0.15     I       .183                   .438 I 4H     I     0.14             .183                   .438 I 4v      I     0.14     I       .19                   .456 1 4A     I     0.26     I       .1           _    I  _
.24  
                                                                                          .24 _-
.576 I
52A                                                   .224                  ,538 (6.20.1)
4H I 0.18 I  
                                                                    . 184                  ,440 1 2t-i   I     0.20     I       .220                   .529 52B                   1H            0.24
.205  
                                                                    .308                   I 70 (6.40.1)
,492  
I 1A     I     0.11     I       .158                   ,378 I 2H     I     0.21             .295                   .70 E4--2
,492  
.306 I
3H I 0.18 1
51 B (6.1 9.1)  
.223  
.534  
.438 I
3 v I 0.15 I  
.183 I
4H I 0.14  
.183  
.438 I
4 v I 0.14 I  
.19  
.456 1
4A I
0.26 I  
.1  
.24
_I__-
52A (6.20.1)  
.224
,538
. 1 84
,440 1
2t-i I
0.20 I  
.220  
.529 52B (6.40.1) 0.24  
.308 I 70 1H I
1A I 0.11 I  
.158  
,378 I
2H I
0.21  
.295  
.70 E4--2  


I I Iuel
lunerven An lxelon Corr~wir y Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice  
.. -. lunerven                                   O Y s r t R C R E E K ~ ~ E N E H A II \IU N    ~~
- Test  
A n lxelon C o r r ~ w i ry            STATION PROCEDURE Title Containment Spray and Emergency Service Water System I 1 Revision No.
~  
Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice               - Test             ~           ~   - -
~
I    62 ATTACHMENT 607.4.004-4 (contit i ued)
ATTACHMENT 607.4.004-4 (con ti t i ued)
IST VALVE  
IST VALVE  


==SUMMARY==
==SUMMARY==
SHEET COMPONENT / POSITION PARAMETER (STEP)                                 Acce pta nce C riteria          TESTED / TESTED Pump 51 A Flow                                                                       V-21-8    Closed (6.14.2)     4100                 GPM                                               V-21-10 Open Water Flowing from V-3-698 (6.16.7) (Initial One)                                       Little or INo          V-3-133 Closed X
SHEET I\\UI I Iuel OYsrtR CREEK
little or no   excessive Pump 51 B Shaft Rotation (6.1 1.8) -yesJno                                       No Shaft Rotation            V-21-8    Closed 23 Pump 52A Flow PPC                                                                     V-3-67    Closed E;
~ ~ E N E H A I I N ~ ~
Point ESW-12                                  J.                                      V-3-68    Open (6.26)       3050               GPM           9?
STATION PROCEDURE 1 Revision No.
Pump 525 Shaft Rotation (6.13.4) - y e s X n o                                 No Shaft Rotation            V-3-67    Closed Pump 515 Flow                                                                         V-21-10 Closed (6.35.2)     4100                 GPM                     -
I 62 PARAMETER (STEP)
                                                            > 4000GPM                  V-21-8    Open Pump 51A Shaft Rotation (6.32.8) - y e s X n o                                 No Shaft Rotation            V-21-10 Closed Pump 52B Flow PPC Point ESW-12                                               -
Pump 51 A Flow (6.14.2) 4100 GPM Water Flowing from V-3-698 (6.16.7) (Initial One) little or no excessive Pump 51 B Shaft Rotation (6.1 1.8) -yesJno X
                                                            > 3100 GPM V-3-68    Closed V-3-67    Open (6.46)     3200               GPM Pump 52A Shaft Rotation (6.34.4) - y e s X n o                                 No Shaft Rotation             V-3-68     Closed E4-3
23 E;
Pump 52A Flow PPC (6.26) 3050 GPM 9?
Point ESW-12 J.
Pump 525 Shaft Rotation (6.13.4) - y e s X n o Pump 515 Flow (6.35.2) 4100 GPM Pump 51A Shaft Rotation (6.32.8) - y e s X n o Pump 52B Flow PPC Point ESW-12 (6.46) 3200 GPM Pump 52A Shaft Rotation (6.34.4) - y e s X n o Acce p t a n ce C rite ria Little or INo No Shaft Rotation No Shaft Rotation
> 4000GPM No Shaft Rotation
> 3100 GPM No Shaft Rotation COMPONENT / POSITION TESTED / TESTED V-21-8 Closed V-21-10 Open V-3-133 Closed V-21-8 Closed V-3-67 Closed V-3-68 Open V-3-67 Closed V-21-10 Closed V-21-8 Open V-21-10 Closed V-3-68 Closed V-3-67 Open V-3-68 Closed E4-3  


merven                           I OYSTER CREE:.K tiENERATlNti                             lvullluel STATION PROCEDURE I     -F An Lxeloii r u r n p a n y 607.4.004 Containment Spray and Emergency Service Water System 62 Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice Test                                 ~   _-   _
merven I
IST VALVE STROKE TIME  
I, -F An Lxeloii rurnpany I
l STEP lvullluel 607.4.004 OYSTER CREE:.K tiENERATlNti STATION PROCEDURE I 6.4.4.1 Containment Spray and Emergency Service Water System Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice Test  
~
6.4.5.1 62 I 6.4.6.1
~ 6.4.9.1 I
6.5.1 1
6.5.1
_~
VALVE V-21-17
~~
V-21-18 V-21-18
~_
v-21-11 v-21-11 V-21-17 IST VALVE STROKE TIME  


==SUMMARY==
==SUMMARY==
 
~
_                          _~                     ~ _ _.  .    -  - - _ ~ -~                -  -      -    -  -    _ _ _ _ ..
DIRECTION CLOSE
I l      STEP      VALVE                        DIRECTION        ACTUA I-             ACCEPT RANGE                        LIMIT1NG TIME (sec)-          --            ( s e a -~        VALUE (sec) ('I I 6.4.4.1
_~
                                                                      ~~
OPEN CLOSE OPEN CLOSE OPEN
V-21-17                        CLOSE                  30.1         MIN. 26.4 seconds                38.7 seconds
~
                            ~~                     _~ -
ACTU A I-TIME (sec)  
MAX: 35.6 seconds
~~
                                                                                            ~    ~~                  -
30.1 37.8 40.0 65.2 69.7  
6.4.5.1    V-21-18                          OPEN                  37.8          MIN: 33.1 seconds                 48.6 seconds MAX: 44.7 seconds I
-~
                                                                                    ~
37.4
6.4.6.1    V-21-18                        CLOSE                  40.0          MIN: 32.2 seconds                 47.3 seconds
-~
                  - -          _    ~_                                                ~~
ACCEPT RANGE
MAX: 43.5 ~    -
-~
seconds
(sea MIN. 26.4 seconds MAX: 35.6 seconds MIN: 33.1 seconds  
  ~    6.4.9.1      v-21-11                          OPEN                  65.2          MIN: 57.6 seconds                84.7 seconds MAX: 77.9 seconds                         _
~ MAX: 44.7 seconds MIN: 32.2 seconds MAX: 43.5 seconds MIN: 57.6 seconds MAX: 77.9 seconds MIN: 57.0 seconds MAX: 77.0 seconds MIN: 26.9 seconds MAX. 36.3 seconds  
I 6.5.1    v-21-11                        CLOSE                  69.7          MIN: 57.0 seconds                 83.7 seconds
~  
                                                                        -~
~~
MAX: 77.0 seconds 1        6.5.1    V-21-17                          OPEN                  37.4          MIN: 26.9 seconds                39.5 seconds MAX. 36.3 seconds
~~  
                                                                                          ~   ~~               -~
~  
(')   Values are maximum, unless otherwise specified.
-~  
~
~~
LI M IT1 N G VALUE (sec)
_ ('I 38.7 seconds 48.6 seconds 47.3 seconds 84.7 seconds 83.7 seconds 39.5 seconds
(') Values are maximum, unless otherwise specified.
Comments:
Comments:
Persons Performing Test:
Persons Performing Test:
Date
Date  


Appendix C                     Job Performance Measure                 Form ES-C-1 7 , I WORKSHEET Facility:     Oyster Creek     .             Tiask NO.:   -                   ___  -.
Appendix C 7
Job Performance Measure No.:           NRC JPM ADMIN   . SR04 (SRO) -
I Job Performance Measure Form ES-C-1 WORKSHEET Facility:
Oyster Creek.
Tiask NO.: -
Job Performance Measure No.:
NRC JPM ADMIN  
. SR04 (SRO)
WA  
WA  


==Reference:==
==Reference:==
Generic
-~
                          -~       _2.3.41SRO
Generic  
                              ~ _ __  __ -    -.3.1)-
~
Examiner:                              __
2.3.41SRO  
Facility Evaluator:   _.__       ___-
-. 3.1)-
Facility Evaluator: _.__
Method of Testing:
Method of Testing:
Simulated Performance                         Alctual Performance       __ .
Simulated Performance Examiner:
X..
Alctual Performance
Classroom        _ _  X        Simulator      - ~    -
__. X..
Plant       _~~~  - -.
_~~~ - -.
Plant Classroom X
Simulator
- ~ -
Read to the Examinee:
Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Line 743: Line 1,042:
Task Standard: Determines that only the Authorization for Emergency Exposure form for Chris Cat should be authorized, and that the others should not be authorized.
Task Standard: Determines that only the Authorization for Emergency Exposure form for Chris Cat should be authorized, and that the others should not be authorized.
Required Materials: Completed Authorizaticln for Emergency Exposure Forms.
Required Materials: Completed Authorizaticln for Emergency Exposure Forms.
NRC JPM ADMIN SR04                                                         Page 1 of 8
NRC JPM ADMIN SR04 Page 1 of 8  


Appendix C                 Job Performance Measure                 Form ES-C-1 WORKSHEET General  
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General  


==References:==
==References:==
: 1. EP-AA-113, Personnel Protective Actions, revision 8
: 1. EP-AA-113, Personnel Protective Actions, revision 8
: 2. EP-AA-113-F-02,Authorization For EImergency Exposure, revision 6 Initiating Cue: Review for authorization the 3 Authorization For Emergency Exposure forms provided to you from the RP Manager. If not approved, state why.
: 2. EP-AA-113-F-02, Authorization For EImergency Exposure, revision 6 Initiating Cue: Review for authorization the 3 Authorization For Emergency Exposure forms provided to you from the RP Manager. If not approved, state why.
Time Critical Task: No.
Time Critical Task: No.
Validation Time:     9 minutes NRC JPM ADMIN SR04                                                   Page 2 of 8
Validation Time:
9 minutes NRC JPM ADMIN SR04 Page 2 of 8  


Appendix C                 Job Performance Measure                     Form ES-C-1 WORKSHEET Performance lriformation Denote criticaI steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance lriformation Denote criticaI steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidates the completed Authorization for Emergency Exposure forms.
Standard:
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidates the completed Authorization for Emergency Exposure forms.
Comment:
Comment:
_._ _ _ _ ~                       _  _  _  ~                       -
_._ _ _ _ ~  
                  ~-          ~~ ~       ~     -   ~~_ ~     ~ ~~   ~~   -
~
~  
~~  
~~  
~  
- ~~_  
~  
~  
~~  
~-
SAT/UNSAT Note: The determinations may be made in any order.
SAT/UNSAT Note: The determinations may be made in any order.
J         Performance Step: 2 Procedure Step: 3.2, 3.3 Determines that authorization should not be provided to Alan Able (JOB A) since it will only result in a dose of 4 Rem (1/2 hour x 8 Rem/hr).
J Performance Step: 2 Procedure Step: 3.2, 3.3 Determines that authorization should not be provided to Alan Able (JOB A) since it will only result in a dose of 4 Rem (1/2 hour x 8 Rem/hr).
Standard:
Standard:
Comment:
Comment:
SATNNSAT NRC JPM ADMIN SR04                                                         Page 3 of 8
SATNNSAT NRC JPM ADMIN SR04 Page 3 of 8  


Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 3
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
- ~
Performance Step: 3  
~
Procedure Step: 4.3.3 Determines that authorization should not be provided to Bob Blake (JOB B) since he already has had an emergency exposure of >25 Rem before.
Procedure Step: 4.3.3 Determines that authorization should not be provided to Bob Blake (JOB B) since he already has had an emergency exposure of >25 Rem before.
Standard: Determines that authorization should not be provided to Bob Blake (JOB 8) since he already has had an emergency exposure of >25 Rem before.
Standard:
Determines that authorization should not be provided to Bob Blake (JOB 8) since he already has had an emergency exposure of >25 Rem before.
Comment:
Comment:
J     Performance Step: 4 Procedure Step: Determines that authorization should be authorized for Chris Cat. He has had no prior emergency exposure > 25 Rem, and his expected exposure is > 5 Rem (416 x 20 = 13.3 Rem)
J Performance Step: 4 Procedure Step: Determines that authorization should be authorized for Chris Cat. He has had no prior emergency exposure > 25 Rem, and his expected exposure is > 5 Rem (416 x 20 = 13.3 Rem)
Standard: Determines that authorization should be authorized for Chris Cat.
Standard:
He has had no prior emergency exposure > 25 Rem, and his expected exposure is > 5 Rein (4/6x 20 = 13.3 Rem)
Determines that authorization should be authorized for Chris Cat.
He has had no prior emergency exposure > 25 Rem, and his expected exposure is > 5 Rein (4/6 x 20 = 13.3 Rem)
SAT/UNSAT JPM Stop Time:
SAT/UNSAT JPM Stop Time:
NRC JPM ADMIN SR04                                               Page 4 of 8
NRC JPM ADMIN SR04 Page 4 of 8  


Appendix C                 Job Performance Measure         Form ES-C-1 WORKSHEET Validation of Completion JPM Number:          -NRC_ _JPM
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM ADMIN SR04
                          -    _ _ _ ADMIN
~ _ - _ - ~-
                                      ~     _ - _ - SR04
JPM Number:
                                                      ~-
Examinee's Name:
Examinee's Name:             ~ -___          _-._______
Examiner's Name:  
Examiner's Name:
~ -___
Date Performed:       _ _                ~
Date Performed:  
Facility Evaluator:                       ~       ~- ~-
~
Number of Attempts:     ~         -
Facility Evaluator:  
Time to Complete:                   ~   --      - -~ -    -
~-
Question:
~-  
~
Number of Attempts:  
~
Time to Complete:  
~  
-~ -
Question:  


===Response===
===Response===
Result:               Satisfactory/Unsatisfactory Examiner's Signature and Date:
Result:
NRC JPM ADMIN SR04                                           Page 5 of 8
Satisfactory/Unsatisfactory Examiner's Signature and Date:
NRC JPM ADMIN SR04 Page 5 of 8  


Appendix C         Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Simulator Setup
: 1. None.
: 1. None.
NRC JPM ADMIN SR04                         Page 6 of 8
NRC JPM ADMIN SR04 Page 6 of 8  


. *' . Appendix C                     Job Performance Measure               Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
: 1. The plant was at rated power when a severe earthquake occurred.
: 1. The plant was at rated power when a severe earthquake occurred.
: 2. Chemistry has confirmed fuel failure:;.
: 2. Chemistry has confirmed fuel failure:;.
Line 804: Line 1,125:
Task Cue:
Task Cue:
Authorize or NOT authorize the 3 Authorization For Emergency Exposure forms provided to you from the RP Manager. If not approved, state why.
Authorize or NOT authorize the 3 Authorization For Emergency Exposure forms provided to you from the RP Manager. If not approved, state why.
NRC JPM ADMIN SR04                                                     Page 7 of 8
NRC JPM ADMIN SR04 Page 7 of 8  


. j . Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET Personal information on the volunteers to perform the 3 different jobs.
j Appendix C A
I
Job Performance Measure Form ES-C-1 WORKSHEET MSlVs to secure the steam leak into the Turbine Building.
                      ~ PURPOSE: To enter the Trunion Room to manually close the MSlVs to secure the steam leak into the Turbine Building.
DOSE RATE: 8 R/hour.
A DOSE RATE: 8 R/hour.
Personal information on the volunteers to perform the 3 different jobs.
~   _  _ -~
I  
~ PURPOSE: To enter the Trunion Room to manually close the JOB DURATION: 30 minutes
~
- - ~- --
~
~
-~
Volunteer:
Volunteer:
JOB DURATION: 30 minutes Alan Able Age:
Alan Able Age:
44
44 Prior Lifetime No I
                                                  ~ -_-  ~- - -
Employee 001 11 1 ID:
Prior Lifetime
Emergency Exposure?
                                                                        -  -  ~  -
I 1775 mrem
No Employee         001 11                       Emergency Exposure?
, Dose:
1 ID:
JOB B Volunteer:
I Dose:
Employee ID:
1775 mrem PURPOSE: To rescue an unconscious worker in the Drywell.
Current Dose:
JOB B            DOSE RATE: 32 R/hour.
PURPOSE: To rescue an unconscious worker in the Drywell.
JOB DURATION: 50 minutes Volunteer:      Bob Blake     Age:   47     Prior Lifetime           Yes Employee        00222                         Emergency Exposure?       27 Rem ID:
DOSE RATE: 32 R/hour.
Current         1050 mrem Dose:
JOB DURATION: 50 minutes Bob Blake Age:
47 Prior Lifetime Yes 00222 Emergency Exposure?
27 Rem 1050 mrem JOB C
_~ __
Volunteer:
Employee ID:
Current Dose:
PURPOSE: To close the RWCIJ isolation valve to stop flooding in the Reactor Building.
PURPOSE: To close the RWCIJ isolation valve to stop flooding in the Reactor Building.
JOB C DOSE RATE: 20 R/hour.
DOSE RATE: 20 R/hour.
JOB DURATION: 40 minutes
JOB DURATION: 40 minutes Chris Cat Age: 40 Prior Lifetime No 00333 Emergency Exposure?
        -  _~  __
1350 mrem NRC JPM ADMIN SR04 Page 8 of 8  
Volunteer:      Chris Cat     Age:   40     Prior Lifetime           No Employee        00333                         Emergency Exposure?
ID:
Current          1350 mrem Dose:
NRC JPM ADMIN SR04                                                       Page 8 of 8


EP-AA-113-F-02 Exeian                                                                                        Revision B Page 1 of 1 Nuclcar AUTHORIZATION FOR EMERGENCY EXPOSURE Name:    Alan Able
Exeian EP-AA-113-F-02 Revision B Page 1 of 1 Nuclcar AUTHORIZATION FOR EMERGENCY EXPOSURE Datle / Time:
        ~_.___.__        -~ ___-  - - ~    __  Datle / Time:   -Today
Today Now
_______            __ _Now
-~
__  -~
Name:
Employee ID Number:     _001
Alan Able Employee ID Number:
_ ~11
_ _ ~ _
_      _ ~ _ Current Annual Exposure:               1775   - mrem
001 11  
~
Current Annual Exposure:
1775  
- mrem  
~_.___.___
-~ __ - - -
~


===Reason for Request===
===Reason for Request===
JOB
JOB A: To enter the Trunion Room to manually  
  - A: To enter the Trunion Room to manually close the
-~ close the  
                                                -~            MSlVs to secure the steam leak
-- - MSlVs  
                                                            -- -  -                ~               -
- to secure the  
    ~-   ~-                                  ___. -                            ___
~
steam leak -
~-  
~-
REQUESTING AUTHORIZATION TO EXCEED:
REQUESTING AUTHORIZATION TO EXCEED:
5 REM TEDE     (Authorized t o receive greater than 5 Rem TEDE but less than 10 Rem TEDE) a   10 REM TEDE     (Authorized t o receive greater than 10 Rem TEDE but less than 25 Rem TEDE) a   25 REM TEDE     (Authorized to receive greater than 25 Rem)
5 REM TEDE (Authorized to receive greater than 5 Rem TEDE but less than 10 Rem TEDE) a 10 REM TEDE (Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE) a 25 REM TEDE (Authorized to receive greater than 25 Rem)
                                                                          . loday/xow
* Emergency Worker Signature
                                                                          . ~-.-
..... loday/xow  
* Emergency Worker Signature                                                Date /Time
~-
Date /Time
* Emergency Worker Exposure Limits and Associated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are understood.
* Emergency Worker Exposure Limits and Associated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are understood.
John Redia
John Redia Rad. Protection Management (Review)
      - _--_  --    --          ~         ~     ~-   -__                 lodaJ/gow Rad. Protection Management (Review)                                        Date / Time
~  
          ~
~  
Station Emergency Director (Authorization)                                 Date / Time Authorize? Y e s / No     If NO, why not:                                         __
~- -__
 
lodaJ/gow Date / Time  
EP-AA-113-F-02 Exelan,                                                                                Revision 6 Page 1 of 1 Nuciear AUTHORIZATION FOR EMERGENCY EXPOSURE Name:      Bob Blake~-              ~    ___  Date / Time: -
~
Today
Station Emergency Director (Authorization)
____      -~      - ..Now Employee ID Number:         ~~00222-Current Annual Exposure:       1050 -- mrem
Date / Time Authorize? Yes / No If NO, why not:
: Exelan, Nuciear AUTHORIZATION FOR EMERGENCY EXPOSURE EP-AA-113-F-02 Revision 6 Page 1 of 1 Date / Time:
Today Now Current Annual Exposure:
1050 -- mrem Employee ID Number:  
~~ 00222-  
- ____ -~
Name:
Bob Blake
~-  
~


===Reason for Request===
===Reason for Request===
- JOB_-
JOB _-
  -    B: To
B: To rescue an unconscious worker in - the Drywell.-
__  rescue an unconscious worker in
                                                  -the Drywell.-
REQUESTING AUTHORIZATION TO EXCEED:
REQUESTING AUTHORIZATION TO EXCEED:
5 REM TEDE       (Authorized t o receive greater than 5 Rem TEDE but less than 10 Rem TEDE) 10 REM TEDE     (Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE) 25 REM TEDE     (Authorized to receive greater than 25 Rem)
5 REM TEDE (Authorized to receive greater than 5 Rem TEDE but less than 10 Rem TEDE) 10 REM TEDE (Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE) 25 REM TEDE (Authorized to receive greater than 25 Rem)
* Emergency Worker Signature                                           Date / Time
* Emergency Worker Signature
* Emergency Worker Exposure Limits and Associated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are understood.
* Emergency Worker Exposure Limits and Associated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are understood.
jofin K e d a
Date / Time jofin Keda Rad. Protection Management (Review)  
  ~                                -                    -___            Iod2/Now Rad. Protection Management (Review)                                     Date / Time Station Emergency Director (Authorization)                             Date / Time Authorize? Yes / No             If NO, why not:                 - ~______~           __
~
                    ~   . -___                                                            ~-
Iod2/Now Date / Time Station Emergency Director (Authorization)
Your Name:                                           .-
Authorize? Yes / No If NO, why not:
Date / Time
- ~ _ _ _ _ _ _ ~  
~  
~-
Your Name:  


- '* .                                                                                          EP-AA-113-F-02 Exelan         I Revision 6 Page 1 of 1 Nudear AUTHORIZATION FOR EMErRGENCY EXPOSURE Name:     Chris Cat
Exelan I
                . _~
Nudear AUTHORIZATION FOR EMErRGENCY EXPOSURE Name:
                        -                          Date II Time:       Today
Chris Cat
_ _ _.~       - -           Now Employee ID Number:     00333
_~
__ _ ~ _ _ _    Curirent Annual Exposure:               1350--__ mrem
Date II Time:
Today
_. ~ -
EP-AA-113-F-02 Revision 6 Page 1 of 1 Now Employee ID Number:
00333  
~
_ _ Curirent Annual Exposure:
1350 -  
- __ mrem  


===Reason for Request===
===Reason for Request===
JOB C: To close the RWCU isolation valve
JOB C: To close the RWCU isolation  
                                          ~     to stolp
~ valve to stolpfloodD in the Reactor
______._                    i n the Reactor___Building.
___ Building.
f l o o d D____
REQUESTING AUTHORIZATION TO EXCEED:
REQUESTING AUTHORIZATION TO EXCEED:
a   5REMTEDE       (Authorized to receive greater than 5 Rem TEDE but less than 10 Rem TEDE) a    10REMTEDE      (Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE) a    25REMTEDE      (Authorized to receive greater than 25 Rem)
a 5REMTEDE a 10REMTEDE a 25REMTEDE (Authorized to receive greater than 5 Rem TEDE but less than 10 Rem TEDE)
* Emergency Worker Signature                                               Date / Time
(Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE)
(Authorized to receive greater than 25 Rem)
* Emergency Worker Signature
* Emergency Worker Exposure Limits and Associ'ated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are! understood.
* Emergency Worker Exposure Limits and Associ'ated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are! understood.
John
Date / Time John Reds Rad. Protection Management (Review)
        ~ _
~  
Reds
~
_    .- ~
_ _.~
_____.___              _ _ .~                           - T*/%OW Rad. Protection Management (Review)                                        Date / Time
Station Emergency Director (Authorization)
                                                                                  - -~
T*/%OW Date / Time  
Station Emergency Director (Authorization)                                  Date /Time Authorize? Yes / No     If NO, why not:                     __    _  - ~-   ~   ~
- -~
Date /Time Authorize? Yes / No If NO, why not:  
- ~-  
~  
~  


I T AppendixC                       Job Performance Measure                 Form ES-C-1 WORKSHEET Determine Emergency C1,assificationand Protective Action Task
I T
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Determine Emergency C1,assification and Protective Action Recommendations
_ ~ _ _ _
_ _ _ ~ _
~ __________
Task


==Title:==
==Title:==
Recommendations___. _~___    ___~_  ~ __________
Job Performance Measure No.:
Job Performance Measure No.:             NRC JPlVl ADMIN SR05 (SR0)-
NRC JPlVl ADMIN SR05 (SR0)-
WA  
WA  


==Reference:==
==Reference:==
Generic 2.4.29 (SRO
Generic  
                                    ~        --   4.0)
~ 2.4.29 (SRO  
- - 4.0)
Method of Testing:
Method of Testing:
Simulated Performance                   -    -   Actual Performance             X    ~-
X Simulated Performance  
Classroom             X     ~   Simulator   -              Plant Read to the Examinee:
- Actual Performance  
~-
Classroom X  
~
Simulator Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant was at rated power when an autornatic scram occurred 45 minutes ago. The following conditions currently exist:
The plant was at rated power when an autornatic scram occurred 45 minutes ago. The following conditions currently exist:
0   All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 O F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem NRC JPM ADMlN SR05                                                         Page 1 of 8
0 e
e e
0 e
e e
e 0
e All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 O F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem NRC JPM ADMlN SR05 Page 1 of 8  


\ AppendixC                     Job Performance Measure               Form ES-C-1 WORKSHIEET Task Standard: The emergency has been classified and the PARS have been determined.
\\
AppendixC Job Performance Measure Form ES-C-1 WORKSHIEET Task Standard: The emergency has been classified and the PARS have been determined.
Required Materials: None.
Required Materials: None.
General  
General  
Line 924: Line 1,305:
: 1. EP-AA-1010, Radiological Emergency Plan Annez for Oyster Creek Station, revision 0.
: 1. EP-AA-1010, Radiological Emergency Plan Annez for Oyster Creek Station, revision 0.
: 2. EP-AA-111, Emergency Classification and Protective Action Recommendations, revision 13.
: 2. EP-AA-111, Emergency Classification and Protective Action Recommendations, revision 13.
: 3. EP-AA-111-F-10, Oyster Creek Plant Based PAR Flowchart, revision A.
: 3. EP-AA-111 -F-10, Oyster Creek Plant Based PAR Flowchart, revision A.
Initiating Cue: Classify the emergency event (include the EAL designation). State the reason for this classification.
Initiating Cue: Classify the emergency event (include the EAL designation). State the reason for this classification.
Time Critical Task: Yes.
Time Critical Task: Yes.
Validation Time:       12 minutes Part 1 10 minutes Part 2 NRC JPM ADMIN SR05                                                   Page 2 of 8
Validation Time:
12 minutes Part 1 10 minutes Part 2 NRC JPM ADMIN SR05 Page 2 of 8  


Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET  
  -~
-~
Performance Information Denote critical steps with a check mark   J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Handout first page of STUDENT HANDOUT.
Standard:
Comment:
Comment:
J         Performance Step: 2 d d
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Handout first page of STUDENT HANDOUT.
~  _ . ~.
J Performance Step: 2 Procedure Step: Clas d d
Procedure Step: Clas ifies t ,le emergency as a General Emergency (FG1).
ifies t,le emergency as a General Emergency (FG1).
Standard:      Classifies the emergency as a General Emergency (FG1). This classification is made within I 5 minutes from the JPM Start Time.
Classifies the emergency as a General Emergency (FG1). This classification is made within I 5 minutes from the JPM Start Time.
Reasons: Loss of Fuel Clad barrier (RPV water level < -20); Loss of Reactor Coolant barrier (qPV water level < 0 ) ; and Potential Loss of Primary Containment barrier (CHRRMS =r 1210 R/hr less than 2 hours after shutdown)
Reasons: Loss of Fuel Clad barrier (RPV water level < -20); Loss of Reactor Coolant barrier (qPV water level < 0 ) ; and Potential Loss of Primary Containment barrier (CHRRMS =r 121 0 R/hr less than 2 hours after shutdown)  
Note:           Record time that the first page of the STUDENT HANOUT is received from each Candidafle.
~
_. ~.
Standard:
Note:
Comment:
Comment:
NRC JPM ADMIN SR05                                                       Page 3 of 8
Record time that the first page of the STUDENT HANOUT is received from each Candidafle.
NRC JPM ADMIN SR05 Page 3 of 8  


                                          - a - -              --
a Appendix C Job Performanice Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
*. . Appendix C                     Job Performanice Measure               Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
The plant was at rated power when an (automatic scram occurred 45 minutes ago. The following conditions currently exist:
The plant was at rated power when an (automatic scram occurred 45 minutes ago. The following conditions currently exist:
e All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60" with Corle Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 "F Main Stack RAGEMS indicates 4.1 vCi/cc HRN Drywell hydrogen indicates 3.1o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 1 15 mRem Additional Initial Conditions:
e e
e e
e e
e e
e e
e All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60" with Corle Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 "F Main Stack RAGEMS indicates 4.1 vCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 1 15 mRem Additional Initial Conditions:
Environmental conditions show that the wind is from 50" at 20 mph There are no travel impediments There are no Sea Breezes Task Cue: THIS IS A TIME CRITICAL JPM Determine the Protective Action Recomrnendations (PARS).
Environmental conditions show that the wind is from 50" at 20 mph There are no travel impediments There are no Sea Breezes Task Cue: THIS IS A TIME CRITICAL JPM Determine the Protective Action Recomrnendations (PARS).
Protective Action Recommendations:
Protective Action Recommendations:
Name:                                         -__.__    Time:
Name:
Time:
(NRC Only)
(NRC Only)
NRC JPM ADMIN SR05                                                     Page 8 of 8
NRC JPM ADMIN SR05 Page 8 of 8  


I , AppendixC                         Job Performanlce Measure                   Form ES-C-1 WORKSHEET Facility:     Ojster
.I  
                  .~   ___ __Creek
, AppendixC Job Performanlce Measure WORKSHEET Form ES-C-1 Facility:  
                              -_ ..                    Task NO.:     . 2000301401
.~
                                                                        -    ~~           - __ -  -
Ojster
___ __ Creek Task NO.:  
. 2000301401  
~~
Task
Task


==Title:==
==Title:==
Comglete     the Technical Specifications Log Sheet
Comglete the Technical Specifications Log Sheet  
                                  -_____________                            . ~ _ _ _ _ _ _ _ _ _
. ~ _ _ _ _ _ _ _ _ _
Job Performance Measure No.:               NRC JPM ADMIN R01 (RO)~-
Job Performance Measure No.:
NRC JPM ADMIN R01 (RO) ~-
K/A  
K/A  


==Reference:==
==Reference:==
Generic 2.1 .I 8 (RO ____2.9J Examinee:      ~~                 .~.             Examiner:   ~                 - .  .
Generic 2.1.I 8 (RO
____ 2.9J  
~~  
.~.
Examiner:  
~
Examinee:
Method of Testing:
Method of Testing:
Simulated Performance             -  -            Actual Performance        -  ~ __X _- .  ~
X Actual Performance
Classroom                   -. . . Simulator     ~     X     ~   Plant                     ~ _ _
~
Read to the Examinee:
~
Simulated Performance  
~ _ _
Classroom  
-... Simulator  
~
X  
~
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. The plant is rated power.
: 1. The plant is rated power.
: 2. You are the on-shift Reactor Operator on the 4-12 shift.
: 2. You are the on-shift Reactor Operator on the 4-12 shift.
: 3. The current datehime is April 20, 2008 at 1700.
: 3. The current datehime is April 20, 2008 at 1700.
Task Standard: Page E l - 1 of the Technicad Specifications Log Sheet is correctly completed and the discrepancies are noted. No remarks are made of in-specification readings.
Task Standard: Page El-1 of the Technicad Specifications Log Sheet is correctly completed and the discrepancies are noted. No remarks are made of in-specification readings.
Required Materials: A completed page E l - 1 (for the 11-7 and 7-3 shifts) of Procedure 681.4.004, Technical Specification Log Sheet.
Required Materials: A completed page El-1 (for the 11 -7 and 7-3 shifts) of Procedure 681.4.004, Technical Specification Log Sheet.
General  
General  


==References:==
==References:==
: 1. Procedure 681.4.004, Technical Specifications Log Sheet, revision 12.
: 1. Procedure 681.4.004, Technical Specifications Log Sheet, revision 12.
NRC JPM ADMIN R01                                                               Page 1 of 11
NRC JPM ADMIN R01 Page 1 of 11  


. AppendixC                 Job Performance Measure                   Form ES-C-1 WORKSHEET Initiating Cue: Complete page E l -1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: Complete page E l -1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
Time Critical Task: No.
Time Critical Task: No.
Validation Time:     10 Minutes.
Validation Time:
NRC JPM ADMIN R 0 1                                                    Page 2 of 11
10 Minutes.
NRC JPM ADMIN R01 Page 2 of 11  


. AppendixC                   Job Performance Measure                   Form ES-C-1 WORKSHEET Denote critical steps with a check mark 4 Note 1: The values may be recorded in any order.
. AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Denote critical steps with a check mark 4 Note 1 : The values may be recorded in any order.
Note 2: The discrepancies noted while cornpleting the log may be reported at the time of discovery or some other time during the JPM.
Note 2: The discrepancies noted while cornpleting the log may be reported at the time of discovery or some other time during the JPM.
Note 3: Hand the Candidate the partially completed procedure.
Note 3: Hand the Candidate the partially completed procedure.
Performance Step: 1
Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
_    ~-
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.  
Procedure Step: Provides repeat back of initiating cue.
~-
Standard:      Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Standard:
JPM Start Time:
JPM Start Time:
Comment:
Comment:
SAT/UNSAT
SAT/UNSAT  
            ~_      ~~         ~~
~~  
~~  
~_
Performance Step: 2 Procedure Step: Records position of AOG valve V-7-31.
Performance Step: 2 Procedure Step: Records position of AOG valve V-7-31.
Standard:      Records position of valve AOG V-7-31 as closed on Panel 1OXF SAT/UNSAT NRC JPM ADMIN R 0 1                                                  Page 3 of 11
Records position of valve AOG V-7-31 as closed on Panel 1 OXF Standard:
SAT/UNSAT NRC JPM ADMIN R01 Page 3 of 11  


. AppendixC                 Job Performance Measure               Form ES-C-1 WORKSHEET Performance Step: 3 Procedure Step: Records Torus water level from the following instruments:
. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 3 Procedure Step: Records Torus water level from the following instruments:
LT-37 LT-38 Narrow Range on Panel 9XR Standard:  Records Torus water level irom the following instruments as on the KEY:
LT-37 LT-38 Narrow Range on Panel 9XR Records Torus water level irom the following instruments as on the KEY:
LT-37 (Indicator on Panel 1F/2F)
LT-37 (Indicator on Panel 1 F/2F)
LT-38 (Indicator on Panel 1F/2F)
LT-38 (Indicator on Panel 1 F/2F)
Narrow Range Recorder on Panel 9XR Comment:
Narrow Range Recorder on Panel 9XR Standard:
SAT/U NSAT Performance Step: 4 Procedure Step: Records Torus water temperature from the following indicators:
Comment:
DIV I DIV II Standard:  Records Torus water temp'erature from the following indicators as on the KEY: (Indicator on F'anel 1F/2F)
SAT/U NSAT Performance Step: 4 Standard:
DIV I DIV II SAT/UNSAT NRC JPM ADMlN R 0 1                                             Page 4 of 11
Procedure Step: Records Torus water temperature from the following indicators:
DIV I DIV II Records Torus water temp'erature from the following indicators as on the KEY: (Indicator on F'anel 1 F/2F)
DIV I DIV II SAT/UNSAT NRC JPM ADMlN R 0 1 Page 4 of 11  


- AppendixC               Job Performance Measure                 Form ES-C-1 WORKSI-IEET Performance Step: 5 Procedure Step: Records Isolation Condenser area temperatures from the following instruments:
- AppendixC Job Performance Measure WORKSI-IEET Form ES-C-1 Performance Step: 5 Standard:
0   IB06A 0   IB06B IB06C IB06D Standard:  Records Isolation Condenser area temperatures from the following instruments as on the KEY: (Panel 10R)
Procedure Step: Records Isolation Condenser area temperatures from the following instruments:
IB06A 0   IB06B IBO6C 0 IB06D Comment:         . ..                                  ~-      . .-
0 IB06A 0
                        ..-    ..      ~~-                           ....
IB06B IB06C IB06D Records Isolation Condenser area temperatures from the following instruments as on the KEY: (Panel 10R)
IB06A 0
IB06B IBO6C 0
IB06D  
~-
Comment:  
~~-
SAT/UNSAT Performance Step: 6 Procedure Step: Records Isolation Condenser levels from the following instruments:
SAT/UNSAT Performance Step: 6 Procedure Step: Records Isolation Condenser levels from the following instruments:
IG06A IG06B Standard:  Records Isolation Condenser levels from the following instruments as on the KEY: (Indicator on Panel 1F/2F)
IG06A IG06B Records Isolation Condenser levels from the following instruments as on the KEY: (Indicator on Panel 1 F/2F)
IG06A IG06B Comment:   ..                      .  -        ~ - .. .     ~               ~.
IG06A IG06B Standard:  
SAT/U NSAT NRC JPM ADMlN R 0 1                                                Page 5 of 11
~ -...  
~  
~.
Comment:
SAT/U N SAT NRC JPM ADMlN R01 Page 5 of 11  


. AppendixC                   Job Performance Measure                 Form ES-C-1 WORKS+iEET
. AppendixC Job Performance Measure Form ES-C-1 WORKS+iEET  
  -~
-~
J     Performance Step: 7
J Performance Step: 7  
  ~           ~
~  
~
Procedure Step: Record Nii.rogen Makeup and calculate nitrogen use for the shift and for the day.
Procedure Step: Record Nii.rogen Makeup and calculate nitrogen use for the shift and for the day.
Standard:  Records Nitrogen Makeup i3nd calculates nitrogen use for the shift, as on the KEY.
Records Nitrogen Makeup i3nd calculates nitrogen use for the shift, as on the KEY.
Calculates and records nitrogen use for the day by subtracting the previous day 3-1 1 integrator reading from the current 3-11 integrator reading, as on the KEY.
Standard:
Calculates and records nitrogen use for the day by subtracting the previous day 3-1 1 integrator reading from the current 3-1 1 integrator reading, as on the KEY.
Recognizes/reports that the daily nitrogen use is > 250 units.
Recognizes/reports that the daily nitrogen use is > 250 units.
Comment:
Comment:
Performance Step: 8 Procedure Step: Record RIB 119 radiation levels from:
Performance Step: 8 Standard:
Radiation monitor B-9 Radiation monitor C-9 Standard:  Records RB 119 radiation levels from:
Procedure Step: Record RIB 1 19 radiation levels from:
Radiation monitor B-9 Radiation monitor C-9 as on the key.
Radiation monitor B-9 Radiation monitor C-9 Radiation monitor B-9 Radiation monitor C-9 as on the key.
Records RB 11 9 radiation levels from:
Comment:
Comment:
SATNNSAT NRC JPM ADMIN R 0 1                                                Page 6 of 11
SATNNSAT NRC JPM ADMIN R01 Page 6 of 11  


. AppendixC             Job Performance Measure               Form ES-C-1 WORKSI-iEET Performance Step: 9 Procedure Step: Record RE! Vent Radiation Monitor levels:
. AppendixC Job Performance Measure WORKSI-iEET Form ES-C-1 Performance Step: 9 Procedure Step: Record RE! Vent Radiation Monitor levels:
Radiation monitor Channel 1 Radiation monitor Channel 2 Standard: Procedure Step: Records RB Vent Radiation Monitor levels:
Radiation monitor Channel 1 Radiation monitor Channel 2 Standard:
Radiation monitor Channel 1 Radiation monitor Channel 2, as on the KEY.
Procedure Step: Records RB Vent Radiation Monitor levels:
SAT/UNSAT Performance Step: 10 Procedure Step: Record the Shutdown Cooling Room lowest temperature.
Radiation monitor Channel 2, as on the KEY.
Standard:  Records the Shutdown Cooling Room lowest temperature, as on the KEY. (Panel 10R)
Radiation monitor Channel 1 SAT/UNSAT Performance Step: 10 Procedure Step: Record the Shutdown Cooling Room lowest temperature.
NRC JPM ADMIN R 0 1                                            Page 7 of 11
Records the Shutdown Cooling Room lowest temperature, as on the KEY. (Panel 10R)
Standard:
NRC JPM ADMIN R01 Page 7 of 11  


. AppendixC                 Job Performarice Measure                   Form ES-C-1 WORKS HEET
. AppendixC Job Performarice Measure Form ES-C-1 WORKS H EET Performance Step: 11 Procedure Step: Calculate IFuel Pool Slab AT Calculates Fuel Pool Slab AT by subtracting the Shutdown Cooling Room temperature from the Fuel Pool temperature, as on the key.  
          - ~-
- ~-
Performance Step: 11 Procedure Step: Calculate IFuel Pool Slab AT Standard:    Calculates Fuel Pool Slab AT by subtracting the Shutdown Cooling Room temperature from the Fuel Pool temperature, as on the key.
Standard:
J      Performance Step: 12 Procedure Step: Record the previous day lowest Torus water level, todays highest Torus water level, and the differential.
Performance Step: 12 Procedure Step: Record the previous day lowest Torus water level, todays highest Torus water level, and the differential.
Standard:    Records the previous day lowest Torus water level, todays highest Torus water level, and the differential, as on the KEY.
Records the previous day lowest Torus water level, todays highest Torus water level, and the differential, as on the KEY.
Reports the differential level is greater than allowed (actual is 5 0.2 allowed).
Reports the differential level is greater than allowed (actual is 5 0.2 allowed).
Cue:         The previous days lowest Torus water level from Panel 9XR is 150.0.
J Standard:
Cue:
Comment:
Comment:
The previous days lowest Torus water level from Panel 9XR is 150.0.
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMIN R 0 1                                                  Page 8 of 11
NRC JPM ADMIN R01 Page 8 of 11  


. AppendixC                   Job Performance Measure         Form ES-C-1 WORKS t i EET Validation of Completion JPM Number:           NRC
. AppendixC Job Performance Measure WORKS t i E ET Form ES-C-1 Validation of Completion NRC JPM ADMIN F301 JPM Number:
                        - __ JPM  - _ _ _ADMIN
Examinees ~
                                          - - _  F301 Examinees ~       ~   ~   _  e Examiners Name:               -      _        -  -    _ __
~
Date Performed:       -          __
~
Facility Evaluator:     _ _    -        ____  _.  -  - -
e Examiners Name:
Number of Attempts:   -                            _-_--
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Time to Complete:
Question:
Question:
Result:               Satisfactory/U nsat isfactory Examiners Signature and Date:
Result:
NRC JPM ADMIN R 0 1                                          Page 9 of 11
Satisfactory/U n sat isfactory Examiners Signature and Date:
NRC JPM ADMIN R01 Page 9 of 11  


.. . Appendix C                 Job Performanlce Measure             Form ES-C-1 WORKSHEET Simulator.Setur,
... Appendix C Job Performanlce Measure Form ES-C-1 WORKSHEET Simulator. Setur,
: 1. Reset to full power IC-65
: 1. Reset to full power IC-65
: 2. Insert the following:
: 2. Insert the following:
Line 1,072: Line 1,507:
: e. SWI-RMS066A to 1.O (RB vent rad mon)
: e. SWI-RMS066A to 1.O (RB vent rad mon)
: d. SWI-RMS067A to 1.O (RB veirlt rad mon)
: d. SWI-RMS067A to 1.O (RB veirlt rad mon)
: 3. Have ready a 681.4.004 Attachment 1, completed for the 11-7 and 7-3 shifts (see Completed 681.4.004)
: 3. Have ready a 681.4.004 Attachment 1, completed for the 11 -7 and 7-3 shifts (see Completed 681.4.004)
NRC JPM ADMIN R 0 1                                             Page 10 of 11
NRC JPM ADMIN R 0 1 Page 10 of 11  


I AppendixC                   Job Performarce Measure                 Form ES-C-1 WORKS 1-1EET STUDENT H.ANDOUT Initial Conditions:
I AppendixC Job Performarce Measure Form ES-C-1 WORKS 1-1 E ET STUDENT H.ANDOUT Initial Conditions:
: 1. The plant is rated power.
: 1. The plant is rated power.
: 2. You are the on-shift Reactor Operator on the 4-12 shift
: 2. You are the on-shift Reactor Operator on the 4-12 shift
: 3. The current date/tirne is April 20, 2008 at 1700.
: 3. The current date/tirne is April 20, 2008 at 1700.
Task Cue:
Task Cue:
Complete page E l - 1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Speciftication Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
Complete page El-1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Speciftication Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
NRC JPM ADMIN R 0 1                                                  Page 11 of 11
NRC JPM ADMIN R01 Page 11 of 11  


AmerGen,.
AmerGen,.
An Exelon Company 1   OYSTER CREEK GENERATING STATION PROCEDURE                                 I Number 681.4.004 Title Technical Specification Log Sheet                                                                 I Revision No.
1 OYSTER CREEK GENERATING Number An Exelon Company STATION PROCEDURE I 681.4.004 DATE Title Technical Specification Log Sheet Todav Revision No.
12 TECHNICAL SPECIIzICATIONLOG SHEET DATE                        Todav SUB AOG                                                                     TORUS                                             STATION V-7-31                 LEVEL                       (9XR)             Normal                       TEMP                     TouP**
I 12 SHIFT 11-7 7-3 3-11 TECHNICAL SPECIIzICATION LOG SHEET SUB STATION TouP**
SHIFT          Closed           LT-37         LT-38       NARROW                 1144''             Divl     DivI-           Limit 11-7      Closed             152           152         150.2                   -
AOG TORUS V-7-31 LEVEL (9XR)
                                                                                      < I53"           82       82             -<95"F           (1)
Normal TEMP Closed LT-37 LT-38 NARROW 1144''
For Limit 7-3        Closed             152           152         150.3                       See         82       82               m*            m Attachment 3-11      Closed             152           152         150.4                     312.9-7       82       82 iolation Condenser Area Tei      QS (10R                                                                                                      Units          Limit Differ.
Divl DivII-Limit Closed 152 152 150.2  
Units 11-7 I          I 7-3     [ 75        [ 74                                                                                                      0816489 t-+j-r 3-11
< I 53" 82 82  
                                                                                                      -                          I              I Temp ~65&deg;F                                                                                                                  270
<95"F (1)
                                          - Action 6 Daily: (3-11) (prev. 3-1I)
For Limit Attachment m
VIOLATED I
m*
R.B. El. 1l ! Y                   RB Vent Rad (Meters)                   SD Hx RIM     Fuel Pool           Previous     current         Differential SHIFT      6-9     C-9                           CHI CH2                                 Temp Lalw       Slab AT               Day's     Day's         Level in the Limit < 50"++            Lowest    Highest            Torus 11-7      1.0     1.0           var50           1.0     1.0                 Var9       69         27                       Torus       Torus mRlHr                                       mRlHr                                            Level     Level 7-3        1.0     1.0         Max 100           1.0     1.0                             69         27                       9XR         9XR            Limit 1.2" MWHr 3-11      1.0     1.0           InRlHr           1.0     1.0                             69         27                   150.0       150.4         0.4 VIOLATED Elev. 119'                         EDG                         Comments:
Closed 152 152 150.3 See 82 82 Closed 152 152 150.4 312.9-7 82 82 SHIFT 11-7 7-3 3-11 R.B. El. 1 l ! Y RB Vent Rad (Meters)
Fuel Pool                 Fuel Oil Tank SHIFT       Temp                         Lvl.         1                       NOTE: Red readings indicate values to place on the LOQ- Sheet provided to the 1 1 Candidate in IC-65.
SD Hx RIM Fuel Pool Previous current Differential 6-9 C-9 CHI CH2 Temp Lalw Slab AT Day's Day's Level in the 1.0 1.0 var50 1.0 1.0 Var9 69 27 Torus Torus mRlHr Level Level 1.0 1.0 Max 100 1.0 1.0 69 27 9XR MWHr 1.0 1.0 InRlHr 1.0 1.0 69 27 150.0 150.4 0.4 VIOLATED Lowest Highest Torus Limit < 50"++
Limit                          Limit 7-3       96             5125"       14950               -
mRlHr 9XR Limit 1.2" Area Tei 11-7 I
                                                              >      4KI                                      Makeup z 250 units Gal.
I 7-3
F Calculated in accordance with Procedure 312.9 which also contains notification requirements.
[ 75
*)
[ 74 t - + j - r 3-1 1 iolation Condenser QS (10R Temp ~65&deg;F
Calculated in accordance with Procedure 312.11
- Action 6 I
*rr Conducted in accordance with 681.4.005. NA when generator is off line.
Units Limit Differ.
mr Maximum 3&deg;F difference between various Torus temperature indications.
Units 0816489 I
    +
I Daily: (3-1 1) - (prev. 3-1 I) 270 VIOLATED Elev. 119' EDG Comments:
ID.-AA..-     -49    a\ 16 niiicnr ....-..ir\     _--
Fuel Pool Fuel Oil Tank SHIFT Temp Lvl.
If both DWEDT pumps are inoperable, use 3.0 gpm for identified leakage and subtract from the 1-8 value
1 NOTE: Red readings indicate values to place on the LOQ Sheet provided to the Limit 7-3 1 96 1 5125" F
                                                              ,.......,hill . +.-.    -.....in\
14950 Limit
- >I 4K Gal.
Candidate in IC-65.
Makeup z 250 units  
*)
Calculated in accordance with Procedure 312.9 which also contains notification requirements.
Calculated in accordance with Procedure 312.11 Conducted in accordance with 681.4.005. NA when generator is off line.
Maximum 3&deg;F difference between various Torus temperature indications.
If both DWEDT pumps are inoperable, use 3.0 gpm for identified leakage and subtract from the 1-8 value
*rr mr
+
ID.-AA..-  
- 4 9 a\\ 16 niiicnr....-..ir\\ _--  
,.......,hill  
..-+...
in\\  


? > Appendix C                     Job Performance Measure                       Form ES-C-1 WORKSHEET Facility:       Oyster Creek                   "ask No.:         2000101404 Task
?
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility:
Oyster Creek "ask No.:
20001 01404 Task


==Title:==
==Title:==
Perform a Manual Core tieat- Balance Calculation Job Performance Measure No.:           _NRC JP'M-ADMLN-RO2 (RQ WA  
Perform a Manual Core tieat-Balance Calculation Job Performance Measure No.:
_NRC JP'M-ADMLN-RO2 (RQ WA  


==Reference:==
==Reference:==
  -Generic 2.1.201_RO       -~ -4.3)
  -Generic 2.1.201_RO  
Facility Evaluator:                             C:) ate :       _____-            ___-
-~  
- 4.3)
Facility Evaluator:
C:) a te :
Method of Testing:
Method of Testing:
Simulated Performance             -        -~   Actual Performance           -~
X Simulated Performance  
X Classroom               X
-~ Actual Performance  
                            -  -    Simulator     .      - - -        Plant     - .
-~
Read to the Examinee:
Classroom X
Simulator Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the taslk successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the taslk successfully, the objective for this job performance measure will be satisfied.
: 1. The reactor has been steady at full power for several hours.
: 1. The reactor has been steady at full power for several hours.
Line 1,133: Line 1,591:
: f. Feedwater temperature (recorder Panel 5F/5F) indicates 31 1 "F
: f. Feedwater temperature (recorder Panel 5F/5F) indicates 31 1 "F
: g. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr
: g. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr
: h. Total recirculation flow (recorder Panel 3F) indicates 15 x 1O4 gpm
: h. Total recirculation flow (recorder Panel 3F) indicates 15 x 1 O4 gpm
: i. RWCU flow (recorder Panel 3F) indicates 400 gpm
: i. RWCU flow (recorder Panel 3F) indicates 400 gpm  
      -        ~~   -  -                __ ____  -      _    _ _ -  - ~     - __ _ _ -  -
~~  
NRC JPM ADMIN R 0 2                                                            Page 1 of 16
~
NRC JPM ADMIN R02 Page 1 of 16  


Appendix C                 Job Performance Measure               Form ES-C-1 WORKSHEET Task Standard: A manual core heat balancle has been completed IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Standard: A manual core heat balancle has been completed IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.
Required Materials: Calculator.
Required Materials: Calculator.
General  
General  
Line 1,147: Line 1,606:
Initiating Cue: Calculate core thermal power (CTP) IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.
Initiating Cue: Calculate core thermal power (CTP) IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.
Time Critical Task: No.
Time Critical Task: No.
Validation Time:     19 minutes NRC JPM ADMIN R 0 2                                               Page 2 of 16
Validation Time:
19 minutes NRC JPM ADMIN R 0 2 Page 2 of 16  


Appendix C                 Job Performance Measure                   Form ES-C-1 WORKSHEET
Appendix C Job Performance Measure WORKSHEET Form ES-C-1  
                ~   -  _
~
                      -~     ~
-~  
Performance It i f o rmation Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeal back of initiating cue JPM Start Time:             -
~
Standard:      Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Perform an ce I ti f o rmat io n Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeal Standard:
Provides repeat back of initiating the repeat back.
Comment:
Comment:
____~
back of initiating cue JPM Start Time:
cue. Evaluator acknowledges
_ _ _ _ ~
SAT/UNSAT Performance Step: 2 Procedure Step: Reviews Precautions and Limitations.
SAT/UNSAT Performance Step: 2 Procedure Step: Reviews Precautions and Limitations.
Standard:       Reviews Precautions and Limitations.
Standard:
Reviews Precautions and Limitations.
Note: The expected values are provided in the KEY.
Note: The expected values are provided in the KEY.
NRC JPM ADMIN R 0 2                                                   Page 3 of 16
NRC JPM ADMIN R 0 2 Page 3 of 16  


Appendix C               Job Performance Measure                 Form ES-C-1 WORKSt-ilEET Performance Information J       Performance Step: 3
Appendix C Job Performance Measure Form ES-C-1 WORKS t-il E ET Performance Information J
-    -  ~
Performance Step: 3  
~
Procedure Step: 5.1.1.1 Records local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room.
Procedure Step: 5.1.1.1 Records local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room.
Standard:   Directs EO to read local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room, and records on the Feedwater Flow Calculation Worksheet, Line A.
Standard:
Cue:         As the EO, report reading on the venture transmitter (FT-422-1) in the Feedwater Pump Room as 492.5 inches.
Directs EO to read local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room, and records on the Feedwater Flow Calculation Worksheet, Line A.
Cue:
Comment:
Comment:
J       Performance Step: 4 Procedure Step: 5.1.1.2 Record Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree.
As the EO, report reading on the venture transmitter (FT-422-1) in the Feedwater Pump Room as 492.5 inches.
Standard:   Reads Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree and records on the Feedwater Flow Calculation Worksheet, Line B.
J Performance Step: 4 Procedure Step: 5.1.1.2 Record Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree.
Standard:
Reads Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree and records on the Feedwater Flow Calculation Worksheet, Line B.
Comment:
Comment:
NRC JPM ADMlN R 0 2                                                Page 4 of 16
NRC JPM ADMlN R02 Page 4 of 16  


Appendix C               Job Performance Measure                     Form ES-C-1 WORKSHEET Performance lrilformation J       Performance Step: 5 Procedure Step: 5.1.1.3 Obtain the specific volume (v) at the Feedwater at 1100 psia and the temperature recorded in Step 5.1.1.2 from Attachment 1001             3 or ASME approved steam tables.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance lrilformation J
Standard:   Obtain the specific volume (v) at the Feedwater at 1100 psia and the temperature recorded in Step 5.1.1.2 from Attachment 1001.6-3 or ASME approved steam tables, and records on the Feedwater Flow Calculation Worksheet, Line C.
Performance Step: 5 Procedure Step: 5.1.1.3 Obtain the specific volume (v) at the Feedwater at 1100 psia and the temperature recorded in Step 5.1.1.2 from Attachment 1001 3 or ASME approved steam tables.
Comment:
Standard:
          ~             ~   ~ ~-       -  .    -- ___ __ _ _ ~ _
Obtain the specific volume (v) at the Feedwater at 1 100 psia and the temperature recorded in Step 5.1.1.2 from Attachment 1001.6-3 or ASME approved steam tables, and records on the Feedwater Flow Calculation Worksheet, Line C.
J       Performance Step: 6 Procedure Step: 5.1.1.4 Calculates total Feedwater flow using the following equation:
Comment:  
F = 0.0429387 SQRT (AP/v)I Standard:   Calculates total Feedwater flow using the following equation:
~  
~  
~  
~-
__ _ _ ~ _
J Performance Step: 6 Procedure Step: 5.1.1.4 Calculates total Feedwater flow using the following equation:
F = 0.0429387 SQRT (AP/v)I Standard:
Calculates total Feedwater flow using the following equation:
F = 0.0429387 SQRT (AP/v) and records on the Feedwater Flow Calculation Worksheet, Line D.
F = 0.0429387 SQRT (AP/v) and records on the Feedwater Flow Calculation Worksheet, Line D.
Comment:
Comment:  
_    ~-
~-
SATNNSAT NRC JPM ADMIN R 0 2                                                   Page 5 of 16
SATNNSAT NRC JPM ADMIN R 0 2 Page 5 of 16  


Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 7 Procedure Step: 5.2.1 Record reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F)
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Standard: Reads reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line A.
Performance Step: 7 Procedure Step: 5.2.1 Record reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F)
Comment:
Standard:
          -  -  -  ~       ~~~     -  ~-  -- ~   -~ -  __- - -
Reads reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line A.
SAT/U NSAT J     Performance Step: 8 Procedure Step: 5.2.2 Record Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F)
Comment:  
Standard:   Reads Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F) or transfers the Feedwater temperature obtained earlier, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line B.
~~-
~  
~
~
-~  
~
SAT/U NSAT J
Performance Step: 8 Procedure Step: 5.2.2 Record Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F)
Standard:
Reads Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F) or transfers the Feedwater temperature obtained earlier, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line B.
Comment:
Comment:
SATNNSAT NRC JPM ADMIN R 0 2                                              Page 6 of 16
SATNNSAT NRC JPM ADMIN R02 Page 6 of 16  


Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 9 Procedure Step: 5.2.3 Record recirculation flow to the nearest thousand gpm (Recorder Panel 3F).
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Standard: Reads recirculation flow to the nearest thousand gpm (Recorder Panel 3F), and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line C.
Performance Step: 9 Procedure Step: 5.2.3 Record recirculation flow to the nearest thousand gpm (Recorder Panel 3F).
Standard:
Reads recirculation flow to the nearest thousand gpm (Recorder Panel 3F), and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line C.
Comment:
Comment:
J     Performance Step: 10 Procedure Step: 5.2.4 Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds prt,assure.
J Performance Step: 10 Procedure Step: 5.2.4 Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds prt, assure.
%mdard:    Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line D.
Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line D.  
Comment:
%mdard:
_-__  ~~                       _ _ _ ~ ~ - ~
Comment:  
SAT/U NSAT NRC JPM ADMIN R 0 2                                             Page 7 of 16
~~
_ _ _ ~ ~ -  
~
S AT/U N SAT NRC JPM ADMIN R 0 2 Page 7 of 16  


Appendix C                 Job Performance Measure                 Form ES-C-1 WORKSt-IEET Performance Information J         Performance Step: 11 Procedure Step: 5.2.5 Record Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure.
Appendix C Job Performance Measure Form ES-C-1 WORKSt-IEET Performance Information J
Standard:     Reads Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure in step 5.2.4 and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line E Comment:
Performance Step: 11 Procedure Step: 5.2.5 Record Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure.
                                        ~,                         -_            -
Standard:
SATAJNSAT J         Performance Step: 12
Reads Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure in step 5.2.4 and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line E Comment:  
~      ~~    -
~,
Procedure Step: 5.2.6 Record the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 1100 psia using Feedwater temperature.
SATAJNSAT J
Standard:     Reads the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 1100 psia using Feedwater temperature in step 5.2.2, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line F.
Performance Step: 12 Procedure Step: 5.2.6 Record the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature.  
Comment:
~
_                        _                ~   ~
~~
SATNNSAT NRC JPM ADMlN R 0 2                                                 Page 8 of 16
Standard:
Reads the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature in step 5.2.2, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line F.
Comment:  
~  
~
SATNNSAT NRC JPM ADMlN R 0 2 Page 8 of 16  


Appendix C             Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information  
~~         ~
~~  
J     Performance Step: 13
~
          ._~
J Performance Step: 13 Procedure Step: 5.2.7 Calculate the difference of the Main Steam and Feedwater enthalpies.  
Procedure Step: 5.2.7 Calculate the difference of the Main Steam and Feedwater enthalpies.
~
Standard: Calculates t h e difference of Ihe Main Steam and Feedwater enthalpies by subtracting Feedwater enthalpy in step 5.2.6 from Main Steam enthalpy in step 5.2.5, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line G.
Standard:
Comment:
Calculates the difference of Ihe Main Steam and Feedwater enthalpies by subtracting Feedwater enthalpy in step 5.2.6 from Main Steam enthalpy in step 5.2.5, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line G.
              -  -            -        -      ~ __      --
Comment:  
J     Performance Step: 14 Procedure Step: 5.2.8 Record total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet.
~
Standard: Copies total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet, Line D, onto the Heat Balance Data, Calculation, and Analysis Worksheet, Line H.
J Performance Step: 14 Procedure Step: 5.2.8 Record total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet.
Comment:
Standard:
              -          __                                                  ~-
Copies total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet, Line D, onto the Heat Balance Data, Calculation, and Analysis Worksheet, Line H.
NRC JPM ADMIN R 0 2                                                Page 9 of 16
Comment:  
~-
NRC JPM ADMIN R02 Page 9 of 16  


Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 15 Procedure Step: 5.2.9 Calculate the product of the Feedwater flow and the enthalpy difference to obtain MBTU/hr.
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J
Standard: Calculates the product of the Feedwater'flow in step 5.2.8 and the enthalpy difference in step 5.2.7 to obtain MBTU/hr, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line I.
Performance Step: 15 Procedure Step: 5.2.9 Calculate the product of the Feedwater flow and the enthalpy difference to obtain MBTU/hr.
Comment:
Standard:
                                                        ~ ~ ~~
Calculates the product of the Feedwater'flow in step 5.2.8 and the enthalpy difference in step 5.2.7 to obtain MBTU/hr, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line I.
J     Performance Step: 16 Procedure Step: 5.2.10 Convert MBTU/hr to Megawatts (MBTU/hr x 0.293).
Comment:  
Standard: Converts MBTU/hr to Megawatts by multiplying MBTU/hr in step 5.2.9 by 0.293, records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line J.
~  
~  
~~
J Performance Step: 16 Procedure Step: 5.2.1 0 Convert MBTU/hr to Megawatts (MBTU/hr x 0.293).
Standard:
Converts MBTU/hr to Megawatts by multiplying MBTU/hr in step 5.2.9 by 0.293, records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line J.
Comment:
Comment:
NRC JPM ADMIN R 0 2                                             Page 10 of 16
NRC JPM ADMIN R 0 2 Page 10 of 16  


Appendix C                 Job Performance Measure                 Form ES-C-1 WORKSHEET
Appendix C Job Performance Measure WORKSHEET Form ES-C-1  
-~ ~
-~  
Pe rfor ma nce I1 format io n J       Performance Step: 17 Procedure Step: 5.2.1 1 Record RWCU flow to the nlearest gpm (recorder Panel 3F) on Line K of Attachment 1001.6-2.
~
Standard:     Reads RWCU flow to the nearest gpm (recorder Panel 3F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line K.
P e rf o r m a n ce I 11 form at i o n J
Performance Step: 17 Standard:
Comment:
Comment:
SAT/UNSAT
SAT/UNSAT Procedure Step: 5.2.1 1 Record RWCU flow to the nlearest gpm (recorder Panel 3F) on Line K of Attachment 1001.6-2.
-    ~   ~   -                ~-     ~
Reads RWCU flow to the nearest gpm (recorder Panel 3F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line K.
J       Performance Step: 18 Procedure Step: 5.2.12 Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), per the following equation.
~
Enter the appropriate value for Fixed Losses on Line L of Attachment 1001.6-2.
~  
Fixed Losses = [(K) x 0.01361 + 9.0 Standard:     Calculates the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), per the following equation, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line L.
~-  
Fixed Losses = [(Line K) x 0.01361 + 9.0 Comment:
~
            ~ __ . ~ -~     __ ~      _ - _ ~ __~ ~   __ __          ~~ -
J Performance Step: 18 Procedure Step: 5.2.1 2 Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), per the following equation.
NRC JPM ADMIN R 0 2                                                Page 11 of 16
Enter the appropriate value for Fixed Losses on Line L of 001.6-2.
Fixed Losses = [(K) x 0.01 361 + 9.0 Standard:
Calculates the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), per the following equation, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line L.
Fixed Losses = [(Line K) x 0.01361 + 9.0 Comment:  
~  
~  
-~
_ _ ~
~
~  
~  
~~
NRC JPM ADMIN R02 Page 11 of 16  


Appendix C             Job Performance Measure               Form ES-C-1 WORKSHEET Pe rfo rmance Iri f o r mat ion J     Performance Step: 19 Procedure Step: 5.2.13 Add the Fixed Losses from L.ine L to the Megawatts from Line J and record the Calculated C'TP on Line N.
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 P e rf o r ma n ce I ri f o r m a t io n J
Standard: Adds the Fixed Losses from step 5.2.12 to the Megawatts from step 5.2.10 and record the Calculated CTP on Line N on the Heat Balance Data, Calculation, and Analysis Worksheet.
Performance Step: 19 Procedure Step: 5.2.1 3 Add the Fixed Losses from L.ine L to the Megawatts from Line J and record the Calculated C'TP on Line N.
Comment:
Standard:
          -~             -            -
Adds the Fixed Losses from step 5.2.12 to the Megawatts from step 5.2.10 and record the Calculated CTP on Line N on the Heat Balance Data, Calculation, and Analysis Worksheet.
Comment:  
-~
Performance Step: 20 Procedure Step: 5.2.14 Record PPC Core Thermal Power (CTP) in Line M.
Performance Step: 20 Procedure Step: 5.2.14 Record PPC Core Thermal Power (CTP) in Line M.
Standard: This step is NA since the PPC is unavailable.
Standard:
This step is NA since the PPC is unavailable.
Comment:
Comment:
NRC JPM ADMIN R 0 2                                           Page 12 of 16
NRC JPM ADMIN R 0 2 Page 12 of 16  


Appendix C               Job Performance Measure                       Form ES-C-1 WORKSHEET Performance lriiformation Performance Step: 21 Procedure Step: 5.2.1 5 Subtract the Calculated CTP from the PPC Core Thermal Power
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance lriiformation Performance Step: 21 Procedure Step: 5.2.1 5 Subtract the Calculated CTP from the PPC Core Thermal Power
[Line M - Line N]. If this value is positive, the comparison is considered conservative. If negative, the comparison is non-conservative. Place an X in the appropriate box.
[Line M - Line N]. If this value is positive, the comparison is considered conservative. If negative, the comparison is non-conservative. Place an X in the appropriate box.
Standard: This step is NA since the PPC is unavailable.
Standard:
Comment:
Comment:
            ~ - -~-   -  __  ~       --  -  -  -~ - ~ _ __ _ _ ~
This step is NA since the PPC is unavailable.
_ - ~. -
~ - -  
~-  
~  
- -~ - ~
_ _ _ ~
_ - ~. -
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMIN R 0 2                                                  Page 13 of 16
NRC JPM ADMIN R02 Page 13 of 16  


Appendix C                   Job Performancle Measure             Form ES-C-1 WORKSHEET Validation of Completion JPM Number:            NRC JPM ADMIN R 0 2 Examinees Name:             ~-     - -    ~              ~-
Appendix C Job Performancle Measure Form ES-C-1 WORKSHEET JPM Number:
Examiners Name:       - -      -  -  __    -~~   ~   --  -
Validation of Completion NRC JPM ADMIN R 0 2  
Date Performed:       __ ~ _ _ _ -     -~       -   ~     --
~-
Facility Evaluator:   ___ ~~     __  -     -  ~               -
Examinees Name:  
Number of Attempts:   -          --    ~     -     -
~-  
Time to Complete:             --        -              -_    -
~
Question:
Examiners Name:  
        -~         -      ~
- _ _ -~~  
~
Date Performed:
__ ~ _ _ _ - -~ -  
~
Facility Evaluator:  
~~  
- ~
Number of Attempts:  
~ - -
Time to Complete:
Question:  
-~  
~  


===Response===
===Response===
Result:                 Satisfactory/Unsatisfactory Examiners Signature and Date:                   ... -~             ._- - ~ ---
Result:
NRC JPM ADMIN R 0 2                                                Page 14 of 16
Satisfactory/Unsatisfactory Examiners Signature and Date:  
... -~  
._ --~-
NRC JPM ADMIN R02 Page 14 of 16  


'. . Appendix C         Job Performance Measure Form ES-C-1 WORKSHEET Simulato r $et up
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Si m u lat o r $et u p
: 1. None.
: 1. None.
NRC JPM ADMIN R 0 2                         Page 15 of 16
NRC JPM ADMIN R 0 2 Page 15 of 16  


Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHIEET STUDENT H[\NDOUT Initial Conditions:
Appendix C Job Performance Measure Form ES-C-1 WORKSHIEET STUDENT H[\\NDOUT Initial Conditions:
: 1. The reactor has been steady at full power for several hours.
: 1. The reactor has been steady at full power for several hours.
: 2. The PPC is currently unavailable.
: 2. The PPC is currently unavailable.
Line 1,292: Line 1,830:
: a. APRMs indicate 100% power
: a. APRMs indicate 100% power
: b. RPV water level instrument NR GEMAC indicates 161
: b. RPV water level instrument NR GEMAC indicates 161
: c. Local total Feedwater AP from .the venturi transmitter (FT-422-1) indicates 492.5 inches of water
: c. Local total Feedwater AP from.the venturi transmitter (FT-422-1) indicates 492.5 inches of water
: d. Core AP indicates 16.5 psid
: d. Core AP indicates 16.5 psid
: e. Reactor pressure (NR recorder Panel 5F/6F) indicates 1020 psig
: e. Reactor pressure (NR recorder Panel 5F/6F) indicates 1020 psig
: f. Feedwater temperature (recorder Panel 5F/5F) indicates 31 1 F
: f. Feedwater temperature (recorder Panel 5F/5F) indicates 31 1 F
: g. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr
: g. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr
: h. Total recirculation flow (recorder Panel 3F) indicates 15 x 1O4 gpm
: h. Total recirculation flow (recorder Panel 3F) indicates 15 x 1 O4 gpm
: i. RWCU flow (recorder Panel 3F) indicates 400 gpm Task Cue:
: i. RWCU flow (recorder Panel 3F) indicates 400 gpm Task Cue:
Calculate core thermal power (CTP) IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Flange.
Calculate core thermal power (CTP) IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Flange.
NRC JPM ADMIN R 0 2                                                   Page 16 of 16
NRC JPM ADMIN R 0 2 Page 16 of 16  


ATTACHMENT 1001.6-1 FEEDWATER FLOW CALCULATION WORKSHEET Preparer:                                                             Date:                     Time:
ATTACHMENT 1001.6-1 FEEDWATER FLOW CALCULATION WORKSHEET Preparer:
Date:
Time:
Prerequisites met:
Prerequisites met:
A   5.1.1.1     DP From Total Flow Venturi Transmitter (FT-422-1)               Local Transmitter DP Reading             492.5         in H20 5.1.1.2               Feedwater Temperature (ID 101)                           Panel 5F/6F Recorder                   31I          deg F 5.1.1.3             Specific Volume at 1100 psia and (B)             Attachment 1001.6-3 or ASME Steam Tables         0.01748       ft3/lbm 5.1.1.4                 TOTAL FEEDWATER FLOW                               FT = 0.0429387 x SQRT[(A) / (C)]           7.207       Mlbm/hr iB&&   2: J" Loop F;ow-caicii;afion                               A Loop                    5 Loop            c Loop      1 D=          A=          B=          E=  C=          F=
A B
5.1.2.1     Feedwater Pump Room Nozzle DP Gauges (RV45)                                                                             in H20 F   5.1.2.2                     Average Nozzle DP                                                                                       in H20 Pos 15 =                  Pos 16 =          Pos 17 =
C D
5.1.2.3           Loop Temperature: Recorder 13R-005                                                                                 deg F H   5.1.2.4               Loop Specific Volume at 1400 psia:                                                                            ft3/lbm Attachment 1001.6-4 or ASME Steam Tables I   5.1.2.5       Nozzle Discharge Coefficient x Conversion Factor           0.02252                  0.02291          0.02269 Loop Flow:
Comments:
5.1.2.5                                                         FA=                        Fg =              Fc =                  Mlbmlhr
5.1.1.1 DP From Total Flow Venturi Transmitter (FT-422-1)
                                = (I) x SQRT[(F) / (H)]
Local Transmitter DP Reading 492.5 in H20 5.1.1.2 Feedwater Temperature (ID 101)
K   5.1.2.6                 TOTAL FEEDWATER FLOW                                       FT = FA+ FB + Fc                                 Mlbm/hr Comments:
Panel 5F/6F Recorder 31 I deg F 5.1.1.3 Specific Volume at 1 100 psia and (B) 001.6-3 or ASME Steam Tables 0.01748 ft3/lbm 5.1.1.4 TOTAL FEEDWATER FLOW FT = 0.0429387 x SQRT[(A) / (C)]
7.207 Mlbm/hr i B & &
2: J" Loop F;ow-caicii;afion E
5.1.2.1 Feedwater Pump Room Nozzle DP Gauges (RV45)
F 5.1.2.2 Average Nozzle DP G
5.1.2.3 Loop Temperature: Recorder 13R-005 H
5.1.2.4 I
5.1.2.5 Nozzle Discharge Coefficient x Conversion Factor J
5.1.2.5 Loop Specific Volume at 1400 psia: 001.6-4 or ASME Steam Tables Loop Flow:
= (I) x SQRT[(F) / (H)]
K 5.1.2.6 TOTAL FEEDWATER FLOW A Loop 5 Loop c Loop 1 -
D =
A =
B =
E =
C =
F =
in H20 in H20 deg F ft3/lbm Pos 15 =
Pos 16 =
Pos 17 =
0.02252 0.02291 0.02269 FA =
Fg =
Fc =
Mlbmlhr FT = FA + FB + Fc Mlbm/hr  


ATTAC       NT 1001.6-2                                           Revi      27 HEAT BALANCE DATA, CALCULATION, AND ANALYSIS WORKSHEET A   5.2.1         Reactor Pressure (ID-45)                 Panel 5Fl6F Narrow Range Recorder           1020 6    5.2.2     Feedwater Temperature (ID 101)                       Panel 5Fl6F Recorder                 311              deg F C    5.2.3           Recirculation Flow                             Panel 3F Recorder                   15           io4gpm D   5.2.4       Reactor Absolute Pressure                               (A) + 14.7                   1034.7             psia E    5.2.5       Main Steam Enthalpy (hMs)             Attachment 1001.6-5 or ASME Steam Tables       1191.61         BTU/Ibm F   5.2.6       Feedwater Enthalpy (hFW)               Attachment 1001.6-6 or ASME Steam Tables       282.91          BTUIIbm G    5.2.7     Enthalpy Difference (bus - hFw)                             (E) - (F)                   908.7          BTU/lbm H    5.2.8         Total Feedwater Flow                       Attachment 1001.6-1, (0)     or (K)       7.207           Mlbrnlhr I    5.2.9   Feedwater Flow x Enthalpy Difference                          (H) x   (GI               6549.00           MBTU/hr J  5.2.10           Conversion to M W T ~                               0.293X/I)                   1918,853 I
ATTAC NT 1001.6-2 HEAT BALANCE DATA, CALCULATION, AND ANALYSIS WORKSHEET A
K 1 5.2.11 I             RWCU Flow                                  Panel 3F Recorder                    400 I        I
6 C
                                                                                  ~    ~~
Revi 27 5.2.1 Reactor Pressure (ID-45)
5.2.12             Fixed Losses                                 [(K) x 0.01361 + 9.0               14.44 M 1 5.2.14 I   PPC Core Thermal Power (CTP)                     PPC CTP 15 Minute Average N  5.2.13    Calculated Core Thermal Power                                (J) +    (L)              1933.297 I       I                                       I                                             I 0  5.2.15    Core Thermal Power Comparison U Positive Value -+
Panel 5Fl6F Narrow Range Recorder 1020 5.2.2 Feedwater Temperature (ID 101)
Conservative Negative Value -+
Panel 5Fl6F Recorder 31 1 5.2.3 Recirculation Flow Panel 3F Recorder 15 D
Non-Conservative I Date:                     I Time:
E 5.2.4 Reactor Absolute Pressure (A) + 14.7 1034.7 5.2.5 Main Steam Enthalpy (hMs) 001.6-5 or ASME Steam Tables 1191.61 F
G 282.91 908.7 5.2.6 Feedwater Enthalpy (hFW) 001.6-6 or ASME Steam Tables 5.2.7 Enthalpy Difference (bus - hFw)
(E) - (F)
H I
J K 1 5.2.11 I RWCU Flow 5.2.8 Total Feedwater Flow 001.6-1, (0) or (K) 7.207 5.2.9 (H) x (GI 6549.00 191 8,853 Feedwater Flow x Enthalpy Difference I
5.2.10 Conversion to M W T ~
0.293X/I)
Panel 3F Recorder N
400 5.2.13 Calculated Core Thermal Power (J) + (L) 1933.297 L I 5.2.12 I 0
Fixed Losses 5.2.15 Negative Value -+
Non-Conservative
~
~~
[(K) x 0.01361 + 9.0 14.44 M 1 5.2.14 I PPC Core Thermal Power (CTP)
PPC CTP 15 Minute Average I
I I
I Positive Value -+
U Conservative Core Thermal Power Comparison I Date:
I Time:
deg F io4 gpm psia BTU/I bm BTUII bm BTU/lbm Mlbrnlhr MBTU/hr


1 , AppendixC                       Job Performance Measure                     Form ES-C-1 WORKSHEET Facility:     Oyster Creek-                   Task No.:     21501______.__
1 AppendixC Job Performance Measure Form ES-C-1 WORKSHEET 21 501 01 023 Facility:
01023 Task
Oyster Creek-Task No.:
Perform APRM Drawer Clount Task


==Title:==
==Title:==
Perform
Job Performance Measure No.:
___          APRM
NRC  
__ Drawer  Clount Job Performance Measure No.:           NRC JPlVl ADMIN
~ JPlVl ADMIN  
                                                ~          --- R 0- 3 (RO)
--- R03
- (RO)
K/A  
K/A  


==Reference:==
==Reference:==
Generic 2.2.12 (RO 3.0) -
~~-
                      ~~-    ~                        -.
Generic  
Examinee:             ___          .__    -_ ~-E.xam ine r :                   ~
~
Facility Evaluator:                           Date:                               -____
2.2.12 (RO 3.0) - -.
Examinee:  
-_ ~- E.x am in e r :  
~
Facility Evaluator:
Date:
Method of Testing:
Method of Testing:
Simulated Performance             ~-           Actual Performance         ___-    X Classroom     - ___-             Simulator       _- X _._Plant
X Simulated Performance  
                                                        -~                   ~    -
~-
Actual Performance Classroom - ___-
Simulator
_- -~
X Plant
~
Read to the Examinee:
Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Line 1,341: Line 1,935:
Task Standard: Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8 is complete and LPRM 44-25D does not iindicate bypassed.
Task Standard: Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8 is complete and LPRM 44-25D does not iindicate bypassed.
Required Materials: A completed attachment 403-2, with no APRMs bypassed, and LPRMs 36-17B, 28-09D and 44-25D shown as bypassed.
Required Materials: A completed attachment 403-2, with no APRMs bypassed, and LPRMs 36-17B, 28-09D and 44-25D shown as bypassed.
General Refe rences:
General Ref e rences:
: 1. Procedure 202.1, Power Operation, revision 109.
: 1. Procedure 202.1, Power Operation, revision 109.
: 2. Procedure 403, LPRM-APRM System Operations, revision 13.
: 2. Procedure 403, LPRM-APRM System Operations, revision 13.
Initiating Cue: Perform Section 2 of Attachment 202.1-1, APRM Status Check, for APRM 8. Notify the Unit Supervisor of your results.
Initiating Cue: Perform Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8. Notify the Unit Supervisor of your results.
Time Critical Task: No.
Time Critical Task: No.
Validation Time:           13 minutes NRC JPM ADMlN R 0 3                                                          Page 1 of 11
Validation Time:
13 minutes NRC JPM ADMlN R03 Page 1 of 11  


. AppendixC                   Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark J
AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Denote critical steps with a check mark J  
                                                        ~~~~
~~~~
Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate Section 2 of Attachment 202.1-1 and Attachment 403-2.
Standard:
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate Section 2 of Attachment 202.1-1 and Attachment 403-2.
Comment:
Comment:
SATNNSAT
SATNNSAT  
                                                                ~-
~-
Performance Step: 2 Procedure Step: 1 of Attachment 202.1-1.
Performance Step: 2 Procedure Step: 1 of Attachment 202.1 -1.
Place an X in the box next to the LPRMs that are Bypassed.
Place an X in the box next to the LPRMs that are Bypassed.
Standard:      Places an X in the box next to LPRMs 36-176, 28-09D, and 44-25D in the APRM 8 colurrin.
Places an X in the box next to LPRMs 36-176, 28-09D, and 44-25D in the APRM 8 colurrin.
NRC JPM ADMIN R 0 3                                                  Page 2 of 11
Standard:
NRC JPM ADMIN R03 Page 2 of 11  


Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 2 of Attachment 202.1 -1.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 2 of Attachment 202.1 -1.
Place the number of un-bypassed inputs in the last row.
Place the number of un-bypassed inputs in the last row.
Standard: Places the number of un-bypassed inputs (5) in the last row for APRM 8, marked UN-BYPASSED.
Standard:
Comment:
Comment:
Places the number of un-bypassed inputs (5) in the last row for APRM 8, marked UN-BYPASSED.
Performance Step: 4 Procedure Step: 5.3.3.8.1 of Procedure 403.
Performance Step: 4 Procedure Step: 5.3.3.8.1 of Procedure 403.
Obtains permission from the US for LPRM input to APRM drawer count.
Obtains permission from the US for LPRM input to APRM drawer count.
Standard: Obtains permission from the US for LPRM input to APRM drawer count.
Standard:
CUE:       The candidate may or may riot ask permission since he was directed to perform the task. If the candidate does ask, state that they have permission to perform the APRM drawer count.
Obtains permission from the US for LPRM input to APRM drawer count.
CUE:
The candidate may or may riot ask permission since he was directed to perform the task. If the candidate does ask, state that they have permission to perform the APRM drawer count.
Comment:
Comment:
NRC JPM ADMIN R 0 3                                              Page 3 of 11
NRC JPM ADMIN R03 Page 3 of 11  


Appendix C               Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 5 Procedure Step: 5.3.3.8.2 of Procedure 403.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Perform an ce Information J
Performance Step: 5 Standard:
Comment:
Procedure Step: 5.3.3.8.2 of Procedure 403.
Bypass the APRM channel if allowed by Attachment 403-2.
Bypass the APRM channel if allowed by Attachment 403-2.
Standard:  Verifies that Attachment 403-2 allows bypass of APRM 8. Places the APRM BYPASS joystick to the CH 8 position (critical step).
Verifies that Attachment 403-2 allows bypass of APRM 8. Places the APRM BYPASS joystick to the CH 8 position (critical step).
Verifies APRM 8 HI-HI, HIGH, and DN SCL OR INOP lights ON.
Verifies APRM 8 HI-HI, HIGH, and DN SCL OR INOP lights ON.
Comment:
SAT/UNSAT J
SAT/UNSAT J     Performance Step: 6 Procedure Step: 5.3.3.8.3 of Procedure 403.
Performance Step: 6 Procedure Step: 5.3.3.8.3 of Procedure 403.
Rotate drawer INPUT switch clockwise to COUNT.
Rotate drawer INPUT switch clockwise to COUNT.
Standard: Rotates APRM 8 drawer INPUT switch clockwise to COUNT.
Standard:
Note/Cue: Based upon the initial draweir indication, the count indication should display 50 when placed in count, but will show 60 (ie, only 2 LPRMs are bypassed). The candidate may mention this result now and may stop the test. Acknowledge the report and direct the candidate to continue the test.
Rotates APRM 8 drawer INPUT switch clockwise to COUNT.
Note/Cue:
Based upon the initial draweir indication, the count indication should display 50 when placed in count, but will show 60 (ie, only 2 LPRMs are bypassed). The candidate may mention this result now and may stop the test. Acknowledge the report and direct the candidate to continue the test.
Comment:
Comment:
SAT/U NSAT NRC JPM ADMlN R 0 3                                               Page 4 of 11
SAT/U N SAT NRC JPM ADMlN R 0 3 Page 4 of 11  


. AppendixC               Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 7 Procedure Step: 5.3.3.8.3.a of Procedure 403.
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Performance Step: 7 Procedure Step: 5.3.3.8.3.a of Procedure 403.
Continue to rotate input switch clockwise to read LPRM values input to the APRM drawer.
Continue to rotate input switch clockwise to read LPRM values input to the APRM drawer.
Standard: Continues to rotate APRM 8 drawer input switch clockwise to position 8, position 7, etc., up to position 1 to read LPRM values input to the APRM drawer.
Standard:
Note/Cue: Positions 1 and 6 will indicate 0 due to being bypassed from the APRM. Position 7 should show 0, but will indicate a reading similar to the other LPRMs not bypassed. All other positions will show the LPRM reading input (not 0). The candidate may mention this result now and may stop the test. Acknowledge the report and direct the candidate to continue the test.
Continues to rotate APRM 8 drawer input switch clockwise to position 8, position 7, etc., up to position 1 to read LPRM values input to the APRM drawer.
Note/Cue:
Positions 1 and 6 will indicate 0 due to being bypassed from the APRM. Position 7 should show 0, but will indicate a reading similar to the other LPRMs not bypassed. All other positions will show the LPRM reading input (not 0). The candidate may mention this result now and may stop the test. Acknowledge the report and direct the candidate to continue the test.
Comment:
Comment:
SAT/U NSAT J     Performance Step: 8
SAT/U NSAT J
        ~~
Performance Step: 8  
~~
Procedure Step: 5.3.3.8.3.b of Procedure 403.
Procedure Step: 5.3.3.8.3.b of Procedure 403.
Rotate input switch clockwise until AVERAGE is selected.
Rotate input switch clockwise until AVERAGE is selected.
Standard: Rotates APRM 8 drawer input switch clockwise until AVERAGE is selected.
Standard:
Comment:
Comment:
NRC JPM ADMIN R 0 3                                                Page 5 of 11
Rotates APRM 8 drawer input switch clockwise until AVERAGE is selected.
NRC JPM ADMIN R03 Page 5 of 11  


Appendix C               Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information J       Performance Step: 9 Procedure Step: 5.3.3.8.3.c of Procedure 403.
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J
Performance Step: 9 Procedure Step: 5.3.3.8.3.c of Procedure 403.
Un-bypass the APRM channel if the APRM channel was bypassed.
Un-bypass the APRM channel if the APRM channel was bypassed.
Standard:   Un-bypass APRM 8 by placing the ARPM BYPASS joystick to the mid-position (critical step). Verifies APRM 8 HI-HI, HIGH, and DN SCL OR INOP lights OFF.
Standard:
Comment:
Un-bypass APRM 8 by placing the ARPM BYPASS joystick to the mid-position (critical step). Verifies APRM 8 HI-HI, HIGH, and DN SCL OR INOP lights OFF.
                  ~~
Comment:  
Performance Step: 10
~~
~    . - .~
Performance Step: 10 Procedure Step: 5.3.3.8.4 of Procedure 403  
Procedure Step: 5.3.3.8.4 of Procedure 403 Repeat 5.3.3.8(2) through 5.3.3.8(3c) for other APRMS as required.
~
Cue:         No other APRMS testing is required.
. -.~
Standard:   Determines no other APRMs, will be tested..
Repeat 5.3.3.8(2) through 5.3.3.8(3c) for other APRMS as required.
Cue:
No other APRMS testing is required.
Standard:
Comment:
Comment:
NRC JPM ADMlN R 0 3                                                  Page 6 of 11
Determines no other APRMs, will be tested..
NRC JPM ADMlN R03 Page 6 of 11  


. ,* . AppendixC               Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 5.3.3.8.5 of Procedure 403.
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 5.3.3.8.5 of Procedure 403.
Verify all drawers INPUT switches in AVERAGE.
Verify all drawers INPUT switches in AVERAGE.
Standard:  Verifies all drawers INPUT switches in AVERAGE.
Verifies all drawers INPUT switches in AVERAGE.
Standard:
Comment:
Comment:
SAT/UNSAT
SAT/UNSAT  
              ~ -~   ~
~  
J     Performance Step: 12 Procedure Step: 4 of Attachiment 202.1-1.
-~ ~
J Performance Step: 12 Procedure Step: 4 of Attachiment 202.1 -1.
Verify number of inputs correct.
Verify number of inputs correct.
Standard: Verifies number of inputs carrect. The candidate should state, if not done already, that the nlJmber of inputs (6) does not match the expected number of inputs (5).
Standard:
Cue:       Acknowledge the report.
Verifies number of inputs carrect. The candidate should state, if not done already, that the nlJmber of inputs (6) does not match the expected number of inputs (5).
Cue:
Comment:
Comment:
NRC JPM ADMIN R 0 3                                              Page 7 of 11
Acknowledge the report.
NRC JPM ADMIN R03 Page 7 of 11  


. I . AppendixC                 Job Performance Measure               Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 13
I AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
              ~~
Performance Step: 13  
Procedure Step: 5 of Attachment 202.1-1.
~~
Procedure Step: 5 of Attachment 202.1 -1.
Verify bypassed LPRM inputs are correct.
Verify bypassed LPRM inputs are correct.
Standard: Verifies bypassed LPRM inputs are correct. The candidate should state, if not done already, that LPRM 44-25D is does not show bypassed.
Standard:
Cue:       Acknowledge the report.
Verifies bypassed LPRM inputs are correct. The candidate should state, if not done already, that LPRM 44-25D is does not show bypassed.
Cue:
Acknowledge the report.
Comment:
Comment:
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMIN R 0 3                                            Page 8 of 11
NRC JPM ADMIN R03 Page 8 of 11  


1 . Appendix C                     Job Performance Measure               Form ES-C-1 WORKSHEET Validation of Completion JPM Number:           ~
1 Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM ADMON R03 JPM Number:  
NRC JPM ADMON R03      - _-
~
Examinees Name:         -    -  _-  _--      -          ~ -
Examinees Name:
Examiners Name:                                 ~     _ _
Examiners Name:  
Date Performed:                                           -
~
Facility Evaluator:                 -              -  -
Date Performed:  
Number of Attempts:     _        -    ~~ -    ~-    ___
~
Time to Complete:         -                            .~
Facility Evaluator:
Question:
Number of Attempts:  
    - -        -        -    --    --                _   ~-  _ - - - -
~~
Result:                 Satisfactory/U nsatisfactory Examiners Signature and Date:               _
Time to Complete:
NRC JPM ADMIN R 0 3                                                  Page 9 of 11
Question:  
~- _ _ _
.~
~-
Result:
Satisfactory/U nsatisfactory Examiners Signature and Date:
NRC JPM ADMIN R03 Page 9 of 11  


, *, . Appendix C                 Job Performance Measure               Form ES-C-1 WORKSHEET Simulator 3etuD
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator 3etuD
: 1. Reset to full power IC-65.
: 1. Reset to full power IC-65.
: 2. Bypass LPRM 36-1 7B from APRM el (red knob and silver toggle).
: 2. Bypass LPRM 36-1 7B from APRM el (red knob and silver toggle).
: 3. Bypass LPRM 28-09D from APRM I (red knob and silver toggle).
: 3. Bypass LPRM 28-09D from APRM I (red knob and silver toggle).
: 4. Insert the following:
: 4. Insert the following:
: a. SW I-NISI53T to ON; This will light the BYPASS white light for LPRM 44-25D on APRM 8 drawer (DONT NEED red)
: a. SW I-NISI 53T to ON; This will light the BYPASS white light for LPRM 44-25D on APRM 8 drawer (DONT NEED red)
: b. SWI-NIS153CR to OFF; This will stick the bypass switch for LPRM 44-25D to the un-bypassed position. (Not required)
: b. SWI-NIS153CR to OFF; This will stick the bypass switch for LPRM 44-25D to the un-bypassed position. (Not required)
: c. IND-NIS020B to ON; This will place LPRM 44-25D amber light to ON on Panel 4F.
: c. IND-NIS020B to ON; This will place LPRM 44-25D amber light to ON on Panel 4F.
Line 1,459: Line 2,087:
: 7. Have a completed attachment 403-2 with the LPRMs marked.
: 7. Have a completed attachment 403-2 with the LPRMs marked.
: 8. Close APRM drawers.
: 8. Close APRM drawers.
NRC JPM ADMIN R 0 3                                              Page 10 of 11
NRC JPM ADMIN R03 Page 10 of 11  


I 1. , Appendix C                   Job Performancle Measure             Form ES-C-1 WORKSHEET STUDENT HqrNDOUT Initial Conditions:
I 1.
Appendix C Job Performancle Measure Form ES-C-1 WORKSHEET STUDENT HqrNDOUT Initial Conditions:
: 1. The plant is at rated power.
: 1. The plant is at rated power.
Task Cue:
Task Cue:
Perform Section 2 of Attachment 202.1-1, APRM Status Check, for APRM 8.
Perform Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8.
Notify the Unit Supervisor of your results.
Notify the Unit Supervisor of your results.
NRC JPM ADMlN R 0 3                                             Page 11 of 11
NRC JPM ADMlN R 0 3 Page 11 of 11  


t * . Appendix C                       Job Performance Measure                               Form ES-C-1 WORKSHIEET Facility:       Oyster Creek-                         Task NO.:           2000501433 Task
t Appendix C Instrument Job Performance Measure Form ES-C-1 WORKSHIEET Facility:
Oyster Creek-Task NO.:
2000501 433 Task


==Title:==
==Title:==
Determine RPV Water Level Instrument
Determine RPV Water Level Instrument  
                                                      -                -  ~       Availability_-
~
Job Performance Measure No.:               -NRC.JPM _     ADMIN
Availability_-
                                                                  - -        R 0 4- (ROl
Job Performance Measure No.:  
                                                                            ~_        _
- NRC._
WA  
JPM ADMIN
~_ R04
- (ROl WA  


==Reference:==
==Reference:==
Generic
Generic  
                              -~     2.4.21 (RO   -~3.7)
-~
Examinee:              -              ._    _ -    Examiner:
2.4.21 (RO  
Facility Evaluator:       -  -          .        Date:              .
-~ 3.7)
Examiner:
Examinee:
Facility Evaluator:
Method of Testing:
Method of Testing:
Simu lated Perform ance              _ -      .~   Actual Performance                       X Class room             X
Date:
                              -         Simulator                               Plant Read to the Examinee:
X Si m u lat ed Perform an ce
.~ Actual Performance Class room  
- X Simulator Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
Line 1,491: Line 2,129:
: 2. The Primary Containment Control EOP has been entered.
: 2. The Primary Containment Control EOP has been entered.
: 3. RPV pressure is 200 psig and stable.
: 3. RPV pressure is 200 psig and stable.
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical riun temperatures, along with the current water level indications:
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical riun temperatures, along with the current water level indications:  
                              ---      - _ - _.    ~       - -      -
~
RPV Water                 Te rrg-Instrument      Level Reading Instrument NO.
YARWAYB RPV Water Level Reading 89 91 130 84 83
                                                          -~
~
Point 89              -
Te rrg-Instrument NO.  
TE-103-450                                 340 91                TE-103-451 130          -~
-~
TE-103-452
TE-103-450 TE-103-451 TE-103-452 TE-103-453
                                                        .____      ~~
-~
42             360 I
~~
84                TE-103-453                43             405
Point 340 42 360 43 405 I
      ~    YARWAYB                  83                TE-103-454       ~       44     ~       375 NRC JPM ADMIN R 0 4                                                                      Page 1 of 8
TE-103-454  
~
44  
~
375 NRC JPM ADMIN R04 Page 1 of 8  


> ' . Appendix C                 Job Performance Measure                 Form ES-C-1 WORKSHEET Task Standard: IAW the reference provided:,the Candidate has determined that only NR GEMAC B is available for RPV water level indication.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Standard: IAW the reference provided:, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.
Required Materials: None.
Required Materials: None.
General  
General  


==References:==
==References:==
 
1. EMG-SP28, Level Instrumentation Availability, revision 0.
1 . EMG-SP28, Level Instrumentation Availability, revision 0.
Initiating Cue: IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each R I V water level instrument is available for RPV water level indication or is not available.
Initiating Cue: IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each R I V water level instrument is available for RPV water level indication or is not available.
Time Critical Task: No.
Time Critical Task: No.
Validation Time:     7 minutes NRC JPM ADMIN R 0 4                                                   Page 2 of 8
Validation Time:
7 minutes NRC JPM ADMIN R 0 4 Page 2 of 8  


Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark 4 Performance Step: 1
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.  
- _ _ ~ ~_  ~
~
Procedure Step: Provides repeat back of initiating cue.
~_
~
JPM Start Time:
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Standard:
Comment:
Comment:
___      --- _ _ _ _      - -~       _ ~ --~ __  _ __ - -
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
J       Performance Step: 2 Procedure Step: 3.4 Verify that the instrument reference leg temperatures are in the SAFE REGION of the RPV Saturation Temperature Curve.
- -~
Standard:       Compares the provided reference leg temperatures for all level instruments at the given RPV pressure against the RPV Saturation Temperature curve. Determines that YARWAY A is not in the SAFE REGION and thus is not available for RPV water level instrumentation.
_ ~ - -~ _ _
Comment:
J Performance Step: 2 Procedure Step: 3.4 Verify that the instrument reference leg temperatures are in the SAFE REGION of the RPV Saturation Temperature Curve.
                    .-        ~ __    - _ ~ -~     _ _ ~ -                 .
Standard:
NRC JPM ADMlN R 0 4                                                     Page 3 of 8
Compares the provided reference leg temperatures for all level instruments at the given RPV pressure against the RPV Saturation Temperature curve. Determines that YARWAY A is not in the SAFE REGION and thus is not available for RPV water level instrumentation.
Comment:  
~  
~
-~
_ _ ~ -
NRC JPM ADMlN R 0 4 Page 3 of 8  


. . Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 3 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Standard: Compares the NR GEMAC Pi and NR GEMAC 6 indicated water levels at the given reference leg temperatures on the GEMAC NARROW RANGE curve. Determines that NR GEMAC A is not in the Safe Region and thus is not available for RPV water level instrumentation.
Performance Step: 3 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
Standard:
Compares the NR GEMAC Pi and NR GEMAC 6 indicated water levels at the given reference leg temperatures on the GEMAC NARROW RANGE curve. Determines that NR GEMAC A is not in the Safe Region and thus is not available for RPV water level instrumentation.
Determines that NR GEMAC. B is in the Safe Region and thus is available for RPV water level instrumentation.
Determines that NR GEMAC. B is in the Safe Region and thus is available for RPV water level instrumentation.
Comment:
Comment:
J     Performance Step: 4 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
J Performance Step: 4 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
Standard: Compares the YARWAY 6 iirldicated water level at the given reference leg temperatures on the YARWAY curve. Determines that YARWAY 6 is not in the Safe Region and thus is not available for RPV water level instrumentation.
Standard:
Compares the YARWAY 6 iirldicated water level at the given reference leg temperatures on the YARWAY curve. Determines that YARWAY 6 is not in the Safe Region and thus is not available for RPV water level instrumentation.
Comment:
Comment:
NRC JPM ADMIN R 0 4                                              Page 4 of 8
NRC JPM ADMIN R04 Page 4 of 8  


D' . Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information
D '
    ~
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information  
J     Performance Step: 5
~
        ~  ~~
J Performance Step: 5 Procedure Step: 3.5  
Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
~
Standard: Compares the WR GEMAC rndicated water level at the given reference leg temperatures on the GEMAC Wide Range curve.
~~
For each instrument below, the instrument reads in the Safe Region of its respective curve.
Standard:
Compares the WR GEMAC rndicated water level at the given reference leg temperatures on the GEMAC Wide Range curve.
Determines that WR GEMAC is not in the Safe Region and thus is not available for RPV water level instrumentation.
Determines that WR GEMAC is not in the Safe Region and thus is not available for RPV water level instrumentation.
Comment:
Comment:
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMIN R 0 4                                              Page 5 of 8
NRC JPM ADMIN R04 Page 5 of 8  


Y -
Y Appendix C Job Performance Measure WORKSHIEET Form ES-C-1 Va I id at i o n of Co m p le t io n JPM Number:
Appendix C                 Job Performance Measure                   Form ES-C-1 WORKSHIEET Va Iidat io n of Co mplet ion JPM Number:           NRC JPM ADMIN
NRC JPM ADMIN R 0 4 Examinees Name:  
_ -      -          R04 Examinees Name:             __      _ _        ~ ~~~~
~  
Examine rs Nam e : -~               -        -          ~   ~-
~~~~
Date Performed:                 ~
Exam in e rs N am e :  
Facility Evaluator.                           ~         _   ~-
-~  
Number of Attempts:           ____    ~_   ~~               __ -
~ ~-
Time to Complete:     _ _                    ~_~   ___
Date Performed:  
Question:
~
Facility Evaluator.  
~
_ ~-
Number of Attempts:  
~_  
~~
Time to Complete:  
~_~
Question:  


===Response===
===Response===
Result:               Satisfactory/U nsatisfactory Examiners Signature and Date:                                   ~~             .
Result:
NRC JPM ADMIN R 0 4                                                    Page 6 of 8
Satisfactory/U nsatisfactory Examiners Signature and Date:  
~~
NRC JPM ADMIN R04 Page 6 of 8  


V
V Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator ?;etuD
* Appendix C                     Job Performance Measure       Form ES-C-1 WORKSHEET Simulator ?;etuD
: 1. None.
: 1. None.
: 2. Have a blank copy of Support Procedure 28, EMG-SP28, Level Inst r urn entat ion Availability ready.
: 2. Have a blank copy of Support Procedure 28, EMG-SP28, Level I n s t r u rn en tat ion Availability ready.
NRC JPM ADMlN R 0 4                                           Page 7 of 8
NRC JPM ADMlN R 0 4 Page 7 of 8  
 
Appendix C Level Readinq
-- Instrument No.
TE-103-450 89 91 130 84 -
-TE-103-453 83
~- -
TE-103-451 TE-103-452
-~
I TE-103-454 1 - - --
Job Performarice Measure WORKSHEET
-~ Point 1


Appendix C                        Job Performarice Measure                    Form ES-C-1 WORKSHEET STUDENT tjANDOUT Initial Conditions:
F 1
I -
- - - 1 41 -
- 335
--I 1
~~- -
340 40
~
I 42 1
360 43
~
405
~
44 375 1
I - - -
-~
Form ES-C-1 STUDENT tjANDOUT Initial Conditions:
: 1. The Plant was at rated power when a LOCA occurred in the Primary Containment.
: 1. The Plant was at rated power when a LOCA occurred in the Primary Containment.
: 2. The Primary Containment Control EfOP has been entered.
: 2. The Primary Containment Control EfOP has been entered.
: 3. RPV pressure is 200 psig and stable.
: 3. RPV pressure is 200 psig and stable.
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:
Level Instrument       1
Level Instrument 1
                        -    1   Level Readinq
1 i
_                Instrument No.
- -1  
__        -~  Point
- ~ _ _  
                                                                            ~~- -
~- - - -
1 1  ---
NRCEMACA NR GEMAC B i I -
F 1 I -
1 WRGEMAC 1
        ~ _ _     ~-
YARWAYA I
NR GEMAC B NRCEMACA ii  ~- -
I YARWAYB I
89 91 TE-103-450-TE-103-451
Task Cue:
                                                        -  -~
40
                                                                              ~
41-I-
1 340 335  --I 1
1 1
I WRGEMAC YARWAYA YARWAYB-.
                          - -1 I I
130 84 83
                                              -  I 1  -
TE-103-452
                                                      -TE-103-453 TE- 103-454 42 43 44
                                                                                  ~
I
                                                                                      ~
360 405 375 -~
I1 Task Cue:
IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each RPV water level instrument is available for RPV water level indication or is not available.
IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each RPV water level instrument is available for RPV water level indication or is not available.
Available? Yes/No NRC JPM ADMIN R 0 4                                                              Page 8 of 8}}
Available? Yes/No NRC JPM ADMIN R04 Page 8 of 8}}

Latest revision as of 16:48, 14 January 2025

Final - Section a Operating Exam (Folder 3)
ML081330603
Person / Time
Site: Oyster Creek
Issue date: 03/28/2008
From: Ludlam G
AmerGen Energy Co
To: Caruso J
Operations Branch I
Hansell S
Shared Package
ML072851077 List:
References
50-219/08-301, U01688
Download: ML081330603 (121)


Text

  • -

Appendix C w

Form ES-C-1 Job Performance Measure WORKS t-i E ET Facility:

Oyster Creek--

Task No.:

COO00030 Task

Title:

_ _ _ - _ _ ~ - ~

Review a Shift Turnover

_____ Checklist

~

~

Job Performance Measure No.:

WA

Reference:

Generic 2.1,3(SRO 3.4) __

Examinee:

Examiner:

Facility Evaluator:

~

- [late:

Method of Testing:

NRC JF'M. ADMIN SROl

[SRO)

-_ -~

-~

~

~

~

_ - _ _ ~ _ _ _ _ _ _ - _- -

X Simulated Performance

~

- Actual Performance

~

Classroom

~

~

Plant

~

~ -~

X Simulator Read to the Examinee:

1 will explain the initial conditions, which stieps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at rated power with all Rec:irculation Pumps on.
2. You are the oncoming Unit Supervisor after being off for the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
3. Your last shift was completed at 2400 on April 18, 2008.
4. The current datehime is April 19, 2008 at 1200.

Task Standard: The Candidate has reviewed the turnover checklist and noted the discrepancies and any associated actions.

Required Materials: None General

References:

1. OP-OC-100-1002, Main Control Room Turnover Checklist (Operating Mode), revision 5.
2. Technical Specifications 3.7, Auxiliary Electrical Power.
3. Procedure OP-OC-108-104-1001, (Guidance for Limiting and Administrative Conditions for Operations, revision 0.
4. Procedure 324, Thermal Dilution Pumps, revision 69.

NRC JPM ADMlN SROl Page 1 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions. Provide any responses on the handout.

Time Critical Task: No.

Validation Time:

22 minutes NRC JPM ADMIN SRO1 Page 2 of 15

c Appendix C Job Performance Measure WORKSHEET Form ES-C-1

_ _ ~ -

Performance lriformation Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

Standard:

Comment:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the1 completed Turnover Sheet.

Note: The following steps may be performed in any order.

J Performance Step: 2 Procedure Step: Reviews thle Turnover Checklist.

Standard:

Reviews the Turnover Checklist and notes the following:

The TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 2 switch position is not annotated. (The switch should be in NORMAL.)

Comment:

~

- _ _ _ _ - - ~ - - ______

- - ~- -

~

~

_ - - _ - _ _ _ ~ - ~ ~

~

-~

SAT/UNSAT NRC JPM ADMIN SRO1 Page 3 of 15

c Appendix C Job Performance Measure Form ES-C-I WORKSHEET Performance Information J

Performance Step: 3

~-

~-

Procedure Step: Reviews the Turnover Checklist.

Standard:

Reviews the Turnover Checklist and notes the following:

Technical Specification 3.7.C.2 states that if one diesel generator becomes inoperable during power operation, repairs shall be initiated immediately and the other diesel shall be operated at least one hour every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at greater than 80% rated load until repairs are completed.

Procedure OP-OC-I 08-1 04-1001, Guidance for Limiting and Administrative Conditions for Operations, states that EDG 2 shall be satisfactorily tested by 2000 on April 19, 2008. This is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from when EGD 1 was declared inoperable - not 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from when EDG 1 was tagged out for repair. To comply with Technical Specifications, EDG 2 needs to be tested (636.4.013, EDG 2 Load Test) by 2000 on April 19, 21008.

Comment:

~-

~

SAT/UNSAT NRC JPM ADMIN SRO1 Page 4 of 15

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET performance lriformation J

Performance Step: 4 Procedure Step: Reviews the Turnover Checklist.

Standard:

Reviews the Reactor Core State Parameters printout and notes the following:

0 IAW Core Thermal Limits Verification of Procedure 202.1, Power Operation, the thermal limits shall be reviewed and compared against Column C of Attachment 202.1 -5. This comparison shows that MAPLHGR (currently at 100.01) is above the limiting value of 100. The actions from Column C include the following:

o Follow the requirements of TS 3.1 0 as applicable;

. During POWER OPERATION the maximum AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHlGR) for each fuel type as a function of exposure shall not exceed the limits specified in the CORE OPERATING LIMITS REPORT (COLR)

If any time during POWER OPERATION it is determined b y normal surveillance that the limiting value for APL-HGR is being exceeded, action shall be initiated to restore operation to within the prescribed limits. If the APLHGR is not returned to within the prescribed limits within two hours, action shall initiated to bring the reactor to the COLD SHUTDOWN CONDITION within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. During this period surveillance and corresponding action shall continue until reactor operation is within the prescribed limits at which time POWER OPERATION may be continued.

o Notify Manager Reactor Engineering and Director Ope rat ions.

Comment:

~- -

~

~

-~

NRC JPM ADMIN SRO1 JPM Stop Time:

Page 5 of 15

rcI Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number:

NRC

~

JPY P(DM!!!-SR!-_-._

Examinees Name:

~

Examiners Name:

Date Performed:

~

Facility Evaluator:

~_

Number of Attempts:

_. _ _ _ _ _ _ ~

-~

-rime to Complete:

Question:

Response

Result:

SatisfactoryAJnsatisfactory Examiners Signature and Date:

~_ __ _- -

~ - -

NRC JPM ADMIN SRO1 Page 6 of 15

I.

Appendix C Job Performance Measure Form ES-C-1 WORKSI-I1 EET Si m u lat o r Set up

1. None.
2. Include a cope of Core State Parameters Admin SROl along with the Student Handout and the Turnover sheet to the candidate at the start of this JPM.

NRC JPM ADMIN SROl Page 7 of 15

AppendixC Job Performance Measure Form ES-C-1 WORKSHIEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power with all Recirculation Pumps on.
2. You are the oncoming Unit Supervisor after being off for the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
3. Your last shift was completed at 2400 on April 18, 2008.
4. The current datehime is April 19, 2008 at 1200.

Task Cue:

As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) arid note any discrepancies and/or any required actions. Provide any responses on the handout.

NRC JPM ADMlN SROl Page 8 of 15

MAIN CONTROL ROOM 'TURNOVER CHECKLIST (0 P E RAT1 PJ G MOD E) 0P-0c-100-1002 Revision 5 DCC FILE if 20.70.01.01.03 i

I i

_ _ _ _ ~ _-

_ _ _ ~ _

Reactor Hi/Lo Level Bistable Test and Calibration, 619.3 113 Survetllance(s) in progress I

1 Stack

-- RAGEMS Sample and-Effluent Flow -

Functional Test, 621 3 024 1

4 7.-

1 Main Generator Exciter Brush

- Inspection FireHose Station, Plose House and Fire Hydrant Inspection, 645 6.003,-

I Activities in progress

---LA Safety System Status I

1 -___-________

, thcdate/tk o f i w ! % E -

~

~

Identify \\y\\tem or component\\ that are in a degraded mode of' o p e r a h pcrnizted by the 1echiiic:ll Specificationr. For each \\y$tem, compare the length of time it is degraded with the Technical Specification Action Statcmenl. Specifj the frequency of redundant sj\\tem verification or testing and APRM 1 is in BYPASS due to failure of the APRM Surveillar.lce Test - Front Panel Check (620.4 002) All other I

APRMs operable.

, EDG 1 tagged

- outofservice at53E-on 4/18/08.

-._ 7-dayCO.

-- EDG

- 2 testixevery

__ - 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> - - -. _ _ - -

Compensatory Comments k

a n

y compenmtory action\\ in effect as a result of'l'rocedure CC-AA-112 ('I enip Mod), Procedure WC-AA-101 (On-Line Maintenance). out of wrvice plant eqnipment or components, or as directed by the SM or OS.

k D G 2 and associated systems are protected IAW Procedure 341 due to EDG 1 inoperable.

t Recording Offgas Radiation Monitor levels every hour due to AOG trip. No adverse trends noted-Turnover Comments 1

EDG 1 declared inoperable at 2000 on 4/18/08, and tagged :)ut for repair at 2300 on 4/18/08 Electrical Maintenance

~ reports a ground in the control system and is continuing to investigate. There IS currently no estimate on the return-to-service time IAW Technical Specifications, EDG 2 must complete a satisfactory surveillance by 2300 on 411 9/08 I (AnnuncJators T4bLT5bJ I AOG tripped 1600 4/18/08 and remains outofserice -41 required actions completed. (Annunciators 10F3b. 1 OXF3d 1 1 OXF4d).

NRC JPM ADMIN SRO1 Page 9 of 15

OP -0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Shift

  • Shift Unit Supervisor
  • i 1

I osfi slsul(

~

__J--

  • Signature acknowledges all qualifications to stand watch are current and any changes in medical status have been reported IAW OP-AA-I 05-1 01.

NRC JPM ADMIN SROl Page 10 of 15

I MAIN CON'I'ROL ROOM TURNOVER CHECKLIST

((IONTIN IJEI))

0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01 0 3

-~

I.

EDG2satus

~- _.__- _______

V-24-29 isolationIsTgnal bypass switch in nor-al V-24-30 isolation sigEl bypass switch in normal TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 1 in normal BYP CHAN

_ - 2 in normal --

2anel11R EF 1-8 control switch in auto EF 1 -9control switch in auto Panel 13R Pond Pump select switch TORUSIDW VENT &PURGE ISOL VLVS H I R

- -~

~- -

One pump in auto, one pump in manual -

Panel I ~ X R 1

~

CNTMT VENT AND PURGE isolATloN BYPASS in normal Panel 11XR Main Generator Digital Protective Re1 (DPRS A and 8) operating with n indications Confirm fans on rear of panels operating I

7-7x

- l Y j i - ---E _I_--

!NO Panels

~

12XR,

_ 13R7 14R

_~ (rear of panels)__

~

~-

~

X NRC JPM ADMIN SROl Page 11 of 15

0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 General

- - - Turnover

__ - Checks Core Maneuvering Daily instruction Sheet, Attachment 1001.22-3 and reflects plant_operati_ng conditions.

Control room panel walkdown_perfofmed_neat-end

~

ofshift.

Reviewed reasons for annun-ciated-alarms with all operators Control room panel walkdown performed withoncoming shift_

Yes Performed light test on alarm windows.

~-

~

Yes

- ~-

NRC JPM ADMlN SROl Page 12 of 15

a :

Control Room,Alarm Sheet Shift 0000 - 1200 Date 41 19/08 A

13 C I) E I+'

NRC JPM ADMlN SROl 0P-0c-100-1002 Revision 5 DCC FILE 11 20.70.01.01.03 A

13 C

1)

E I'

i r-I 1 p - r - r 1

Page 1 x

i t

t I

I Page 13 of 15

Control Room Alarm Sheet A I3 C D E 17 A 13 C 1) E F A R C D E F G H K M F

1 2 3 4 10 11' 1

2 3

4 5

6 7

8 9

10 11 12 0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Page2 A I3 C I) E F 9XF 12F R 0 Remarks Reviewed By:

NRC JPM ADMIN SROl Page 14 of 15

STUDENT HANDOUT Name:

NRC JPM ADMlN SRO1 Date:

Page 15 of 15

I VI e e k

u e

I Y

I_

I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Job Performance Measure No.:

NRC

~

JFM ADMIN_SR02/SBFl WA

Reference:

Generic

~- 2.1.141SRO 3.31 _ _

Facility Evaluator:

Date:

Method of Testing:

Simulated Performance Actual Performance X

Classroom

_ X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

In it ial Conditions:

1. A plant startup is in progress.
2. The REACTOR MODE SELECTOR switch is in STARTUP
3. All IRMs indicate midscale on Range 8.
4. All APRMs indicate 1%.
5. Annunciator 9XF7d, 24 VDC PP-A PWR LOST alarmed 20 minutes ago.
6. Electrical maintenance suspects a short circuit.
7. The current datehime is April 19, 2008 at 1000.
8. A recovery plan has not been established.

Task Standard: The Candidate completes the Shift Managers Notification Worksheet IAW OP-AA-106-101, Significant Event Reporting, and determines notification is required due to an unexpected /2 scram and entry into a 5 72-hour shutdown LCO.

Required Materials: None.

NRC JPM ADMlN SR02 Page 1 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General

References:

1.
2.
3.
4.
5.
6.

Technical Specifications. (have available)

Procedure OP-AA-106-101, Significant Event Reporting, revision 8.

(handout)

Procedure RAP-SXF7d, 24 VDC PP-A LOST, revision 0. (handout)

Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Operations, revision 0.

EP-AA-1010, Exelon Nuclear Radiollogical Emergency Plan Annex for Oyster Creek Station, revision 0 (have available)

Exelon Reportability Manual Initiating Cue: Complete Attachment 2, Shift Manager's Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator. Determine who the Shift Manager notifies of this event and why. Determining the requirement for ii written report and LER will be performed by another Operator.

Time Critical Task: No.

Validation Time:

22 minutes NRC JPM ADMIN SR02 Page 2 of 14

Appendix C Job Performance Measure WORKStIEET Form ES-C-1 Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

Standard:

Comment:

Provides repeat back of initiating the repeat back.

JPM Start Time:

cue. Evaluator acknowledges Performance Step: 2 Procedure Step: Record datehime of the event on Attachment 2.

Standard:

Records datehime of the event on Attachment 2 as 4/19/08 1000.

Note:

Comment:

Completion of the Attachment may be performed in any order

__ ~-

NRC JPM ADMIN SR02 Page 3 of 14

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance lriformation

~

~~

~

Performance Step: 3 Procedure Step: Records current power/mode on Attachment 2.

~-

-~

Standard:

Records current power/mode on Attachment 2 as 1 %, Startup, or midscale on Range 8 of the IRMs, Startup.

Note:

Only Performance Step 3 or performance Step 4 is critical, with STARTUP mode listed.

Comment:

SAT/U NSAT Performance Step: 4 Procedure Step: Records prior power/mode on Attachment 2.

Standard:

Comment:

Records prior power/mode on Attachment 2 as 1 %, Startup, or midscale on Range 8 of the IRMs, Startup.

NRC JPM ADMIN SR02 Page 4 of 14

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance lriformation Performance Step: 5 Procedure Step: Records description.

~

Standard:

Records a short description of the event: receipt of annunciator 24 VDC PP-A LOST, or loss of 24 VDC PP-A, or similar wording. The description may contain the plant impact of YZ scram as well.

Comment:

Performance Step: 6 Procedure Step: Determines, if the event requires an EP declaration.

Standard:

Comment:

Determines that the event does not require an EP declaration.

. ~~~-

~

-. ~

NRC JPM ADMIN SR02 Page 5 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKS ti EET Performance Information Performance Step: 7 Procedure Step: Determines if the event requires reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.

Standard:

Determines that the event does not require reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.

Comment:

~

~

~

- ~ _ - - ~ _

Performance Step: 8 Procedure Step: Determines if an oil discharge intohpon waters or adjoining shoreline.

Standard:

Comment:

Determines there is no oil discharge intohpon waters or adjoining shoreline.

NRC JPM ADMIN SR02 Page 6 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKS ti EET Performance Information Performance Step: 9 Procedure Step: Determines if a leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or upon surface waters, groundwater, or onto the ground.

Determines there is no leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or iupon surface waters, groundwater, or onto the ground.

Standard:

Comment:

Performance Step: 10 Procedure Step: Determines if a release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.

- ~-

Standard:

Determines no release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.

NRC JPM ADMIN SR02 Page 7 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: Determines if any of the following occurred:

RCRA Program Exception Fieport submitted, or Environmental Noncompliance endangering health or environment.

Standard:

Determines none of the following occurred: RCRA Program Exception Report submitted, or Environmental Noncompliance endangering health or environment.

Comment:

Performance Step: 12 Procedure Step: Determines if the event is threatening health or environment or release equal to or in excess of EPA reportable quantity.

Standard:

Determines the event is not threatening health or environment or release equal to or in excess of EPA reportable quantity.

Comment:

NRC JPM ADMIN SR02 Page 8 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 13 Procedure Step: Determines' if any of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.

~

Standard:

Determines none of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.

Comment:

SAT/UNSAT J

Performance Step: 14 Procedure Step: Determines if any of the following occurred:

reactivity management event; hazardous material incident; fitness for duty; injury resulting in olfsite medical attention; major enforcement action; non-routine communication to/from the NRC; reactor water condition above EPRl Action Level II; any event outside the plant design basis; any event proceeds differently than expected: unexpected '/2 scram, unexpected and significant plant transient, LCO action that will not be met within deadline, initiation of a prompt investigation, or, an unexplained risk change.

Standard:

Determines that an unexpected '/2 scram has occurred. Checks YES to perform notifications and notifies the SOS/OD, DSM, and NRC Resident Inspector. The candidate may also determine that an unexplained risk change has occurred.

Comment:

NRC JPM ADMIN SR02 Page 9 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKS HI EET Performance Information J

Performance Step: 15

~~

Procedure Step: Determines if any of the following occurred: the event forced entry into a 5 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> shutdown LCO; the event forced a plant shutdown or unplanned power reduction; the event involved a significant breakdown of plant radiological or environmental controls.

Standard:

Procedure Step: Determines that the event forced entry into a 5 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> shutdown LCO (loss of this Bus is a 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> shutdown IAW TS 3.7.6. Checks YES to perform notifications and notifies the SOWOD, DSM, and NRC Resident Inspector.

Comment:

.~.

SAT/U NSAT NRC JPM ADMIN SR02 Page 10 of 14

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Standard:

Performance Step: 16 Procedure Step: Determines if any of Reportability Requirements (occurred.

Determines that none of the TS 6.9.3 Requirements occurred.

the TS 6.9.3 Unique Unique Reportability Comment:

JPM Stop Time:

NRC JPM ADMlN SR02 Page 11 of 14

Appendix C Job Performance Measure Form ES-C-1 W 0 R KS kil E ET Va I i d at io n of Co m p I et io n NRC JPM ADMIN SR02 JPM Number:

Examinees Name:

Date Performed:

~~

~

Number of Attempts:

Time to Complete:

Question:

Response :

Result:

Satisfactory/Unsatisfactory Examiners Signature and Date:

NRC JPM ADMlN SR02 Page 12 of 14

_ __ _ ~ _ _. -

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Si m u lato r Setup

1. None.
2. Have a clean copy of Procedure OP-AA-106-101, Significant Event Reporting, and RAP-SXF7d, 24 VDC; PP-A LOST as handouts to the Candidate.

NRC JPM ADMIN SR02 Page 13 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKS I-E ET

~~~

STUDENT HANDOUT Initial Conditions:

1. A plant startup is in progress.

2. The REACTOR MODE SELECTOR switch is in STARTUP.
3. All IRMs indicate midscale on Range 8.
4. All APRMs indicate 1%.
5. Annunciator 9XF7d, 24 VDC PP-A PWR LOST alarmed 20 minutes.
6. Electrical maintenance suspects a short circuit.
7. The current datehime is April 19, 2008 at 1000.
8. A recovery plan has not been established.

Task Cue:

Complete Attachment 2, Shift Managers Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator.

Determine who the Shift Manager notifies of this event and why.

Determining the requirement for a written report and LER will be performed by another Operator.

NRC JPM ADMlN SR02 Page 14 of 14

OP-AA-106-101 Revision 8 Page 8 of 14 1 the NRC via ENS or to an outside agency per Exelon Reportability Reference Manual?

1 1 YES, Perform the following 3 Shift Manager's Notification Worksheet Page 1 of 5 rD&TE/TLME of Event I EVENT DESCRIPTION (use additional paper as necessary)

I J

_ ~ _ _ _ ___

Does the event / condition require an EP Declaration?

1 YES, Perform required communications after completing notifications required per site specific EP procedures Does the event I condition require reporting to I

1

1.

~..

Notify:

SOS I OD NRC Operations Center Duty Station Manager (DSM)

PM SVP NDO Manager, Reg. Assurance Group ANI and INPO (Alert or higher EAL)

NRC Senior Resident Inspector If time permits Independent SRO peer check completed NRC Form 361 SRO Signature Notify sos / OD NRC Operations Center DSM 9

PM 1

SVP NDO

. Manager, Nuclear Oversight Group

=

Communication (as required)

Environmental (as required)

Manager, Reg Assurance Group NRC Senior Resident Inspector Time

  • Date and Time all notification:

have been completed by DSW Time Date and Time all notification:

have been completed by DSPu

OP-AA-106-101 Revision 8 Page 9 of 14 Did the following eventsicondition occur?

Oil discharge intoiupon navigable waters o adjoining shoreline I ] YES, Perform notifications +

Oyster Creek Only Att a c PI rn e n t 2 Shift Man a cj e r's N cl tifi ca t ion Worksheet NOTE Refer to Attachment 3 for additional notification and reporting iristructionb Oyster Creek Only -

N I

D b

Did any of the following events/conditions xcur?

A leak or discharge of petroleum prod or hazardous substance from the warehouse drop tank Spill or discharge of hazardous mater in a quantity that constitutes a reporta discharge into or upon surface waters groundwater, or onto the ground (incl Petroleum products) 1 YES, Perform notifications 3 NOTE Relcr to Attachment 3 for additional notification and reportinq iristructions I

1

~.

3id the following eventskondition o c c F ielease of designated hazardous substant n amounts equal to or in excess of a EPA eportable quantity 1 YES. Perform notifications 3 Oyster Creek Only licfcr to Attachmenl 3 for additional notitication and reporting instructions P N e 2 of 5

____- - ~ _ _ _

Notify sos / OD National Response Center (EPA)

E PA NRC Operations (3enter DSM

=

PM 1

SVP

' NDO

. Manager, Reg Assurance Group First Energy (,JCP&L) (Oyster Creek Only)

NRC Senior Resident Inspector Notify.

SOS / OD State DEP Ocean County Hecilth Department NRC Operations Center DSM 9

PM 1

SVP NDO

. Manager, Reg. Assurance Group

' First Energy (..ICP&L)

NRC Senior Resident Inspector Notify SOS / OD National Response Center (EPA)

State DEP Lacey Twp Police (Oyster Creek Only)

NRC Operations Center DSM PM 1

SVP NDO

' Manager, Reg Assurance Group

. First Energy (JCP&L) (Oyster Creek Only)

NRC Senior Residcbnt Inspector Time

?

Date and Time all notifications have been completed by DSM Date

-L--

Date and Time all notifications have been completed by DSM T---

Time

. A Date and Time all notifications have been completed by DSM

OP-AA-106-101 Revision 8 Page 10 of 14 Date Did any of the following events / conditions-occur?

RCRA Program Exception Report Environmental Noncompliance Submitted endangering health or Environment 1 1 YES, Perform notifications 3 Hcfer to Attdchrncnt 3 lor additional nclifiLdticn dnd reporting Instructions Did any of the following events / conditions-occur?

Incident threatening health or environment or release equal lo or in excess of EPA reportable quantity j 1 YES, Perform notifications 3 Oyster Creek Only Time Shift Managers Ncitification Worksheet Page 3 of 5 1

NOTt Hcfer to Atlachrnerit 3 lor additional notification and reporling instructions Oyster Creek Only Did the following eventsicondition occur?

[ ] YES, Perform notifications 3 Loss of ? O or more sirens Spurious activation signal with 1 or more sirens still sounding Rcler to Attachrncnt 3 for additional notification and reporting instructions

--_-_-I_.__

Notify.

SOS / OD State DEP NRC Operations Center DSM 1

PM 1

SVP

. NDO Manager, Reg Assurance Group NRC Senior Resident InsDector Notify SOS / OD National Response Center State DEP NRC Operations Center 3SM 1

PM SVP NDO Manager, Reg Assurance Group VRC Senior Resident Inspector Votlfy.

30s I OD 3cean County Police Dispatcher I R C Operations Ccnter I S M I

PM SVP NDO Manager, Reg Assurance Group I R C Senior Resident Inspector Date Time

-t----I have been completed by DSM have been completed by DSM Time

+--*

OP-AA-106-101 Revision 8 Page 11 of 14 Shift Managers Notification Worksheet Page 4 of 5 Did any of the following events/conditions occur7 1

2 HaLardous material incident 3

4 Fitness-for-duty event 5

6 Reactivity management event per OP-AA-300 1540 Sentinal / Oram Risk level is / or is planned to be ORANGE or RED Injury resulting in offsite medical attention Major enforcement action fine. or other sanction, serious operating event that could result in such action, including events which have been or maybe brought to NRC upper management attention Non-routine communications to / from NRC Reactor Water Chemistry above or at EPRI Action Level II Any event or operation condition outside plant design basis

@ Unexpected Y2 scram b Unexpected, significant plant transient c LCO action that will not be met within deadline d Initiation of a prompt investigation e

Unplanned Risk Change I ~ E s.

Perform notifications 3 7

8 9

10 Any event that proceeds differently than expected i l Did the eventkondition force entry into a (72hour 2

shutdown LCO7 Did the eventlcondition force a plant shutdown or unplanned power reduction7 le Power reductions required due to high discharge temperature or required to perform an activity such as main condenser backwashing Did the eventicondition involve a significant breakdown of plant radiological or environmental controls7 3

/YES, Perform notifications Nutify SOS I OD D:;M I/

PM

. SVP 1

NDO Manager, Nuclear Oversighr Communication (as required)

Environmental (as required)

NKC Semor Resident Inspector 4 Group Notify SO!;

/ OD DSM J Work Week Manager Director Work Mgmt (via WWM)

Eng Duty Manager PM SVP NDO URI: Senior Resident Inspector J Manager Nuclear Oversight Group

_ _ ~ - _ _ - -

Date and Time all notifications have been completed by DSM


I---- _.

Time notifications have been completed by DSM

OP-AA-106-101 Revision 8 Page 12 of 14 REPORT DUE WITHIN U

30DAYS Shift Manager's Ncltification Worksheet Page 5 of 5 CHECK ONE U

REQUIRED Oyster Creek Only Did any of the following TS 6 9 3 Unique Reportability Requirement events occur7 Leak test on a sealed source that yielded 20 005 pCi of removable contamination A reportable event pursuant to the ODCM EMRV or Safety Valve challenge or failure (non LER reportable) a A challenge is an automatic actuation outside purposeful surveillance or testing A special reporl is to be sent to the NRC within 60 days b

Any of the following SLC (Liquid Poison) Technical Specification conditions a

.32C3(b) b 3 2 C 3 ( e ) ( i )

c 4 2 E 5 Inoperable high-range radioactive noble gas effluent monitor (TS 3 13 H)

[ ] YES, Perform notifications 3 Notify:

SOS OD DSM Work Week Manager 9

Director,Work Mgmt. (via 1

Eng Duty Manager (via PM

' SVP 1

hDO Manager, Nuclear Oversight WWM)

VdWM)

Group NRC Senior Resident Inspector Time

  • Date and Time all notifications have been completed by DSM REQUIRED WRITTEN REPORT I

LICENSEE EVENT REPORT CHECK ONE

-1 REQUIRED

-I NOT REQUIRED I L1 NOTREQUIRED REPORT DUE WITHIN U

30DAYS U

60DAYS OTHER

3 AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility:

Oyster Creek Task No.:

2260201402 Task

Title:

-~~

Review Acceptance

_ - -- Criteria

_ _ _ _ - - ~

for a Completed Surveillance Test Job Performance Measure No.:

_NRC JPlM ADMIN SR03 WA

Reference:

Generic 2.2.1 2. (SRO

- - 3.4)

Examinee:

Examiner:

Facility Evaluator:

Method of Testing:

X Si m u lat ed Performance

_ ~.

- ~

Actual Performance

~

Plant

~

Classroom X

Simulator Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

1.
2.
3.

The plant is at rated power.

Surveillance test, 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and C:omprehensive/Preservice/Post-Maintenance Inservice Test, has just belen completed.

The test was a normally scheduled test.

Task Standard: The Candidate reviews the surveillance test Acceptance Criteria, recognizes the component discrepancies, and states the required action for each component discrepancy.

Required Materials: None.

General

References:

1. Procedure 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Cornprehensive/Preservice/Post-Maintenance Inservice Test, revision 62.
2. AD-AA-101, Processing of Procedures and T&RMs, revision 18.

NRC JPM ADMlN SR03 Page 1 of 10

I

. AppendixC Job Performancle Measure Form ES-C-1 WORKSHEET Initiating Cue: Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets.

State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.

State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions Time Critical Task: No.

Validation Time:

20 minutes.

NRC JPM ADMIN SR03 Page 2 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

~-

Standard:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate with the section of the completed procedure and the attached sheets.

Comment:

NRC JPM ADMIN SR03 Page 3 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Step 7.1.1 7.1.2 7.1.3 7.1.4 SATNNSAT ACCEPTANCE CRITERIA Required Action if UNSAT/Reason NOTEKUE: IF the Candidates do not state TS requirements, tell them to list the most limiting TS requirement.

Incorrect use of temporary procedure change for TS surveillance acceptance criteria of ESW flow > 3000 gpm. Declare ESW Pump 52A inoperable and apply TS 3.4.C.4 due to low flow (1 5 day LCO from this inoperable component alone).

UNSAT CRITICAL 7.1.5 SAT 7.1.6 SAT 7.2.1 SAT None None NRC JPM ADMIN SR03 Page 4 of 10

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Step SATWNSAT 7.2.2 SAT 7.2.3 UNSAT CRITICAL 7.2.4 UNSAT C R lTlC AL 7.3 SAT 7.4 SAT NRC JPM ADMIN SR03 ACCEPTANCE CRITERIA R eq u ired Act ion if U N S AT/R ea so n Containment Spray Pump 51 6 vibration 4A is above the action range. Declare Containment Spray Pump 51 6 inoperable and apply TS 3.4.C.4 { 15 day LCO from this inoperable component alone). But, since more than 1 pump is inoperable in the same loop, the loop must be considered inoperable. IAW TS 3.4.C.3, a 7 day LCO now applies.

Valve V-21-17 strokes outside the accept range but less than the limiting value. Retest immediately or declare inoperable and apply TS.

- - - ~- - -

-~

~

None Page 5 of 10

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 JPM Number:

Validation of Completion NRC JPM ADMIN SIR03

-~~

~

~~

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

~

-~

_~~

Number of Attempts:

-rime to Complete:

~

Question:

Response :

Result:

Satisfactory/Unsatisfactory Examiners Signature and Date:

~- -

NRC JPM ADMIN SR03 Page 6 of 10

. AppendixC Job Performance Measure Form ES-C-1 WORKSI-IEET Simulator Setup

1. None.
2. Provide pages 45 through E4-4 ONLY of 607.4.004. (Include a good page E2-1 since this page has been modiiied in the handout)
3. Make the following steps on the test:
a. Step 7.1.4: Lineout 3100 and insert 3000. Include TPC data.
b. On the IST Pump Summary Sheet table, insert ESW 52A flow at 3050 gpm. Have all other flows acceptable.
c. On the vibration table for point 4A for Containment Spray Pump 51 6, insert a value greater than the ACTION limit. Mark all other vibrations below the ALERT values. (0.26 in/sec)
d. In the valve stroke summary table, make the OPENING time for V-21-18 greater than the ACCEPT RANGE, but less than the LIMITING VALUE. Mark all others in the ACCEPT RANGE (37.4 seconds)
e. In the IST Valve Summary Sheet, lineout 31 00 gpm and insert 3000 gpm for ESW Pump 52A flow. Initial and date.

NRC JPM ADMIN SR03 Page 7 of 10

~

. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power.
2. Surveillance test, 607.4.004, Containment Spray and Emergency Service Water S ys tem 1 Pump Operability and Com pre he n s ive/P reserv ice/Post-Maintenance lnservice Test, has just been completed.
3. The test was a normally scheduled test.

Task Cue:

Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets. State any test discrepancies and any required actions lor any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.

State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions NRC JPM ADMIN SR03 Page 8 of 10

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Step SATNNSAT 7.1.1 SAT 7.1.2 SAT 7.1.3 SAT 7.1.4 STUDENT biANDOUT ACCEPTANCE CRITERIA Required Act ion if U N S AT/Reason NRC JPM ADMlN SR03 Page 9 of 10

. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT ACCEPTANCE CRITERIA Step SATNNSAT Required Action if UNSAT/Reason 7.2.2 7.2.4 NRC JPM ADMIN SR03 Page 10of 10

OYSTER CREEK GENERATING 1

STATION F'ROCEDURE AmerGen An Exelon Company Revision No.

62 cv Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive I Presiervice I Post-Maintenance lnservice Test

~

~~

Number 607.4.004 In itia IIVerifv 6.56 ALIGN heat exchanger instrument valves in accordance with 07.4.004-6.

BB I 6.57 CONFIRM OPEN ESW Flow Gauge DPI-532-5 Isolation Valves V-3-569 and V-3-570.

BB I 6.58 RESTORE drywell pressure IAW Procedure 31 2.

BB I 6.59 NOTIFY Chemistry Technician to check and adjust the injection rate of chlorine IAW Procedure 326.

BB I 6.60 TRANSFER all pertinent data to Attachment 607.4.004-4.

BB I 6.61 REVIEW the results of this test against Section 7.0 Acceptance Criteria.

$23 I 6.62 RECORD commentsldiscrepancies on the Surveillance Review Form.

BB I 7.0 ACCEPTANCE CRITERIA 7.1 The components tested by this procledure meet Tech. Spec.

operability requirements if the following criteria are met. If any are not met, consider the affected component inoperable and follow the requirements of Tech. Spec. Section 3.4.C and Procedure LS-AA-120:

7.1.1 Containment Spray System Discharge Pressure is 160 psig.

7.1.2 The Containment Spray and Emergency Service Water Pumps start and stop when given appropriate signals.

7.1.3 TPC 4231

'V 4/24/u8 1.4

-7. Sisa&

Today Each Containment Spray Heat Exchanger total differential pressure is (40 psid.

Emergency service water flow rate as indicated on Plant Process Computer Point ESW-12 is 2 m

Containment Spray water fliow rate is 24000 gpm.

30@%Pm I.1.5 45.8

OYSTER CREEK GENERATING STATION F'ROCEDURE AmerGen I

~n ixcloi (urnpar y Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preslervice / Post-Maintenance lnservice Test

__ _ _ _ _ -~

~

~

Number 607.4.004 7.2 I Revision No.

62 7.1.6 All motor operated valves operate as specified and all valve stroke times do not exceed the Limiting Value listed on Attachment 607.4.004-4.

NOTE When a component is Preservice (baseline) tested per the 1ST Program, new alert and action level values are established for that component. The alert/action levels associated with the old component (Attachment 607.4.004-4) should not be used to determine operability of the new component.

The components tested by this procedure meet In-Service Test (IST) requirements for operability if the following criteria are met. If any are not met, consider the component inoperable and follow the requirements of Tech Spec Section 3.4.C and Procedure LS-Ab,-120.

7.2.1 Containment Spray Pump flows are between the high and low action ranges as listed on the IST Pump Summary Sheet and IST Valve Summary Sheet (Attachment 607.4.004-4).

7.2.2 ESW pump flow values are between the high and low action ranges as listed on the IST Pump Summary Sheet and IST Valve Summary Sheet (Attachment 607.4.004-4).

7.2.3 ESW and Containment Spray Pump vibration readings are below the action range as listed on the Vibration Data Sheet (Attachment 607.4.004-4).

7.2.4 All valves on Attachment 607.4.004-4 meet the acceptance criteria 7.2.4.1 E

a valve fails to stroke to the required position OR if its stroke time exceeds the limiting value of full stroke time specified in Attachment 607.4.004-2, THEN it shall be immediately declared inoperable and the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be followed.

46.0

OYSTER CREEIK GENERATING STATION PROCEDURE AmerGen I

Ai' ixelon Conipany Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Presiervice / Post-Maintenance lnservice Test

~

Number 607.4.004 Revision No.

62

.I 7.2.4.2 a valve fails to stroke to the required position within its acceptable range as specified in Attachment 607.4.OQ4-2, U

T does @t exceed the limiting value of full stroke time specified in Attachment 607.4.004-2, THEN it shall ble immediately retested or declared inoperable, at the direction of the US.

1.

IF the valve is declared inoperable, THEN the requirements of Technical Specification 3 4C and Procedure LS-AA-120 shall be followed.

2.

IF ttie valve is retested AND it fails to stroke exceeds the limiting THEN it shall be immediately declared inoperable AND the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be followed.

value of full stroke time,

3.

IF the valve is retested AND again fails to stroke within its acceptable range K

T does not exceed the limiting value of full stroke

tirne, THEN the data shall be analyzed within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> to verify that the new stroke time represents acceptable operation, AND the requirements of Procedure LS-AA-120 shall be followed.

47.0

OYSTER CREEK GENERATING 1

STATION F'ROCEDURE

AmerGen, An txelon (minany Title Containment Spray and Emergency Service 'Water System I Pump Operability and Comprehensive / Preservice / Post-M ai n tenance I nse rvice Test

~

~

Number 607.4.004 Revision No.

62 N0TE:If such verification is not performed within the 96 hour0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> limit, the valve shall be declared inoperable aind the requirements of Technical Specification 3.4C and Procedure LS-AA-120 shall be met.

4.

IF the valve is retested AND strokes within its acceptable range, THEN the cause of the initial deviation shall be analyzed and the results documented AND the requirements of Procedure LS-AA-120 shall be followed.

7.2.4.3 E

excessive flow is observed from V-3-698, AND operating ESW Pump flow is 131 00 gpm THEN the ESW system is operable and the keepfill line is not required to be isolated.

If the following criterion is not met, check the calibration of the affected Containment Spray Heat Exchanger Pressure gauges. If calibration checks are satisfactory, schedule the affected heat exchanger(s) for tube side cleaning as soon as practical.

7.3.1 The Containment Spray Heat Exchanger total AP 520 psid.

If any alert threshold is exceeded, or if the following criteria are any other deviation from proper operation is noted, initiate a CAP in accordance with Procedure LS-AA-120 (unless i3 CAP was issued previously):

7.4.1 7.4.2 7.4.3 met, or if Corner Room cooling fans start on appropriate signals.

All Heat Exchanger tube to shell AP's are 1 5 psid.

There is no leakage from Heat Exchanger Thermal Relief valves V-3-82, V-3-83, V-21-21 and V-21-22.

48.0

OYSTER CREEK GENERATING STATION PROCEDURE AmerGen A n ixelun rorripdn)

~

~-

Revision No.

62

~

Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice I Post-Maintenance lnservice

-~ Test

~

-~ -~

.~

Number 607.4.004 8.0 ATTACHMENT 8.1 607.4.004-1, ESW Pump Vibration Locations 8.2 607.4.004-2, Cont. Spray Pump Vibration Locations 8.3 607.4.004-3, Test Equipment 8.4 607.4.004-4, IST Pump Summary Sheet and IST Valve Summary Sheets 8.5 607.4.004-5, Cont. Spray and ESW Initial Instrumentation Valving.

8.6 607.4.004-6, Cont. Spray and ESW Final Instrumentation Valving 8.7 607.4.004-7, Heat Exchanger Differential Pressure Verification.

8.8 607.4.004-8, IST Valves 8.9 607.4.004-9, P rese rv ice/Base I in e/Com p re h e n sive Test I n st ru m en ts 49.0

OYSTER CREfiK GENERATING I\\UII Iuel merven I

An t d n n C o v p d n b 1

STATION PROCEDURE 1

607.4.004 Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice

~~

Test

~

~-

ATTACH MEN T 607.4.004-1 Revision No.

62 ESW PUMP VIBRATION LOCATIONS Note: Accelerometer probe locations are the same for all (4) ESW Pumps.

1A 1H (probe faces north-south)

(probe faces east-west)

E l -1

merven OYSTER CREEK GENERATING I\\UI I luel 1

STATION PROCEDURE 1

607.4.004 An txeloti Cornpany Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice

._ - - ~

Test ~

~-

~-~

~~

Revision No.

62 ATTACHMENT 607.4.004-2 CONT. SPRAY PUMP AND MOTCIR VIBRATION LOCATIONS NOTE: HORIZONTAL POINTS MAY BE TAKEN FROM EITHER SIDE OF THE BEARING HOUSING E2-1

OYSl EH C R t k K tiENtHAllNG STATION PROCEDURE Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Presiervice / Post-Maintenance lnservice Test

-~

ATTACH MEN T 607.4.004-3 TEST EQUIFMENT I\\ UI 1 Iuel 607.4.004 Revision No.

62 Preferred Controlled / Calibrated Test Equipment 6/2008 I

1a-2120 CSI Model 21 20 Vibration Instrument Wilcoxon AE793 Transducer CSI Model A0760GP Transducer CSI Model A0220HF Transducer

-Wilcoxon Model Wilcoxon

-~

Model

_~

793R

~

Transducer 1

2A-AE793 3A-aO760GT I -

~...-

I I-

- - 6/2008

- I -

t ----

t-I.

Engineering Alternates - Complete as Necessary Evaluation by:

Date:

meruen OYSTER CREE:.K GENERA rlNG IVUlllUt;I An t x e oil Conpar y 1

STATION PROCEDURE I

607.4.004 I

52A (6.24.1.2) 528 (6.44.1.2)

Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-

~

~

~.

Maintenance

-~

lnservice

-- Test

-~

2994 3058 3034 3099 Revision No.

62 ATTACHMENT 607.4.004-4 IST PUMP

SUMMARY

SHEET Date of Test CONTAINMENT SPRAY FLOW Pump (Step) 51 A (6.1 4.2 or 6.14.6.2 (4) 51 B (6.35.2 or 6.35.6.2 (4)

Comprehensive Lower Limit Action Alert 3800 1

3948 Comprehensive Pump (Step)

I Action 1 Alert Measured Flow (GPM)

,4100 41 00 ESW Fj-OW PPC Measured Flow (G PM) 3050 Comprehensive Action N/A 4326

_I 4326 I

Comprehensive Alert 1

Action N/A I

3316 N/A 1

3360 E4-1

cunerven Ar Lxelor orrip~r y OYSTER CHEt:K GENERAIING STATION P ROCEDU RE I\\IUIIIUt?I 607.4.004 Revision No.

62 i

Overall Reading, in/sec Measured -

Action

.624 0.22 I

3H I

.26 51 A (6.19.

I 3 v I 0.21 I

.24

.576 I

4H I 0.18 I

.205

,492

,492

.306 I

3H I 0.18 1

51 B (6.1 9.1)

.223

.534

.438 I

3 v I 0.15 I

.183 I

4H I 0.14

.183

.438 I

4 v I 0.14 I

.19

.456 1

4A I

0.26 I

.1

.24

_I__-

52A (6.20.1)

.224

,538

. 1 84

,440 1

2t-i I

0.20 I

.220

.529 52B (6.40.1) 0.24

.308 I 70 1H I

1A I 0.11 I

.158

,378 I

2H I

0.21

.295

.70 E4--2

lunerven An lxelon Corr~wir y Title Containment Spray and Emergency Service Water System I Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice

- Test

~

~

ATTACHMENT 607.4.004-4 (con ti t i ued)

IST VALVE

SUMMARY

SHEET I\\UI I Iuel OYsrtR CREEK

~ ~ E N E H A I I N ~ ~

STATION PROCEDURE 1 Revision No.

I 62 PARAMETER (STEP)

Pump 51 A Flow (6.14.2) 4100 GPM Water Flowing from V-3-698 (6.16.7) (Initial One) little or no excessive Pump 51 B Shaft Rotation (6.1 1.8) -yesJno X

23 E;

Pump 52A Flow PPC (6.26) 3050 GPM 9?

Point ESW-12 J.

Pump 525 Shaft Rotation (6.13.4) - y e s X n o Pump 515 Flow (6.35.2) 4100 GPM Pump 51A Shaft Rotation (6.32.8) - y e s X n o Pump 52B Flow PPC Point ESW-12 (6.46) 3200 GPM Pump 52A Shaft Rotation (6.34.4) - y e s X n o Acce p t a n ce C rite ria Little or INo No Shaft Rotation No Shaft Rotation

> 4000GPM No Shaft Rotation

> 3100 GPM No Shaft Rotation COMPONENT / POSITION TESTED / TESTED V-21-8 Closed V-21-10 Open V-3-133 Closed V-21-8 Closed V-3-67 Closed V-3-68 Open V-3-67 Closed V-21-10 Closed V-21-8 Open V-21-10 Closed V-3-68 Closed V-3-67 Open V-3-68 Closed E4-3

merven I

I, -F An Lxeloii rurnpany I

l STEP lvullluel 607.4.004 OYSTER CREE:.K tiENERATlNti STATION PROCEDURE I 6.4.4.1 Containment Spray and Emergency Service Water System Pump Operability and Comprehensive / Preservice / Post-Maintenance lnservice Test

~

6.4.5.1 62 I 6.4.6.1

~ 6.4.9.1 I

6.5.1 1

6.5.1

_~

VALVE V-21-17

~~

V-21-18 V-21-18

~_

v-21-11 v-21-11 V-21-17 IST VALVE STROKE TIME

SUMMARY

~

DIRECTION CLOSE

_~

OPEN CLOSE OPEN CLOSE OPEN

~

ACTU A I-TIME (sec)

~~

30.1 37.8 40.0 65.2 69.7

-~

37.4

-~

ACCEPT RANGE

-~

(sea MIN. 26.4 seconds MAX: 35.6 seconds MIN: 33.1 seconds

~ MAX: 44.7 seconds MIN: 32.2 seconds MAX: 43.5 seconds MIN: 57.6 seconds MAX: 77.9 seconds MIN: 57.0 seconds MAX: 77.0 seconds MIN: 26.9 seconds MAX. 36.3 seconds

~

~~

~~

~

-~

~

~~

LI M IT1 N G VALUE (sec)

_ ('I 38.7 seconds 48.6 seconds 47.3 seconds 84.7 seconds 83.7 seconds 39.5 seconds

(') Values are maximum, unless otherwise specified.

Comments:

Persons Performing Test:

Date

Appendix C 7

I Job Performance Measure Form ES-C-1 WORKSHEET Facility:

Oyster Creek.

Tiask NO.: -

Job Performance Measure No.:

NRC JPM ADMIN

. SR04 (SRO)

WA

Reference:

-~

Generic

~

2.3.41SRO

-. 3.1)-

Facility Evaluator: _.__

Method of Testing:

Simulated Performance Examiner:

Alctual Performance

__. X..

_~~~ - -.

Plant Classroom X

Simulator

- ~ -

Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant was at rated power when a severe earthquake occurred.
2. Chemistry has confirmed fuel failures.
3. Many plant systems have either failed to automatically isolate or are currently leaking from breaks or incomplete system isolations.
4. An emergency has been declared by the Shift Manager but no emergency operating facilities have been activatled.
5. The RP Manager has forwarded 3 Authorization for Emergency Exposure forms to you for your approval. Personal information on the volunteers to perform the 3 different jobs is also provided.

Task Standard: Determines that only the Authorization for Emergency Exposure form for Chris Cat should be authorized, and that the others should not be authorized.

Required Materials: Completed Authorizaticln for Emergency Exposure Forms.

NRC JPM ADMIN SR04 Page 1 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General

References:

1. EP-AA-113, Personnel Protective Actions, revision 8
2. EP-AA-113-F-02, Authorization For EImergency Exposure, revision 6 Initiating Cue: Review for authorization the 3 Authorization For Emergency Exposure forms provided to you from the RP Manager. If not approved, state why.

Time Critical Task: No.

Validation Time:

9 minutes NRC JPM ADMIN SR04 Page 2 of 8

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance lriformation Denote criticaI steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

Standard:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidates the completed Authorization for Emergency Exposure forms.

Comment:

_._ _ _ _ ~

~

~

~~

~~

~

- ~~_

~

~

~~

~-

SAT/UNSAT Note: The determinations may be made in any order.

J Performance Step: 2 Procedure Step: 3.2, 3.3 Determines that authorization should not be provided to Alan Able (JOB A) since it will only result in a dose of 4 Rem (1/2 hour x 8 Rem/hr).

Standard:

Comment:

SATNNSAT NRC JPM ADMIN SR04 Page 3 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 3

~

Procedure Step: 4.3.3 Determines that authorization should not be provided to Bob Blake (JOB B) since he already has had an emergency exposure of >25 Rem before.

Standard:

Determines that authorization should not be provided to Bob Blake (JOB 8) since he already has had an emergency exposure of >25 Rem before.

Comment:

J Performance Step: 4 Procedure Step: Determines that authorization should be authorized for Chris Cat. He has had no prior emergency exposure > 25 Rem, and his expected exposure is > 5 Rem (416 x 20 = 13.3 Rem)

Standard:

Determines that authorization should be authorized for Chris Cat.

He has had no prior emergency exposure > 25 Rem, and his expected exposure is > 5 Rein (4/6 x 20 = 13.3 Rem)

SAT/UNSAT JPM Stop Time:

NRC JPM ADMIN SR04 Page 4 of 8

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM ADMIN SR04

~ _ - _ - ~-

JPM Number:

Examinee's Name:

Examiner's Name:

~ -___

Date Performed:

~

Facility Evaluator:

~-

~-

~

Number of Attempts:

~

Time to Complete:

~

-~ -

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's Signature and Date:

NRC JPM ADMIN SR04 Page 5 of 8

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Simulator Setup

1. None.

NRC JPM ADMIN SR04 Page 6 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant was at rated power when a severe earthquake occurred.
2. Chemistry has confirmed fuel failure:;.
3. Many plant systems have either failed to automatically isolate or are currently leaking from breaks or incomplete system isolations.
4. An emergency has been declared by the Shift Manager but no emergency operating facilities have been activated.
5. The RP Manager has forwarded 3 Authorization for Emergency Exposure forms to you for your approval. Personal information on the volunteers to perform the 3 different jobs is also provided.

Task Cue:

Authorize or NOT authorize the 3 Authorization For Emergency Exposure forms provided to you from the RP Manager. If not approved, state why.

NRC JPM ADMIN SR04 Page 7 of 8

j Appendix C A

Job Performance Measure Form ES-C-1 WORKSHEET MSlVs to secure the steam leak into the Turbine Building.

DOSE RATE: 8 R/hour.

Personal information on the volunteers to perform the 3 different jobs.

I

~ PURPOSE: To enter the Trunion Room to manually close the JOB DURATION: 30 minutes

~

- - ~- --

~

~

-~

Volunteer:

Alan Able Age:

44 Prior Lifetime No I

Employee 001 11 1 ID:

Emergency Exposure?

I 1775 mrem

, Dose:

JOB B Volunteer:

Employee ID:

Current Dose:

PURPOSE: To rescue an unconscious worker in the Drywell.

DOSE RATE: 32 R/hour.

JOB DURATION: 50 minutes Bob Blake Age:

47 Prior Lifetime Yes 00222 Emergency Exposure?

27 Rem 1050 mrem JOB C

_~ __

Volunteer:

Employee ID:

Current Dose:

PURPOSE: To close the RWCIJ isolation valve to stop flooding in the Reactor Building.

DOSE RATE: 20 R/hour.

JOB DURATION: 40 minutes Chris Cat Age: 40 Prior Lifetime No 00333 Emergency Exposure?

1350 mrem NRC JPM ADMIN SR04 Page 8 of 8

Exeian EP-AA-113-F-02 Revision B Page 1 of 1 Nuclcar AUTHORIZATION FOR EMERGENCY EXPOSURE Datle / Time:

Today Now

-~

Name:

Alan Able Employee ID Number:

_ _ ~ _

001 11

~

Current Annual Exposure:

1775

- mrem

~_.___.___

-~ __ - - -

~

Reason for Request

JOB A: To enter the Trunion Room to manually

-~ close the

-- - MSlVs

- to secure the

~

steam leak -

~-

~-

REQUESTING AUTHORIZATION TO EXCEED:

5 REM TEDE (Authorized to receive greater than 5 Rem TEDE but less than 10 Rem TEDE) a 10 REM TEDE (Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE) a 25 REM TEDE (Authorized to receive greater than 25 Rem)

  • Emergency Worker Signature

..... loday/xow

~-

Date /Time

  • Emergency Worker Exposure Limits and Associated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are understood.

John Redia Rad. Protection Management (Review)

~

~

~- -__

lodaJ/gow Date / Time

~

Station Emergency Director (Authorization)

Date / Time Authorize? Yes / No If NO, why not:

Exelan, Nuciear AUTHORIZATION FOR EMERGENCY EXPOSURE EP-AA-113-F-02 Revision 6 Page 1 of 1 Date / Time:

Today Now Current Annual Exposure:

1050 -- mrem Employee ID Number:

~~ 00222-

- ____ -~

Name:

Bob Blake

~-

~

Reason for Request

JOB _-

B: To rescue an unconscious worker in - the Drywell.-

REQUESTING AUTHORIZATION TO EXCEED:

5 REM TEDE (Authorized to receive greater than 5 Rem TEDE but less than 10 Rem TEDE) 10 REM TEDE (Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE) 25 REM TEDE (Authorized to receive greater than 25 Rem)

  • Emergency Worker Signature
  • Emergency Worker Exposure Limits and Associated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are understood.

Date / Time jofin Keda Rad. Protection Management (Review)

~

Iod2/Now Date / Time Station Emergency Director (Authorization)

Authorize? Yes / No If NO, why not:

Date / Time

- ~ _ _ _ _ _ _ ~

~

~-

Your Name:

Exelan I

Nudear AUTHORIZATION FOR EMErRGENCY EXPOSURE Name:

Chris Cat

_~

Date II Time:

Today

_. ~ -

EP-AA-113-F-02 Revision 6 Page 1 of 1 Now Employee ID Number:

00333

~

_ _ Curirent Annual Exposure:

1350 -

- __ mrem

Reason for Request

JOB C: To close the RWCU isolation

~ valve to stolpfloodD in the Reactor

___ Building.

REQUESTING AUTHORIZATION TO EXCEED:

a 5REMTEDE a 10REMTEDE a 25REMTEDE (Authorized to receive greater than 5 Rem TEDE but less than 10 Rem TEDE)

(Authorized to receive greater than 10 Rem TEDE but less than 25 Rem TEDE)

(Authorized to receive greater than 25 Rem)

  • Emergency Worker Signature
  • Emergency Worker Exposure Limits and Associ'ated Risks (EP-AA-113 Attachment 1) have been reviewed and the potential health affects are! understood.

Date / Time John Reds Rad. Protection Management (Review)

~

~

_ _.~

Station Emergency Director (Authorization)

T*/%OW Date / Time

- -~

Date /Time Authorize? Yes / No If NO, why not:

- ~-

~

~

I T

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Determine Emergency C1,assification and Protective Action Recommendations

_ ~ _ _ _

_ _ _ ~ _

~ __________

Task

Title:

Job Performance Measure No.:

NRC JPlVl ADMIN SR05 (SR0)-

WA

Reference:

Generic

~ 2.4.29 (SRO

- - 4.0)

Method of Testing:

X Simulated Performance

- Actual Performance

~-

Classroom X

~

Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant was at rated power when an autornatic scram occurred 45 minutes ago. The following conditions currently exist:

0 e

e e

0 e

e e

e 0

e All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 O F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem NRC JPM ADMlN SR05 Page 1 of 8

\\

AppendixC Job Performance Measure Form ES-C-1 WORKSHIEET Task Standard: The emergency has been classified and the PARS have been determined.

Required Materials: None.

General

References:

1. EP-AA-1010, Radiological Emergency Plan Annez for Oyster Creek Station, revision 0.
2. EP-AA-111, Emergency Classification and Protective Action Recommendations, revision 13.
3. EP-AA-111 -F-10, Oyster Creek Plant Based PAR Flowchart, revision A.

Initiating Cue: Classify the emergency event (include the EAL designation). State the reason for this classification.

Time Critical Task: Yes.

Validation Time:

12 minutes Part 1 10 minutes Part 2 NRC JPM ADMIN SR05 Page 2 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET

-~

Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

Standard:

Comment:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Handout first page of STUDENT HANDOUT.

J Performance Step: 2 Procedure Step: Clas d d

ifies t,le emergency as a General Emergency (FG1).

Classifies the emergency as a General Emergency (FG1). This classification is made within I 5 minutes from the JPM Start Time.

Reasons: Loss of Fuel Clad barrier (RPV water level < -20); Loss of Reactor Coolant barrier (qPV water level < 0 ) ; and Potential Loss of Primary Containment barrier (CHRRMS =r 121 0 R/hr less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after shutdown)

~

_. ~.

Standard:

Note:

Comment:

Record time that the first page of the STUDENT HANOUT is received from each Candidafle.

NRC JPM ADMIN SR05 Page 3 of 8

a Appendix C Job Performanice Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

The plant was at rated power when an (automatic scram occurred 45 minutes ago. The following conditions currently exist:

e e

e e

e e

e e

e e

e All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60" with Corle Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 "F Main Stack RAGEMS indicates 4.1 vCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 1 15 mRem Additional Initial Conditions:

Environmental conditions show that the wind is from 50" at 20 mph There are no travel impediments There are no Sea Breezes Task Cue: THIS IS A TIME CRITICAL JPM Determine the Protective Action Recomrnendations (PARS).

Protective Action Recommendations:

Name:

Time:

(NRC Only)

NRC JPM ADMIN SR05 Page 8 of 8

.I

, AppendixC Job Performanlce Measure WORKSHEET Form ES-C-1 Facility:

.~

Ojster

___ __ Creek Task NO.:

. 2000301401

~~

Task

Title:

Comglete the Technical Specifications Log Sheet

. ~ _ _ _ _ _ _ _ _ _

Job Performance Measure No.:

NRC JPM ADMIN R01 (RO) ~-

K/A

Reference:

Generic 2.1.I 8 (RO

____ 2.9J

~~

.~.

Examiner:

~

Examinee:

Method of Testing:

X Actual Performance

~

~

Simulated Performance

~ _ _

Classroom

-... Simulator

~

X

~

Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

1. The plant is rated power.
2. You are the on-shift Reactor Operator on the 4-12 shift.
3. The current datehime is April 20, 2008 at 1700.

Task Standard: Page El-1 of the Technicad Specifications Log Sheet is correctly completed and the discrepancies are noted. No remarks are made of in-specification readings.

Required Materials: A completed page El-1 (for the 11 -7 and 7-3 shifts) of Procedure 681.4.004, Technical Specification Log Sheet.

General

References:

1. Procedure 681.4.004, Technical Specifications Log Sheet, revision 12.

NRC JPM ADMIN R01 Page 1 of 11

. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: Complete page E l -1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.

Time Critical Task: No.

Validation Time:

10 Minutes.

NRC JPM ADMIN R01 Page 2 of 11

. AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Denote critical steps with a check mark 4 Note 1 : The values may be recorded in any order.

Note 2: The discrepancies noted while cornpleting the log may be reported at the time of discovery or some other time during the JPM.

Note 3: Hand the Candidate the partially completed procedure.

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

~-

Standard:

JPM Start Time:

Comment:

SAT/UNSAT

~~

~~

~_

Performance Step: 2 Procedure Step: Records position of AOG valve V-7-31.

Records position of valve AOG V-7-31 as closed on Panel 1 OXF Standard:

SAT/UNSAT NRC JPM ADMIN R01 Page 3 of 11

. AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 3 Procedure Step: Records Torus water level from the following instruments:

LT-37 LT-38 Narrow Range on Panel 9XR Records Torus water level irom the following instruments as on the KEY:

LT-37 (Indicator on Panel 1 F/2F)

LT-38 (Indicator on Panel 1 F/2F)

Narrow Range Recorder on Panel 9XR Standard:

Comment:

SAT/U NSAT Performance Step: 4 Standard:

Procedure Step: Records Torus water temperature from the following indicators:

DIV I DIV II Records Torus water temp'erature from the following indicators as on the KEY: (Indicator on F'anel 1 F/2F)

DIV I DIV II SAT/UNSAT NRC JPM ADMlN R 0 1 Page 4 of 11

- AppendixC Job Performance Measure WORKSI-IEET Form ES-C-1 Performance Step: 5 Standard:

Procedure Step: Records Isolation Condenser area temperatures from the following instruments:

0 IB06A 0

IB06B IB06C IB06D Records Isolation Condenser area temperatures from the following instruments as on the KEY: (Panel 10R)

IB06A 0

IB06B IBO6C 0

IB06D

~-

Comment:

~~-

SAT/UNSAT Performance Step: 6 Procedure Step: Records Isolation Condenser levels from the following instruments:

IG06A IG06B Records Isolation Condenser levels from the following instruments as on the KEY: (Indicator on Panel 1 F/2F)

IG06A IG06B Standard:

~ -...

~

~.

Comment:

SAT/U N SAT NRC JPM ADMlN R01 Page 5 of 11

. AppendixC Job Performance Measure Form ES-C-1 WORKS+iEET

-~

J Performance Step: 7

~

~

Procedure Step: Record Nii.rogen Makeup and calculate nitrogen use for the shift and for the day.

Records Nitrogen Makeup i3nd calculates nitrogen use for the shift, as on the KEY.

Standard:

Calculates and records nitrogen use for the day by subtracting the previous day 3-1 1 integrator reading from the current 3-1 1 integrator reading, as on the KEY.

Recognizes/reports that the daily nitrogen use is > 250 units.

Comment:

Performance Step: 8 Standard:

Procedure Step: Record RIB 1 19 radiation levels from:

Radiation monitor B-9 Radiation monitor C-9 Radiation monitor B-9 Radiation monitor C-9 as on the key.

Records RB 11 9 radiation levels from:

Comment:

SATNNSAT NRC JPM ADMIN R01 Page 6 of 11

. AppendixC Job Performance Measure WORKSI-iEET Form ES-C-1 Performance Step: 9 Procedure Step: Record RE! Vent Radiation Monitor levels:

Radiation monitor Channel 1 Radiation monitor Channel 2 Standard:

Procedure Step: Records RB Vent Radiation Monitor levels:

Radiation monitor Channel 2, as on the KEY.

Radiation monitor Channel 1 SAT/UNSAT Performance Step: 10 Procedure Step: Record the Shutdown Cooling Room lowest temperature.

Records the Shutdown Cooling Room lowest temperature, as on the KEY. (Panel 10R)

Standard:

NRC JPM ADMIN R01 Page 7 of 11

. AppendixC Job Performarice Measure Form ES-C-1 WORKS H EET Performance Step: 11 Procedure Step: Calculate IFuel Pool Slab AT Calculates Fuel Pool Slab AT by subtracting the Shutdown Cooling Room temperature from the Fuel Pool temperature, as on the key.

- ~-

Standard:

Performance Step: 12 Procedure Step: Record the previous day lowest Torus water level, todays highest Torus water level, and the differential.

Records the previous day lowest Torus water level, todays highest Torus water level, and the differential, as on the KEY.

Reports the differential level is greater than allowed (actual is 5 0.2 allowed).

J Standard:

Cue:

Comment:

The previous days lowest Torus water level from Panel 9XR is 150.0.

JPM Stop Time:

NRC JPM ADMIN R01 Page 8 of 11

. AppendixC Job Performance Measure WORKS t i E ET Form ES-C-1 Validation of Completion NRC JPM ADMIN F301 JPM Number:

Examinees ~

~

~

e Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Result:

Satisfactory/U n sat isfactory Examiners Signature and Date:

NRC JPM ADMIN R01 Page 9 of 11

... Appendix C Job Performanlce Measure Form ES-C-1 WORKSHEET Simulator. Setur,

1. Reset to full power IC-65
2. Insert the following:
a. SWI-RMS050A to 1.1 (RB 119 B9 rad)
b. SWI-RMS063A to 1.1 (RN 119 rad C9)
e. SWI-RMS066A to 1.O (RB vent rad mon)
d. SWI-RMS067A to 1.O (RB veirlt rad mon)
3. Have ready a 681.4.004 Attachment 1, completed for the 11 -7 and 7-3 shifts (see Completed 681.4.004)

NRC JPM ADMIN R 0 1 Page 10 of 11

I AppendixC Job Performarce Measure Form ES-C-1 WORKS 1-1 E ET STUDENT H.ANDOUT Initial Conditions:

1. The plant is rated power.
2. You are the on-shift Reactor Operator on the 4-12 shift
3. The current date/tirne is April 20, 2008 at 1700.

Task Cue:

Complete page El-1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Speciftication Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.

NRC JPM ADMIN R01 Page 11 of 11

AmerGen,.

1 OYSTER CREEK GENERATING Number An Exelon Company STATION PROCEDURE I 681.4.004 DATE Title Technical Specification Log Sheet Todav Revision No.

I 12 SHIFT 11-7 7-3 3-11 TECHNICAL SPECIIzICATION LOG SHEET SUB STATION TouP**

AOG TORUS V-7-31 LEVEL (9XR)

Normal TEMP Closed LT-37 LT-38 NARROW 1144

Divl DivII-Limit Closed 152 152 150.2

< I 53" 82 82

<95"F (1)

For Limit Attachment m

m*

Closed 152 152 150.3 See 82 82 Closed 152 152 150.4 312.9-7 82 82 SHIFT 11-7 7-3 3-11 R.B. El. 1 l ! Y RB Vent Rad (Meters)

SD Hx RIM Fuel Pool Previous current Differential 6-9 C-9 CHI CH2 Temp Lalw Slab AT Day's Day's Level in the 1.0 1.0 var50 1.0 1.0 Var9 69 27 Torus Torus mRlHr Level Level 1.0 1.0 Max 100 1.0 1.0 69 27 9XR MWHr 1.0 1.0 InRlHr 1.0 1.0 69 27 150.0 150.4 0.4 VIOLATED Lowest Highest Torus Limit < 50"++

mRlHr 9XR Limit 1.2" Area Tei 11-7 I

I 7-3

[ 75

[ 74 t - + j - r 3-1 1 iolation Condenser QS (10R Temp ~65°F

- Action 6 I

Units Limit Differ.

Units 0816489 I

I Daily: (3-1 1) - (prev. 3-1 I) 270 VIOLATED Elev. 119' EDG Comments:

Fuel Pool Fuel Oil Tank SHIFT Temp Lvl.

1 NOTE: Red readings indicate values to place on the LOQ Sheet provided to the Limit 7-3 1 96 1 5125" F

14950 Limit

- >I 4K Gal.

Candidate in IC-65.

Makeup z 250 units

  • )

Calculated in accordance with Procedure 312.9 which also contains notification requirements.

Calculated in accordance with Procedure 312.11 Conducted in accordance with 681.4.005. NA when generator is off line.

Maximum 3°F difference between various Torus temperature indications.

If both DWEDT pumps are inoperable, use 3.0 gpm for identified leakage and subtract from the 1-8 value

  • rr mr

+

ID.-AA..-

- 4 9 a\\ 16 niiicnr....-..ir\\ _--

,.......,hill

..-+...

in\\

?

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility:

Oyster Creek "ask No.:

20001 01404 Task

Title:

Perform a Manual Core tieat-Balance Calculation Job Performance Measure No.:

_NRC JP'M-ADMLN-RO2 (RQ WA

Reference:

-Generic 2.1.201_RO

-~

- 4.3)

Facility Evaluator:

C:) a te :

Method of Testing:

X Simulated Performance

-~ Actual Performance

-~

Classroom X

Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the taslk successfully, the objective for this job performance measure will be satisfied.

1. The reactor has been steady at full power for several hours.
2. The PPC is currently unavailable.
3. All prerequisites to perform this procedure have been met.
4. Calculating RWCU system differential temperature is not required.
5. The following indications are provided:
a. APRMs indicate 100% power
b. RPV water level instrument NR GEMAC indicates 161"
c. Local total Feedwater AP from the venturi transmitter (FT-422-1) indicates 492.5 inches of water
d. Core AP indicates 16.5 psid
e. Reactor pressure (NR recorder Panel 5F/6F) indicates 1020 psig
f. Feedwater temperature (recorder Panel 5F/5F) indicates 31 1 "F
g. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr
h. Total recirculation flow (recorder Panel 3F) indicates 15 x 1 O4 gpm
i. RWCU flow (recorder Panel 3F) indicates 400 gpm

~~

~

NRC JPM ADMIN R02 Page 1 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Standard: A manual core heat balancle has been completed IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.

Required Materials: Calculator.

General

References:

1. Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation -

Power Range, revision 27.

Initiating Cue: Calculate core thermal power (CTP) IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.

Time Critical Task: No.

Validation Time:

19 minutes NRC JPM ADMIN R 0 2 Page 2 of 16

Appendix C Job Performance Measure WORKSHEET Form ES-C-1

~

-~

~

Perform an ce I ti f o rmat io n Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeal Standard:

Provides repeat back of initiating the repeat back.

Comment:

back of initiating cue JPM Start Time:

cue. Evaluator acknowledges

_ _ _ _ ~

SAT/UNSAT Performance Step: 2 Procedure Step: Reviews Precautions and Limitations.

Standard:

Reviews Precautions and Limitations.

Note: The expected values are provided in the KEY.

NRC JPM ADMIN R 0 2 Page 3 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKS t-il E ET Performance Information J

Performance Step: 3

~

Procedure Step: 5.1.1.1 Records local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room.

Standard:

Directs EO to read local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room, and records on the Feedwater Flow Calculation Worksheet, Line A.

Cue:

Comment:

As the EO, report reading on the venture transmitter (FT-422-1) in the Feedwater Pump Room as 492.5 inches.

J Performance Step: 4 Procedure Step: 5.1.1.2 Record Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree.

Standard:

Reads Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree and records on the Feedwater Flow Calculation Worksheet, Line B.

Comment:

NRC JPM ADMlN R02 Page 4 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance lrilformation J

Performance Step: 5 Procedure Step: 5.1.1.3 Obtain the specific volume (v) at the Feedwater at 1100 psia and the temperature recorded in Step 5.1.1.2 from Attachment 1001 3 or ASME approved steam tables.

Standard:

Obtain the specific volume (v) at the Feedwater at 1 100 psia and the temperature recorded in Step 5.1.1.2 from Attachment 1001.6-3 or ASME approved steam tables, and records on the Feedwater Flow Calculation Worksheet, Line C.

Comment:

~

~

~

~-

__ _ _ ~ _

J Performance Step: 6 Procedure Step: 5.1.1.4 Calculates total Feedwater flow using the following equation:

F = 0.0429387 SQRT (AP/v)I Standard:

Calculates total Feedwater flow using the following equation:

F = 0.0429387 SQRT (AP/v) and records on the Feedwater Flow Calculation Worksheet, Line D.

Comment:

~-

SATNNSAT NRC JPM ADMIN R 0 2 Page 5 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 7 Procedure Step: 5.2.1 Record reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F)

Standard:

Reads reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line A.

Comment:

~~-

~

~

~

-~

~

SAT/U NSAT J

Performance Step: 8 Procedure Step: 5.2.2 Record Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F)

Standard:

Reads Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F) or transfers the Feedwater temperature obtained earlier, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line B.

Comment:

SATNNSAT NRC JPM ADMIN R02 Page 6 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 9 Procedure Step: 5.2.3 Record recirculation flow to the nearest thousand gpm (Recorder Panel 3F).

Standard:

Reads recirculation flow to the nearest thousand gpm (Recorder Panel 3F), and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line C.

Comment:

J Performance Step: 10 Procedure Step: 5.2.4 Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds prt, assure.

Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line D.

%mdard:

Comment:

~~

_ _ _ ~ ~ -

~

S AT/U N SAT NRC JPM ADMIN R 0 2 Page 7 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSt-IEET Performance Information J

Performance Step: 11 Procedure Step: 5.2.5 Record Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure.

Standard:

Reads Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure in step 5.2.4 and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line E Comment:

~,

SATAJNSAT J

Performance Step: 12 Procedure Step: 5.2.6 Record the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature.

~

~~

Standard:

Reads the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature in step 5.2.2, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line F.

Comment:

~

~

SATNNSAT NRC JPM ADMlN R 0 2 Page 8 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information

~~

~

J Performance Step: 13 Procedure Step: 5.2.7 Calculate the difference of the Main Steam and Feedwater enthalpies.

~

Standard:

Calculates the difference of Ihe Main Steam and Feedwater enthalpies by subtracting Feedwater enthalpy in step 5.2.6 from Main Steam enthalpy in step 5.2.5, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line G.

Comment:

~

J Performance Step: 14 Procedure Step: 5.2.8 Record total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet.

Standard:

Copies total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet, Line D, onto the Heat Balance Data, Calculation, and Analysis Worksheet, Line H.

Comment:

~-

NRC JPM ADMIN R02 Page 9 of 16

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J

Performance Step: 15 Procedure Step: 5.2.9 Calculate the product of the Feedwater flow and the enthalpy difference to obtain MBTU/hr.

Standard:

Calculates the product of the Feedwater'flow in step 5.2.8 and the enthalpy difference in step 5.2.7 to obtain MBTU/hr, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line I.

Comment:

~

~

~~

J Performance Step: 16 Procedure Step: 5.2.1 0 Convert MBTU/hr to Megawatts (MBTU/hr x 0.293).

Standard:

Converts MBTU/hr to Megawatts by multiplying MBTU/hr in step 5.2.9 by 0.293, records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line J.

Comment:

NRC JPM ADMIN R 0 2 Page 10 of 16

Appendix C Job Performance Measure WORKSHEET Form ES-C-1

-~

~

P e rf o r m a n ce I 11 form at i o n J

Performance Step: 17 Standard:

Comment:

SAT/UNSAT Procedure Step: 5.2.1 1 Record RWCU flow to the nlearest gpm (recorder Panel 3F) on Line K of Attachment 1001.6-2.

Reads RWCU flow to the nearest gpm (recorder Panel 3F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line K.

~

~

~-

~

J Performance Step: 18 Procedure Step: 5.2.1 2 Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), per the following equation.

Enter the appropriate value for Fixed Losses on Line L of 001.6-2.

Fixed Losses = [(K) x 0.01 361 + 9.0 Standard:

Calculates the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed Losses), per the following equation, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line L.

Fixed Losses = [(Line K) x 0.01361 + 9.0 Comment:

~

~

-~

_ _ ~

~

~

~

~~

NRC JPM ADMIN R02 Page 11 of 16

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 P e rf o r ma n ce I ri f o r m a t io n J

Performance Step: 19 Procedure Step: 5.2.1 3 Add the Fixed Losses from L.ine L to the Megawatts from Line J and record the Calculated C'TP on Line N.

Standard:

Adds the Fixed Losses from step 5.2.12 to the Megawatts from step 5.2.10 and record the Calculated CTP on Line N on the Heat Balance Data, Calculation, and Analysis Worksheet.

Comment:

-~

Performance Step: 20 Procedure Step: 5.2.14 Record PPC Core Thermal Power (CTP) in Line M.

Standard:

This step is NA since the PPC is unavailable.

Comment:

NRC JPM ADMIN R 0 2 Page 12 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance lriiformation Performance Step: 21 Procedure Step: 5.2.1 5 Subtract the Calculated CTP from the PPC Core Thermal Power

[Line M - Line N]. If this value is positive, the comparison is considered conservative. If negative, the comparison is non-conservative. Place an X in the appropriate box.

Standard:

Comment:

This step is NA since the PPC is unavailable.

~ - -

~-

~

- -~ - ~

_ _ _ ~

_ - ~. -

JPM Stop Time:

NRC JPM ADMIN R02 Page 13 of 16

Appendix C Job Performancle Measure Form ES-C-1 WORKSHEET JPM Number:

Validation of Completion NRC JPM ADMIN R 0 2

~-

Examinees Name:

~-

~

Examiners Name:

- _ _ -~~

~

Date Performed:

__ ~ _ _ _ - -~ -

~

Facility Evaluator:

~~

- ~

Number of Attempts:

~ - -

Time to Complete:

Question:

-~

~

Response

Result:

Satisfactory/Unsatisfactory Examiners Signature and Date:

... -~

._ --~-

NRC JPM ADMIN R02 Page 14 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Si m u lat o r $et u p

1. None.

NRC JPM ADMIN R 0 2 Page 15 of 16

Appendix C Job Performance Measure Form ES-C-1 WORKSHIEET STUDENT H[\\NDOUT Initial Conditions:

1. The reactor has been steady at full power for several hours.
2. The PPC is currently unavailable.
3. All prerequisites to perform this procedure have been met.
4. Calculating RWCU system differential temperature is not required.
5. The following indications are provided:
a. APRMs indicate 100% power
b. RPV water level instrument NR GEMAC indicates 161
c. Local total Feedwater AP from.the venturi transmitter (FT-422-1) indicates 492.5 inches of water
d. Core AP indicates 16.5 psid
e. Reactor pressure (NR recorder Panel 5F/6F) indicates 1020 psig
f. Feedwater temperature (recorder Panel 5F/5F) indicates 31 1 F
g. Total steam flow (recorder Panel 5F/6F) indicates 7.1 Mlb/hr
h. Total recirculation flow (recorder Panel 3F) indicates 15 x 1 O4 gpm
i. RWCU flow (recorder Panel 3F) indicates 400 gpm Task Cue:

Calculate core thermal power (CTP) IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Flange.

NRC JPM ADMIN R 0 2 Page 16 of 16

ATTACHMENT 1001.6-1 FEEDWATER FLOW CALCULATION WORKSHEET Preparer:

Date:

Time:

Prerequisites met:

A B

C D

Comments:

5.1.1.1 DP From Total Flow Venturi Transmitter (FT-422-1)

Local Transmitter DP Reading 492.5 in H20 5.1.1.2 Feedwater Temperature (ID 101)

Panel 5F/6F Recorder 31 I deg F 5.1.1.3 Specific Volume at 1 100 psia and (B) 001.6-3 or ASME Steam Tables 0.01748 ft3/lbm 5.1.1.4 TOTAL FEEDWATER FLOW FT = 0.0429387 x SQRT[(A) / (C)]

7.207 Mlbm/hr i B & &

2: J" Loop F;ow-caicii;afion E

5.1.2.1 Feedwater Pump Room Nozzle DP Gauges (RV45)

F 5.1.2.2 Average Nozzle DP G

5.1.2.3 Loop Temperature: Recorder 13R-005 H

5.1.2.4 I

5.1.2.5 Nozzle Discharge Coefficient x Conversion Factor J

5.1.2.5 Loop Specific Volume at 1400 psia: 001.6-4 or ASME Steam Tables Loop Flow:

= (I) x SQRT[(F) / (H)]

K 5.1.2.6 TOTAL FEEDWATER FLOW A Loop 5 Loop c Loop 1 -

D =

A =

B =

E =

C =

F =

in H20 in H20 deg F ft3/lbm Pos 15 =

Pos 16 =

Pos 17 =

0.02252 0.02291 0.02269 FA =

Fg =

Fc =

Mlbmlhr FT = FA + FB + Fc Mlbm/hr

ATTAC NT 1001.6-2 HEAT BALANCE DATA, CALCULATION, AND ANALYSIS WORKSHEET A

6 C

Revi 27 5.2.1 Reactor Pressure (ID-45)

Panel 5Fl6F Narrow Range Recorder 1020 5.2.2 Feedwater Temperature (ID 101)

Panel 5Fl6F Recorder 31 1 5.2.3 Recirculation Flow Panel 3F Recorder 15 D

E 5.2.4 Reactor Absolute Pressure (A) + 14.7 1034.7 5.2.5 Main Steam Enthalpy (hMs) 001.6-5 or ASME Steam Tables 1191.61 F

G 282.91 908.7 5.2.6 Feedwater Enthalpy (hFW) 001.6-6 or ASME Steam Tables 5.2.7 Enthalpy Difference (bus - hFw)

(E) - (F)

H I

J K 1 5.2.11 I RWCU Flow 5.2.8 Total Feedwater Flow 001.6-1, (0) or (K) 7.207 5.2.9 (H) x (GI 6549.00 191 8,853 Feedwater Flow x Enthalpy Difference I

5.2.10 Conversion to M W T ~

0.293X/I)

Panel 3F Recorder N

400 5.2.13 Calculated Core Thermal Power (J) + (L) 1933.297 L I 5.2.12 I 0

Fixed Losses 5.2.15 Negative Value -+

Non-Conservative

~

~~

[(K) x 0.01361 + 9.0 14.44 M 1 5.2.14 I PPC Core Thermal Power (CTP)

PPC CTP 15 Minute Average I

I I

I Positive Value -+

U Conservative Core Thermal Power Comparison I Date:

I Time:

deg F io4 gpm psia BTU/I bm BTUII bm BTU/lbm Mlbrnlhr MBTU/hr

1 AppendixC Job Performance Measure Form ES-C-1 WORKSHEET 21 501 01 023 Facility:

Oyster Creek-Task No.:

Perform APRM Drawer Clount Task

Title:

Job Performance Measure No.:

NRC

~ JPlVl ADMIN

--- R03

- (RO)

K/A

Reference:

~~-

Generic

~

2.2.12 (RO 3.0) - -.

Examinee:

-_ ~- E.x am in e r :

~

Facility Evaluator:

Date:

Method of Testing:

X Simulated Performance

~-

Actual Performance Classroom - ___-

Simulator

_- -~

X Plant

~

Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

1. The plant is at rated power.

Task Standard: Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8 is complete and LPRM 44-25D does not iindicate bypassed.

Required Materials: A completed attachment 403-2, with no APRMs bypassed, and LPRMs36-17B, 28-09D and 44-25D shown as bypassed.

General Ref e rences:

1. Procedure 202.1, Power Operation, revision 109.
2. Procedure 403, LPRM-APRM System Operations, revision 13.

Initiating Cue: Perform Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8. Notify the Unit Supervisor of your results.

Time Critical Task: No.

Validation Time:

13 minutes NRC JPM ADMlN R03 Page 1 of 11

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Denote critical steps with a check mark J

~~~~

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

Standard:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate Section 2 of Attachment 202.1-1 and Attachment 403-2.

Comment:

SATNNSAT

~-

Performance Step: 2 Procedure Step: 1 of Attachment 202.1 -1.

Place an X in the box next to the LPRMs that are Bypassed.

Places an X in the box next to LPRMs36-176, 28-09D, and 44-25D in the APRM 8 colurrin.

Standard:

NRC JPM ADMIN R03 Page 2 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 2 of Attachment 202.1 -1.

Place the number of un-bypassed inputs in the last row.

Standard:

Comment:

Places the number of un-bypassed inputs (5) in the last row for APRM 8, marked UN-BYPASSED.

Performance Step: 4 Procedure Step: 5.3.3.8.1 of Procedure 403.

Obtains permission from the US for LPRM input to APRM drawer count.

Standard:

Obtains permission from the US for LPRM input to APRM drawer count.

CUE:

The candidate may or may riot ask permission since he was directed to perform the task. If the candidate does ask, state that they have permission to perform the APRM drawer count.

Comment:

NRC JPM ADMIN R03 Page 3 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Perform an ce Information J

Performance Step: 5 Standard:

Comment:

Procedure Step: 5.3.3.8.2 of Procedure 403.

Bypass the APRM channel if allowed by Attachment 403-2.

Verifies that Attachment 403-2 allows bypass of APRM 8. Places the APRM BYPASS joystick to the CH 8 position (critical step).

Verifies APRM 8 HI-HI, HIGH, and DN SCL OR INOP lights ON.

SAT/UNSAT J

Performance Step: 6 Procedure Step: 5.3.3.8.3 of Procedure 403.

Rotate drawer INPUT switch clockwise to COUNT.

Standard:

Rotates APRM 8 drawer INPUT switch clockwise to COUNT.

Note/Cue:

Based upon the initial draweir indication, the count indication should display 50 when placed in count, but will show 60 (ie, only 2 LPRMs are bypassed). The candidate may mention this result now and may stop the test. Acknowledge the report and direct the candidate to continue the test.

Comment:

SAT/U N SAT NRC JPM ADMlN R 0 3 Page 4 of 11

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 7 Procedure Step: 5.3.3.8.3.a of Procedure 403.

Continue to rotate input switch clockwise to read LPRM values input to the APRM drawer.

Standard:

Continues to rotate APRM 8 drawer input switch clockwise to position 8, position 7, etc., up to position 1 to read LPRM values input to the APRM drawer.

Note/Cue:

Positions 1 and 6 will indicate 0 due to being bypassed from the APRM. Position 7 should show 0, but will indicate a reading similar to the other LPRMs not bypassed. All other positions will show the LPRM reading input (not 0). The candidate may mention this result now and may stop the test. Acknowledge the report and direct the candidate to continue the test.

Comment:

SAT/U NSAT J

Performance Step: 8

~~

Procedure Step: 5.3.3.8.3.b of Procedure 403.

Rotate input switch clockwise until AVERAGE is selected.

Standard:

Comment:

Rotates APRM 8 drawer input switch clockwise until AVERAGE is selected.

NRC JPM ADMIN R03 Page 5 of 11

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J

Performance Step: 9 Procedure Step: 5.3.3.8.3.c of Procedure 403.

Un-bypass the APRM channel if the APRM channel was bypassed.

Standard:

Un-bypass APRM 8 by placing the ARPM BYPASS joystick to the mid-position (critical step). Verifies APRM 8 HI-HI, HIGH, and DN SCL OR INOP lights OFF.

Comment:

~~

Performance Step: 10 Procedure Step: 5.3.3.8.4 of Procedure 403

~

. -.~

Repeat 5.3.3.8(2) through 5.3.3.8(3c) for other APRMS as required.

Cue:

No other APRMS testing is required.

Standard:

Comment:

Determines no other APRMs, will be tested..

NRC JPM ADMlN R03 Page 6 of 11

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: 5.3.3.8.5 of Procedure 403.

Verify all drawers INPUT switches in AVERAGE.

Verifies all drawers INPUT switches in AVERAGE.

Standard:

Comment:

SAT/UNSAT

~

-~ ~

J Performance Step: 12 Procedure Step: 4 of Attachiment 202.1 -1.

Verify number of inputs correct.

Standard:

Verifies number of inputs carrect. The candidate should state, if not done already, that the nlJmber of inputs (6) does not match the expected number of inputs (5).

Cue:

Comment:

Acknowledge the report.

NRC JPM ADMIN R03 Page 7 of 11

I AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 13

~~

Procedure Step: 5 of Attachment 202.1 -1.

Verify bypassed LPRM inputs are correct.

Standard:

Verifies bypassed LPRM inputs are correct. The candidate should state, if not done already, that LPRM 44-25D is does not show bypassed.

Cue:

Acknowledge the report.

Comment:

JPM Stop Time:

NRC JPM ADMIN R03 Page 8 of 11

1 Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM ADMON R03 JPM Number:

~

Examinees Name:

Examiners Name:

~

Date Performed:

~

Facility Evaluator:

Number of Attempts:

~~

Time to Complete:

Question:

~- _ _ _

.~

~-

Result:

Satisfactory/U nsatisfactory Examiners Signature and Date:

NRC JPM ADMIN R03 Page 9 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator 3etuD

1. Reset to full power IC-65.
2. Bypass LPRM 36-1 7B from APRM el (red knob and silver toggle).
3. BypassLPRM 28-09D from APRM I (red knob and silver toggle).
4. Insert the following:
a. SW I-NISI 53T to ON; This will light the BYPASS white light for LPRM 44-25D on APRM 8 drawer (DONT NEED red)
b. SWI-NIS153CR to OFF; This will stick the bypass switch for LPRM 44-25D to the un-bypassed position. (Not required)
c. IND-NIS020B to ON; This will place LPRM 44-25D amber light to ON on Panel 4F.
5. Have a blank copy of just attachment 202.1 -1 Section 1 and 2 (pages E l -

1 and E l -2), with APRMs 1-7 N/Ad.

6. Have a copy of 403 Section 5.3, completed and NA as appropriate up to the COUNT section: section 5.3.3.6.
7. Have a completed attachment 403-2 with the LPRMs marked.
8. Close APRM drawers.

NRC JPM ADMIN R03 Page 10 of 11

I 1.

Appendix C Job Performancle Measure Form ES-C-1 WORKSHEET STUDENT HqrNDOUT Initial Conditions:

1. The plant is at rated power.

Task Cue:

Perform Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8.

Notify the Unit Supervisor of your results.

NRC JPM ADMlN R 0 3 Page 11 of 11

t Appendix C Instrument Job Performance Measure Form ES-C-1 WORKSHIEET Facility:

Oyster Creek-Task NO.:

2000501 433 Task

Title:

Determine RPV Water Level Instrument

~

Availability_-

Job Performance Measure No.:

- NRC._

JPM ADMIN

~_ R04

- (ROl WA

Reference:

Generic

-~

2.4.21 (RO

-~ 3.7)

Examiner:

Examinee:

Facility Evaluator:

Method of Testing:

Date:

X Si m u lat ed Perform an ce

.~ Actual Performance Class room

- X Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The Plant was at rated power when a LCCA occurred in the Primary Containment.
2. The Primary Containment Control EOP has been entered.
3. RPV pressure is 200 psig and stable.
4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical riun temperatures, along with the current water level indications:

~

YARWAYB RPV Water Level Reading 89 91 130 84 83

~

Te rrg-Instrument NO.

-~

TE-103-450 TE-103-451 TE-103-452 TE-103-453

-~

~~

Point 340 42 360 43 405 I

TE-103-454

~

44

~

375 NRC JPM ADMIN R04 Page 1 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Standard: IAW the reference provided:, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.

Required Materials: None.

General

References:

1. EMG-SP28, Level Instrumentation Availability, revision 0.

Initiating Cue: IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each R I V water level instrument is available for RPV water level indication or is not available.

Time Critical Task: No.

Validation Time:

7 minutes NRC JPM ADMIN R 0 4 Page 2 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

~

~_

~

JPM Start Time:

Standard:

Comment:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

- -~

_ ~ - -~ _ _

J Performance Step: 2 Procedure Step: 3.4 Verify that the instrument reference leg temperatures are in the SAFE REGION of the RPV Saturation Temperature Curve.

Standard:

Compares the provided reference leg temperatures for all level instruments at the given RPV pressure against the RPV Saturation Temperature curve. Determines that YARWAY A is not in the SAFE REGION and thus is not available for RPV water level instrumentation.

Comment:

~

~

-~

_ _ ~ -

NRC JPM ADMlN R 0 4 Page 3 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 3 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.

Standard:

Compares the NR GEMAC Pi and NR GEMAC 6 indicated water levels at the given reference leg temperatures on the GEMAC NARROW RANGE curve. Determines that NR GEMAC A is not in the Safe Region and thus is not available for RPV water level instrumentation.

Determines that NR GEMAC. B is in the Safe Region and thus is available for RPV water level instrumentation.

Comment:

J Performance Step: 4 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.

Standard:

Compares the YARWAY 6 iirldicated water level at the given reference leg temperatures on the YARWAY curve. Determines that YARWAY 6 is not in the Safe Region and thus is not available for RPV water level instrumentation.

Comment:

NRC JPM ADMIN R04 Page 4 of 8

D '

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information

~

J Performance Step: 5 Procedure Step: 3.5

~

~~

For each instrument below, the instrument reads in the Safe Region of its respective curve.

Standard:

Compares the WR GEMAC rndicated water level at the given reference leg temperatures on the GEMAC Wide Range curve.

Determines that WR GEMAC is not in the Safe Region and thus is not available for RPV water level instrumentation.

Comment:

JPM Stop Time:

NRC JPM ADMIN R04 Page 5 of 8

Y Appendix C Job Performance Measure WORKSHIEET Form ES-C-1 Va I id at i o n of Co m p le t io n JPM Number:

NRC JPM ADMIN R 0 4 Examinees Name:

~

~~~~

Exam in e rs N am e :

-~

~ ~-

Date Performed:

~

Facility Evaluator.

~

_ ~-

Number of Attempts:

~_

~~

Time to Complete:

~_~

Question:

Response

Result:

Satisfactory/U nsatisfactory Examiners Signature and Date:

~~

NRC JPM ADMIN R04 Page 6 of 8

V Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator ?;etuD

1. None.
2. Have a blank copy of Support Procedure 28, EMG-SP28, Level I n s t r u rn en tat ion Availability ready.

NRC JPM ADMlN R 0 4 Page 7 of 8

Appendix C Level Readinq

-- Instrument No.

TE-103-450 89 91 130 84 -

-TE-103-453 83

~- -

TE-103-451 TE-103-452

-~

I TE-103-454 1 - - --

Job Performarice Measure WORKSHEET

-~ Point 1

F 1

I -

- - - 1 41 -

- 335

--I 1

~~- -

340 40

~

I 42 1

360 43

~

405

~

44 375 1

I - - -

-~

Form ES-C-1 STUDENT tjANDOUT Initial Conditions:

1. The Plant was at rated power when a LOCA occurred in the Primary Containment.
2. The Primary Containment Control EfOP has been entered.
3. RPV pressure is 200 psig and stable.
4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:

Level Instrument 1

1 i

- -1

- ~ _ _

~- - - -

NRCEMACA NR GEMAC B i I -

1 WRGEMAC 1

YARWAYA I

I YARWAYB I

Task Cue:

IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each RPV water level instrument is available for RPV water level indication or is not available.

Available? Yes/No NRC JPM ADMIN R04 Page 8 of 8