ML081330656

From kanterella
Jump to navigation Jump to search
Draft, Section B Operating Exam (Folder 2)
ML081330656
Person / Time
Site: Oyster Creek
Issue date: 02/29/2008
From: Ludlam G
AmerGen Energy Co
To: Caruso J
Operations Branch I
Hansell S
Shared Package
ML072851077 List:
References
U01688 05000219/2008-301
Download: ML081330656 (130)


Text

{{#Wiki_filter:1 AppendixC Job Performancle Measure Form ES-C-1 WORKSWEET Facility: Oyster Creek- - Task No.: 20201 -~ _ _ 01 403 .~ - - _ _ Task

Title:

~ Starta Reactor Recirculation Pump at Power ~ ~ _ _ Job Performance Measure No.: NRC ~.. JPM SlMl (RO/SRO) WA

Reference:

_ ~ _ _ 202001 ~ . - A4.01 _ _ (RO/SRO 3.7/3.7) Method of Testing: Simulated Performance Actual Performance X Classroom -.~ Simulator - x Plant -~. ~ Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. The plant at about 85% power.
2. Reactor Recirculation Pump A spuriously tripped 30 minutes ago and is in an idle configuration, with its controller in manual.
3. Section 8.0 of Procedure 301.2, Reactor Recirculation System, has been completed up to and including Step 8.3.5.
4. Another Licensed Operator is available to control the MASTER RECIRC SPEED CONTROLLER.
5. An EO has been briefed on the evolution, has a copy of the procedure and is in the Recirculation MG Set Room with a radio.
6. The appropriate margins to rated core thermal power and core thermal limits have been established.

Task Standard: Reactor Recirculation Pump A has been started IAW Procedure 301.2 and is being controlled in AUTO. Required Materials: None. ~ ~- NRC JPM SlMl Page 1 of 19

c AppendixC Job Performance Measure Form ES-C-1 WORKS J-{I E ET General

References:

1. Procedure 301.2, Reactor Recircula1:ion System, revision 55.

Initiating Cue: Starting at Step 8.3.6 of Procedure 301.2, Reactor Recirculation System, complete the normal startup of Retactor Recirculation Pump A. Time Critical Task: No. Validation Time: 29 minutes NRC JPM SIM1 Page 2 of 19

I AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance lr>tformation Denote critical steps with a check mark Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. ~- ~ JPM Start Time: Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Comment: ~- -~ Performance Step: 2 Procedure Step: Verifies Prerequisites and reviews Precautions and Limitations. Standard: Comment: Verifies Prerequisites and reviews Precautions and Limitations. NRC JPM SlMl Page 3 of 19

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Ir-iformation Performance Step: 3 Procedure Step, 8.3.6 Verify that the CCW FLOW 'LO alarm at Panel 3F for the respective Pump A IS clear. Verifies that the CCW FLOW LO alarm at Panel 3F for Recirculation Pump A is clear. Standard: ~~ Comment: ~~ -~ ~~ ~ ~ ~ -~ ~ ~ Performance Step: 4 Procedure Step: 8.3.7 Lineup the recirculation loop valves for the pump being started as follows:

1. Open the pump disclqarge bypass valve.
2. Open the pump suclion valve.
3. Close the pump discharge valve Standard:

Confirms the following Valve positions for Reactor Recirculation Pump A:

1. DlSCH BYPASS V-37-11 is open (red light ON, green light OFF) 2 PUMP SUCTION V-37-9 is open (red light ON, green light OFF).
3. DISCHARGE V-37-IO is closed (red light OFF, green light ON).

Comment: -.~~ ~ ~ ~~ ~ ~ ~ ~~ ~~. SAT/UNSAT NRC JPM SIMl Page 4 of 19

AppendixC Job Performancie Measure W 0 R KS t-il E ET Form ES-C-1 Performance Ir-iformation Performance Step: 5 Procedure Step: 8.3.8.1 Standard: (h-fm-ent: Place the MG set in the manual mode Verifies the MG Set is in manual (MAN selected) on Recirculation Pump A MG SET SPEED CONTROLLER. -~ ~ ~ Standard: Performance Step: 6 Procedure Step: 8.3.8.2 Verify the STRT/NORM pushbutton is selected to NORM. Verifies the STRT/NORM pushbutton is selected to NORM (NORM selected) on Recirculation Pump A MG SET SPEED CONTROLLER. Comment: NRC JPM SIM1 Page 5 of 19

I AppendixC Job Performance Measure Form ES-C-1 WORKSHEET -~ ~ Perform an ce 11-1 for mat ion J Performance Step: 7 Procedure Step: 8.3.8.3 Withdraw the scoop tube to the full speed (100%) position by rotating the manual adjustment knob in the clockwise direction until the V bar display indicates 100% position. Standard: Withdraw the scoop tube to the full speed (1 00%) position by rotating the manual adjustment knob in the clockwise direction until the V bar display indicates 100% position on Recirculation Pump A MG SET SPEED CONTROLLER. Cue: Comment: State the scoop tube indicates 100%. It may show slightly less. ~- ~ Performance Step: 8 Procedure Step: 8.3.9 ~- Locally verify the scoop tube position at 100% position Standard: Directs the EO to locally verify the scoop tube for Recirculation Pump A MG Set is at the 100% position. Cue: Report that the scoop tube for Recirculation Pump A MG Set is at the 100% position and is operating normally. ~ SAT/UNSAT NRC JPM SIMl Page 6 of 19

Job Performance Measure Form ES-C-1 WORKSt-I EET Performance Information Performance Step: 9 Procedure Step: 8.3.1 0 Verify that the associated 4 160V bus voltage for the MG Set to be started is greater than 41 00 volts. ~ Standard: Comment: Verifies that 41 60 Bus 1 A indicates greater than 41 00 volts. ~ ~ ~ ~ ~~ SAT/U NSAT J Performance Step: 10 -~ ~~ Procedure Step: 8.3.1 1 Start the MG Set by placinci the pump DRIVE MOTOR control switch in the START position and then release the switch. Standard: Start the MG Set by placing the Recirculation Pump A MG Set DRIVE MOTOR control switch in the START position and then release the switch (red light: ON, green light OFF; MG SET MOTOR AMPS rises, then falls). Cue: If asked as the EO, report i i good start on the MG Set A motor. SATAJNSAT NRC JPM SlMl Page 7 of 19

Appendix C Job Performance Measure Form ES-C-1 WORKS t-1 E ET Perforrnance Information Performance Step: 11 Cue: If the Candidate asks if this is an expedited or normal startup, report that this is a normal startup. Procedure Step: 8.3.1 2.2 If a normal MG Set start is planned, then operate the MG Set with the scoop tube at the 100°/c position until the low temperature alarm associated with that MG Set clears from recorder IA 55. Standard: A normal MG Set start is planned. Operate the MG Set A with the scoop tube at the 100% position until the low temperature alarm associated with that MG Set clears from recorder IA 55. Confirms the low temperature alarm on IA 55 is clear. Cue: Comment: State that the low temperature alarm for MG Set A on recorder IA 55 is clear. NRC JPM SIMI Page 8 of 19

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Perform an ce I n f o rm a t io n Cue: Standard: Performance Step: 12 Procedure Step: 8.3.1 2.3 Acknowledge temperature recorder IA 55 alarm as follows:

1. Open key panel cover
2. press FUNC key
3. Press softkey associated with Alarm ACK option to release alarm indication and output relay
4. Close key panel cover.

Report that the temperature recorder IA55 is acknowledged (the soft key function does not work). Acknowledges temperature recorder IA 55 alarm as follows:

1. Opens key panel co'ver
2. presses FUNC key
3. Presses softkey associated with Alarm ACK option to release alarm indication and output relay
4. Closes key panel cover.

Booth: Insert STL-RFCOOG to ON 110 activate the WARM light, if it is not already on. ~ S AT/U N SAT Performance Step: 13 Procedure Step: 8.3.12.4 Verify the warm light illuminates. ~~~ Standard: Confirms the MG Set A WARM light illuminates. NRC JPM SIM1 Page 9 of 19

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET P e rfo r man ce I n f o r ma t io n Performance Step: 14 Procedure Step: 8.3.1 3 Verify reactor power is c 1833 MWth. ~ ~- _ _ Standard: Comment: Verifies reactor power is < 1833 MWth. Performance Step: 15 Procedure Step: 8.3.14 ~- ~~ Confirm that the highest AFRM is at least 6% below the APRM rod block line for the existkg recirculation flow (as indicated on Panel 3F) using the Power Operation Curve. Standard: Confirms that the highest APRM IS at least 6% below the APRM rod block line for the existing recirculation flow (as indicated on Panel 3F) using the Power Operation Curve on the PPC. Comment: ~ ~~ SAT/U NSAT NRC JPM SIM1 Page 10 of 19

AppendixC Job Performance Measure Form ES-C-1 WORKS ti EET Perform an ce Information Note: Step 8.3.1 5 (establish appropriate margins) was provided as part of the initial conditions. J Performance Step: 16 ~ ~- ~ Procedure Step: 8.3.16 Start the recirculation pump sequence by pressing the STRT/NORM pushbutton arid, as directed by the US, place and hold the DRIVE MOTOR cointrol switch to START. Cue: When asked to use the MG Set A DRIVE MOTOR switch for the startup, direct use of the MG Set A DRIVE MOTOR switch. Standard: Starts the recirculation pump sequence by pressing the MG Set A STRT/NORM pushbutton arid places and holds the MG Set A DRIVE MOTOR control switch to START. Comment: S AT/U N SAT NRC JPM SIM1 Page 11 of 19

Form ES-C-1 3 Appendix C Job Performance Measure WORKSHEET ~ P e rf o r m a n ce Information ~~ Performance Step: 17 Procedure Step: 8.3.1 7 ~~ ~ ~ -~ Verify the field breaker clos13s and the pump start sequence is activated as the scoop tube passes through the 40%-30% range. the field breaker closes and the pump start sequence is ctivated as the scoop tube passes through the 40%-30% range (rise in GENERATOR AMPS and KILOVOLTS and MG SET MOTOR AMPS for MG Set A). The field breaker closes at slightly < 30%. If the Candidate notices this, tell the Candidate to continue. Comment: ~ ~ S AT/U N SAT Performance Step: 18 Procedure Step: 8.3.18.1 When the pump has completed its start sequence and the initial surges of generator current, voltage, and frequency and pump DRIVE MOTOR current have settled, then release the DRIVE MOTOR control switch after generator amps have stabilized. Standard: When the pump has completed its start sequence and the initial surges of generator current, voltage, and frequency and pump DRIVE MOTOR current have settled, then releases the DRIVE MOTOR control switch after generator amps have stabilized. Comment: NRC JPM SIMl Page 12 of 19

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Perform an ce I i i f o rma t io n J Performance Step: 19 ~~ Procedure Step: 8.3.1 8.2 Depress the STRT/NORM pushbutton to reactivate the manual adjustment knob. Standard: Depresses the STRTINORM pushbutton on the A MG SET SPEED CONTROLLER (NORM selected) to reactivate the manual adjustment knob. Comment: Performance Step: 20 Procedure Step: 8.3.1 8.3 Monitor pump speed by depressing the DlSP pushbutton until the P is reached. Standard: Monitors pump speed by depressing the CHNG DlSP pushbutton on the A MG SET SPEED CONTROLLER the until the P is reached (P is selected). Comment: SAT/UNSAT NRC JPM SIM1 Page 13 of 19

Form ES-C-1 . '.. Appendix C Job Performance Measure WORKSHEET Performance lriformation J Performance Step: 21 ~~ Procedure Step: 8.3.18.4 Adjust the speed of the purip which is being placed into service to match the differential pressure of the pumps in order to prevent reverse flow. Standard: Rotates the manual adjustment clockwise to raise the Recirculation Pump A speed to match the Recirculation Pump A PUMP AP to the PUMP AP of the other running pumps. SAT/UNSAT Note: Steps 22 - 24 are performed concurrently. -~ J Performance Step: 22 -~ Procedure Step: 8.3.19.1 Open the pump discharge valve. Standard: Opens the Recirculation Pump A discharge valve by placing the DISCHARGE V-37-10 to the OPEN position (red light ON, green light OFF). Comment: NRC JPM SIM1 Page 14 of 19

Form ES-C-1 b I. Appendix C Job Performance Measure WORKSI-IEET Performance Information J Performance Step: 23 Procedure Step: 8.3.1 9.2 Adjust the speed of the pump which is being placed in the service to maintain its differential pressure equal to the differential pressure of the operating pumps. The candidate should discuss raising Recirculation Pump A speed while you, as the second operator, will lower speed on the other running pumps to maintain total recirculation flow constant. See step 8.3 19.3. Rotates the Recirculation Pump A manual adjustment knob clockwise to raise pump speed to maintain its PUMP AP equal to the PUMP AP of the opera:ing pumps. Second Operator: Standard: Comment. ~ ~ _~._ ~ J Performance Step: 24 Procedure Step: 8.3.1 9.4 When the speed for the pump being placed into service is equal to the speed of the other operating pumps (S and P displays are approximately equal), then places its individual MG SET SPEED CONTROLLER in automatic. When the speed of Recirculation Pump A (P display on the A MG SET SPEED CONTROLLER), is equal to the other pumps speed, (as displayed by the S display on the A MG SET SPEED CONTROLLER), places the A MG SET SPEED CONTROLLER in automatic by pressing the AUTO/MAN pushbutton (AUTO is selected). Standard: Comment: NRC JPM SIM1 Page 15 of 19

I, Appendix C Job Performance Measure Form ES-C-1 WORKS 1-i E ET Performance information Performance Step: 24 Procedure Step: 8.3.20 Maintain MG Set Oil Cooler outlet temperature 120 OF - 135 O F as indicated by local instrumentation in MG Set Room. Standard: Directs the EO to maintain MG Set Oil Cooler outlet temperature 120 OF - 135 O F as indicated by local instrumentation. Cue: Acknowledge the request. Comment: ~ ~~ ~~ ~~ ~._ SAT/UNSAT Terminating Cue: Reactor Recirculation Pump A has been started IAW Procedure 301.2 and is being controlled iri AUTO. JPM Stop Time: NRC JPM SIMl Page 16 of 19

L Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number: NRC ~ JPM SlMl- ~ ~- Examinees Name: ~~ ~ Examiners Name: ~-~ ~ ~ Date Performed. ~ -~ ~ ~ ~ Facility Evaluator: ~ Number of Attempts: ~ ~~ ~ Time to Complete: Question: ~~ ~ ~ ~ ~ ~ ~ Result: Examiners Signature and Date: ~ Sat i sf ac t o ry/U n sat i s f a c t o r y NRC JPM SIM1 Page 17 of 19

=. Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Sim u lator: Set up

1. Reset to a 4-loop IC, or reset to full power IC-65 and perform the following:
a.
b.

Close the discharge valve C.

d.
e.
f.
2. Have a copy of the procedure with.the Precautions & Limitations section, and Section 8 completed up to and including step 8.3.5.
3. This JPM requires an instructor to act as a licensed operator on the floor to manipulate the master recirc controller.

Trip the A recirc pump Place the controller in manu'iil Ensure recirc pump temperature monitoring is NOT selected to the A recirc pump Place power at about 85% power snap to IC-0 for future use in the day NRC JPM SIM1 Page 18 of 19

Form ES-C-1

  • -., Appendix C Job Performarce Measure WORKSIiEET

~~~ STUDENT I-IANDOUT Initial Conditions:

1.
2.
3.
4.
5.
6.

The plant at about 85% power. Reactor Recirculation Pump A spuriously tripped 30 minutes ago and is in an idle configuration, with its controller in manual. Section 8.0 of Procedure 301.2, Reactor Recirculation System, has been completed up to and including Step 8.3.5. Another Licensed Operator is available to control the MASTER RECIRC SPEED CONTROLLER. An EO has been briefed on the evolution, has a copy of the procedure and is in the Recirculation MG Set Room with a radio. The appropriate margins to rated core thermal power and core thermal limits have been established. Task Cue: Starting at Step 8.3.6 of Procedure 30'1.2, Reactor Recirculation System, complete the normal startup of Reactor Recirculation Pump A. NRC JPM SlMl Page 19 of 19

AppendixC Job Performance Measure Form ES-C-1 WORKS t-IEET Facility: Oyster Creek-Task No.: 2090201 003 Perform Core Spray Surveillance with faulted Core Spray Task

Title:

Pump - (Alternate --. Path) -~ - _ _ _ - _ ~ - - Job Performance Measure No.: _ N R C JJWSLM2 (RO/SRO] WA

Reference:

20900 - A4.01 (RO/SRO ~ 3.8/3.6) Examinee: 1: xa m in e r : Facility Evaluator: - Date: Method of Testing: Simulated Performance Actual Performance ~ ~ X Class room Simulator X Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. The plant is at rated power.
2. Core Spray Pump Operability Test, 61 0.4.002, is in progress and is complete up to and including Step 6.4.
3. The testing is a normal surveillance for pumps NZOlA and NZ03A only.
4. An Equipment Operator has been briefed on the evolution, and is standing-by with the procedure and a radio on RB !51.

Task Standard: The Core Spray Booster Pump is manually tripped after the Core Spray Pump trips. Required Materials: None. General

References:

1. Procedure 61 0.4.002, Core Spray Pump Operability Test, revision 48 Initiating Cue: Continue with surveillance lest 61 0.4.002, Core Spray Pump Operability Test, beginning at Step 6.5.

NRC JPM SIM2 Page 1 of 10

a AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No. Validation Time: 9 minutes NRC JPM SIM2 Page 2 of 10

r AppendixC Job Performarce Measure Form ES-C-1 WORKSIHEET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. ~~ JPM Start Time: Standard: Comment: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Performance Step: 2 Procedure Step: Reviews Precautions and Limitations. Stan da rd : Comment: Reviews P recau t io n s and 1.-i m it at ions. - ~ - ~~ -~ SAT/UNSAT NRC JPM SIM2 Page 3 of 10

I AppendixC I Job Performance Measure Form ES-C-1 WORKS t--I EET Performance Information J Performance Step: 3 Procedure Step: 6.5 Start Core Spray MAIN PUMP (control switch on 1 F/2F) for Core Spray Main Pump NZOI A. Standard: Places Core Spray MAIN PtJMP NZOl A control switch to START (red light ON, green light OFF, MAIN PUMPS AMPS NZOlA rises, PUMP DISCH PRESS MAII'dS rises). S AT/U N SAT Performance Step: 4 Procedure Step: 6.5.1 Record Core Spray PUMP DISCH PRESS - MAINS PIT-RV03A (1 F/2F) > 150 psig. Standard: Comment: Record Core Spray PUMP DISCH PRESS - MAINS PIT-RV03A (1 F/2F) > 150 psig. SAT/U NSAT NRC JPM SIM2 Page 4 of 10

Appendix C Job Performarice Measure WORKSHEET Form ES-C-1 Performance Information ~~ J Performance Step: 5 Procedure Step: 6.6 If Core Spray PUMP DISCH PRESS - MAINS PIT-RV03A is > 100 psig, then start a Core Spray Booster Pump from the control switch on 1 F/ZF. ~ Standard: Verifies PUMP DISCH PRESS - MAINS PIT-RV03A is > 100 psig, then starts Core Spray Booster Pump NZ03A by placing BOOSTER PUMP NZ03A control switch to START (red light ON, green light OFF, PUMP DISCH PRESS - BOOSTERS rises). Comment: Performance Step: 6 Procedure Step: 6.6.1 Verify alarm SYSTEM 1 LOW PERMISSIVE (B2e) annunciates (if reactor press c 300 psig). Standard: Comment: Recognizes reactor pressure is > 300 psig and that SYSTEM 1 LOW PERMISSIVE (B2e) will not annunciate. S AT/U N SAT NRC JPM SIM2 Page 5 of 10

Appendix C I Job Performance Measure Form ES-C-1 W 0 R KS t i E ET Performance Information J -~~ - Standard: Booth Cue: Note: Comment: Performance Step: 7 Procedure Step: 6.7 Open V-20-27 and establish Core Spray flow by taking the keylock switch to OPEN (51 NW). Directs the EO over the radio to open V-20-27 and establish Core Spray flow by taking the keylock switch to OPEN. (Red light ON, gtreen light OFF) On the pump trip, verifies MAIN PUMP NZOlA red light OFF, green light ON, MAIN PUMPS AMPS NZOlA at 0. Acknowledge the report. Insert Remote LOA-CSSO16 from 0% to 1 00%. When Core Spray System I flow exceeds 4000 GPM, Core Spray Main Pump NZOlA will trip. Annunciator B4e will alarm. The candidate may refer to the alarm response B4e. SATNNSAT NRC JPM SIM2 Page 6 of 10

a Appendix C Job Performarllce Measure Form ES-C-1 WORKSHEET ~ Performance Information J Performance Step: 8 - -~ Procedure Step: Trips Core Spray Booster Pump NZ03A. Standard: Trips Core Spray Booster Pump NZ03A by placing CORE SPRAY 1 BOOSTER PUMP NZ03A control switch to STOP (red light OFF; green light ON; PUMP DISCH PRESS BOOSTERS falls to 0). Comment: SAT/UNSAT Terminating Cue: The Core Spray Booster Pump is manually tripped after the Core Spray Pump trips. JPM Stop Time: NRC JPM SIM2 Page 7 of 10

Appendix C I Job Performance Measure W ORKSt.1 E ET Form ES-C-1 Validation of Completion NRC JPM SIM2 ~~ ~ ~~ JPM Number: Examinees Name: ~ ~- ~- - ~ - ~ Exam in e r s Name : Date Performed: Facility Evaluator: Number of Attempts: Time to Complete: Question: ~- ~~ ~ ~ -~ Result: Satisfactory/Unsatisfactory Examiners Signature and Date: NRC JPM SIM2 Page 8 of 10

I Appendix C Job Performance Measure Form ES-C-1 WORKS H E ET Simulatyr SetuD

1. Reset to full power IC (IC-65) or similar
2. Insert Remote LOA-CSS017 to FALSE
a. This will rack-in the breaker for Core Spray System I Test Valve, V-20-27
3. Insert the following:
a. Conditional Trigger pp-fitrv26a-1 v.gt.4000 on Trigger 1
b. Malfunction MAL-CSS002a on Trigger 1
i. These two items will trip Core Spray Main NZOlA when Core Spray System I flow exceeds 4000 GPM
4. Have a surveillance test completed up to step 6.4 (61 0.4.002).

NRC JPM SIM2 Page 9 of 10

Appendix C 4

Job Performance Measure WORKSHEET Form ES-C-1 STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power.
2. Core Spray Pump Operability Test, 61 0.4.002, is in progress and is complete up to and including Step 6.4.

3 The testing is a normal surveillance for pumps NZOlA and NZ03A only.

4. An Equipment Operator has been briefed on the evolution, and is standing-by with the procedure and a radio on RB 51.

Task Cue: Continue with surveillance test 61 0.4.002, Core Spray Pump Operability Test, beginning at Step 6.5. NRC JPM SIM2 Page 10 of 10

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Time Critical Task: No. Validation Time: 11 minutes NRC JPM SlM3 Page 2 of 12

L

' AppendixC Job Performance Measure Form ES-C-1 WORKS k.1 E ET Facility:

Oyster Creek T,ask No.: 2120201303- ~~~ Perform Anticipatory Scriiim Turbine Stop Valve Closure test Task

Title:

-~~ with RPS ~ Actuation ~ elternate Path) ~~ ~ _ _ _ Job Performance Measure No.: NRC JPM SIM3 (RO/SRO) WA

Reference:

241 000 K3.01 (-RO/SRO 4.V4.1) Examiner: ~ Examinee: -~ Date: Facility Evaluator: ~~ Method of Testing: S im u lated Performance Actual Performance ~ X Classroom Simulator X Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. The plant is steady at 90% power with no other testing in-progress.
2. All prerequisites have been verified.
3. The procedure is complete up to step 6.2.

Task Standard: The Candidate recognizes a '/2 scram when Turbine Stop Valve

  1. 2 is tested and places the MAIN STOP VALVE TEST SELECT switch in OFF, resets the '/2 scram, notifies the Shift Manager, and exits the test.

Required Materials: None. General

References:

1. Procedure 61 9.4.002, Anticipatory Scram Turbine Stop Valve Closure Test (>45% Load), revision 18.

Initiating Cue: Perform Procedure 61 9.4.002, Anticipatory Scram Turbine Stop Valve Closure Test (245% Load), starting at Step 6.3. NRC JPM SIM3 Page 1 of 12

' Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Denote critical steps with a check mark 4 ~~ ~~ Performance Step: 1 Procedure Step. Provides repeat back of initiating cue. JPM Start Time: Standard: Comment: Provides repeat back of initiating cue. Evaluafor acknowledges the repeat back. ~~~ ~~~~~~ ~ ~~~~ ~ ~ S AT/U N SAT Performance Step: 2 Procedure Step: Reviews Precautions and Limitations. Stan da rd : Comment: Reviews P reca u t io n s and 1.. i m it at ions. SAT/UNSAT NRC JPM SIM3 Page 3 of 12

' AppendixC Job Performance Measure Form ES-C-1 WORKSt-I EET P e rf o rm a n ce I n f o rma t io n J Performance Step: 3 Procedure Step: 6.4 Place the Main Stop Valve Test Select switch in No. 3 position Standard: Comment: Places the MAIN STOP VALVE TEST SELECT switch in No. 3 position. ~ . _~ SAT/UNSAT J Performance Step: 4 Procedure Step: 6.5 Momentarily press pushbutton Main Stop Valve Test. Standard: Comment: Momentarily press MAIN STOP VALVE TEST pushbutton. NRC JPM SIM3 Page 4 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 6.5.1 Verify No. 3 Stop Valve closed. ~ ~~~~~ Standard: Verifies No. 3 Stop Valve closed (MAIN STOP VALVE POSITION No. 3 pointer points to C). SAT/UNSAT Performance Step: 6 Procedure Step: 6.5.2 Verify the following: Relay 1 K12 energized Relay 2K11 energized Relay 1 K52 energized Relay 2K51 energized Standard: Verifies the following relays energized: 1 K12, 2K11, 1 K52, and 2K51. Cue: Relays 1 K12, 2K11, 1 K52, and 2K51 are energized. ~ SAT/UNSAT NRC JPM SIM3 Page 5 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKS ti EET Performance I ri f o r ma t io n J Performance Step: 7 Procedure Step: 6.7 Place the Main Stop Valve Test Select switch in No. 2 position. Standard: Places the MAIN STOP VALVE TEST SELECT switch in No. 2 position. -~ Performance Step: 8 Procedure Step: 6.7.1 ~ ~~ Verify No. 3 Stop Valve opens. Standard: Comment: Verifies No. 3 Stop Valve opens (MAIN STOP VALVE POSITION No. 3 pointer points to 0). ~- SAT/UNSAT NRC JPM SIM3 Page 6 of 12

AppendixC I Job Performance Measure W 0 R KS I--1 E ET Form ES-C-1 Performance Information Performance Step: 9 Procedure Step: 6.7.2 Verify all Stop valves open. Standard: Comment: Verifies all Stop valves open (all MAIN STOP VALVE POSITION No. 1, 2, 3, 4 pointers point to 0). SAT/UNSAT J Performance Step: 10 ~~ -~ Procedure Step: 6.8 Momentarily press push button Main Stop Valve Test. Standard: Momentarily presses MAIN STOP VALVE TEST pushbutton. Note: This will result in a YZ scram condition. When recognized by the candidate, provide the cue below. Cue: Comment: Relay 1 K11 is de-energized., SATlU NSAT NRC JPM SIM3 Page 7 of 12

AppendixC I Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J Performance Step: 11 Procedure Step: 6.6.1 ~~ Immediately open No. 2 Stop Valve by placing the Main Stop Valve Test Select switch in OFF. Standard: Immediately opens No. 2 Slop Valve by placing the MAIN STOP VALVE TEST SELECT switch in OFF. Booth: Comment: When TSV indicates full open, DELETE MAL RLY-RPS021A. ~~- - - ~ ~ ~- -~ ~ ~ SAT/UNSAT J Performance Step: 12 Procedure Step: 6.6.2 Reset the half-scram. NoteKue: The candidate will ask for concurrent verification for resetting the Y scram. State that you will perform the concurrent verification and agree with what ever action the candidate takes. Standard: Resets the half-scram by pressing the SCRAM SYSTEM RESET pushbutton (RPS 1 SCRAM SOLENOIDS ON). Comment: NRC JPM SIM3 Page 8 of 12

AppendixC Job Performance Measure Form ES-C-1 . \\ WORKS t-i EET P e rf o rm a n ce Information Performance Step: 13 Procedure Step: 6.6.3 Notify the Shift Manager. Standard: Notifies the Shift Manager. Cue: Acknowledge the report. Comment: SATNNSAT Performance Step: 14 Procedure Step: 6.6.4 Exit this procedure. Standard: Exits this procedure Cue: Acknowledge the report. Comment. ~ Terminating Cue: The Candidate recognizes a '/2 scram when Turbine Stop Valve #2 is tested and places the MAIN STOP VALVE TEST SELECT switch in OFF, resets the Y2 scram, notifies the Shift Manager, and exits the test. JPM Stop Time: NRC JPM SIM3 Page 9 of 12

... Appendix C Job Performance Measure Form ES-C-1 W ORKSI-I E ET Validation of Completion NRC JPM SIM3 JPM Number: -~~~ ~ ~ Examinee's Name: ~ Examiner'sName: ~ ~ ~ Date Performed: ~~ -~ ~ Facility Evaluator: ~ Number of Attempts: Time to Complete: Question: ~ ~~

Response

Satisfactory/Unsatisfactory Examiner's Signature and Date: NRC JPM SIM3 Page 10 of 12

Appendix C . 5. Job Performance Measure Form ES-C-1 WORKSHEET

1.
2.
3.
4.
5.
6.

Simulator ;Setup Reset to full power IC-65 and reduce recirculation flow to <90% power. (about 40 hz) Insert Trigger: on Trigger 1, insert the following: hwx31 d047r.lt.0.50 Insert malfunction RLY-RPS021 A on Trigger 1. When Stop Valve #2 goes closed, this will de-energize relay 1 Kl 1. Verify all Turbine Stop Valve selsyns indicate OPEN on Panel 14R. Have a copy of the procedure completed up to and including step 6.2 (61 9.4.002). When Stop Valve H 2 is reopened, delete RLY-RPS021A. NRC JPM SIM3 Page 11 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSIiEET STUDENT H-ANDOUT Initial Conditions:

1. The plant is steady at 90% power with no other testing in-progress.
2. All prerequisites have been verified.
3. The procedure is complete up to step 6.2.

Task Cue: Perform Procedure 61 9.4.002, Anticipa.tory Scram Turbine Stop Valve Closure Test (145% Load), starting at !Step 6.3. NRC JPM SIM3 Page 12 of 12

x

Appendix C Job Performance Measure Form ES-C-1 WORKS *-I E ET Facility: Oyster - -. Creek Task No.: -~ 20701 ~ 01 003 Control reactor Pressure using the Isolation Condenser Tube Task

Title:

Side vents ~ Job Performance Measure No.: NRC ~~ JPM SIM4 (RO/SRO) WA

Reference:

207000 K1.02 ~~ (RO/SRO ~- 4.0/4.2) ~ f:! xam in e r : Examinee: ~~~ ~ Facility Evaluator: Method of Testing: Simulated Performance Classroom Date: ~ -~ Act u a I Perform an ce X Simulator X Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions: 1. The plant scrammed from low power arid the RPV Control - No ATWS EOP has been entered.

2. The MSlVs are closed.
3. The Isolation Condensers are not required to be isolated.
4. The main condenser is intact.
5. There is no offsite radioactivity release in-progress Task Standard: Isolation Condenser A and B vent valves are open for RPV pressure control.

Required Materials: None. General

References:

v

1. EMG-SP15, Alternate Pressure Control Systems IC Tube Side Vents, revision 0.

NRC JPM SIM4 Page 1 of 10

Appendix C Job Performance Measure Form ES-C-1 W 0 R KS 1-1 E ET Initiating Cue: Place BOTH Isolation Condenser A and 6 tube side vents in-service, IAW EMG-SP15, Alternate Pressure Control Systems IC Tube Side Vents, to lower RPV pressure. Time Critical Task: No. Validation Time: 4 minutes NRC JPM SIM4 Page 2 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSti EET Performance Information Denote critical steps with a check mark Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. JPM Start Time: Standard: Comment: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. SAT/UNSAT Performance Step: 2 Procedure Step: 2.1 Verifies: Isolation Condensers are not required to be isolated. Main Condenser is initact. Offsite radioactivity release rate is expected to remain below the release rate, which requires an Unusual Event. These conditions are provided in the initiating cue. Note: Standard: Verifies: Isolation Condensers are not required to be isolated. Main Condenser is intact. Offsite radioactivity release rate is expected to remain below the release rate, which requires an Unusual Event. Comment: S AT/U N SAT NRC JPM SIM4 Page 3 of 10

L

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 ~~~ Performance Information J Performance Step: 3 ~ ~ Procedure Step: 2.2, 2.2.1, 2.2.2 Open the EOP BYPASS PLUGS panel inside of Panel 1OXF. Remove the bypass plug from position BP2 and insert a bypass plug into position BP1. Standard: Opens the EOP BYPASS PLUGS panel inside of Panel 1 OXF. Removes the bypass plug from position BP2 and inserts the bypass plug into position BFY. Comment: ~~ ~ S AT/U N SAT J Performance Step: 4 Procedure Step: 2.2.3. 2.2.4. Remove the bypass plug from position BP4 and insert a bypass plug into position BP3. Standard: Comment: Removes the bypass plug from position BP4 and insert the bypass plug into position BP3. ~ -~ ~ - __- ~- ~ S AT/U N SAT NRC JPM SIM4 Page 4 of 10

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 3.1 Verify that RPV water level is below 180 in. Verifies RPV water level is below 180 in Standard: Comment: Performance Step: 6 Procedure Step. 3.2 Confirm open the following Isolation Condenser Steam Inlet Valves for the Isolation Condensers to be used (Panel 1 F/2F) Isolation Condenser A V-14-30 V-14-31 Isolation Condenser B V-14-32 V-14-33 Standard: Confirm open the following isolation Condenser Steam Inlet Valves for the Isolation Condensers to be used (Panel 1 F/2F) Isolation Condenser A 9 V-14-30 (red light ON, green light OFF) V-14-31 (red light ON, green light OFF) V-14-32 (red light ON, green light OFF) V-14-33 (red light ON, green light OFF) Isolation Condenser B Comment: ~ ~ ~ ~~ S AT/U N SAT NRC JPM SIM4 Page 5 Of 10

. e. Appendix C Job Performance Measure Form ES-C-1 W 0 R KS I--I E ET ~~~ Performance Information ~~ J Performance Step: 7 Procedure Step: 3.3 Open the following lsolatiori Condenser Vents for the Isolation Condensers to be used: Isolation Condenser A V-14-5N-14-20 Isolation Condenser B V-14-1N-14-19 Standard: Opens the following Isolation Condenser Vents for the Isolation Condensers to be used: Isolation Condenser A 0 V-14-5N-14-20 by placing ISOL COND VENT V-14-5 and V-14-20 switch to the right (red lights ON, green lights OFF) Isolation Condenser B 0 V-14-lN-14-19 by p'lacing ISOL COND VENT V-14-1 and V-14-19 switch to the right (red lights ON, green lights OFF) Comment: SATNNSAT NRC JPM SIM4 Page 6 of 10

J

' AppendixC Job Performance Measure WORKS *-I E ET Form ES-C-1 Performance Information Performance Step: 8 Procedure Step: 3.4 

~~ ~ Control reactor pressure as directed by the Unit Supervisor by cycling the tube side vents designated in step 3.3. Cue: RPV pressure is slowly lowering Standard: Monitors reactor pressure. Comment: S AT/U N SAT Terminating Cue: Isolation Condenser A and 6 vent valves are open for RPV pressure con t ro I. JPM Stop Time: NRC JPM SIM4 Page 7 of 10

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC JPM - SIM4 Examinees Name: ~~ Examiners Name : . -~ ~ Date Performed: Facility Evaluator: ~~ Number of Attempts: ~- ~ ~~ -~ Time to Complete: Question: ~~

Response

Result: Satisfactory/U nsatisfactory ~ Examiners Signature and Date: ~~ NRC JPM SIM4 Page 8 of 10

'1 , Appendix C Job Performance Measure Form ES-C-1 WORKStiEET Simulator Setup

1. Reset to full power IC-65.
2. Have a blank copy of EMG-SP15 ready.

NRC JPM SIM4 Page 9 of 10

~ I Appendix C Job Performance Measure Form ES-C-1 WORKSI-IEET STUDENT H-ANDOUT Initial Conditions:

1. The plant scrammed from low power and the RPV Control - No ATWS EOP has been entered.
2. The MSlVs are closed.
3. The Isolation Condensers are not required to be isolated.
4. The main condenser is intact.
5. There is no offsite radioactivity release in-progress.

Task Cue: Place BOTH Isolation Condenser A and B tube side vents in-service, IAW EMG-SP15, Alternate Pressure Control Systems IC Tube Side Vents, to lower RPV pressure. NRC JPM SIM4 Page 10 of 10

Appendix C Job Performarice Measure Form ES-C-1 WORKSHEET I ' b Fac i I i t y : Oyster-C reek-TaskNo.: ~. 2230101508_ ~ ~ Vent the Primary Containment to Maintain pressure Below ~~ Task

Title:

-~ 3psig (Alternate Path] Job Performance Measure No.: NRC JPM SIM5-(RO/SRO) K/A

Reference:

223001 - K1.09 __ (_RO/SRC> - ~ ~ ~ ~ 3.4/3.6) ~ Examinee: ~~ Examiner: Facility Evaluator: ~ ~ Date: Method of Testing: ~ X Simulated Performance ~~~ Actual Performance ~~ Classroom Simulator X Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. The plant is at rated power.
2. A partial loss of Drywell cooling has occurred.
3. The Primary Containment Control EOP has been entered Task Standard: The Primary Containment is being vented via the Drywell through the Standby Gas Treatment System 2.

Required Materials: None. General

References:

1. EMG-SP31, Venting the Primary Containment to Maintain Pressure Below 3.0 PSIG, revision 0.

Initiating Cue: Vent the Primary Containment through Standby Gas Treatment System 2 IAW EMG-SP31, Venting the Primary Containment to Maintain Pressure Below 3.0 PSIG. Venting the T o w ~ s - p n 9 erred. NRC JPM SIM5 Page 1 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET 7 Time Critical Task: No. Validation Time: 8 minutes NRC JPM SIM5 Page 2 of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information I Denote critical steps with a check mark J Performance Step: 1 ~ Procedure Step: Provides rlepeat back of initiating cue. JPM Start Time: Standard: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Comment: ~ -~ S AT/U N SAT J Performance Step: 2 Procedure Step: 3.2.1 Select a SGTS Train for operation by placing the STANDBY GAS SELECT switch in position SYSTEM 1 or SYSTEM 2 (panel 11 R). Standard: Selects SGTS Train 2 for operation by placing the STANDBY GAS SELECT switch in the I3YS 2 position. Comment: ~- ~ SAT/U NSAT NRC JPM SIM5 Page 3 of 12

Appendix C I / Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 3 ~ - -~ Procedure Step: 3.2.3 Place the fan control switch for the train selected in the HAND position (panel 11 R). Standard: Places the STANDBY GAS 2 EXHAUST FAN 1-9 control switch to the HAND position (red light ON, green light OFF). Cue: Comment: This action will initiate control room annunciators. Tell the Candidate that another Operator will attend to these alarms. SATNNSAT J Performance Step: 4 ~ Procedure Step: 3.2.3 Close the SGTS CROSSTIE V-28-48 (Panel 11 R). Standard: Closes the SGTS CROSSTIE V-28-48 by placing the SGTS CROSSTIE V-28-48 switch to the CLOSE position (red light OFF, green light ON). ~ ~~ SAT/U NSAT NRC JPM SIM5 Page 4 of 12

Appendix C ( Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 5 Procedure Step: 3.2 4.a Perform the following actions in rapid succession: Secure operating Reactor Building Supply Fans by placing the respective control switches in OFF po!;ition (Panel 11 R). Perform the following actions in rapid succession: Secures the operating Reactor Building Supply Fans by placing SUPPLY FAN 1-12 switch in the OFF position (red light OFF, green light ON), and SUPPLY FAN 1-14 in the OFF position (red light OFF, green light ON). This action will initiate control room annunciators. Tell the Candidate that another Operator will attend to these alarms. Standard: Cue: Comment: ~ -~ ~- -~ J Performance Step: 6 Procedure Step: 3.2.4.b Perform the following action!; in rapid succession: Immediately secure Exhaust Fan EF 1-5 (or EFR 1-6) by placing control switch in STOP position (Panel 11 Fl). Standard: Perform the following actions in rapid succession: Immediately secures Exhaust Fan EF 1-5 by placing the REACTOR BUILDING EXHAUST FAN 1 -5control switch in STOP position (red light OFF, green light ON). Cue: Comment: This action will initiate control room annunciators Tell the Candidate that another Operator will attend to these alarms. ~- SATNNSAT NRC JPM SIM5 Page 5 of 12

Appendix C a Job Performanlce Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 7 ~ Procedure Step: 3.2.5 Close V-28-21 and V-28-22! by placing EXH VALVES TO MAIN EXHAUST control switch in CLOSE position (Panel 11 R). Standard: Closes V-28-21 and V-28-22 by placing EXH VALVES TO MAIN EXHAUST control switch in CLOSE position (red lights OFF, green lights ON). ~ ~- S AT/U N SAT Performance Step: 8 Procedure Step: 3.2.6 Close V-28-43 and V-28-42 by placing the MAIN SUPPLY HEADER VALVES TO DW control switch in CLOSE position (Panel 11 R). Standard: Verifies the MAIN SUPPLY HEADER VALVES TO DW V-28-43 and V-28-42 control switch is in the CLOSE position (red lights OFF, green lights ON). Comment: S AT/U N SAT NRC JPM SIM5 Page 6of 12

Appendix C i Job Performance Measure Form ES-C-1 WORKSNHEET Performance Information J Performance Step: 9 Procedure Step: 3.2 7.a.l Open Torus Vent valve V-28-18 (Panel 11 F) Standard: N ot e/C u e: Comment: SAT/U NSAT Opens the Torus Vent valve V-28-18 by placing the TORUS VENT EXHAUST VALVE control switch to the right (red light OFF, green light ON). Reports that the Torus Vent valve, V-28-18 fails to open, and may ask for further direction. Torus Vent valve, V-28-18, will fail to open. (the Torus cannot be If the Candidate asks for direction, direct the Candidate to continue to vent the Primary Containment IAW EMG-SP31. vented) -E:- Performance Step: 10 Procedure Step: 3.2.7.b.1 Verify that the Torus cannot be vented. ~ Standard: Comment: Verifies that the Torus cannot be vented. ~ -- ~ NRC JPM SIM5 Page 7of 12

Appendix C \\c I Job Performarice Measure WORKSHEET Form ES-C-1 Pe rfo rm an ce Information Performance Step: 11 Procedure Step: 3.2.7.b.2 Inform the Unit Supervisor Standard: Informs the Unit Supervisor. Cue: Acknowledge the report. Comment: ~ ~ -~ ~ ~ ~ -~ ~ ~. S AT/U NSAT J Performance Step: 12 -~ _ _ ~ ~ Procedure Step: 3.2.7.b.3 Open the Drywell Vent valve V-23-21 (Panel 12XR). Standard: Comment: Opens the Drywell Vent valve V-23-21 by placing the DRYWELL VENT VALVE V-23-21 control switch to OPEN (red light ON, green light OFF). ~ ~~ S AT/U N SAT NRC JPM SIM5 Page 8 of 12

I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 13 Procedure Step: 3.2.7.b.4 Open the Drywell Vent Valve V-23-22 (Panel 12XR). Standard: Opens the Drywell Vent Valve V-23-22 by placing the DRYWELL VENT VALVE V-23-22 control switch to OPEN (red light ON, green light OFF). Note: The Candidate may monitor Primary Containment pressure at this point. Cue: Comment: Primary Containment pressure is lowering slowly. ~~ SAT/U NSAT Terminating Cue: The Primary Containment is being vented via the Drywell through the Standby Gas Treatment System 2. JPM Stop Time: NRC JPM SIM5 Page 9 of 12

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number: NRC JPM SIM5 Examinee's Name: Examiner's Name: Date Performed. Facility Evaluator: Number of Attempts: Time to Complete: Quest ion : Response : Result: Satisfactory/Unsatisfactory Examiner's Signature and Date: ~- NRC JPM SIM5 Page 10of 12

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET r, Simulator Setup

1. Reset to rated power IC-65.
2. Insert malfunction VLV-CNAOl6 to FAIL AS IS (closed). This will prevent valve V-28-18 from opening.
3. Have a blank copy of EMG-SP31 ready.

NRC JPM SIM5 Page 11 of 12

Appendix C Job Performancle Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power.
2. A partial loss of Drywell cooling has occurred.
3. The Primary Containment Control EOP has been entered.

Task Cue: Vent the Primary Containment through Staindby Gas Treatment System 2 IAW EMG-SP31, Venting the Primary Containment to Maintain Pressure Below 3.0 PSIG. Venting the Torus is preferred. NRC JPM SIM5 Page 12 of 12

T y AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster -_ Creek Task No : 26201 01 002 Transfer Busses 1 A and 'I B to the Startup Transformers ~- Task

Title:

(Alternate Path) ~ Job Performance Measure No.: NRC ~ JPM SIM6 (RO/SRO) K/A

Reference:

262001 K4.02 (RO/SRO 2.9/3.3) Examinee: Examiner: ~- - _ _ ~ Facility Evaluator: Date: Method of Testing: Simulated Performance Actual Performance X Classroom Simulator X Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. The plant was at power when a manual scram has become imminent.
2. Recirculation flow has been reduced to 8.5 x lo4 gpm.
3. The System Dispatcher has been notified.

Task Standard: Busses 1A and 1 B has been manually transferred from the Auxiliary Transformer to the Startup Transformers and breaker 1 B has been manually opened. Required Materials: None. General

References:

1. ABN-1, Reactor Scram, revision 7 Initiating Cue: Transfer Busses 1A and 1 E3 to the Startup Transformers JAW ABN-1, Reactor Scram, Attachment ABN-1-4.

NRC JPM SIM6 Page 1 of 13

I J AppendixC Job Performance Measure Form ES-C-1 WORKSHIEET ~ Time Critical Task: No. Validation Time: 6 minutes NRC JPM SIM6 Page 2 of 13

AppendixC Job Performance Measure Form ES-C-1 WORKSWEET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. -~ ~ JPM Start Time: Standard: Comment: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. ~ - ~ ~ ~ ~- ~ J Performance Step: 2 Procedure Step: 1 insert key into the Synchroscope switch for Startup Breaker S1A. Standard: Comment: Inserts key into the SYNCHROSCOPE switch for STARTUP BREAKER S1A. S AT/U N SAT NRC JPM SIM6 Page 3 of 13

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 ~~ Performance Information J Performance Step: 3 -~ - Procedure Step: 2 Place Synchroscope key to the ON position. Standard: Places SYNCHROSCOPE key to the ON position. Incoming and Running show > 4000 Volts and Synchroscope indicates 12:OO oclock posit ion. SATNNSAT J Performance Step: 4 ~ Procedure Step: 3 Place Startup breaker S1A control switch to the CLOSE position. Standard: Cue: Comment: Places STARTUP BREAKER S l A control switch to the CLOSE position (red light ON, green light OFF). If the Bus OV alarms come:s in, report that another Operator will investigate. NRC JPM SIM6 Page 4 of 13

AppendixC Job Performance Measure WORKS I-I E ET Form ES-C-1 Performance lr?iformation Performance Step: 5 Procedure Step: 4 ~ ~ ~- Verify Startup Breaker S1 A closed by the associated RED light illuminated. Standard: Verifies STARTUP BREAKER S1 A closed by the associated RED light illuminated (red light ON, green light OFF). Comment: -~ ~ ~ ~ ~~ S AT/U N SAT Performance Step: 6 Procedure Step: 5 ~~ Verify Main Breaker 1A trips by the associated green OPEN light iI luminated. Standard: Comment: Verifies MAIN BREAKER 1 A trips by the associated green OPEN light illuminated (red light OFF, green light ON). SAT/U NSAT NRC JPM SIM6 Page 5 of 13

6 AppendixC Job Performance Measure Form ES-C-1 WORKS t-i E ET P e rf o rm a n ce I 11 format ion Performance Step: 7 Procedure Step: 6 Place Main Breaker 1A control switch to the TRIP position to match the mechanical indication to the light indication and to clear the alarm. ~ .~ Standard: Comment: Places MAIN BREAKER 1 A control switch to the TRIP position (green flag). ~. ~- ~ SAT/U N SAT Performance Step: 8 Procedure Step: 7 Place Synchroscope switch for Startup Breaker S1A to the OFF position ~ ~ Standard: Comment: Places SYNCHROSCOPE switch for Startup Breaker S l A to the OFF position. NRC JPM SIM6 Page 6 of 13

h Appendix C Job Performance Measure WORKSH'EET Form ES-C-1 Performance Information ~ ~~ ~~ J Performance Step: 9 ~- ~ ~ Procedure Step: 1 Insert key into the Synchroscope switch for Startup Breaker S1 B. Standard: Comment: Inserts key into the SYNCHROSCOPE switch for STARTUP BREAKER S1B. J Performance Step: 10 Procedure Step: 2 Place Synchroscope key to the ON position. Standard: Places SYNCHROSCOPE key to the ON position. ~ ~ SATNNSAT NRC JPM SIM6 Page 7 of 13

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Pe rfo rmance I n fo rma t io n J Performance Step: 11 Procedure Step: 3 Place Startup breaker S1 B control switch to the CLOSE position. Standard: Places STARTUP BREAKER S1B control switch to the CLOSE position (red light ON, green light OFF). SAT/UNSAT Performance Step: 12 Procedure Step: 4 Verify Startup Breaker S1 B closed by the associated RED light ill urn inated. -- ~ ~-._ Standard: Comment: Verifies STARTUP BREAKER S1 B closed by the associated RED light illuminated (red light ON, green light OFF). NRC JPM SIM6 Page 8 of 13

Appendix C t Job Performance Measure Form ES-C-1 WORKS I--1 E ET Performance hformation J Performance Step: 13 Procedure Step: 5 Verify Main Breaker 1 B trips by the associated green OPEN light illuminated. Note: Main Breaker 1 B will not automatically open. Standard: Verifies MAIN BREAKER 1 E3 trips by the associated green OPEN light illuminated (red light OFF, green light ON). Recognizes that Main Breaker 1 B did not open and opens it by taking the MAIN BREAKER 1 B control switch to the TRIP position (red light OFF, green light ON). The Candidate may report the breaker failure at this time (not critical). Comment: S AT/U N SAT ~~~ ~~ ~~ Performance Step: 14 Procedure Step: 6 ~~ ~ Place Main Breaker 1 B control switch to the TRIP position to match the mechanical indication to the light indication and to clear the alarm. Standard: This was accomplished in the previous step. Comment: SAT/UNSAT NRC JPM SIM6 Page 9 of 13

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Standard: Comment: Performance Step: 15 Procedure Step: 7 Place Synchroscope switch lor Startup Breaker S1 B to the OFF position. Places SYNCHROSCOPE switch for Startup Breaker S1 B to the OFF position. Terminating Cue: Busses 1A and 1 B has been manually transferred from the Auxiliary Transformer to the Startup Transformers and breaker 1 B has been manually opened. JPM Stop Time: - NRC JPM SIM6 Page 10 of 13

b Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC JPM SIM6 Examinee's Name: ~ ~ Examiner's Name: Date Performed: ~ ~ ~ Facility Evaluator: ~ ~ Number of Attempts: Time to Complete. Question:

Response

Result: ~~ ~ ~ SatisfactorykJnsatrsfactory Examiner's Signature and Date: NRC JPM SIM6 Page 11 of 13

0. Appendix C Job Performance Measure Form ES-C-I WORKSHEET Si m u I a tor $et u p

1. Reset to full power IC-65
2. Insert Malfunction BKR-EDS023B to FAIL AUTO TRIP
3. Have a blank copy of Attachment ABIN-1-4 ready.

NRC JPM SIM6 Page 12 of 13

1.., Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT H-ANDOUT In it ial Conditions:

1. The plant was at power when a manual scram has become imminent.
2. Recirculation flow has been reduced to 8.5 x lo4 gpm.
3. The System Dispatcher has been notified.

Task Cue: Transfer Busses 1 A and 1 B to the Startup Transformers IAW ABN-1, Reactor Scram, Attachment ABN-1-4. NRC JPM SIM6 Page 13 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKS t-i EET F ac i I it y : - 0 yst e LC r ee k 1-ask No.: 21 50201 ~ 401.- Task

Title:

Perform an APRM - Gain Adjustment Job Performance Measure No.: NRC JPM -- SIM7. WA

Reference:

5005 A4.03 -~ (RO/SRO ~ 3.2/3.3) Examinee: Facility Evaluator: Method of Testing: Actual Performance X Simulated Performance ~ X Plant Classroom ~ Simulator ~ _ _ _ - ~ Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. Reactor Recirculation flow was just adjusted to attain 100% reactor power a short while ago.
2. Reactor power has been steady for the last 5 minutes.
3. Procedure 403 allows bypassing APRM 1.
4. The procedure revision, prerequisites and precautions and limitations have been verified by the Unit Supwvisor.

Task Standard: APRM 1 gain has been adjusted such that APRM 1 indicates 1 00% 2 1 %. Required Materials: Small screwdriver General

References:

1. 202.1, Power Operations, revision 1 10 Initiating Cue: Perform an APRM Gain Adjustment on APRM 1 IAW Attachment 202.1 -9.

NRC JPM SIM7 Page 1 of 9

Appendix C Job Performance Measure W ORKSH I: ET Form ES-C-1 Time Critical Task: No. Validation Time: 4 minutes NRC JPM SIM7 Page 2 of 9

I Appendix C Job Performance Measure Form ES-C-1 WORKSIiEET Performance Information Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. JPM Start Time: Standard: Comment: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. ~~ ~ S AT/U N SAT ~ ~ Performance Step: 2 Procedure Step: 1.O Verify with the US procedure revision, prerequisites and precautions and limitations ~ ~~ ~~ Standard: Verifies with the US procedure revision, prerequisites and precautions and limitations. Cue: Comment: This was given in the initia[ conditions. ~ ~ ~~ ~ ~~ S AT/U N SAT NRC JPM SIM7 Page 3 of 9

I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Iniformation Performance Step: 3 Procedure Step: 2.1 Allow reactor power to stabilize for at least 2 minutes. ~~ Standard: Allows reactor power to stabilize for at least 2 minutes. Cue: Comment: This was given in the initial conditions. ~ ~ ~ -~ ~ J Performance Step: 4 Procedure Step: 2.2 If allowed by 403, bypass APRM 1. Standard: Places the APRM BYPASS joystick in the CH 1 position. Comment: ~ SAT/U NSAT NRC JPM SIM7 Page 4 of 9

a

  • Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J

Performance Step: 5 Procedure Step: 2.3 Pull out the APRM 1 drawer Standard: Pulls out the APRM 1 drawer. J Performance Step: 6 Procedure Step: 2.4 Turn the gain adjustment pot with a small screwdriver (R10 on calibration and feedback unit) clockwise to raise gain or counterclockwise to lower gain while monitoring APRM output on the selected drawer. Standard: Inserts small screwdriver and turns CW or CCW to change APRM power indication. Comment: NRC JPM SIM7 Page 5 of 9

r .I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 7 Procedure Step: 2.5 When output on APRM 1 drawer matches required APRM setting within 1 %, then stop gain adjustment. When output on APRM 1 drawer matches required APRM setting within 1 %, then stops gain adjustment. With reactor power at 1 OO%, APRM 1 should indicate 100% 2 1 %. -~ Standard: Comment: S AT/U N SAT J Performance Step: 8 Procedure Step: 2.6 Un-bypasses APRM 1. Places the APRM BYPASS joystick used earlier to the center position. Standard: Comment: ~~- -~ ~-~ ~ ~ ~- ~- S AT/U N SAT Terminating Cue: JPM Stop Time: NRC JPM SIM7 Page 6 of 9

I i Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number: NRC JPM SIM7 Examinees Name: ~ Examine r s Name : Date Performed, Facility Evaluator: ~ ~- ~ Number of Attempts: ~~ Time to Complete: ~ ~ ~~ Question: Result: ~~ Sat i sf actor y/ U n sat i sf a c t o r y Examiners Signature and Date: --- ~. NRC JPM SIM7 Page 7 of 9

i r. Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. Reset to full power IC-65.
2. Change APRM 1 gain so that the APRM reads c 98°/0.
3. Have a blank copy of Attachment 202.1 -9 ready.

NRC JPM SIM7 Page 8 of 9

I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. Reactor Recirculation flow was just adjusted to attain a short while ago.
2. Reactor power has been steady for the last 5 minutes
3. Procedure 403 allows bypassing APRM 1.

00% reactor power

4. The procedure revision, prerequisites, and precautions and limitations have been verified by the Unit Supervisor.

Task Cue: Perform an APRM Gain Adjustment on APRM 1 IAW Attachment 202.1 -9. NRC JPM SIM7 Page 9 of 9

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: 28801 01403 ~- Task

Title:

Swap Control -- Room Ventilation Fans (Alternate Path) Job Performance Measure No,: NRC - JPPA SIM8 (RO) WA

Reference:

~ 290003 ~- A4.02 -~ (RO 2.8) ~ Examinee: Exam in e r: Date: Facility Evaluator: ~ Method of Testing: Simulated Performance Actual Performance X Classroom Simulator X Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. The B Control Room Ventilation Fan is currently in service and needs to be removed from service for maintenance.
2. All prerequisites have been verified to perform the procedure, including TBCCW and Instrument, Service and Breathing Air Systems.
3. An EO has been briefed on the evolution, has a copy of the procedure and a radio and is ready to support the evolution.
4. AOG tripped earlier in the shift and is being investigated.
5. Offgas Radiation Monitors have shown a slight rise.
6. The procedure has been completed up to and including step 10.4.5.

Task Standard: The Control Room Ventilation Fans have been swapped from 8 to A, and the A Ventilation System has been placed in the PART RECIRC emergency mode. Required Materials: None. NRC JPM SIM8 Page 1 of 13

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET General

References:

1. Procedure 331.1, Control Room and Old Cable Spreading Room Heating, Ventilation and Air Conditioning System, revision 23.

Initiating Cue: Swap Control Room Ventilation System Fans IAW Procedure 331. l, Control Room and Old Cable Spreading Room Heating, Ventilation and Air Conditioning System, starting at step 10.4.6. Time Critical Task: No. Validation Time: 10 minutes NRC JPM SIM8 Page 2 of 13

AppendixC Job Performance Measure Form ES-C-1 W 0 R KS 1-1 E ET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. ~~ ~ JPM Start Time: Standard: Comment: Provides repeat back af initiating cue. Evaluator acknowledges the repeat back. Performance Step: 2 Procedure Step: Reviews Precautions and Limitations. ~~~~ ~ Standard: Reviews Precautions and Limitations. Comment: SAT/UNSAT NRC JPM SIM8 Page 3 of 13

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J Performance Step: 3 Procedure Step: 10.4.6 Stop B Control Room HVAC by placing FN-826-008B System Initiation switch to OFF (Panel 9XR). Standard: Places the CONTROL ROOM HVAC B SYSTEM INITIATION control switch to OFF (red light OFF, green light ON). SAT/UNSAT Performance Step: 4 Procedure Step: 10.4.7 Verify FN-826-008B, Supply Fan stopped. Standard: Verifies CONTROL ROOM HVAC B Supply Fan OFF (red light OFF, green light ON). Comment: NRC JPM SIM8 Page 4 of 13

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Performance Step: 5 Procedure Step: 10 4.8 Verify Isolation Dampers are closed. DM-826-039 (Panel 9XR) DM-826-040 (Panel 9XR) Standard: Verifies lS0latiOn Dampers are closed. DM-826-039 (Panel 9XR) (red light OFF, green light ON) DM-826-040 (Panel 9XR) (red light OFF, green light ON) Comment: ~~ SAT/UNSAT Performance Step: 6 Procedure Step: 10.4.9 Momentarily place the A Control Room HVAC System Bypass switch in RESET (Panel 11 R). Standard: Comment: Momentarily places the CONTROL ROOM HVAC A SYSTEM BYPASS switch in RESET ~~ SAT/UNSAT NRC JPM SIM8 Page 5 of 13

Appendix C e Job Performance Measure Form ES-C-1 WORKSHEET Performance lnformat ion Performance Step: 7 Procedure Step: 10.4.1 0 Place mode selector for System A to the desired position (Panel 11 R). Cue: If the Candidate asks which mode to be in, state normal mode. Standard: Comment: Confirms the CONTROL ROOM HVAC A SYSTEM MODE switch is in NORM. J Performance Step: 8 Procedure Step: 10.4.1 1 Start A Control Room HVAC by placing FN-826-008A System Initiation switch to ON (Panel 11 R). Standard: Comment: Places the CONTROL ROOM HVAC A SYSTEM INITIATION switch to ON (red light ON. green light OFF). SAT/UNSAT NRC JPM SIM8 Page 6 of 13

Appendix C t t Job Performance Measure WORKS H E ET Form ES-C-1 Pe rfo rmance I n lo rma t io n Performance Step: 9 Procedure Step: 10.4.1 2 Verify Isolation Dampers are open. DM-826-042 (Panel 11 R) DM-826-043 (Panel 1 1 R) Verifies Isolation Dampers aire open. DM-826-042 (Panel 11 R) (red light ON, green light OFF) DM-826-043 (Panel 11 R) (red light ON, green light OFF) -~ ~ -~ Standard: Comment: ~- SAT/UNSAT Performance Step: 10 Procedure Step: 10.4.13 Verify FN 826-008A, Supply Fan is running. Standard: Comment: Verifies CONTROL ROOM MVAC A Supply Fan ON (red light ON, green light OFF). SAT/UNSAT NRC JPM SIM8 Page 7 of 13

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance lnformat ion Performance Step: 11 Procedure Step: 10.4.14 Close the following refrigeration compressor circuit breakers on the side of the air conditioriing unit 1-826-001A as required (based on heat load): Breaker 1 Breaker2 Breaker3 Note/Cue: The Candidate may ask how many breakers to close. Close all breakers. Directs the EO to close the following refrigeration compressor circuit breakers on the side of the air conditioning unit 1-826-001A which were opened earlier: Breaker 1 Breaker2 Breaker3 Standard: Comment: SAT/UNSAT NRC JPM SIM8 Page 8 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET ~~ Performance lnformat ion ~- Performance Step: 12 Procedure Step: 10.4.15 ~ -~ Standard: Start FN-826-009, Kitchen and Toilet Fan as needed by placing its five-minute timer control switch in START. Note/Cue 1 : This is not modeled in the simulator. The kitchen fan timer is in start. Cue 2: Offgas Radiation Monitors have risen sharply and the Stack RAGEMS is also rising. Place the Control Room Ventilation System into the proper emergency mode. Comment: S AT/U N SAT Performance Step: 13 Procedure Step: Provides repeat back of initiating cue. Standard: Comment: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. ~~ SAT/U N SAT NRC JPM SIM8 Page 9 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 14 Procedure Step: 8.1.1 Place system in partial recirculation mode by placing mode switch for System B (panel 9XR) or for System A (Panel 11 R) in PAR REC. Standard: Places the CONTROL ROOM HVAC A SYSTEM MODE switch in PART RECIRC (amber PART RECIRC light ON, NORM light OFF). Comment: ~ ~~ SAT/U NSAT Terminating Cue: The Control Room Ventilation Fans have been swapped from B to A, and the A Ventilation System has been placed in the PART RECIRC emergency mode. JPM Stop Time: __ NRC JPM SIM8 Page 10 of 13

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 JPM Number: NRC -. JPM SIM8 Examinees Name: Validation of Completion Exam in e r s N am e : Date Performed: Facility Evaluator: Number of Attempts: Time to Complete: Question:

Response

Result: Satisfactory/Unsatisfactory Examiners Signature and Date: NRC JPM SIM8 Page 11 of 13

Appendix C Job Performance Measure Form ES-C-1 WORKS H E ET s L Simulator Setup

1. Reset to full power IC-65
2. Verify CR HVAC System B is in operation
3. Have procedure 331.1, section 10 complete up to and including step 10.4.6.

NRC JPM SIM8 Page 12 of 13

I 1 -. Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The B Control Room Ventilation Fan is currently in service and needs to be removed from service for maintenance.
2. All prerequisites have been verified to perform the procedure, including TBCCW and Instrument, Service arid Breathing Air Systems.
3. An EO has been briefed on the evolution, has a copy of the procedure and a radio and is ready to support the evolution.
4. AOG tripped earlier in the shift and is being investigated.
5. Offgas Radiation Monitors have shown a slight rise.
6. The procedure has been completed up to and including step 10.4.5.

Task Cue: Swap Control Room Ventilation System Fans IAW Procedure 331. I, Control Room and Old Cable Spreading Room Heating, Ventilation and Air Conditioning System, starting at step 10.4.6. NRC JPM SIM8 Page 13 of 13

Y f Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: - Oyster


~

Creek ~ Task No.: 26201 __ _- 01 - 001 Task

Title:

Perform -~~ - SBO - Panel ~~ Operations Job Performance Measure No.: ~ NRC ~- JPM PLANT1 (RO/SRO) WA

Reference:

262001 ~ ~ K3.05 (RO/SRCI 3.2/3.5) Exam in e r : Examinee: ~ ~_~ ~ Facility Evaluator: _. ~ Date: _~ Method of Testing: S im u lated Performance X Actual Performance X Class roo m ~- Simulator Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions:

1. The plant was at rated power when a total loss of offsite power has occurred.
2. Another Operator has completed steps 1-4 of Attachment ABN-37-2.
3. The Forked River Combustion Turbine Operator has reported that CT#1 is ready.

Task Standard: Combustion Turbine #1 (CT#l) is supplying the station through the SBO Breaker. Required Materials: None. General

References:

1. ABN-37, Station Blackout, revision :7 Initiating Cue: Complete Attachment ABN-:37-2, starting at step 5.0. Utilize CT#1 NRC JPM PLANT1 Page 1 of 14

1 T Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No. Validation Time: 15 minutes NRC JPM PLANT1 Page 2 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. ~~ -~ JPM Start Time: Standard: Comment: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. J Performance Step: 2 Procedure Step: 5.0 Place the SBO Breaker 69 permissive switch on the breaker cubicle in the CLOSED position. Standard: Place the SBO Breaker 69 permissive switch on the SBO Breaker cubicle in the CLOSED position. Cue: Comment: The SBO Breaker 69 permissive switch on the SBO Breaker cubicle is in the CLOSED position. SAT/UNSAT NRC JPM PLANT1 Page 3 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 3 Procedure Step: 6.0 Place the keylock SYNCH/BYPASS SWITCH to the BYPASS position. Using the key on the padlock., places the keylock SYNCH/BYPASS SWITCH to the BYPASS position. The keylock SYNCH/BYPASS SWITCH is in the BYPASS position. -~~ Standard: Cue: S AT/U N SAT Performance Step: 4 Procedure Step: 8.1.1 When System Dispatch or the FRCT operator reports that CT#1 is ready, perform the following at the SBO Panel: Verify the following lockout relays are not tripped: SBO XFMR OVERCURRENT LKOUT RELAY 86TX3-3 SBO XFMR DIFF/GND OVERCURRENT LOCKOUT RELAY 86TX3-4 SBO BRKR OVERCURRENT LKOUT RELAY 86TX3-5 Standard: Verifies the following lockout relays are not tripped (no flags): SBO XFMR OVERCURRENT LKOUT RELAY 86TX3-3 SBO XFMR DIFF/GND OVERCURRENT LOCKOUT RELAY 86TX3-4 SBO BRKR OVERCURRENT LKOUT RELAY 86TX3-5 Cue: No lockouts are tripped. Comment: ~ ~ SAT/U N SAT NRC JPM PLANT1 Page 4 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 5 Procedure Step: 8.1.2 Verify the COMBUSTION TlJRB 1 READY TO START blue light is not lit. Standard: Verifies the COMBUSTION TURB 1 READY TO START blue light is not lit. Cue: Comment: The COMBUSTION TURB 1 READY TO START blue light is not lit. Performance Step: 6 Procedure Step: 8.1.3 Verify 230 KV CKT SWITCHER 89-B9 is open. Standard: Verifies 230 KV CKT SWITCHER 89-B9 is open (red light OFF, green light ON). Cue: Comment: The 230 KV CKT SWITCHER 89-B9 is open NRC JPM PLANT1 Page 5 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: 8.1.4 - ~- ~~~ ~~ Verify CT 1 GENERATOR I3RKR 52G1 is closed. Standard: Verifies CT 1 GENERATOR BRKR 52G1 is closed (red light ON, green light OFF). CT 1 GENERATOR BRKR 52G1 is closed. Cue: Performance Step: 8 Procedure Step: 8.1.5 Verify CT 1 PLANT FEEDER BRKR 52G-1 N is closed. Standard: Verifies CT 1 PLANT FEEDER BRKR 52G-1 N is closed (red light ON, green light OFF). Cue: Comment: CT 1 PLANT FEEDER BRKR 52G-1N IS closed ~ ~ ~ ~ ~~ SAT/UNSAT NRC JPM PLANT1 Page 6 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Pe rfo r man ce I n f o rmat io n Performance Step: 9 Procedure Step: 8.1.6 Verify CT 2 PLANT FEEDER BRKR 52G-2N is open. Standard: Verifies CT 2 PLANT FEEDER BRKR 52G-2N is open (red light OFF, green light ON). Cue: Comment: CT 2 PLANT FEEDER BRKR 52G-2N is open. SATNNSAT J Cue: Performance Step: 10 LBS-C is open. Procedure Step: 8.2.1 Direct System Dispatch or the FRCT Operator to open OC SUPPLY BREAKER 52G-1 IV. Standard: Directs System Dispatch or the FRCT Operator to open OC SUPPLY BREAKER 52G-1 IV (red light OFF, green light ON). Cue: OC SUPPLY BREAKER 52G-1 N is open. (CT 1 PLANT FEEDER BRKR 52G-1 N) NRC JPM PLANT1 Page 7 of 14

e ( Appendix C Job Performance Measure Form ES-C-1 WORKS t i EET Performance I r i fo r ma t io n Performance Step: 11 Procedure Step: 8.2.2 Confirm SBO BRKR is open. ~~ Standard: Confirms SBO BRKR is open (red light OFF, green light ON) Cue: SBO BRKR IS open. Comment: ~ ~- ~ Performance Step: 12 Procedure Step: 8.2.3 Confirm open CT 1 LOAD BREAK SWITCH LBS-A. Standard: Confirms CT 1 LOAD BREAK SWITCH LBS-A open (red light OFF, green light ON). Cue: Comment: CT 1 LOAD BREAK SWITCH LBS-A open. -~ ~ ~~ S AT/U N SAT NRC JPM PLANT1 Page 8 of 14

b Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information ~ ~ Performance Step: 13 Procedure Step: 8.2.4 Confirm open CT 2 LOAD BREAK SWITCH LBS-6. Standard: Confirms CT 2 LOAD BREAK SWITCH LBS-B open (red light OFF, green light ON). Cue: CT 2 LOAD BREAK SWITC:H LBS-B is open Comment: ~ ~~ SAT/UNSAT J Performance Step: 14 Procedure Step: 8.2.5 Close SBO XFMR LOAD BREAK SWITCH LBS-C. Standard: Closes SBO XFMR LOAD UREAK SWITCH LBS-C by placing its control switch to CLOSE (red light ON, green light OFF). Cue: Comment: SBO XFMR LOAD BREAK SWITCH LBS-C IS closed. ~~ ~~ ~ ~~ NRC JPM PLANT1 Page 9 of 14

Appendix C Job Performance Measure WORKS ti EET Form ES-C-1 ~~ ~~ Performance Information -~ ~~ ~ J Performance Step: 15 Procedure Step: 8.2.6 Close CT 1 LOAD BREAK SWITCH LBS-A. -~ ~ ~ Standard: Closes CT 1 LOAD BREAK SWITCH LBS-A by placing its control switch to CLOSE (red light ON, green light OFF). Cue Comment: CT 1 LOAD BREAK SWITCH LBS-A is closed. J Performance Step: 16 Procedure Step: 8.2.7 Direct System Dispatch or the FRCT Operator to close OC SUPPLY BREAKER 52G-1 IN. Standard: Directs System Dispatch or the FRCT Operator to close OC SUPPLY BREAKER 52G-1 N (red light ON, green light OFF). (CT 1 PLANT FEEDER BRKR 512G-1 N) Cue: Comment: OC SUPPLY BREAKER 52G-1N is closed. (CT 1 PLANT FEEDER BRKR 52G-1N) SATNNSAT NRC JPM PLANT1 Page 10 of 14

I. A Appendix C Job Performance Measure Form ES-C-1 WORKS I-iEET Performance Information Performance Step: 17 Procedure Step: 8.3 If LBS-A is open.. Standard: Determines position of LBS-A as closed Cue: LBS-A is closed. Comment: ~- -~ -~ ~- ~- ~ J Cue 1: Performance Step: 18 The Control Room directs that you close the SBO Breaker. Procedure Step: 8.4 When directed by the Control Room, close the SBO Breaker Standard: Closes the SBO BRKR by placing its control switch to close (red light ON, green light OFF). Cue 2 Comment: The SBO Breaker is closed ~~ ~ Terminating Cue: Combustion Turbine #I (CT#l) is supplying the station through the SBO Breaker. JPM Stop Time: NRC JPM PLANT1 Page 11 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number: NRC ~ JPM PLANT1 Examinees Name: Examiners Name: Facility Evaluator: Number of Attempts: Time to Complete: ~ Question: ~ ~ ~ - ~- ~ ~~ _ ~ _ _ ~ ~ Result: Satisfactory/Unsatisfactory Examiners Signature and Date: NRC JPM PLANT1 Page 12 of 14

I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. None.

NRC JPM PLANT1 Page 13 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

1. The plant was at rated power when a total loss of offsite power has occurred.
2. Another Operator has completed steps 1-4 of Attachment ABN-37-2.
3. The Forked River Combustion Turbine Operator has reported that CT#1 is ready.

Task Cue: Complete Attachment ABN-37-2, starting at step 5.0. Utilize CT#1 THIS JPM IS SIMULATE ONLY. THERE WILL BE NO MANIPULATIONS OF PL.ANT COMPONENTS. NRC JPM PLANT1 Page 14 of 14

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility: Oyster Creek Task No.: ABN-30 ~ Task Title. Perform ~ Backup Methods for Critical Functions ~~ ~ Job Performance Measure No.: WA

Reference:

259001 ~ K1.07 (RO/SRO 2.9/2.9) NRC JF'M PLANT2 (RO/SRO) Examinee: F: xa m in e r : Facility Evaluator: Date: Method of Testing Simulated Performance X Act u a I Perf o rm an ce Classroom Simulator Plant Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions: 1. The plant was at rated power when a Control Room evacuation was required.

2. All Feedwater Pumps were running prior to the Control Room evacuation.

Task Standard: All Feedwater Pumps are tripped and locked-out IAW Attachment ABN-30-1. Required Materials: 69 Permissive key is simulated. General

References:

1. ABN-30, Control Room Evacuation, revision 6 Initiating Cue: Perform those actions to trip the Reactor Feed Water Pumps IAW Attachment ABN-30-1.

NRC JPM PLANT2 Page 1 of 8

Appendix C Job Performance Measure W 0 R KS 1-4 E ET Form ES-C-1 Time Critical Task: No. Validation Time: 10 minutes NRC JPM PLANT2 Page 2 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue. JPM Start Time: Standard: Comment: Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. - _ _ - ~ -~~~ ~~ ~~ ~~ ~ Note: Tripping the Feed Water Pumps can take place in any order. ~ ~ ~~~ J Performance Step: 2 Procedure Step: 3 Manually TRIP and LOCKCUT (using the 69 Permissive Switch) the following Feed Water piimp breakers: Manually TRIP and LOCKOUT the breaker for A Feed Water Pump P-2-2A at 41 60 1 A Bus, Unit A8 by: A Feed Water Pump P-2-2A at 4160 1A Bus, Unit A8 Standard:

1. Inserts the 69 Permissive key into the 69 Permissive keylock
2. Rotates the keylock to the TRIP position and holds
3. Places the front panel breaker switch to the TRIP position and releases
4. Releases the keylock and removes the key Observe red light OFF, green light ON, 0 amps The A Feed Water Pump breaker IS open and locked-out.

Cue: Comment: ~ ~ NRC JPM PLANT2 Page 3 of 8

.. I Appendix C Job Performance Measure Form ES-C-1 WORKS ti EET Performance Information J Performance Step: 4 Procedure Step. 3 Manually TRIP and LOCKOUT (using the 69 Permissive Switch) the following Feed Water pump breakers: Manually TRIP and LOCKOUT the breaker for B Feed Water Pump P-2-2B at 4160 1 B BUS, Unit 82 by: 6 Feed Water Pump P-2-2B at 41 60 1 B Bus, Unit 82 Standard:

1. Inserts the 69 Permissive key into the 69 Permissive keylock
2. Rotates the keylock to the TRIP position and holds
3. Places the front panel breaker switch to the TRIP position and releases
4. Releases the keylock and removes the key Observe red light OFF, green light ON, 0 amps The B Feed Water Pump breaker is open and locked-out Cue:

Comment: ~~ ~~ ~. SAT/U N SAT NRC JPM PLANT2 Page 4 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 4 Procedure Step: 3 Manually TRIP and LOCKClUT (using the 69 Permissive Switch) the following Feed Water piimp breakers: C Feed Water Pump P-2-2C at 4160 1 B Bus, Unit B10 Manually TRIP and LOCKClUT the breaker for A Feed Water Pump P-2-2C at 4160 1C Eus, Unit B10 by: Standard:

1. Inserts the 69 Permissive key into the 69 Permissive keyloc k
2. Rotates the keylock to the TRIP position and holds
3. Places the front panel breaker switch to the TRIP position and releases
4. Release the keylock and removes the key Observe red light OFF, green light ON, 0 amps The C Feed Water Pump breaker is open and locked-out.

Cue: Comment: ~ ~~ ~ Terminating Cue: All Feedwater Pumps are tripped and locked-out IAW Attachment ABN-30-1. JPM Stop Time: NRC JPM PLANT2 Page 5 of 8

L.. Appendix C Job Performarice Measure Form ES-C-1 WORKSHEET Va I id at ion of Completion JPM Number: Examinees Name: ~ Examiners Name: ~- ~ Date Performed: -~ Facility Evaluator: Number of Attempts: Time to Complete: ~ Question: -~ Result: Examiners Signature and Date: ~- NRC JPM PLANT2 Page 6 of 8

a d Appendix C Job Performanlce Measure Form ES-C-1 WORKSHEET Simulator Setup 1. None NRC JPM PLANT2 Page 7 of 8

4 vl Appendix C Job Performanlce Measure Form ES-C-1 WORKSHEET STUDENT bANDOUT In it ial Conditions:

1. The plant was at rated power when a Control Room evacuation was required.
2. All Feedwater Pumps were running prior to the Control Room evacuation Task Cue:

Perform those actions to trip the Reactor Feed Water Pumps IAW Attachment ABN-30-1. THIS JPM IS SIMULATE ONLY. THERE WILL BE NO MANIPULATIONS OF PLANT COMPONENTS. NRC JPM PLANT2 Page 8 of 8

L Appendix C Job Performance Measure Form ES-C-1 WORKSIiEET Task NO.: 2860401 403 Facility: oyster Creek ~ ~~. Task

Title:

Lineup ~ Fire Water to Core Spray to Raise Torus Water Level Job Performance Measure No.. NRC JPM PLANT3 (RO/SRO) WA

Reference:

286000 Al.05 (RO/SRO 3.2/3.2) Examinee: ~ ~ Exam in e r : Facility Evaluator: Date: ~ ~~ Method of Testing: Simulated Performance ~~~ X Actual Performance Classroom ~ Simulator X Plant ~~ Read to the Examinee: I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. Initial Conditions: 1. The plant was at rated power when an event occurred resulting in a lowering Torus water level.

2. The US has determined to makeup to the Torus via Core Spray System 2, IAW the EOPs.
3. Core Spray is not required for adequate core cooling.
4. The NW Corner Room is not accessible.
5. EMG-SP37, Makeup to the Torus Via Core Spray System, is complete up to and including Step 3.3.3.

Task Standard: Fire Water is injecting into the Torus IAW EMG-SP37. Required Materials: A radio and Reactor Eluilding keys are simulated. General

References:

1. EMG-SP37, Makeup to the Torus Via Core Spray System, revision 0.

NRC JPM PLANT3 Page 1 of 10

o r Appendix C Job Performance Measure WORKS tiEET Form ES-C-1 Initiating Cue: IAW EMG-SP37, Makeup to the Torus Via Core Spray System, inject Fire Water into the Torus, starting at Step 3.2.4. Time Critical Task: No. Validation Time: 22 minutes NRC JPM PLANT3 Page 2 of 10

L. c Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance I information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat Standard: Comment: Provides repeat back of initiating the repeat back. back of initiating cue. JPM Start Time: cue. Evalua for acknowledges S AT/U N SAT Note: Performance Steps 2 and 3 may be performed in any order. Performance Step: 2 Procedure Step: 3.3.4 Open the breaker for the Coire Spray System 2 Parallel Isolation valve: ~- ~~ V-20-21 (MCC 1A21) Standard: Opens the breaker for the Core Spray System 2 Parallel Isolation valve: V-20-21 (MCC 1A21) by rotating the switch to OFF Cue: Comment: The breaker for the Core Spray System 2 Parallel Isolation valve V-20-21 is open. S AT/U N SAT NRC JPM PLANT3 Page 3 of 10

i Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 3 Procedure Step: 3.2.4 Open the breaker for the Core Spray System 2 Parallel Isolation valve: V-20-41 (MCC 1AB2) Standard: Cue: Comment: Opens the breaker for the Core Spray System 2 Parallel Isolation valve: V-20-41 (MCC 1AB2) by rotating the switch to OFF The breaker for the Core Spray System 2 Parallel Isolation valve V-20-41 is open. S AT/U N SAT Procedure Step: 3.3.5.1 Close Tell-Tale Drain valve V-20-90 (South Side RB). Standard: Closes Tell-Tale Drain valve V-20-90 by rotating valve handwheel CW until tight. Cue: Comment: Tell-Tale Drain valve V-20-90 is closed. ~ ~~ S AT/U N SAT NRC JPM PLANT3 Page 4 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance information J Performance Step: 5 . ~- ~ ~ -~ Procedure Step: 3.3.5.2 Start the available Diesel Fire Pumps by placing their switches in MAN position (Panel 13R). Standard: Calls the Control Room on the radio and directs them to start the available Diesel Fire Pumps. Cue: Comment: All available Diesel Fire Pumps are started. ~- SAT/U NSAT J Performance Step: 6 ~- ~ ~ Procedure Step: 3.3.5.3 Open Fire Protection Supply valve V-20-82 (South Side RB). Standard: Open Fire Protection Supply valve V-20-82 by rotating the valve handwheel CCW until tight. Cue: Comment: Fire Protection Supply valve V-20-82 is open. ~~ SATAJNSAT NRC JPM PLANT3 Page 5 Of 10

Appendix C Job Performance Measure Form ES-C-1 WORKS 1-1 E ET Performance Information Performance Step: 7 Procedure Step: 3.3.5.4 control switches in the 0 0 Core Spray Main Pump B and Core Spray Main PLimp D Standard: Calls the Co on the radio and directs them place Core control switches in the PULL-TO-Core Spray Main Pump B and Core Spray Main Pump D Core Spray Main Pumps B and D are in the PULL-TO-LOCK position. Cue: Comment: ~- ~ SAT/UNSAT NRC JPM PLANT3 Page 6 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J Performance Step: 8 Procedure Step: 3.3.6 Unlock and place the breaker for Torus Test Flow Return Valve V-20-26 in the ON position (MCC 1 B21 A) (RB23 E). Standard: Unlocks the breaker for Torus Test Flow Return Valve V-20-27, and rotates the breaker switch to the ON position on MCC 1 A21 B. Cue: The breaker for Torus Test Flow Return Valve V-20-26 is in the ON position. S AT/U N SAT J Performance Step: 9 -~ Procedure Step: 3.3.7 Open Torus Test Flow Return Valve V-20-26 (Keylock RB 51 NW). Standard: Open Torus Test Flow Return Valve V-20-26 by inserting the key in the upper keylock and rotating to the right. (red light ON, green light OFF) Cue: Torus Test Flow Return Valve V-20-26 is open. Comment: ~~ S AT/U N SAT Terminating Cue: Fire Water is injecting into the Torus IAW EMG-SP37 JPM Stop Time: NRC JPM PLANT3 Page 7 of 10

s L Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number: NRC JPM PLANT3 Examinee's Name: Examiner's Name: Date Performed: Facility Evaluator: Number of Attempts: Time to Complete: Question: ~~

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature and Date: ~~ NRC JPM PLANT3 Page 8 of 10

+* Appendix C Job Performance Measure Form ES-C-1 WORKS t i EET Simulator Setup

1. Have a copy of EMG-SP37 completed up to and including 3.2.3.

NRC JPM PLANT3 Page 9 of 10

r-.. Appendix C Job Performance Measure Form ES-C,-1 WORKSHEET STUDENT H-ANDOUT Initial Conditions:

1. The plant was at rated power when an event occurred resulting in a lowering Torus water level.
2. The US has determined to makeup to the Torus via Core Spray System 1, IAW the EOPs.
3. Core Spray is not required for adequate core cooling.
4. The NW Corner Room is not accessible.
5. EMG-SP37, Makeup to the Torus Via Core Spray System, is complete up to and including Step 3.2.3.

Task Cue: IAW EMG-SP37, Makeup to the Torus Via Core Spray System. inject Fire Water into the Torus, starting at Step 3.2.4. THIS JPM IS SIMULATE ONLY. THERE WILL BE NO MANIPULATIONS OF PLANT COMPONENTS. NRC JPM PLANT3 Page 10 of 10}}