IR 05000271/2011011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
Line 2: Line 2:
| number = ML15331A160
| number = ML15331A160
| issue date = 12/22/2011
| issue date = 12/22/2011
| title = Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities.
| title = Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities
| author name = Conte R
| author name = Conte R
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc.
{{#Wiki_filter:==SUBJECT:==
VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 0500027 1 t2ol 1 01 1


(Indian Point Nuclear Generating Units 2 and 3)
==Dear Mr. Wamser:==
NYS000459 ASLBP #: 07-858-03-LR-BD01    Submitted: November 9, 2012 Docket #: 05000247 l 05000286 Exhibit #: NYS000459-00-BD01  Identified: 11/5/2015 Admitted: 11/5/2015  Withdrawn:
on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results of the inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff.
Rejected:  Stricken:
 
Other:
This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion was directed toward those activities and facilities accessible during the refueling outate.
UNITED STATES NUCLEAR REGULATORY COMMISSION


==REGION I==
-witnin these areas, the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel.
475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 December 22, 20lL Mr. Christopher Wamser Entergy Nuclear Operations, Inc.


Vermont Yankee Nuclear power Station 185 Old Ferry Road P.O. Box 500 Brattleboro, VT 05302-0500 SUBJECT: VERMONT YANKEE NUCLEAR  POWER STATION INSPECTION REPORT 0500027
on the basis of the samples selected for review, there were no findings identified during this inspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112.
        - NRC INTEGRATED 1 t2ol 1 01 1


==Dear Mr. Wamser:==
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results of the inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff.
Entergy Nuclear Operations, Inc.


This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion-witninwas directed toward those activities and facilities accessible during the refueling outate. these areas, the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel.
(Indian Point Nuclear Generating Units 2 and 3)


on the basis of the samples selected for review, there were no findings identified during this inspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
NYS000459-00-BD01 11/5/2015 11/5/2015 NYS000459 Submitted: November 9, 2012 tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Sincerely,

Revision as of 06:20, 10 January 2025

Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities
ML15331A160
Person / Time
Site: Vermont Yankee  Entergy icon.png
Issue date: 12/22/2011
From: Conte R
NRC/RGN-III/DRS/EB1
To: Wamser C
Entergy Nuclear Operations
SECY RAS
References
RAS 23737, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 IR-11-011
Download: ML15331A160 (12)


Text

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 0500027 1 t2ol 1 01 1

Dear Mr. Wamser:

on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results of the inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff.

This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion was directed toward those activities and facilities accessible during the refueling outate.

-witnin these areas, the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel.

on the basis of the samples selected for review, there were no findings identified during this inspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112.

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

NYS000459-00-BD01 11/5/2015 11/5/2015 NYS000459 Submitted: November 9, 2012 tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/Z,tr*J>M Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-271 License No. DPR-28 Enclosure:

NRC lnspection Report 0500027 1 1201 101 1 cc w/enclosure: Distribution via ListServ