ML20133F569: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
.n,w | |||
. a -- =. | |||
..w | |||
..u.. | |||
w -.-..a..u.u =.a... c - | |||
DISTRlBUTIO!;: | |||
i:RR Contract File (DCorlay) | i:RR Contract File (DCorlay) | ||
Br'anch Rdg. File VZeoli, CON DDandois, C0fi | Br'anch Rdg. File VZeoli, CON DDandois, C0fi ZRosztoczy, DST | ||
~ | |||
ZRosztoczy, DST | " MEMORANDUM FOR: | ||
Edward L. Halman,. Director NAY 2 7 Jgg3 fodell Division of Contracts, ADM Vgratege) | |||
FROM: | RBallard FROM: | ||
Richard H. Vollmer, Director WJohnston Division of Engineering, NRR EPentecost CPaugh P-415 | |||
==SUBJECT:== | ==SUBJECT:== | ||
REQUEST FOR PROCESSING OF AN'NRR PROCUREMENT ACTION: | |||
RFPA NO.: | RFPA NO.: | ||
Richard H. Vollmer, Director Division of Engineering Office of Nuclear Reactor Regulaticn | NRR-83-109 TITLE: | ||
Attachments: | Analysis of Potential Flood Levels at the Trojan Nuclear Power Plant FIN NO.: B8649 The attached regbest for Procurement Action.(REPA),, NRC. Form 400, Parts 1 and 2, is forwaa ded for your action. | ||
If you have any questions concerning the acceptance and processing of this request, please contact Mr. E. Pentecost ext. 27067. | |||
Richard H. Vollmer, Director Division of Engineering Office of Nuclear Reactor Regulaticn Attachments: | |||
As Stated t | As Stated t | ||
h | h V. | ||
V. | * Verbal concurrence | ||
* Verbal concurrence | . E SjSEPentec[ost DE/EHEB DE/EHEB DE/EHEB AD/MCET D | ||
DE/EHEB | TSB/NRR D | ||
* WJohnston * | Rt adell:mg*MFliegel + | ||
RVorlmer 5/ | RBallard | ||
[LB- | * WJohnston | ||
* BG enter RVorlmer 5/ | |||
'83 ' 5/ /83 5/ /83 5/ /83 5/),p83 5 [ /83 5 | |||
/83 8500080345 850618 | |||
[LB-3 PDR | |||
_}} | |||
Latest revision as of 08:28, 12 December 2024
| ML20133F569 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 05/27/1983 |
| From: | Vollmer R Office of Nuclear Reactor Regulation |
| To: | Halman E NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML19264D658 | List:
|
| References | |
| CON-FIN-B-8649, FOIA-85-353 NUDOCS 8508080345 | |
| Download: ML20133F569 (1) | |
Text
-
.n,w
. a -- =.
..w
..u..
w -.-..a..u.u =.a... c -
DISTRlBUTIO!;:
i:RR Contract File (DCorlay)
Br'anch Rdg. File VZeoli, CON DDandois, C0fi ZRosztoczy, DST
~
" MEMORANDUM FOR:
Edward L. Halman,. Director NAY 2 7 Jgg3 fodell Division of Contracts, ADM Vgratege)
RBallard FROM:
Richard H. Vollmer, Director WJohnston Division of Engineering, NRR EPentecost CPaugh P-415
SUBJECT:
REQUEST FOR PROCESSING OF AN'NRR PROCUREMENT ACTION:
RFPA NO.:
NRR-83-109 TITLE:
Analysis of Potential Flood Levels at the Trojan Nuclear Power Plant FIN NO.: B8649 The attached regbest for Procurement Action.(REPA),, NRC. Form 400, Parts 1 and 2, is forwaa ded for your action.
If you have any questions concerning the acceptance and processing of this request, please contact Mr. E. Pentecost ext. 27067.
Richard H. Vollmer, Director Division of Engineering Office of Nuclear Reactor Regulaticn Attachments:
As Stated t
h V.
- Verbal concurrence
. E SjSEPentec[ost DE/EHEB DE/EHEB DE/EHEB AD/MCET D
TSB/NRR D
Rt adell:mg*MFliegel +
RBallard
- WJohnston
- BG enter RVorlmer 5/
'83 ' 5/ /83 5/ /83 5/ /83 5/),p83 5 [ /83 5
/83 8500080345 850618
[LB-3 PDR
_