Forwards Questions for Transmittal to Licensee Re Postulated Breakout of Spirit Lake & Effects on Facility
ML20132B567
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/04/1983
From: Ballard R
Office of Nuclear Reactor Regulation
To: Clark R
Office of Nuclear Reactor Regulation
Shared Package
ML19264D658 List:
References
FOIA-85-353 NUDOCS 8305170172
Download: ML20132B567 (13)


Text

_. l - . : L.: . .: .:6-n._ a Oh -

_aw.a ~ -.a. a.; _ 2L M :.::.a z: -.

. * - .W $

J UNITED STATES NUCLEAR REGULATORY COMMisslON

' f , [1 j WASHINGTON, D. C. 20555

  • I
  • 26M[/

gv MAY 4 1983 Docket No. 50-344 r

MEMORANDUM FOR: Robert A. : Clark, Chief .,

Operating Reactors Branch No. 3, DL THRU: William V. Johnston, Assistant Director yhsl/

p Materials, Chemical & Environmental Technology, DE 7

FROM: Ronald L. Ballard, Chief Environmental & Hydrologic Engineering Branch, DE

SUBJECT:

HYDROLOGIC ENGINEERING QUESTIONS CONCERNING THE EFFECTS OF A SPIRIT LAKE BREAK 0UT ON THE TROJAN PLANT Plant Name: Trojan Nuclear Plant -

Licensing Stage: Operating Responsible Branch: Operating Reactors Branch No. 3;_C. Trammell, PM __

Status: Continuing Review In a letter to you dated April 12, 1983, the Trojan Plant licensee, Portland ,

General Electric Comp.any, pr.ovided a discussion of a recently. published USGS report titled "Mudflow Hazards Along the Toutle -and Cowlitz. Rivers From the Hypothetical Failure of Spirit Lake Blockage." In its discussion, the licensee states that the mudflow peak postulated by the USGS is substantially less than the design basis flood for the Trojan Plant. The licensee, however, does not address the differences between the design basis Columbia River flood and that discussed in the USGS report including the potential for sediment deposition in the Columbia River and the resultant reduction in channel cross-sectional area which could cause flood levels to rise above the design basis flood level of 45 feet MSL.

To address these con: erns, we have prepared the attached questions for your transnittal to the licensee.

These questions are also a followup to our Spirit Lake-Mount St. Helens-Trojan Status which is being submitted to you under a separate memo.

pW Y'

./

U PP l';/J n

m -

[ .

aa.; 2 a-.x. - . . -.  :.a ..-.:=Lu 2.dki.aw. _: .. .. > :. .. .:.c.. w : ._.

N Robert A. Clark 1933

~' ~

Tnese questions were prepared by R. Gonzales who can be reached at extension 28010.

9 Ongiria; sign: :-; .':.n.i L Bal:2rd

. Ronald L. Eallard, Chief Environmental & Hydrologic Engineering Branch Division of Engineering Attachments: As stated cc: w/o attachtent R. Vollner D. Eisenhut w/attachtent W. Johnston G. Lainas -

O. Parr R. Jackson - -

G. Lecr - - ' '

C. Tramell -

'.' 71iegel -

~

R. Cenzales .- .

. DISTRIBUTION:

Dockets EHEB Rdg RLBallard .

(

s

_,, A* C .- + ,

e m c c > '.D.E. .:.E. .H. .E. . .

((

.'. p. . . .k. .H. .d.B.. .Q.E. .;.EH

. . E.. .. .. n.. . . .D. E :

7

'$hy..................

y . .. . ... . . .. .... ......

" " ^ " ' > M9.ny.1gs.ms ...tW11.ege.l..... ..RLBM.la. .... ...V, .o s' ton.. . ................... .... .... .... .. .... ..............

    • " > 5/.4/.8. 3. . . . . . . .. . .5././/..

. .(.8. 3. ... . .. .f. ./. 8 3. . . . .5/.Y.

. 5./.

. . . . /.8. 3. . . ...............

~

N

= ~

a :. a - . . -.- a - ~ ~ - -. a. mm -. - - ~ ~ - - -

Hydrologic Engineering Questions Concerning a Postulated Breakout of Spirit Lake and the Effects on the Trojan Nuclear Plant In referring to USGS Report 82-4125, you state that the Trojsn Pla~ nt is protected against conditions that might be expected from a failure of the Spirit Lake debris blockage. .You apparently base this statement on the fact that the design basis flood for Trojan, 4,400,000 cfs, is substantially more than the 1,090,000 cfs postulated by the USGS in their report. We would agree with this reasoning if the Spirit Lake breakout flood was a clear-water flood. However, since it would be a mudflow, the forces considered in analyzing fluid flow, particularly pressure, inertia and viscosity would be significantly different.

We would expect that the more viscous mudflow would result in reduced channel efficiency and higher flood levels for a given flow. _ , _ In addition, the nudflow _ ,

would be capable of depositing a tremendous aq0Jnt of sedicer.t in the Columbia ,

i River thus resulting ,in even, higher flood levels. _

~

The staff position is that you have not provided sufficient information to show that a breakout of Spirit Lake and the ensuing nudflow would not affect the safety of the Trojan Plant. You should therefore provide the following informa-tion for staff review.

1. Taking the scenario in the USGS report as a "given", discuss the potential for sediment deposition in the Columbia River, i.e., how much of the 9 '

2.4 x 10 cubic yards of sediment that would be entrained in the Spirit Lake breakout flood would be deposited in the Columbia River?

.x: - w u -

w=--. z --.

=.

-w m u- . . . . . -

-.a - .. w :.u.L:

w.. u

2. The Corps of Engineers estimates in their report, " Mount St. Helens, The Challenge to Restore and Protect," that about 45,000,000 cubic yards of r

mudflow infill were deposited in the Columbia River following the May 1980 eruption of Mount St. Helens; the major portion being deposited from j

about 5 miles downstream of the mouth of the Cowlitz River (River Mile 63)

I to about the vicinity of the Trojan Plant (River Mile 72). Of this amount, i

about 14,000,000 cubic yards were removed by the Corps of Engineers and i

4 about 31,000,000 cubic yards were lef t in the river outside the 600 foot wide navigation channel'. Discuss the impact of this new condition.on the flood carrying capacity of the Columbia River and the effect on the design basis water level of 45 ft at Trojan.

3. Assume that the sedinent amount determine [in ycur response to question 1 -

would. be deposited between River Miles 63'a,nd, 72, as .was,- the case following the 1980 audflow, and analyse the impact on flood levels in the Columbia River at the Trojan Plant.

4. Tne USGS study necessarily required many assumptions concerning items such as the amount of sedinent that would be entrained, dam failure node, downstream routing methods, flood peak attenuation, etc. The USGS assumptions were reasonable and not necessarily upper bound conditions such as are usually assumed in siting of nuclear power plants. You should therefore assume other debris blockage failures and nudflow hydrographs more severe than the USGS's, and discuss the likelihood e

~

of water levels exceeding plant grade elevation of 45 feet nsi at Trojan.

_..-.m.

.; a)L',1

, .,--~-

.. ar - c.+L.r. e .

- . ~~Ge wdni . L ..i s- a:. . .

ru-a. salidaauv; .: mal

~~ u a:-. :-i.4 . L'. , G:;. :G -4. .; ' - -- --

5. Discuss the effect of water levels higher than elevation 45 feet msl on the safety of the Trojan Plant assuc.ing various durations and levels of r

flooding.-

.~

a e S

e e 9 *

.e e e .

+

9 me-

, Iy

' b. .

6 r

, i t

. i

}

.. , ,._........o- .< -' .

Enclosure 2 RECORD OF TELEPHONE CONVERSATION

. . ,. DATE: March 10, 1983 PROJECT: TROJAN-Portland RECORDED BY: Raymond Gonzales General Electric Co.

r TALKED WITH: Tom Davis 0F the Corps of Engineers, North Pacific Division MAIN SUBJECT OF CALL: To inquire about the Corps involvement in the post Mount St. Helens eruption effects on the Columbia River.

I spoke to Tom Davis who is.in the Planning Division of the North Pacific Division of the Corps of Engineers. Tom suggested that we contact Mr. Pat Keough who is the Chief of the Planning Division of the Portland District.

His number is 8-423-6413.

TomtoldmethathebelievesthattheWater3aysExperimentStation(WES)has done some modeling of a Spirit Lake breakout and the results are considerably different from-the USGS study. (Perhaps what we need has already been done).

Tom tells me that the Spirit Lake in-house expert is Bill (Ed) Daugherty (8-423-6454) so we may want to talk to Bill. However, we should first talk to Keough and if he doesn't mention Daugherty, we may inquire about other on-going -

COE studies.

Daugherty works in the Engineering Division so he may have some information that Keough doesn't have.

4

} s

_,. ....;..:-.. __ . ._ - . . _ _ . . ~ _ _ -

Enclosure 3 RECORD OF TELEPHONE CONVERSATION DATE: April 1, 1983 PROJECT: TROJAN-Portland RECORDED BY: Raymond Gcnzales General Electric Co.

r TALKED WITH: Ed Daugherty 0F the Corps of Engineers, Portland MAIN SUBJECT OF CALL: To inquire about the status of a Corps' request that '

USGS assess the impact of mudflows on the Columbia River.

1 The USGS is planning to conduct a study of the impacts 'of mudflows, on the Columbia River, that could result from a Spirit Lake breakout. This USGS study is expected to take about a year to complete. The Corps of Engineers .

would like to have some idea of the magnitude of flooding on the Columbia River in a shorter time span than a year and has requested the USGS perform a quick study to determine this. I called Ed Daugherty of the Corps (FTS 8-423-6454) to inquire whether the USGS had agreed to do such a study. Mr. Daugherty hasn't received a response from the USGS yet. However, Mr. Daugherty did say that the USGS is quite reluctant to do a short study so he does not know what will be done. He promised to find out and let us know. I requested that he send copies of the report " Mount St. Helens Eruption,The Challenge to Restore ,

and Protect, October 1981, COE-Portland". He said that this report is just a historical account of COE activities after the May 1980 eruption and has nothing to do with future eruptions or mudflows. I told him to send us a copy anyway.

l l

, t

Enclosure 4

-2 RECORD OF TELEPHONE CONVERSATION DATE: April 19, 1983 PROJECT: TROJAN-Portland RECORDED BY: Myron Fliegel General Electric Co.

r I TALKED WITH: D. Kresch 0F the United States Geological Survey MAIN SUBJECT OF CALL: To inquire about the possibility of the USGS doing a quick study of the impacts, of a potential spirit Lake breakout, on the Trojan Plant.

I called David Kresch, USGS co-author of Spirit Lake Dam failure report (82-4125) at FTS 390-6510 in Tacoma. I discussed NRC's interest in flood effects of Spirit Lake (S. L.) dam failure in relation to the Trojan plant on the Columbia River. Kresch said that FEMA had been investigating feasibility i

of USGS doing a quick analysis of Columbia River effects of S.L. dam failure but he didn't know whether USGS had agreed to do the work. He promised to find out and get back to me. I told Kresch that NRC was interested in a more nar-rowly defined evaluation.in that we were only interested in the effects at the Trojan site rather than a large stretch of the Columbia. I stated our request as:

Estimate flows and evalations in the Columbia River at the Trojan site ~

assuming'a failure of the Spirit Lake dam and flows in the Toutle and Cowlitz Rivers as per Report 82-4125. Also estiamte elevation of sediment deposited.

I also told Kresch that-if the above could not be accomplished NRC would settle for an estimate of the likelihood and duration of Columbia River ele-vations exceding 45' msl (plant grade) at Trojan assuming dam failure and Cowlitz hydrograph as in Report 82-4125. We discussed the meaning of "likeli-hood". I stated that we were starting from the assumptions used in Report 82-4125 and were not asking for probabilities of those assumptions occurring.

Also, that we said " likelihood" rather than " probability" to convey the quali-tative nature of the assessment. .

1 i IaskedthattheUSGSalsoqualitativelydiscussitbeeffectsofotherdam failure scenarios and mudflow hydrographs, more s'evere than those in Report 82-4125, on the likelihood of elevations above 45'. msl at Trojan.

t9 I told Kresch that the time from we needed was .about the end of June because Trojan was to restart in July or August. ,

Kresch said that he'would discuss the request with appropriate USGS management and that he or somebody else would get back to me soon today or within a couple a of days. -

I fd

. . . . . - ._.L.-.-  :.- .. -. . t: . ~. . =. ;.. :~ ~ . .  :.= .- -

Enclosure 5

. 7.

RECORD OF TELEPHONE CONVERSATION DATE: April 19.-1983 PROJECT: Trojan Portland RECORDED BY: Raymond Gonzales . Gen,eral Electric Co.

TALKED WITH: Al Ramirez 0F the Corps of Engineers, Portland MAIN SUBJECT OF CALL: Since it doesn't appear that USGS can do a quick study _

of mudflow impacts on Trojan I wanted to know if the Corps might be capable of doing this.

I called Mr.*Al Ramirez (8-423-6478) of the Corps of Engineers-Portland.to in-quire about the possibility of the COE doing a study of the Columbia River-Trojan mudflow impacts. Mr. Ramirez is the Study Manager for the Compreh6nsive Study of the Toutle-Cowlitz Rivers. This study was authorized as a result of the President's emergency declaration (August 19,1982) concerning the potential for catestrophic flooding from Spirit Lake. This study is t'o be completed &nd on the President's desk by the 15th of November 1983. Mr. Ramirez informed me that "WE.S" has done some modeling for this study and that he expects that by July or August a portion of the report dealing with a long term solution to flooding on the Cowlitz will be completed and available.

As far as the COE doing some work for NRC, it doesn't look too promising.

Mr. Ramirez says they are swamped just trying to meet the November 1983 dead-line for their study report. He mentioned that the Hydrology Section which would do this type of study does not have the resources to do any extra work but he suggested that we call the Chief of Engineering, Mr. Bob Flanagan (8-423-6919) just to make sure. I am trying to get hold of Mr. Flanagan but he is not in today. I will call back tomorrow April 20, 1983.

I 0

e f, p:,)

(

a..- =-. . .aw. a i..w. ,

.- - . . . ..- .... u . . - -

Enclosure 6

, r.

RECORD OF TELEPHONE CONVERSATION DATE: April 19, 1983 PROJECT: Trojan Portland RECORDED BY: 'Raymond Gonzales General Electric Co.

TALKED WITH: Ed Daugherty 0F the Corps of Engineers, Portland MAIN SUBJECT OF CALL: To follow up on telecon of April 1, 1983 between R. Gonzales-NRC and Daugherty COE.

I spoke with Ed Daugherty (COE) to get an update on the Corp's request that USGS do a quick study of Columbia River impacts. The USGS will not do a quick study. FEMA and the USGS are now negotiating about who is to fund the year long study. If FEMA funds it, it will take a year. If USGS funds it, it will take two or three years. Mr. Daugherty suggested that we contact FEMA in Bothell, Washington to express our interest and let them know that.NRC also has i an interest in a quick completion of the study. He suggested we call Mr. Bill Mayer FTS 8-396-0284.

I k '- 't - l l

l i

i S.

~

\

qlS\

1 i, s i

r 3

_ _ _ . . . L

'.;-~ a - .a .=:..;;a w w -.a- .. -.- -. =

. .:=.

, Enclosure 7

~

RECORD OF TELEPHONE CONVERSATION DATE: ,, April 20, 1983 PROJECT: Trojan Portland RECORDED BY: Myron Fliegel General Electric Co.

9 TALKED WITH: Leslie Laird 0F the USGS, Tacoma, Washington ,

MAIN SUBJECT OF CALL: Follow up on telecon of April 19, 1983 between M. Fliegel-NRC and Kresch-USGS I returned call from Leslie Laird, District Chief, OSGS, Tacoma, Washington (FTS 390-6510) at 1:45 p.m. Mr. Laird told me that USGS is working on a model to be used to evaluate effects in Columbia River, of a breakout of Spirit Lake blockage but that won't be completed for at least a year. He said that some of the items I discussed on April 19, 1983 with D. Kresch cannot be answered until that study is complete but that others could. Specifi.cally, Laird.

stated that estimations of sediment deposition levels in the Columbia River cannot be done. However, the technical ability to determine water (actually water and entrained sediment) levels in the Columbia River near Trojan exists now.

Laird will not consider doing any work for NRC, however, because work performed last year for NRC was not paid for. (Note: This work was not done for NRR).

I The work involved the BWIP sites.at Hanford. The USGS reviewed Rockwell's work in groundwater modeling. Evidentally, NRC forget to include it in the budget and had already committed all available FY 82 monies _.when the oversight was discovered. An attempt to have USGS paid by DOE in FY 83 failed. In any event, Laird was adamant about not performing any more work for NRC until he gets paid for the BWIP work - about $30 K.

Because he will not consider working for NRC at this time, Laird will not in-vestigate whether he has the manpower available to actually perform the analy-sis of Columbia River water levels within the time period I discussed with Kresch by the end of June, 1983.

9 6

gb90

.=.~:a.:

= ..-.. - . .~ = 2~.L . . . -

. Enclosure 8 RECORD OF TELEPHONE CONVERSATION DATE: April 25, 1983 PROJECT: TROJAN-Portland RECORDED BY: Raymond Gonzales General Electric Co.

TALKED WITH: B. Mayer, D. Donovan and B. Brown 0F FEMA Bothell. Washington MAIN SUBJECT OF CALL: To discuss status of FEMA-USGS study to determine potential impacts of a Spitit Lake breakout on the Columbia River.

FEMA has requested the USGS to do a study of the potential impacts of a Spirit Lake breakout on the Columbia River. I wanted to let FEbM know that NRC is also interested in such a study as it relates to Trojan.

Mr. Mayer who is the FEMA regional director in Bothell, Washington, referred me to Mr. Dick Donovan and Mr. Bill Brown. Mr. Brown is the one most know-ledgeable about the FEPA-USGS study. Mr. Brown generally reiterated the infor-mation that we've obtain from the USGS and C0E in past telephone conversations.

Mr. Brown, however, did shed some light on the negotiations currently under-way concerning who will fund the study (See tele-con dated April 4, 1983 between Gonzales NRC and Daugherty-COE). The resources for funding the study of the -

Columbi River are not in the USGS's budget at the present time so it would probably take about three years to obtain the funds and do the study. FEMA, hcwever, want an answer as quickly as possible so funds may come from FEMA.

If funds are available now, study will take about a year to complete. Mr.

Brown stated that a quick study like NRC would like to have done is not a new idea; USGS has considered this all along. However, since this is not the usual way of doing business at USGS, trying to overcome inertia within the agency is a major problem.

FEMA is aware that some consideration has been given to having the state (s) of Washington and/or Oregon together with consultants, knowledgeable with sediment-transport processes, do a quick study. USGS would not be an active participant and would draw no conclusions but would sit in on the discussions.

This could be the answer NRC is looking for.

Mr. Brown suggested that NRC write a letter to the regional director of FEMA, Mr. Bill Mayer, stating that NRC also has an urgent need to know what the consequences of a Spirit Lake breakout will be in relation to the Trojan Plant. This letter would improve FEFM's position in their negotiations with USGS as far as getting answers as quickly as possible is concerned.

l ~

~~--~:.-.=.-..=-p-..:.----

- - - :.= x.. w a . ~ . -. =-.=- ~ ~ - ~ - - . . - - -

Enclosure 9  ;

RECORD OF TELEPHONE CONVERSATION DATE: April 26,1983 PROJECT: TROJAN-Portland RECORDED BY: Raymond Gonzales General Ele _ctric Co.

TALKED WITH: Bill Flanagan 0F the Corps of Engineers MAIN SUBJECT OF CALL: To discuss possibility of the C0E performing a quick study for NRC on the impacts of a Spirit Lake breakout on the Columbia River and the Trojan Plant ITEMS DISCUSSED: In a conversation with Mr. Al Ramirez of the COE, (See tele-con record dated April'19, 1983 between Gonzales-NRC and Al Ramirez- COE)

Mr. Ramirez had suggested that we contact Mr. Flanagan to inquire as to the possibility of the COE performing a quick study for NRC. Mr. Flanagan stated that the COE would not be able to do this at the persent time because of the lack of manoower resources and because the USGS and FEMA are already engaged in such a study.