ENS 52442: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/18/2016 11:24 PST
| event date = 12/18/2016 11:24 PST
| last update date = 12/18/2016
| last update date = 12/18/2016
| title = Automatic Scram Due To Load Reject From Substation
| title = Automatic Scram Due to Load Reject from Substation
| event text = On December 18, 2016 at time 1124 PST the plant experienced a full reactor scram.  Preliminary investigations indicate that the scram was caused by a load reject from the Bonneville Power Administration (BPA) Ashe substation.  Further investigations continue. The following conditions have occurred:
| event text = On December 18, 2016 at time 1124 PST the plant experienced a full reactor scram.  Preliminary investigations indicate that the scram was caused by a load reject from the Bonneville Power Administration (BPA) Ashe substation.  Further investigations continue. The following conditions have occurred:
Turbine Governor valve closure
Turbine Governor valve closure

Latest revision as of 20:43, 1 March 2018

ENS 52442 +/-
Where
Columbia Generating Station Energy Northwest icon.png
Washington (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge

10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.18 h-0.0492 days <br />-0.00702 weeks <br />-0.00162 months <br />)
Opened: Jeffery Kuether-Ulberg
18:13 Dec 18, 2016
NRC Officer: Jeff Herrera
Last Updated: Dec 18, 2016
52442 - NRC Website
Loading map...