Line 16: | Line 16: | ||
| event date = 12/18/2016 11:24 PST | | event date = 12/18/2016 11:24 PST | ||
| last update date = 12/18/2016 | | last update date = 12/18/2016 | ||
| title = Automatic Scram Due | | title = Automatic Scram Due to Load Reject from Substation | ||
| event text = On December 18, 2016 at time 1124 PST the plant experienced a full reactor scram. Preliminary investigations indicate that the scram was caused by a load reject from the Bonneville Power Administration (BPA) Ashe substation. Further investigations continue. The following conditions have occurred: | | event text = On December 18, 2016 at time 1124 PST the plant experienced a full reactor scram. Preliminary investigations indicate that the scram was caused by a load reject from the Bonneville Power Administration (BPA) Ashe substation. Further investigations continue. The following conditions have occurred: | ||
Turbine Governor valve closure | Turbine Governor valve closure |
Latest revision as of 20:43, 1 March 2018
Where | |
---|---|
Columbia Generating Station Washington (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.18 h-0.0492 days <br />-0.00702 weeks <br />-0.00162 months <br />) | |
Opened: | Jeffery Kuether-Ulberg 18:13 Dec 18, 2016 |
NRC Officer: | Jeff Herrera |
Last Updated: | Dec 18, 2016 |
52442 - NRC Website
| |