05000423/LER-1997-011, Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 21: Line 21:
| Mode =  
| Mode =  
| Docket = 05000423
| Docket = 05000423
| LER year = 2097
| LER year = 1997
| LER number = 11
| LER number = 11
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 31: Line 31:


=text=
=text=
{{#Wiki_filter:_ . .        -            _ _ . - . _ . - . . .      _ . _ _ _ . . . . _ _
{{#Wiki_filter:_.
_            ___.___-,_.______,._m.                                             _ . _ _ , , , _,
___.___-,_.______,._m.
                    ' g g.g                                                                                       Itape Ferry Iki (Route 1Ns), Waterford, CT 06385 Nuclear Energy                                                                               nin, ion, soa,ar com siain n
' g g.g Itape Ferry Iki (Route 1Ns), Waterford, CT 06385 Nuclear Energy nin, ion, soa,ar com siain n Nordwa.: Nuclear Energy Company P.O. Ilus 128
,                                                                                                                Nordwa.: Nuclear Energy Company
[
;            ,                                                                                                  P.O. Ilus 128
Waterford, CT 06335-0128 (860) 447 1791 l
[                                                                                                                 Waterford, CT 06335-0128                                   ,
Faa (860) 444 4277 The Nortlwant Utihtic Synem June 12,1997 I
(860) 447 1791 l                                                                                                                 Faa (860) 444 4277 The Nortlwant Utihtic Synem June 12,1997                             I Docket No 50-423                                 -
Docket No 50-423 B16525 i
B16525 i
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 i
U.S. Nuclear Regulatory Commission                                                                                                                       !
Millstone Nuclear Power Station Unit No. 3 i
Attention: Document Control Desk                                                             -
Revised Schedule Ca'culation Of Hydroaen Recombiner Heater Performance j
Washington, DC 20555                                                                                                                                     i Millstone Nuclear Power Station Unit No. 3                                                                               i Revised Schedule Ca'culation Of Hydroaen Recombiner Heater Performance                                                                                       j The purpose of this letter is to provide our revised schedule for the completion of                                                                     {
The purpose of this letter is to provide our revised schedule for the completion of
corrective actions previously committed to in Licensee Event Report 97-011-00,                                                                           i "Hydroaen Recombiner Heaters Potentially Outside Of Dosion Basis Under                                                                                   l Dearaded Voltaae Conditions". This extension is necessitated as a direct result                                                                           i of providing the incorrect parameters to Boeing /Rocketdyne with which to perform the calculations committed to within our letter of February 28,1997.                                                                             !
{
The design parameters provided were based on the original sub-atmospheric                                                                               j pressure containment design. These parameters changed as a result of an                                                                                 ;
corrective actions previously committed to in Licensee Event Report 97-011-00, i
increase in containment operating pressure authorized under Amendment 59.                                                                               !
"Hydroaen Recombiner Heaters Potentially Outside Of Dosion Basis Under l
Our revised commitments are provided in Attachment 1.                                                                                                     l Should you have any questions regarding this matter please contact Mr.
Dearaded Voltaae Conditions". This extension is necessitated as a direct result i
of providing the incorrect parameters to Boeing /Rocketdyne with which to perform the calculations committed to within our letter of February 28,1997.
The design parameters provided were based on the original sub-atmospheric j
pressure containment design. These parameters changed as a result of an increase in containment operating pressure authorized under Amendment 59.
Our revised commitments are provided in Attachment 1.
l Should you have any questions regarding this matter please contact Mr.
David A. Smith at (860) 437-5840.
David A. Smith at (860) 437-5840.
Very truly yours,                                                                             l 1
Very truly yours, 1
NORTHEAST NUCLEAR ENERGY COMPANY                                                             l G.
NORTHEAST NUCLEAR ENERGY COMPANY C.
C.
A G..#"
A                                                         ,
irector - Millstone Unit 3 f
irector - Millstone Unit 3                                               f
\\
                                                                                                                                                  \
9706180301 970612 PDR ADOCK 05000423:
9706180301 970612 PDR     ADOCK 05000423:                                                                                                           g S                           PDR '
g S
mams unus-es                                                                          l]l$,         ,
PDR '
l]l$,
mams unus-es


t  ,                    U.S. Nucl:ar Regulatory Commission l
U.S. Nucl:ar Regulatory Commission t
B16525'Page 2                                                                       i i
l B16525'Page 2 ec '
ec ' H. J. Miller, Region i Administrator                                       '
H. J.
i-                           W.D. Travers, PhD, Director, Special Projects Office J. W. Andersen, NRC Project V,anager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3                 ;
Miller, Region i Administrator i-W.D. Travers, PhD, Director, Special Projects Office J. W. Andersen, NRC Project V,anager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 i
i f
f l
l s
s l
l l
\\
l l
l e
                                                                                                            \
l                                                                                                         I e
I
I


    -. ~ .   . .      . . . . - . . -    .._..          _.  .    - _ . - . - - - . - _ ~ _ _ - - - . - . . .                  . . - _ .
-. ~.
l l         ct l-I                                                                                                                                           f Docket No. 50-423 B16525 l
:- _. -. - - -. - _ ~ _ _ - - -. -...
l                                                                                                                                           i i
l l
I Attachment 1 Millstone Nuclear Power Station Unit No. 3 Revised Commitments I
ct l-I f
Docket No. 50-423 B16525 l
l i
i I
Millstone Nuclear Power Station Unit No. 3 Revised Commitments I
l i
l i
1 l
l l
June 1997            l l
1 i
l l
l l
l June 1997 l
i l
4 U.S. Nucl:cr Regulatory Commission B16525%ttachment 1\\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any r(asstions regarding this document or any associated regulatory commitments.


4
==Commitment==
,-    U.S. Nucl:cr Regulatory Commission B16525%ttachment 1\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this                                      ,
Committed Date B16233-01 1 Perform a calculation or evaluation to August 13,1997 (LER 97-011-00) determine the Hydrogen Recombiner heater performance under degraded voltage conditions.
document. Please notify the Manager - Nuclear Licensing at the Millstone                                        l Nuclear Power Station Unit No. 3 of any r(asstions regarding this document or                                  :
any associated regulatory commitments.
Commitment                            Committed Date B16233-01             1 Perform a calculation or evaluation to       August 13,1997 (LER 97-011-00) determine the Hydrogen Recombiner heater performance under degraded voltage conditions.
i f
i f
i i
i i
I
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 17:17, 11 December 2024

Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions
ML20140H529
Person / Time
Site: Millstone 
Issue date: 06/12/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16525, NUDOCS 9706180301
Download: ML20140H529 (4)


LER-1997-011, Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions
Event date:
Report date:
4231997011R00 - NRC Website

text

_.

___.___-,_.______,._m.

' g g.g Itape Ferry Iki (Route 1Ns), Waterford, CT 06385 Nuclear Energy nin, ion, soa,ar com siain n Nordwa.: Nuclear Energy Company P.O. Ilus 128

[

Waterford, CT 06335-0128 (860) 447 1791 l

Faa (860) 444 4277 The Nortlwant Utihtic Synem June 12,1997 I

Docket No 50-423 B16525 i

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 i

Millstone Nuclear Power Station Unit No. 3 i

Revised Schedule Ca'culation Of Hydroaen Recombiner Heater Performance j

The purpose of this letter is to provide our revised schedule for the completion of

{

corrective actions previously committed to in Licensee Event Report 97-011-00, i

"Hydroaen Recombiner Heaters Potentially Outside Of Dosion Basis Under l

Dearaded Voltaae Conditions". This extension is necessitated as a direct result i

of providing the incorrect parameters to Boeing /Rocketdyne with which to perform the calculations committed to within our letter of February 28,1997.

The design parameters provided were based on the original sub-atmospheric j

pressure containment design. These parameters changed as a result of an increase in containment operating pressure authorized under Amendment 59.

Our revised commitments are provided in Attachment 1.

l Should you have any questions regarding this matter please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, 1

NORTHEAST NUCLEAR ENERGY COMPANY C.

A G..#"

irector - Millstone Unit 3 f

\\

9706180301 970612 PDR ADOCK 05000423:

g S

PDR '

l]l$,

mams unus-es

U.S. Nucl:ar Regulatory Commission t

l B16525'Page 2 ec '

H. J.

Miller, Region i Administrator i-W.D. Travers, PhD, Director, Special Projects Office J. W. Andersen, NRC Project V,anager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 i

f l

s l

\\

l e

I

-. ~.

- _. -. - - -. - _ ~ _ _ - - -. -...

l l

ct l-I f

Docket No. 50-423 B16525 l

l i

i I

Millstone Nuclear Power Station Unit No. 3 Revised Commitments I

l i

l l

l June 1997 l

i l

4 U.S. Nucl:cr Regulatory Commission B16525%ttachment 1\\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any r(asstions regarding this document or any associated regulatory commitments.

Commitment

Committed Date B16233-01 1 Perform a calculation or evaluation to August 13,1997 (LER 97-011-00) determine the Hydrogen Recombiner heater performance under degraded voltage conditions.