{{#Wiki_filter:p WipLF CREEK | {{#Wiki_filter:p WipLF CREEK NUCLEAR OPcRATING CORPORATION | ||
Clay C. Wa. Ten Vice Presidant and Chief Operating Officer NAR 261999 | ) | ||
Clay C. Wa. Ten Vice Presidant and Chief Operating Officer NAR 261999 I | |||
WO 99-0029 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washingto7, D. C. | |||
'20555 | |||
==Reference:== | ==Reference:== | ||
: 1) NRC {{letter dated|date=February 2, 1999|text=letter dated February 2, 1999}}, from J. N. Donohew, NRC, to O. L. Maynard, WCNOC, | : 1) NRC {{letter dated|date=February 2, 1999|text=letter dated February 2, 1999}}, from J. | ||
: 2) Letter ET 99-0011, dated March 5, 1999, from | N. | ||
: Donohew, NRC, to O. | |||
L. Maynard, WCNOC, | |||
: 2) Letter ET 99-0011, dated March 5, | |||
1999, from R. | |||
A. | |||
Muench, WCNOC, to USNRC | Muench, WCNOC, to USNRC | ||
| Line 31: | Line 39: | ||
Docket No. 50-482: Certified Copy of the Improved Technical Specifications (ITS) and the ITS Bases (TAC NO. M98738) | Docket No. 50-482: Certified Copy of the Improved Technical Specifications (ITS) and the ITS Bases (TAC NO. M98738) | ||
Gentlemen: | Gentlemen: | ||
In Reference | In Reference 1, | ||
Technical Specifications to the format and expanded bases of the improved | the NRC provided a draft Safety Evaluation (SE) for the license amendment which would convert the Wolf creek Generating Station (WCG3). | ||
The WCNOC comments on the draft SE were provided in Reference 2. | Technical Specifications to the format and expanded bases of the improved Standard Technlcal Specificationo The letter requested that Wolf Creek Nuc3 3r Operating Corporation (WCNCC) provide commente on the draft SE in. | ||
also committed that a certified copy of the ITS and the ITS Bases will be | i writing, and a certified Improved Technical Specificatione (ITS) and Bases, within 30 days of receipt of the letter or with the update to the associated license amendment request, whichever date is later. | ||
During the final preparation of the certified copy of the ITS, | The WCNOC comments on the draft SE were provided in Reference 2. | ||
The Attachment provides a summary of the correction's made. These corrections do not result in a change to the information riovided in the draft safety Evaluation, but reflect the results of discussions with the staff and responses to Requests for Additional Information. | Reference 2 also committed that a certified copy of the ITS and the ITS Bases will be provided to the NRC by March 26, 1999 to support issuance of the license i | ||
amendment. | |||
During the final preparation of the certified copy of the ITS, several editorial corrections were identified and incorporated into the ITS and Bases. | |||
The Attachment provides a summary of the correction's made. | |||
These corrections do not result in a change to the information riovided in the draft safety Evaluation, but reflect the results of discussions with the staff and responses to Requests for Additional Information. | |||
If you have any questions concerning this re9ponse, please contact me at (316) 364-4034, or Mr. Michael J. Angus, 316-354-4077. | If you have any questions concerning this re9ponse, please contact me at (316) 364-4034, or Mr. Michael J. Angus, 316-354-4077. | ||
Very truly yours, | Very truly yours, | ||
$ch 9904050206 990326 Clay C. Warren g | |||
PDR ADOCK 050004E2 O | |||
P PDR Q | |||
PO, Box 411/ Burhngton. KS 60839 / Phone: (316) 364-8331 An Equal Opportunity Empeoyet M T'HCVET L | |||
I | |||
\\ | |||
Q): < | Q): < | ||
f ' | f ' | ||
,.t. | |||
. s.; | |||
7 WO' 99-0029 - | 7 WO' 99-0029 - | ||
Page:2 of 2 1 | Page:2 of 2 1 | ||
b | b | ||
' CCW/rir.- | |||
i | |||
cc i . ' W.- D. Johnson (NRC) ,--- w/a :. | .-Attachment Enclosure. | ||
E. W. ' Merschof f - (NRC) , .w/a . | s cc i. ' W.- D. Johnson (NRC),--- w/a :. | ||
Senior Resident' Inspector (NRC) ,-'. w/a K. M.l Thomas (NRC), . w/a i | E. W. ' Merschof f - (NRC),.w/a. | ||
I''b, | Senior Resident' Inspector (NRC),-'. w/a K. M.l Thomas (NRC),. w/a i | ||
i M:' | I''b, i M:' | ||
. n., | |||
.l. | |||
I o | I o | ||
l: | l: | ||
a | a | ||
' ). | |||
y | y p | ||
p | * I. | ||
* I . | 1 f | ||
1 f | 5 5 | ||
F% | |||
) | |||
STATE OF KANSAS ) | STATE OF KANSAS ) | ||
) SS l | |||
COUNTY OF COFFEY ) | |||
Clay C. Warren, of lawful age, being first duly sworn upon oath says that he is Chief Operating Officer of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief. | Clay C. Warren, of lawful age, being first duly sworn upon oath says that he is Chief Operating Officer of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief. | ||
By MARY E. GIFFORD | By MARY E. GIFFORD Clay C. hen Noten Public Statgof Kansas | ||
.My Appt. rapir 84/o 9/l991 Chief Operating Officer SUBSCRIBED and sworn to before me this N day of M 1999. | |||
NC4D4 | NC4D4. | ||
Notary PIIblic Expiration Date IR | Notary PIIblic Expiration Date IR 09 'l390 l~ | ||
i b | i b | ||
j | |||
Attachm nt 3 to WO 99-0029 Page 1 of 1 Summary of Corrections | Attachm nt 3 to WO 99-0029 Page 1 of 1 Summary of Corrections 1. | ||
Section 1.1, Definitions. | |||
CHANNEL OPERATIONAL TEST. | |||
The word."such" was added to the last sentence after "... required for channel OPERABILITY". | |||
Adding this word is consistent with traveler TSTF-205. | Adding this word is consistent with traveler TSTF-205. | ||
2. | |||
Section 3.3, Instrumentation. Table 3.3.1-1, Note (1). | |||
In the response to Comment Number Q 2-37, Note (1) should have been revised to refer to Function 6 d. | |||
3. | |||
Section 3.3, Instrumentation. Table 3.3.1-1, Functions 6 and 7. | |||
In the j | |||
Allowable Value Column, the page numbers associated with Notes 1 and 2 are revised to reflect the correct page numbers based on the clean copy of ITS. | |||
4. | |||
Section 3.3, Instrumentation. | |||
SP 3.3.2.14. | |||
In the response to Comment Number Q 3.3-19, Note (p) to the Table was converted to SR 3.3.2.14. | |||
During that conversion, the incorrect MODE was placed in the Frequency. | During that conversion, the incorrect MODE was placed in the Frequency. | ||
The Frequency is revised to state: | The Frequency is revised to state: | ||
This is consistent with CTS Table 4.3-2, Function 5A. | "... Prior to entering MODE 2 This is consistent with CTS Table 4.3-2, Function 5A. | ||
5. | |||
In tne responsc to O 3.4.11-3 in which TSTF-113 was withdrawn, the Note to the .tequired Actions for Conditjons C and F should have been revised to E.2. | Section 3.4, Reactor Coolant System. | ||
Section 3.4.11, Conditions C and F. | |||
In tne responsc to O 3.4.11-3 in which TSTF-113 was withdrawn, the Note to the.tequired Actions for Conditjons C and F should have been revised to E.2. | |||
6. | |||
Section 3.6, Containment Systems. | |||
Bases for Section 3.6.4, Applicable Safety Analyses, discusses the initial pressure conditions used in the containment analysis. The pressure was identified as 14.7 psig, however, the correct initial pressure is 14.7 psia which corresponds to O psig. | |||
) | |||
7. | |||
Section 3. | |||
Electrical Power System. | |||
ITS 3.8.3, Condition E. | |||
The Required As.lons for Condition E has two Actions. The second Required Action should have been identified as Required Action E.2. | |||
8. | |||
Section 3.9, Refueling Operations. LCO 3.9.1 10 modified to add "of" after "... filed portions" to be grammatically correct. | |||
9. | |||
Section 5.0, Adminiatrative Controls. Section 5.5.13, lettered item d. is made into a separat* statement consistent with TSTF-118. | |||
: 10. Additionally, editorial corrections were made to the Bases to reflect appropriate capitalization and grammar. | : 10. Additionally, editorial corrections were made to the Bases to reflect appropriate capitalization and grammar. | ||
w | w | ||
r | r | ||
The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be commitments. Please direct questions regarding these commitments to Mr. | . to WO 99-0029 i | ||
Michael J. Angus, Manager Licensing and Corrective Action at Wolf Creek Generating Station, (316) 364-4077. | Page 1 of 1 LIST OF COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document. | ||
COMMITMENT | Any other statements in this submittal are provided for information purposes and are not considered to be commitments. | ||
Please direct questions regarding these commitments to Mr. | |||
Michael J. | |||
Angus, Manager Licensing and Corrective Action at Wolf Creek Generating Station, (316) 364-4077. | |||
COMMITMENT Due Date/ Event None i | |||
I | I | ||
_}} | _}} | ||
Latest revision as of 15:43, 10 December 2024
| ML20196K726 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/26/1999 |
| From: | Warren C WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20196K729 | List: |
| References | |
| TAC-M98738, WO-99-0029, WO-99-29, NUDOCS 9904050206 | |
| Download: ML20196K726 (5) | |
Text
p WipLF CREEK NUCLEAR OPcRATING CORPORATION
)
Clay C. Wa. Ten Vice Presidant and Chief Operating Officer NAR 261999 I
WO 99-0029 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washingto7, D. C.
'20555
Reference:
- 1) NRC letter dated February 2, 1999, from J.
N.
- Donohew, NRC, to O.
L. Maynard, WCNOC,
- 2) Letter ET 99-0011, dated March 5,
1999, from R.
A.
Subject:
Docket No. 50-482: Certified Copy of the Improved Technical Specifications (ITS) and the ITS Bases (TAC NO. M98738)
Gentlemen:
In Reference 1,
the NRC provided a draft Safety Evaluation (SE) for the license amendment which would convert the Wolf creek Generating Station (WCG3).
Technical Specifications to the format and expanded bases of the improved Standard Technlcal Specificationo The letter requested that Wolf Creek Nuc3 3r Operating Corporation (WCNCC) provide commente on the draft SE in.
i writing, and a certified Improved Technical Specificatione (ITS) and Bases, within 30 days of receipt of the letter or with the update to the associated license amendment request, whichever date is later.
The WCNOC comments on the draft SE were provided in Reference 2.
Reference 2 also committed that a certified copy of the ITS and the ITS Bases will be provided to the NRC by March 26, 1999 to support issuance of the license i
amendment.
During the final preparation of the certified copy of the ITS, several editorial corrections were identified and incorporated into the ITS and Bases.
The Attachment provides a summary of the correction's made.
These corrections do not result in a change to the information riovided in the draft safety Evaluation, but reflect the results of discussions with the staff and responses to Requests for Additional Information.
If you have any questions concerning this re9ponse, please contact me at (316) 364-4034, or Mr. Michael J. Angus, 316-354-4077.
Very truly yours,
$ch 9904050206 990326 Clay C. Warren g
PDR ADOCK 050004E2 O
P PDR Q
PO, Box 411/ Burhngton. KS 60839 / Phone: (316) 364-8331 An Equal Opportunity Empeoyet M T'HCVET L
I
\\
Q): <
f '
,.t.
. s.;
7 WO' 99-0029 -
Page:2 of 2 1
b
' CCW/rir.-
i
.-Attachment Enclosure.
s cc i. ' W.- D. Johnson (NRC),--- w/a :.
E. W. ' Merschof f - (NRC),.w/a.
Senior Resident' Inspector (NRC),-'. w/a K. M.l Thomas (NRC),. w/a i
Ib, i M:'
. n.,
.l.
I o
l:
a
' ).
y p
- I.
1 f
5 5
F%
)
STATE OF KANSAS )
) SS l
COUNTY OF COFFEY )
Clay C. Warren, of lawful age, being first duly sworn upon oath says that he is Chief Operating Officer of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By MARY E. GIFFORD Clay C. hen Noten Public Statgof Kansas
.My Appt. rapir 84/o 9/l991 Chief Operating Officer SUBSCRIBED and sworn to before me this N day of M 1999.
NC4D4.
Notary PIIblic Expiration Date IR 09 'l390 l~
i b
j
Attachm nt 3 to WO 99-0029 Page 1 of 1 Summary of Corrections 1.
Section 1.1, Definitions.
CHANNEL OPERATIONAL TEST.
The word."such" was added to the last sentence after "... required for channel OPERABILITY".
Adding this word is consistent with traveler TSTF-205.
2.
Section 3.3, Instrumentation. Table 3.3.1-1, Note (1).
In the response to Comment Number Q 2-37, Note (1) should have been revised to refer to Function 6 d.
3.
Section 3.3, Instrumentation. Table 3.3.1-1, Functions 6 and 7.
In the j
Allowable Value Column, the page numbers associated with Notes 1 and 2 are revised to reflect the correct page numbers based on the clean copy of ITS.
4.
Section 3.3, Instrumentation.
SP 3.3.2.14.
In the response to Comment Number Q 3.3-19, Note (p) to the Table was converted to SR 3.3.2.14.
During that conversion, the incorrect MODE was placed in the Frequency.
The Frequency is revised to state:
"... Prior to entering MODE 2 This is consistent with CTS Table 4.3-2, Function 5A.
5.
Section 3.4, Reactor Coolant System.
Section 3.4.11, Conditions C and F.
In tne responsc to O 3.4.11-3 in which TSTF-113 was withdrawn, the Note to the.tequired Actions for Conditjons C and F should have been revised to E.2.
6.
Section 3.6, Containment Systems.
Bases for Section 3.6.4, Applicable Safety Analyses, discusses the initial pressure conditions used in the containment analysis. The pressure was identified as 14.7 psig, however, the correct initial pressure is 14.7 psia which corresponds to O psig.
)
7.
Section 3.
Electrical Power System.
ITS 3.8.3, Condition E.
The Required As.lons for Condition E has two Actions. The second Required Action should have been identified as Required Action E.2.
8.
Section 3.9, Refueling Operations. LCO 3.9.1 10 modified to add "of" after "... filed portions" to be grammatically correct.
9.
Section 5.0, Adminiatrative Controls. Section 5.5.13, lettered item d. is made into a separat* statement consistent with TSTF-118.
- 10. Additionally, editorial corrections were made to the Bases to reflect appropriate capitalization and grammar.
w
r
. to WO 99-0029 i
Page 1 of 1 LIST OF COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document.
Any other statements in this submittal are provided for information purposes and are not considered to be commitments.
Please direct questions regarding these commitments to Mr.
Michael J.
Angus, Manager Licensing and Corrective Action at Wolf Creek Generating Station, (316) 364-4077.
COMMITMENT Due Date/ Event None i
I
_