Summary of 981013-14 Meeting with Listed Attendees to Discuss Licensee Responses to Staff RAI on Licensee Application for Conversion of Current TSs to Improved TSs for Listed Facilities.Nrc Staff Handouts Encl
ML16342A570
Person / Time
Site: Wolf Creek, Diablo Canyon, Callaway, Comanche Peak  
Issue date: 11/06/1998
From: Donohew J
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M98738, TAC-M98778, TAC-M98779, TAC-M98803, TAC-M98984, TAC-M98985, NUDOCS 9811170154
Download: ML16342A570 (34)


Text

~8 Al40

+

0 Cy I

0 C

O 0

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 November 6, 1998 LICENSEES:

Pacific Gas and Electric Company (PG8 E)

Tu Electric (TUE)

Union Electric Company (UEC)

WolfCreek Nuclear Operating Corporation (WCNOC)

FACILITIES: Diablo Canyon Power Plant, Units 1 and 2 (DCPP)

Comanche Peak Steam Electric Station, Units 1 and 2 (CPSES)

Callaway Plant (CW)

WolfCreek Generating Station (WC)

SUBJECT:

MEETING

SUMMARY

ON IMPROVED TECHNICALSPECIFICATIONS (ITS)

CONVERSION, ITS SECTIONS 3.4 AND 3.6 (TAC NOS. M98738, M98778, M98779, M98803, M98984, AND M98985)

INT D

0 Meetings were conducted on October 13 and 14, 1998, between the Nuclear Regulatory Commission (NRC) staff and the above licensees.

The meetings were held at the request of the licensees to discuss the licensees'esponses to the staffs requests for additional information (RAls) on the licensees'pplications for the conversion of the current Technical Specifications (CTS) to the Improved Technical Specifications (ITS) for the above facilities. The notice for the meeting was issued on October 8, 1998. The meeting was arranged the week before the notice was issued and had to be conducted to meet the schedule to issue the first ITS amendment by the end of 1998.

Attachment 1 is the list of attendees. is the handout provided by the NRC staff to the licensees at the meeting. Attachment 2 is a seven-page table for ITS Section 3.6 and a single-page statement of an ITS Section 3.4 issue.

The table cross references the RAI question numbers for ITS Section 3.6 with the applicable licensee.

The RAI question numbers and licensee applicability that are ggf blacked'out are the RAI responses that were discussed in the meeting.

The dates of the Section 3.6 RAI responses from the licensees are listed in the second table on the next page for ITS Section 3.6.

BCG D

In October 1995, the four licensees formed a joint effort to convert the CTS to the ITS for the plants, and, in letters dated May 15 and June 2, 1997, the licensees submitted applications for each of their plants.

This is discussed in more detail in the previous meeting summaries issued August 28 and October 16, 1998, for the meetings held with the licensees during the weeks of August 10 and September 14, 1998. The previous meetings were on other ITS sections being reviewed during the conversion.

Since the above applications, the staff has issued RAls to the licensees on the following dates:

98fif70f54 98fiOb PDR ADOCK 05000275 P

PDR

ITS Sections Letter Dates 1998 1.0 2.0, 3.0 31,32 3.3 3.4 DCPP July 9 July 7 June 17 July 17 and October 16 July 21 CPSES July 14 July 7 June 17 July 17 and October 16 July 22 CW July 9 July 7

.June 17 July 17 and October 16 July 21 WC July 9 July 7 June 17 July 17 and October 16 July 21 3.6 May 22 3.5, 3.9, 4.0 June 16 June 17 May 22 June 16 May 22 June 16 May 22 3.7 August 14 August 14 August 14 August 14 3.8 September 3 and September 3 and October 7 October 7 September 3 and October 7 September 3 and October 7 5.0 July 15 July 15 July 15 July 15 The licensees have responded to the above RAIs in the following letters:

ITS Sections 1.0, 2.0, 3.0 3.6

Response

Dates DCPP August 28 June 25 CPSES August 28 June 26

'I998 CW August 27 June 26 WC August 28 June 30 3.1, 3.2, 3.5, 3.9, 4.0 3.4, 5.0 3.7 August 6 and October 23 September 25 and October 23 October 16 August 5 and October 23 September 24 and October 23 October 21 August 4 and October 21 September 24 and October 21 October 21 August 5 and October 23 September 24 and October 23 October 16

3 MEETING

SUMMARY

I The agenda for the meeting was for the licensees and the staff to discuss the staffs review of the licensees responses,to the staff's RAls for the following ITS sections:

ITS 3.6, "Containment Systems" ITS 3.4, "Reactor Coolant System" The intent of the discussion on ITS Section 3.6 was for the licensees to understand the staffs comments on the licensees'esponses and the staff to understand how the licensees intended to respond to the comments.

The licensees will provide their responses in later submittals and it is only these responses that the staff willaddress in its safety evaluations for the conversion amendments.

The ITS Section 3.4 issue that was discussed is given in Attachment 2. This was discussed in the meeting only to make the licensees aware of the issue.

The licensees responses to the issue will be addressed later.

The licensees completed their discussions with the staff and the meeting was closed.

There were no decisions by the staff.

OIRIGINAL SIGNED BY:

Jack N. Donohew, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-275, 50-323, 50445, 50-446, 50-482, and 50-483 Attachments:

1. List of Meeting Attendees
2. NRC Staffs Handout cc w/atts: See next page DISTRIBUTION:

Docket.Fi~e OGC (15B18)

EAdensam(EGA1)

KThomas PUBLIC ACRS JHannon S Bloom PD4-1 r/f TGwynn (RIV)

CHawes TPolich JDonohew NGilles JLuehman RGiardina WBeckner WBateman Document Name:

CP101398.MTS

  • See previous concurrence OFC PM/P

-1 LA/PD4-1 TSB TSB PD/ D4-D/P

-1 NAME JDon w/vw CHawes RGiardina JLuehman W

JHannon DATE

/8 /98 I

/98 11 / 02 /98 11/04/98 1L I l98 I I l98 COPY YES/NO YES/NO YES/NO YES/NO YES/NO E /NO OFFICIALRECORD COPY ps

TPa."/

.4

ETING U

M R The agenda for the meeting was for the licensees and the staff to discuss the staffs review of the licensees responses to the staffs RAls for the following ITS sections:

ITS 3.6, "Containment Systems"

~

ITS 3.4, "Reactor Coolant System" The intent of the discussion on ITS Section 3.6 was for the licensees to understand the staff's comments on the licensees'esponses and the staff to understand how the licensees intended to respond to the comments.

The licensees willprovide their responses in later submittals and it is only these responses that the staff willaddress in its safety evaluations for the conversion amendments.

The ITS Section 3.4 issue that was discussed is given in Attachment 2. This was discussed in the meeting only to make the licensees aware of the issue.

The licensees'esponses to the issue will be addressed later.

The licensees completed their discussions with the staff and the meeting was closed.

There were no decisions by the staff.

dn, Jack N. Donohew, Senior roject Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-275, 50-323, 50445, 50-446, 50-482, and 50-483 Attachments:

1. List of Meeting Attendees
2. NRC Staff's Handout cc w/atts: See next page

Union Electric Company Callaway Plant, Unit 1

- CC:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, Maryland 20855 John O'eill, Esq.

Shaw, Pittman, Potts 8 Trowbridge 2300 N. Street, N.W.

Washington,'.C.

20037 Mr. H. D. Bono Supervising Engineer Quality Assurance Regulatory Support Union Electric Company Post Office Box 620 Fulton, Missouri 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road

Steedman, Missouri 65077-1302 Mr. J. V. Laux, Manager Quality Assurance Union Electric Company Post Office Box 620 Fulton, Missouri 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 Mr. Otto L. Maynard President and Chief Executive Officer WolfCreek Nuclear Operating Corporation Post Office Box 411 Burlington, Kansas 66839 Mr. Dan I. Bolef, President.

Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard

'niversity City, Missouri 63130 Mr. Lee Fritz Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151 Mr. Alan C. Passwater, Manager Licensing and Fuels Union Electric Company Post Office Box 66149 St. Louis, Missouri 63166-6149 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, Missouri 65251 Regional Administrator,'egion IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102

0 I

TU Electric Company Comanche Peak, Units 1 and 2 CC:

Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 2159 Glen Rose, TX 76403-2159 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mrs. Juanita Ellis, President Citizens Association for Sound Energy 1426 South Polk Dallas, TX 75224 Mr. Roger D. Walker TU Electric Regulatory Affairs Manager P. O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq.

Morgan, Lewis & Bockius 1800 M Street, N.W.

Washington, DC 20036-5869 Jim Calloway Public UtilityCommission of Texas Electric Industry Analysis P. O. Box13326 Austin, TX 78711-3326 Honorable Dale McPherson County Judge P. O. Box 851 Glen Rose, TX 76043 Office of the Governor ATTN: John Howard, Director Environmental and Natural Resources Policy P. O. Box 12428 Austin, TX 78711 Arthur C. Tate, Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Mr. C. Lance Terry TU Electric Group Vice President Nuclear Attn: Regulatory Affairs Department P. O. Box 1002 Glen Rose, TX 76043

Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant CC:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant do U.S. Nuclear Regulatory Commission P. O. Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra. Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J. Warner, Esq.

Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Ms. Nancy Culver

'an Luis Obispo Mothers for Peace P. O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. David H. Oatiey, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424 Telegram-Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406 Mr. Truman Burns, Mr. Robert Kinosian

'alifornia Public Utilities Commission 505 Van Ness, Room 4102

'San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Mr. Gregory M. Rueger Senior Vice President and General Manager Pacific Gas and Electric Company Nuclear Power Generation Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, California 93940

WolfCreek Nuclear Operating COrporation WolfCreek Generating Station CC:

Jay Silberg, Esq.

Shaw, Pittman, Potts &Trowbridge 2300 N Street, NW Washington, D.C. 20037 Chief Operating Officer WolfCreek Nuclear Operating Corporation P. O. Box 411 Burlington, Kansas 66839 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Supervisor Licensing WolfCreek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 311 Burlington, Kansas 66839 U.S. Nuclear Regulatory Commission Resident Inspectors Office 8201 NRC Road

Steedman, Missouri 65077-1 032 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, Kansas 66604-4027 Mr. Otto L. Maynard President and Chief Executive Officer WolfCreek Nuclear Operating Corporation Post Office Box 411

. Burlington, Kansas 66839 Office of the Governor State of Kansas Topeka, Kansas 66612 Attorney General Judicial Center

.301 S.W. 10th 2nd Floor Topeka, Kansas 66612 County Clerk Coffey County, Courthouse Burlington, Kansas 66839 Vick L. Cooper, Chief Radiation Control Program Kansas Department of Health and Environment Bureau of Airand Radiation Forbes Field Building 283 Topeka, Kansas 66620

LIST OF ATIENDEES A MEETINGS TS ECTI S 33 and 3 G

S 11-14 199 SAME J. Donohew R. Giardina N. Gilles W. Beckner M. Reinhart J. Luehman J. Puisipher D. Woodlan S. Smith E. Kahl D. Shafer M. Greer S. Wideman M. Leppke F ILIATION NRC/NRR/PDIV-1 NRC/NRR/TSB NRC/NRR/TSB NRC/NRR/TSB NRC/NRR/TSB NRC/NRR/TS8 NRC/NRR/SCSB TU Electric (CPSES)

TU Electric (CPSES)

UE Company (CW)

UE Company (CW)

WCNOC (WC)

WCNOC (WC)

PG&E (DCPP)

(only 10/1 3/98)

'only 10/1 3/98)

(only 10/14/98)

(only 10/14/98)

(only 10/14/98)

(only 10/1 3/98)

NRC NRR HICB PDIV-1 TSB PG8E SCSB UE WCNOC Nuclear Regulatory Commission Office of Nuclear Reactor Regulation "Instrumentation and Controls Branch Project Directorate IV-1 Technical Specifications Branch Pacific Gas and Electric Company Containment Systems Branch Union Electric WolfCreek Nuclear Operating Corporation ATTACHMENT1

~

Table providing the list of questions in the staff's RAI for ITS Section 3.6, "Containment Systems."

The licensees responses to these 'questions were discussed in the meeting.

ITS Section 3.4 issue discussed in the meeting.

ATTACHNIENT2

RAI APPLICABILITY RAI NO.

DIABLO CANYON COMANCHE PEAK ggg~

~+a CQ

~$

WOLF CREEK CALLAWAY 3.6.'1-5 3.6.1-6 X

X KXa

~ ~

3.6.2-5 3.6.2-6 X

X X

RAI NO.

3.6.3-1 DIABLO CANYON COMANCHE PEAK X

WOLF CREEK X

CALLAWAY 3.6.3-3 3.6.3%

X X

X 3.6.3-7

%K%

3.6.3-10 3.6.3-11 3.6.3-12 3.6.3-13 3.6.3-14 3.6.3-16 3.6.3-16 3.6.3-17 X

X X

X

~

~

3.6.3-21 3.6.3-22 3.6.3-23 3.6.3-24 3.6.3-26 3.6.3-26 X

X

RAI NO.

3.6.3-28 3.6.3-29 3.6.3-30 DIABLO CANYON X

X COMANCHE PEAK X

X X

WOLF CREEK

@PQ X

X CALLAWAY X

3.6.3-33 3.6.3-34 3.6.3-35 X

~

~

3.6.3-39 X

3.6.3%3 3.6.3~

X X

/~we 3.6.3%8 X

RAI NO.

DIABLO CANYON COMANCHE PEAK WOLF CREEK CALLAWAY

~,

~

h h

~

~

3.6.3-56 QP X

lEEiF 3.6.5-3 3.6.5%

E 3.6.6-2 X

6ZF 3.6.6-7 3.6.6-'8 a

1St gg 3.6.6-'l3 X

3.6.6-15

~

~

RAI NO.

'i~~ig 3.6.6-18 3.6.6-19 DIABLO CANYON X

COMANCHE PEAK WOLF CREEK CALLAWAY

~

~

QQ 3.6.7-2 3.6.7 3.6.7%'P gggp 4

4 3.6.7-12 X

3.6.7-16 3.6.8-1 X

~

~

RAI NO.

~

DIABLO CANYON COMANCHE PEAK WOLF CREEK, CALLAWAY gpss+

'C

~

~

I 3.6.8-6 3.6.8-7

ITe~

Qu.

pgggeo Q~ fOAJ QUA.rVCHf.

'~~

WowP C.g ~c.

h 3

C4 3i( -O~ l CP 5

~ 4 OOC Cf'.u - us 4

<< ~l orat CP

> 6 WQ.

3 iQ

<92 4JC 3

~ (, -e<

WC 3 4-sos

~C. g,4 "0 ol, W< 9.t, -oto c 8

t