{{#Wiki_filter:UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                  Revision:     17 D. C. COOK NUCLEAR PLANT Table:     13.1-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:       1 of 6
{{#Wiki_filter:I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 1 of 6
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITIAL REACTOR FUELING SYSTEM TESTS                                                     TEST OBJECTIVE
 
: 1. Electrical System             Ensured continuity, circuit integrity, and the correct and reliable functioning of electrical apparatus required for core loading. Special attention is directed to the following tests:
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING
(a)     Station loss of voltage auto-transfer test.
 
(b)     Normal to preferred offsite auxiliary power transfer test.
SYSTEM TESTS TEST OBJECTIVE
: 2. Voice Communication System     Verified proper communication between all local stations, for interconnection to commercial phone service, and balanced and adjusted amplifiers and speakers. Verified that all temporary communication stations located at the fuel loading status boardsites were functioning.
: 1. Electrical System Ensured continuity, circuit integrity, and the correct and reliable functioning of electrical apparatus required for core loading. Special attention is directed to the following tests:
 
(a) Station loss of voltage auto-transfer test.
(b) Normal to preferred offsite auxiliary power transfer test.
: 2. Voice Communication System Verified proper communication between all local stations, for interconnection to commercial phone service, and balanced and adjusted amplifiers and speakers. Verified that all temporary communication stations located at the fuel loading status boardsites were functioning.
: 3. Essential Service Water System Verified that service water was available for all component cooling required during core loading.
: 3. Essential Service Water System Verified that service water was available for all component cooling required during core loading.
: 4. Fire Protection System         Verified proper operation of the System by ensuring the design intent was met for the fire pumps, and verified that the automatic start functions operated as designed, and verified that the pressure controls met acceptance specifications.
: 4. Fire Protection System Verified proper operation of the System by ensuring the design intent was met for the fire pumps, and verified that the automatic start functions operated as designed, and verified that the pressure controls met acceptance specifications.
5 Compressed Air System         Verified leak tightness of the system proper operation of all compressors, the, manual and automatic operation of controls at design setpoints, design air-dryer cycle time and moisture content of discharge air, and proper air pressure to each controller served by the system.
5 Compressed Air System Verified leak tightness of the system proper operation of all compressors, the, manual and automatic operation of controls at design setpoints, design air-dryer cycle time and moisture content of discharge air, and proper air pressure to each controller served by the system.
: 6. Reactor Coolant System         Flushed and cleaned the reactor coolant and related primary systems, obtained the degree of Cleaning                       cleanliness required for the intended service. Provisions were made to maintain cleanliness and protection from contaminated sources after system cleaning and acceptance was completed. Coolant was analyzed for chloride content, solids, pH, and conductivity.
: 6. Reactor Coolant System Flushed and cleaned the reactor coolant and related primary systems, obtained the degree of Cleaning cleanliness required for the intended service. Provisions were made to maintain cleanliness and protection from contaminated sources after system cleaning and acceptance was completed. Coolant was analyzed for chloride content, solids, pH, and conductivity.
Oxygen content is analyzed and brought to specifications prior to exceeding 250 °F.
Oxygen content is analyzed and brought to specifications prior to exceeding 250 °F.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 2 of 6


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                Revision:      17 D. C. COOK NUCLEAR PLANT Table:    13.1-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      2 of 6
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITIAL REACTOR FUELING SYSTEM TESTS                                                   TEST OBJECTIVE
 
: 7. Ventilation Systems         Verified the proper operability of fans, controls, and other components of the Containment Ventilation System and Auxiliary Building Ventilation System.
SYSTEM TESTS TEST OBJECTIVE
: 8. Residual Heat Removal and   Verified adequate component cooling flow to the Residual Heat Removal System, and Component Cooling Water     verified proper operation of instrumentation, controllers, and alarms related to the Residual Systems                     Heat Removal System
: 7. Ventilation Systems Verified the proper operability of fans, controls, and other components of the Containment Ventilation System and Auxiliary Building Ventilation System.
: 9. Chemical and Volume Control Verified prior to critical operation, that the Chemical and Volume Control System System                     functioned as specified in the system description and appropriate manufacturers' technical manuals. More specifically that:
: 8. Residual Heat Removal and Verified adequate component cooling flow to the Residual Heat Removal System, and Component Cooling Water verified proper operation of instrumentation, controllers, and alarms related to the Residual Systems Heat Removal System
(a)     All manual and remotely operated valves were operable manually and/or remotely.
: 9. Chemical and Volume Control Verified prior to critical operation, that the Chemical and Volume Control System System functioned as specified in the system description and appropriate manufacturers' technical manuals. More specifically that:
(b)     All pumps performed to specification.
 
(c)     All temperature, flow, level, and pressure controllers functioned to control at the required set-point when supplied with appropriate signal(s).
(a) All manual and remotely operated valves were operable manually and/or remotely.
(d)     All temperature, flow, level, and pressure alarms provided alarms at the required locations when the alarm setpoint was reached and cleared when the reset point was reached.
(b) All pumps performed to specification.
(e)     The reactor makeup control regulated blending, dilution and boration as designed.
(c) All temperature, flow, level, and pressure controllers functioned to control at the required set-point when supplied with appropriate signal(s).
(f)     The design seal water flow rates were attainable at each reactor coolant pump.
(d) All temperature, flow, level, and pressure alarms provided alarms at the required locations when the alarm setpoint was reached and cleared when the reset point was reached.
(g)     Chemical Addition Subsystem functioned as specified.
(e) The reactor makeup control regulated blending, dilution and boration as designed.
(f) The design seal water flow rates were attainable at each reactor coolant pump.
(g) Chemical Addition Subsystem functioned as specified.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 3 of 6
 
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING
 
SYSTEM TESTS TEST OBJECTIVE
: 10. Fuel Handling Systems 1 Showed that the system design is capable of providing a safe and effective means of transporting and handling fuel from the time it reaches the station until it is stored in the spent fuel pool. In particular, the tests verified that:
 
(a) The major structures required for refueling, such as the reactor cavity, refueling canal, new fuel and spent fuel storage, and decontamination facilities, were in accordance with the design intent.
(b) The major equipment required for refueling such as the manipulator crane, fuel handling tools, and spent fuel transfer system operated in accordance with the design specifications.
(c) All auxiliary equipment and instrumentation functioned properly.
: 11. Radiation Monitoring Systems Verified the calibration, operability and alarm setpoints of all radiation monitors, air particulate monitors, gas monito rs and liquid monitors which are located in the Containment Building, Auxiliary Building, Spent Fuel Area and Control Room.


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                  Revision:      17 D. C. COOK NUCLEAR PLANT Table:    13.1-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      3 of 6
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITIAL REACTOR FUELING SYSTEM TESTS                                                      TEST OBJECTIVE
: 10. Fuel Handling Systems 1        Showed that the system design is capable of providing a safe and effective means of transporting and handling fuel from the time it reaches the station until it is stored in the spent fuel pool. In particular, the tests verified that:
(a)    The major structures required for refueling, such as the reactor cavity, refueling canal, new fuel and spent fuel storage, and decontamination facilities, were in accordance with the design intent.
(b)    The major equipment required for refueling such as the manipulator crane, fuel handling tools, and spent fuel transfer system operated in accordance with the design specifications.
(c)    All auxiliary equipment and instrumentation functioned properly.
: 11. Radiation Monitoring Systems    Verified the calibration, operability and alarm setpoints of all radiation monitors, air particulate monitors, gas monitors and liquid monitors which are located in the Containment Building, Auxiliary Building, Spent Fuel Area and Control Room.
1 Tests are conducted with a dummy fuel element.
1 Tests are conducted with a dummy fuel element.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 4 of 6


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                  Revision:    17 D. C. COOK NUCLEAR PLANT Table:    13.1-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      4 of 6
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITIAL REACTOR FUELING SYSTEM TESTS                                                       TEST OBJECTIVE
 
SYSTEM TESTS TEST OBJECTIVE
: 12. Nuclear Instrumentation System To insure that the instrumentation system is capable of monitoring the reactor leakage neutron flux for the source range. In particular, the tests verified that:
: 12. Nuclear Instrumentation System To insure that the instrumentation system is capable of monitoring the reactor leakage neutron flux for the source range. In particular, the tests verified that:
(a)    All source range equipment, cabling, and interconnections were properly installed.
(b)    The source range detector and associated instrumentation respond to neutron level changes and that the source range protection (high flux reactor trip) as well as alarm features, audible count rate, and strip chart recorders operated properly.
(c)    All auxiliary equipment connected to the source range and temporary core loading detectors operated properly.
(d)    Source range and temporary core loading detectors were properly calibrated and the associated setpoints and alarms were properly adjusted.
: 13. Reactor Plant Sampling System  Verified that a quantity of representative fluid could be obtained safely from each sampling point. In particular, the tests verified that:
(a)    All system piping and components were properly installed.
(b)    All remotely and manually operated valving operated in accordance with the design specifications.
(c)    All sample containers and quick-disconnect couplings function properly.


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                Revision:     17 D. C. COOK NUCLEAR PLANT Table:   13.1-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:     5 of 6
(a) All source range equipment, cabling, and interconnections were properly installed.
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITIAL REACTOR FUELING SYSTEM TESTS                                                 TEST OBJECTIVE 14 Emergency Power System   Demonstrated that the system is capable of providing power for operation of vital equipment under power failure conditions. In particular, the tests verified that:
(b) The source range detector and associated instrumentation respond to neutron level changes and that the source range protection (high flux reactor trip) as well as alarm features, audible count rate, and strip chart recorders operated properly.
(a)     All system components were properly installed (b)     Each emergency diesel functioned according to the design intent under emergency conditions.
(c) All auxiliary equipment connected to the source range and temporary core loading detectors operated properly.
(c)     The emergency units were capable of supplying the power to vital equipment as required under emergency conditions.
(d) Source range and temporary core loading detectors were properly calibrated and the associated setpoints and alarms were properly adjusted.
(d)     All redundant features of the system functioned according to the design intent.
: 13. Reactor Plant Sampling System Verified that a quantity of representative fluid could be obtained safely from each sampling point. In particular, the tests verified that:
: 15. Cold Hydrostatic Tests   Verified the integrity and leak tightness of fluid systems such as the Reactor Coolant System, CVCS, Sampling System, Waste Disposal System and the ECCS by performance of a hydrostatic test at the specified test pressure.
 
(a) All system piping and components were properly installed.
(b) All remotely and manually operated valving operated in accordance with the design specifications.
(c) All sample containers and quick -disconnect couplings function properly.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 5 of 6
 
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING
 
SYSTEM TESTS TEST OBJECTIVE 14 Emergency Power System Demonstrated that the system is capable of providing power for operation of vital equipment under power failure conditions. In particular, the tests verified that:
 
(a) All system components were properly installed (b) Each emergency diesel functioned according to the design intent under emergency conditions.
(c) The emergency units were capable of supplying the power to vital equipment as required under emergency conditions.
(d) All redundant features of the system functioned according to the design intent.
: 15. Cold Hydrostatic Tests Verified the integrity and leak tightness of fluid systems such as the Reactor Coolant System, CVCS, Sampling System, Waste Disposal System and the ECCS by performance of a hydrostatic test at the specified test pressure.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 6 of 6
 
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING
 
SYSTEM TESTS TEST OBJECTIVE
: 16. Hot Functional Tests Using pump heat, the Reactor Coolant System is tested to check heatup and cooldown procedures to demonstrate satisfactory performance of components that were exposed to the reactor coolant temperature; verified proper operation of instrumentation, controllers and alarms, and provided design operating conditions for checkout of auxiliary systems.


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                Revision:    17 D. C. COOK NUCLEAR PLANT Table:    13.1-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      6 of 6
[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITIAL REACTOR FUELING SYSTEM TESTS                                                  TEST OBJECTIVE
: 16. Hot Functional Tests          Using pump heat, the Reactor Coolant System is tested to check heatup and cooldown procedures to demonstrate satisfactory performance of components that were exposed to the reactor coolant temperature; verified proper operation of instrumentation, controllers and alarms, and provided design operating conditions for checkout of auxiliary systems.
The Chemical and Volume Control System was tested to determine that water could be charged at rated flow against normal Reactor Coolant System pressure; to verify letdown flow against design rate for each pressure reduction station; determined the response of the system to changes in pressurizer level; checked procedures and components used in boric boric acid batching and transfer operations; checked operation of the reactor makeup control; checked operation of the excess letdown and seal water flowpath; and verified proper operation of instrumentation controls and alarms.
The Chemical and Volume Control System was tested to determine that water could be charged at rated flow against normal Reactor Coolant System pressure; to verify letdown flow against design rate for each pressure reduction station; determined the response of the system to changes in pressurizer level; checked procedures and components used in boric boric acid batching and transfer operations; checked operation of the reactor makeup control; checked operation of the excess letdown and seal water flowpath; and verified proper operation of instrumentation controls and alarms.
The Sampling System was tested to determine that a specified quantity of representative fluid could be obtained safely and at design conditions from each sampling point.
The Sampling System was tested to determine that a specified quantity of representative fluid could be obtained safely and at design conditions from each sampling point.
The Component Cooling Water System was tested to evaluate its ability to remove heat from systems containing radioactive fluid and other special equipment; verified component cooling flow to all components; and verified proper operation of instrumentation controllers and alarms.
The Component Cooling Water System was tested to evaluate its ability to remove heat from systems containing radioactive fluid and other special equipment; verified component cooling flow to all components; and verified proper operation of instrumentation controllers and alarms.
: 17. Primary System Safety Valve   Tested and set all primary system safety valves ensuring each valve lifted at the specified set Tests                         pressure.
: 17. Primary System Safety Valve Tested and set all primary system safety valves ensuring each valve lifted at the specified set Tests pressure.
 
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 1 of 4
 
OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY
 
SYSTEM TESTS TEST OBJECTIVE
: 1. Electrical S ystem Ensured continuity, circuit integrity and the correct and reliable functioning of electrical apparatus. Electrical tests were performed on transformers, switchgear, motors, cables, control circuits, excitation switchgear, d -c systems, annunciator systems, lighting distribution switchboards, communication systems and miscellaneous equipment. Special attention was directed to the following tests:


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                  Revision:    16.1 D. C. COOK NUCLEAR PLANT Table:    13.2-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      1 of 4 OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY SYSTEM TESTS                                                    TEST OBJECTIVE
(a) High voltage switchgear breaker interlock test (b) Station loss of voltage auto-transfer test (c) Normal to preferred offsite auxiliary power transfer test (d) Tests of protective devices (e) Equipment automatic start tests (f) Exciter check for proper voltage build up (g) Insulation tests
: 1. Electrical System              Ensured continuity, circuit integrity and the correct and reliable functioning of electrical apparatus. Electrical tests were performed on transformers, switchgear, motors, cables, control circuits, excitation switchgear, d-c systems, annunciator systems, lighting distribution switchboards, communication systems and miscellaneous equipment. Special attention was directed to the following tests:
: 2. Essential Service Water System Verified the design head-capacity characteristics of the service water s ystem, i.e., that the system supplied design flow rate through all heat exchangers, and met the specified requirements when operated in the safeguards mode.
(a)     High voltage switchgear breaker interlock test (b)     Station loss of voltage auto-transfer test (c)     Normal to preferred offsite auxiliary power transfer test (d)     Tests of protective devices (e)     Equipment automatic start tests (f)     Exciter check for proper voltage build up (g)     Insulation tests
: 3. Nitrogen Storage S ystem Verified s ystem integrit y, valve operability, regulating and reducing station performance, and the ability to suppl y nitrogen to interconnecting s ystems as required.
: 2. Essential Service Water System Verified the design head-capacity characteristics of the service water system, i.e., that the system supplied design flow rate through all heat exchangers, and met the specified requirements when operated in the safeguards mode.
: 4. Condensate and Feedwater Verified valve and control operability and setpoints, and inspected for completeness and S ys t em integrity. Functional testing was performed when the main steam system was available.
: 3. Nitrogen Storage System        Verified system integrity, valve operability, regulating and reducing station performance, and the ability to supply nitrogen to interconnecting systems as required.
: 4. Condensate and Feedwater       Verified valve and control operability and setpoints, and inspected for completeness and System                        integrity. Functional testing was performed when the main steam system was available.
Flushing and hydrostatic tests were performed where applicable.
Flushing and hydrostatic tests were performed where applicable.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 2 of 4


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                Revision:    16.1 D. C. COOK NUCLEAR PLANT Table:    13.2-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      2 of 4 OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY
OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY
: 5. Residual Heat Removal and     Verified component cooling flow to all components, and verified the proper operation of Component Cooling Water       instrumentation, controllers, and alarms. Specifically, each of the two systems, i.e.,
: 5. Residual Heat Removal and Verified component cooling flow to all components, and verified the proper operation of Component Cooling Water instrumentation, controllers, and alarms. Specifically, each of the two s ystems, i.e.,
Systems                       component cooling system and residual heat removal system, was tested ensuring:
Systems component cooling s ystem and residual heat removal system, was tested ensuring:
(a)    All manual and remotely operated valves were operable.
(b)    All pumps performed their design functions satisfactorily.
(c)    All temperature, flow, level and pressure controllers functioned properly at the required set-points when supplied with appropriate signals.
(d)    All temperature, flow, level and pressure alarms provided alarms at the required locations when the alarm set-point was reached and cleared when the reset point was reached.
: 6. Boron Recovery System          Verified valve and control operability and set-points, flushing and hydrostatic testing as (CVCS)                        applicable, inspection for completeness and integrity. Functional testing was performed when a steam supply was available.
: 7. Safety Injection System (ECCS) Verified correct response to control signals and sequencing of the pumps, valves, and controllers of this system as specified in the system description and the manufacturer's technical manuals. More specifically that:
(a)    All manual and remotely operated valves were operable.
(b)    Each pair of valves installed for redundant flow paths operated as designed.
(c)    All pumps performed their design functions satisfactorily.
(d)    The proper sequencing of valves and pumps occurred on initiation of a safety injection signal.
(e)    The failed position on a loss of power for each remotely operated valve was as specified.
(f)    All level and pressure instruments were set at the specified points, alarmed and reset as required.


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                  Revision:  16.1 D. C. COOK NUCLEAR PLANT Table:    13.2-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      3 of 4 OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY
(a) All manual and remotel y operated valves were operable.
: 8. Containment Spray System      Verified responses to control signals and sequencing of the pumps, valves and controllers as specified in the system description and the manufacturer's technical manuals; checked that the time required to actuate the system after a containment high-high pressure signal is received was appropriate.
(b) All pumps performed their design functions satisfactorily.
: 9. Reactor Control and Protection Verified calibration, operability and alarm settings of the reactor control and protection System                        system; tested its operability in conjunction with other systems; e.g., the nuclear instrumentation system as detailed below.
(c) All temperature, flow, level and pressure controllers functioned properl y at the required set-points when supplied with appropriate signals.
: 10. Nuclear Instrumentation System Ensured that the instrumentation system was capable of monitoring the reactor leakage neutron flux from source range through 120 percent of full power and that protective functions were operating properly. In particular, the tests were designed to verify that:
(d) All temperature, flow, level and pressure alarms provided alarms at the required locations when the alarm set-point was reached and cleared when the reset point was reached.
(a)    All system equipment, cabling and interconnections are properly installed.
: 6. Boron Recovery S ystem Verified valve and control operability and set-points, flushing and hydrostatic testing as (CVCS) applicable, inspection for completeness and integrity. Functional testing was performed when a steam suppl y was available.
(b)    The source range detector and associated instrumentation responded to neutron level changes, and that the source range protection (high flux level reactor trip) as well as alarm features and audible count rate operated properly.
: 7. Safety Injection S ystem (ECCS) Verified correct response to control signals and sequencing of the pumps, valves, and controllers of this system as specified in the s ystem description and the manufacturer's technical manuals. More specificall y that:
(c)     The intermediate range instrumentation operated properly, the reactor protective and control features such as high level reactor trip and high level rod stop signals operated properly, and the permissive for blocking source range trip and source range high voltage-off operated properly.
: 11. Pressurizer Level Control      Ensured that the system was capable of monitoring the full range of pressurizer level alarms System                        and setpoints and that the system, in conjunction with the chemical and volume control system, controls pressurizer level.
: 12. Rod Position Indication System Checked the systems response to test signals verified correct indicating functions. After fuel loading and after the position indication coils were installed, a calibration and complete operational check was performed by operating the individual control rod drive mechanisms.


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                                Revision:    16.1 D. C. COOK NUCLEAR PLANT Table:    13.2-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      4 of 4 OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY
(a) All manual and remotel y operated valves were operable.
: 13. Reactor Thermocouple/ RTD    Checked and calibrated the system and compared thermocouple readings with RTD Instrumentation              readings up to the maximum allowable temperature at isothermal conditions.
(b) Each pair of valves installed for redundant flow paths operated as designed.
: 14. Turbine Auxiliary Cooling    Established the correct cooling to unit components, demonstrating satisfactory performance System                        of pumps, instruments, alarms, controls and established system integrity.
(c) All pumps performed their design functions satisfactorily.
: 15. Primary and Secondary System  Verified correct relief and safety valve pressure set-points.
(d) The proper sequencing of valves and pumps occurred on initiation of a safety injection signal.
    - Safety and Relief Valves
(e) The failed position on a loss of power for each remotely operated valve was as specified.
: 16. Turbine Steam Seal System    Verified valve and control operability and set-points, flushed and hydrostatically tested where applicable, inspected for completeness and integrity. Functional testing was performed when a steam supply was available.
(f) All level and pressure instruments were set at the specified points, alarmed and reset as required.
: 17. Turbine and Turning Gear Test Demonstrated satisfactory operation of these systems.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 3 of 4
: 18. Chemical Volume and Control  Verified that the CVCS functioned according to design intent. More specifically that:
System (a)    The reactor makeup control regulated blending, dilution and boration as designed.
(b)    Chemical addition subsystem functioned as specified.
: 19. Emergency Core Cooling        Verified the performance of the ECCS under full flow conditions.
System


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                            Revision:   16.1 D. C. COOK NUCLEAR PLANT Table:     13.3-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:       1 of 3 POST CRITICALITY TESTING
OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY
: 8. Containment Spray S ystem Verified responses to control signals and sequencing of the pumps, valves and controllers as specified in the s ystem description and the manufacturer's technical manuals; checked that the time required to actuate the system after a containment high -high pressure signal is received was appropriate.
: 9. Reactor Control and Protection Verified calibration, operability and alarm settings of the reactor control and protection S ys t em system; tested its operability in conjunction with other systems; e.g., the nuclear instrumentation system as detailed below.
: 10. Nuclear Instrumentation System Ensured that the instrumentation system was capable of monitoring the reactor leakage neutron flux from source range through 120 percent of full power and that protective functions were operating properl y. In particular, the tests were designed to verif y that:


==SUMMARY==
(a) All system equipment, cabling and interconnections are properl y installed.
(b) The source range detector and associated instrumentation responded to neutron level changes, and that the source range protection (high flux level reactor trip) as well as alarm features and audible count rate operated properl y.
(c) The intermediate range instrumentation operated properl y, the reactor protective and control features such as high level reactor trip and high level rod stop signals operated properl y, and the permissive for blocking source range trip and source range high voltage-off operated properl y.
: 11. Pressurizer Level Control Ensured that the s ystem was capable of monitoring the full range of pressurizer level alarms S ys t em and setpoints and that the system, in conjunction with the chemical and volume control system, controls pressurizer level.
: 12. Rod Position Indication System Checked the s ystems response to test signals verified correct indicating functions. Af ter fuel loading and after the position indication coils were installed, a calibration and complete operational check was performed by operating the individual control rod drive mechanisms.
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 4 of 4
 
OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY
: 13. Reactor Thermocouple/ RTD Checked and calibrated the system and compared thermocouple readings with RTD Instrumentation readings up to the maximum allowable temperature at isothermal conditions.
: 14. Turbine Auxiliary Cooling Established the correct cooling to unit components, demonstrating satisfactory performance S ys t em of pumps, instruments, alarms, controls and established system integrit y.
: 15. Primary and Secondar y System Verified correct relief and safet y valve pressure set-points.
- Safet y and Relief Valves
: 16. Turbine Steam Seal System Verified valve and control operability and set-points, flushed and hydrostatically tested where applicable, inspected for completeness and integrit y. Functional testing was performed when a steam supply was available.
: 17. Turbine and Turning Gear Test Demonstrated satisfactory operation of these s ystems.
: 18. Chemical Volume and Control Verified that the CVCS functioned according to design intent. More specifically that:
S ys t em (a) The reactor makeup control regulated blending, dilution and boration as designed.
(b) Chemical addition subsystem functioned as specified.
: 19. Emergency Core Cooling Verified the performance of the ECCS under full flow conditions.
S ys t em


TEST                          CONDITIONS                                    OBJECTIVES (a)    Cold Shutdown      To measure the drop time of control rod assemblies Control Rod Assembly Drop Tests (b)    Hot Shutdown        under full flow and no flow conditions To Verify that nuclear design predictions for endpoint Normal control group Nuclear Design Check Tests                                          boron concentrations, and isothermal temperature configurations at hot, zero power coefficient are valid All control rod assembly groups at To verify that nuclear design predictions for control rod Control Group Calibration power                              assembly group differential worths are valid To verify that nuclear design predictions for differential Power Coefficient Measurement    Performed at various per levels power coefficients are valid To verify control system response characteristics for the:
I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.3-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 1 of 3
Automatic Control Systems        Approximately 20 percent of rated          (a)    Steam generator level Checkout                        power                                      (b)    Control rod assembly automatic control system (c)    Turbine control system


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                              Revision:    16.1 D. C. COOK NUCLEAR PLANT Table:    13.3-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      2 of 3 POST CRITICALITY TESTING
POST CRITICALITY TES TING


==SUMMARY==
==SUMMARY==
TEST CONDITIONS OBJECTIVES Control Rod Assembly Drop Tests (a) Cold Shutdown To measure the drop time of control rod assemblies (b) Hot Shutdown under full flow and no flow conditions Normal control group To Verify that nuclear design predictions for endpoint Nuclear Design Check Tests configurations at hot, zero power boron concentrations, and isothermal temperature coefficient are valid Control Group Calibration All control rod assembl y groups at To verify that nuclear design predictions for control rod power assembly group differential worths are valid Power Coefficient Measurement Performed at various per levels To verify that nuclear design predictions for differential power coefficients are valid To verif y control s ystem response characteristics for the:
Automatic Control Systems Approximately 20 percent of rated (a) Steam generator level Checkout power (b) Control rod assembly automatic control system (c) Turbine control s ystem I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.3-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 2 of 3
POST CRITICALITY TES TING


TEST                         CONDITIONS                                     OBJECTIVES During static and/or transient conditions at the following percentages of rated power:
==SUMMARY==
To verify all power range instrumentation consisting of Power Range/RTD                                                       power range nuclear channels, and reactor coolant 30 percent Instrumentation Calibration                                          RTD's were responsive to change in reactor power to 50 percent intercalibrate these systems 75 percent 90 percent 100 percent 10 percent step load decrease at 50 To verify control systems performance as evidenced by Load Swing Test and 100 percent power               plant parameter variations To verify ability of plant to sustain plant trip and bring Turbine Trip                      Turbine trip from power plant to an orderly hot shutdown To verify that pressurizer pressure is reduced at the Pressurizer Effectiveness Test    Hot, shutdown required rate by pressurizer spray actuation To measure the minimum shutdown boron concentration Minimum Shutdown Verification    Hot, zero power with one "stuck" control rod assembly To verify that a single control rod assembly inserted Static Control Rod Assembly Drop 50 percent of rated power           fully or part way below the control bank results in hot Test channel factors below design values Reduction from 100 percent to 50 To verify control systems performance as evidenced by Load Reduction                   percent of rated power at a ramp plant parameter variations rate of 5 percent per minute
TEST CONDITIONS OBJECTIVES During static and/or transient conditions at the following percentages of rated power: To verify all power range instrumentation consisting of Power Range/RTD power range nuclear channels, and reactor coolant Instrumentation Calibration 30 percent RTD's were responsive to change in reactor power to 50 percent intercalibrate these systems 75 percent 90 percent 100 percent Load Swing Test 10 percent step load decrease at 50 To verif y control s ystems performance as evidenced by and 100 percent power plant parameter variations Turbine Trip Turbine trip from power To verify ability of plant to sustain plant trip and bring plant to an orderl y hot shutdown Pressurizer Effectiveness Test Hot, shutdown To verif y that pressurizer pressure is reduced at the required rate b y pressurizer spray actuation Minimum Shutdown Verification Hot, zero power To measure the minimum shutdown boron concentration with one "stuck" control rod assembl y Static Control Rod Assembly Drop To verify that a single control rod assembly inserted Test 50 percent of rated power fully or part way below the control bank results in hot channel factors below design values Reduction from 100 percent to 50 To verif y control s ystems performance as evidenced by Load Reduction percent of rated power at a ramp plant parameter variations rate of 5 percent per minute I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.3-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 3 of 3


UFSAR Revision 31.0 INDIANA MICHIGAN POWER                                        Revision:  16.1 D. C. COOK NUCLEAR PLANT Table:    13.3-1 UPDATED FINAL SAFETY ANALYSIS REPORT Page:      3 of 3 POST CRITICALITY TESTING
POST CRITICALITY TES TING


==SUMMARY==
==SUMMARY==
 
TEST CONDITIONS OBJECTIVES Incore Power Distribution 50 percent To verify that nuclear design predicted power Measurements 75 percent distributions are valid for normal control rod patterns 100 percent and configurations Dynamic Control Rod Assembly To verify automatic detection of dropped control rod DropTest 50 percent of rated power assembly, and subsequent automatic rod withdrawal stop and turbine cutback}}
TEST                     CONDITIONS                               OBJECTIVES 50 percent                   To verify that nuclear design predicted power Incore Power Distribution 75 percent                   distributions are valid for normal control rod patterns Measurements 100 percent                 and configurations To verify automatic detection of dropped control rod Dynamic Control Rod Assembly 50 percent of rated power   assembly, and subsequent automatic rod withdrawal DropTest stop and turbine cutback}}

Revision as of 15:37, 15 November 2024

1 to Updated Final Safety Analysis Report, Chapter 13, Tables
ML22340A211
Person / Time
Site: Cook  
Issue date: 11/30/2022
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22340A137 List: ... further results
References
AEP-NRC-2022-62
Download: ML22340A211 (1)


Text

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 1 of 6

[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING

SYSTEM TESTS TEST OBJECTIVE

1. Electrical System Ensured continuity, circuit integrity, and the correct and reliable functioning of electrical apparatus required for core loading. Special attention is directed to the following tests:

(a) Station loss of voltage auto-transfer test.

(b) Normal to preferred offsite auxiliary power transfer test.

2. Voice Communication System Verified proper communication between all local stations, for interconnection to commercial phone service, and balanced and adjusted amplifiers and speakers. Verified that all temporary communication stations located at the fuel loading status boardsites were functioning.
3. Essential Service Water System Verified that service water was available for all component cooling required during core loading.
4. Fire Protection System Verified proper operation of the System by ensuring the design intent was met for the fire pumps, and verified that the automatic start functions operated as designed, and verified that the pressure controls met acceptance specifications.

5 Compressed Air System Verified leak tightness of the system proper operation of all compressors, the, manual and automatic operation of controls at design setpoints, design air-dryer cycle time and moisture content of discharge air, and proper air pressure to each controller served by the system.

6. Reactor Coolant System Flushed and cleaned the reactor coolant and related primary systems, obtained the degree of Cleaning cleanliness required for the intended service. Provisions were made to maintain cleanliness and protection from contaminated sources after system cleaning and acceptance was completed. Coolant was analyzed for chloride content, solids, pH, and conductivity.

Oxygen content is analyzed and brought to specifications prior to exceeding 250 °F.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 2 of 6

[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING

SYSTEM TESTS TEST OBJECTIVE

7. Ventilation Systems Verified the proper operability of fans, controls, and other components of the Containment Ventilation System and Auxiliary Building Ventilation System.
8. Residual Heat Removal and Verified adequate component cooling flow to the Residual Heat Removal System, and Component Cooling Water verified proper operation of instrumentation, controllers, and alarms related to the Residual Systems Heat Removal System
9. Chemical and Volume Control Verified prior to critical operation, that the Chemical and Volume Control System System functioned as specified in the system description and appropriate manufacturers' technical manuals. More specifically that:

(a) All manual and remotely operated valves were operable manually and/or remotely.

(b) All pumps performed to specification.

(c) All temperature, flow, level, and pressure controllers functioned to control at the required set-point when supplied with appropriate signal(s).

(d) All temperature, flow, level, and pressure alarms provided alarms at the required locations when the alarm setpoint was reached and cleared when the reset point was reached.

(e) The reactor makeup control regulated blending, dilution and boration as designed.

(f) The design seal water flow rates were attainable at each reactor coolant pump.

(g) Chemical Addition Subsystem functioned as specified.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 3 of 6

[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING

SYSTEM TESTS TEST OBJECTIVE

10. Fuel Handling Systems 1 Showed that the system design is capable of providing a safe and effective means of transporting and handling fuel from the time it reaches the station until it is stored in the spent fuel pool. In particular, the tests verified that:

(a) The major structures required for refueling, such as the reactor cavity, refueling canal, new fuel and spent fuel storage, and decontamination facilities, were in accordance with the design intent.

(b) The major equipment required for refueling such as the manipulator crane, fuel handling tools, and spent fuel transfer system operated in accordance with the design specifications.

(c) All auxiliary equipment and instrumentation functioned properly.

11. Radiation Monitoring Systems Verified the calibration, operability and alarm setpoints of all radiation monitors, air particulate monitors, gas monito rs and liquid monitors which are located in the Containment Building, Auxiliary Building, Spent Fuel Area and Control Room.

1 Tests are conducted with a dummy fuel element.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 4 of 6

[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING

SYSTEM TESTS TEST OBJECTIVE

12. Nuclear Instrumentation System To insure that the instrumentation system is capable of monitoring the reactor leakage neutron flux for the source range. In particular, the tests verified that:

(a) All source range equipment, cabling, and interconnections were properly installed.

(b) The source range detector and associated instrumentation respond to neutron level changes and that the source range protection (high flux reactor trip) as well as alarm features, audible count rate, and strip chart recorders operated properly.

(c) All auxiliary equipment connected to the source range and temporary core loading detectors operated properly.

(d) Source range and temporary core loading detectors were properly calibrated and the associated setpoints and alarms were properly adjusted.

13. Reactor Plant Sampling System Verified that a quantity of representative fluid could be obtained safely from each sampling point. In particular, the tests verified that:

(a) All system piping and components were properly installed.

(b) All remotely and manually operated valving operated in accordance with the design specifications.

(c) All sample containers and quick -disconnect couplings function properly.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 5 of 6

[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING

SYSTEM TESTS TEST OBJECTIVE 14 Emergency Power System Demonstrated that the system is capable of providing power for operation of vital equipment under power failure conditions. In particular, the tests verified that:

(a) All system components were properly installed (b) Each emergency diesel functioned according to the design intent under emergency conditions.

(c) The emergency units were capable of supplying the power to vital equipment as required under emergency conditions.

(d) All redundant features of the system functioned according to the design intent.

15. Cold Hydrostatic Tests Verified the integrity and leak tightness of fluid systems such as the Reactor Coolant System, CVCS, Sampling System, Waste Disposal System and the ECCS by performance of a hydrostatic test at the specified test pressure.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 17 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.1-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 6 of 6

[HISTORICAL] OBJECTIVES OF SYSTEM TESTS PRIOR TO INITI AL REACTOR FUELING

SYSTEM TESTS TEST OBJECTIVE

16. Hot Functional Tests Using pump heat, the Reactor Coolant System is tested to check heatup and cooldown procedures to demonstrate satisfactory performance of components that were exposed to the reactor coolant temperature; verified proper operation of instrumentation, controllers and alarms, and provided design operating conditions for checkout of auxiliary systems.

The Chemical and Volume Control System was tested to determine that water could be charged at rated flow against normal Reactor Coolant System pressure; to verify letdown flow against design rate for each pressure reduction station; determined the response of the system to changes in pressurizer level; checked procedures and components used in boric boric acid batching and transfer operations; checked operation of the reactor makeup control; checked operation of the excess letdown and seal water flowpath; and verified proper operation of instrumentation controls and alarms.

The Sampling System was tested to determine that a specified quantity of representative fluid could be obtained safely and at design conditions from each sampling point.

The Component Cooling Water System was tested to evaluate its ability to remove heat from systems containing radioactive fluid and other special equipment; verified component cooling flow to all components; and verified proper operation of instrumentation controllers and alarms.

17. Primary System Safety Valve Tested and set all primary system safety valves ensuring each valve lifted at the specified set Tests pressure.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 1 of 4

OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY

SYSTEM TESTS TEST OBJECTIVE

1. Electrical S ystem Ensured continuity, circuit integrity and the correct and reliable functioning of electrical apparatus. Electrical tests were performed on transformers, switchgear, motors, cables, control circuits, excitation switchgear, d -c systems, annunciator systems, lighting distribution switchboards, communication systems and miscellaneous equipment. Special attention was directed to the following tests:

(a) High voltage switchgear breaker interlock test (b) Station loss of voltage auto-transfer test (c) Normal to preferred offsite auxiliary power transfer test (d) Tests of protective devices (e) Equipment automatic start tests (f) Exciter check for proper voltage build up (g) Insulation tests

2. Essential Service Water System Verified the design head-capacity characteristics of the service water s ystem, i.e., that the system supplied design flow rate through all heat exchangers, and met the specified requirements when operated in the safeguards mode.
3. Nitrogen Storage S ystem Verified s ystem integrit y, valve operability, regulating and reducing station performance, and the ability to suppl y nitrogen to interconnecting s ystems as required.
4. Condensate and Feedwater Verified valve and control operability and setpoints, and inspected for completeness and S ys t em integrity. Functional testing was performed when the main steam system was available.

Flushing and hydrostatic tests were performed where applicable.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 2 of 4

OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY

5. Residual Heat Removal and Verified component cooling flow to all components, and verified the proper operation of Component Cooling Water instrumentation, controllers, and alarms. Specifically, each of the two s ystems, i.e.,

Systems component cooling s ystem and residual heat removal system, was tested ensuring:

(a) All manual and remotel y operated valves were operable.

(b) All pumps performed their design functions satisfactorily.

(c) All temperature, flow, level and pressure controllers functioned properl y at the required set-points when supplied with appropriate signals.

(d) All temperature, flow, level and pressure alarms provided alarms at the required locations when the alarm set-point was reached and cleared when the reset point was reached.

6. Boron Recovery S ystem Verified valve and control operability and set-points, flushing and hydrostatic testing as (CVCS) applicable, inspection for completeness and integrity. Functional testing was performed when a steam suppl y was available.
7. Safety Injection S ystem (ECCS) Verified correct response to control signals and sequencing of the pumps, valves, and controllers of this system as specified in the s ystem description and the manufacturer's technical manuals. More specificall y that:

(a) All manual and remotel y operated valves were operable.

(b) Each pair of valves installed for redundant flow paths operated as designed.

(c) All pumps performed their design functions satisfactorily.

(d) The proper sequencing of valves and pumps occurred on initiation of a safety injection signal.

(e) The failed position on a loss of power for each remotely operated valve was as specified.

(f) All level and pressure instruments were set at the specified points, alarmed and reset as required.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 3 of 4

OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY

8. Containment Spray S ystem Verified responses to control signals and sequencing of the pumps, valves and controllers as specified in the s ystem description and the manufacturer's technical manuals; checked that the time required to actuate the system after a containment high -high pressure signal is received was appropriate.
9. Reactor Control and Protection Verified calibration, operability and alarm settings of the reactor control and protection S ys t em system; tested its operability in conjunction with other systems; e.g., the nuclear instrumentation system as detailed below.
10. Nuclear Instrumentation System Ensured that the instrumentation system was capable of monitoring the reactor leakage neutron flux from source range through 120 percent of full power and that protective functions were operating properl y. In particular, the tests were designed to verif y that:

(a) All system equipment, cabling and interconnections are properl y installed.

(b) The source range detector and associated instrumentation responded to neutron level changes, and that the source range protection (high flux level reactor trip) as well as alarm features and audible count rate operated properl y.

(c) The intermediate range instrumentation operated properl y, the reactor protective and control features such as high level reactor trip and high level rod stop signals operated properl y, and the permissive for blocking source range trip and source range high voltage-off operated properl y.

11. Pressurizer Level Control Ensured that the s ystem was capable of monitoring the full range of pressurizer level alarms S ys t em and setpoints and that the system, in conjunction with the chemical and volume control system, controls pressurizer level.
12. Rod Position Indication System Checked the s ystems response to test signals verified correct indicating functions. Af ter fuel loading and after the position indication coils were installed, a calibration and complete operational check was performed by operating the individual control rod drive mechanisms.

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.2-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 4 of 4

OBJECTIVES OF SYSTEMS TESTS PRIOR TO INITIAL CRITICALITY

13. Reactor Thermocouple/ RTD Checked and calibrated the system and compared thermocouple readings with RTD Instrumentation readings up to the maximum allowable temperature at isothermal conditions.
14. Turbine Auxiliary Cooling Established the correct cooling to unit components, demonstrating satisfactory performance S ys t em of pumps, instruments, alarms, controls and established system integrit y.
15. Primary and Secondar y System Verified correct relief and safet y valve pressure set-points.

- Safet y and Relief Valves

16. Turbine Steam Seal System Verified valve and control operability and set-points, flushed and hydrostatically tested where applicable, inspected for completeness and integrit y. Functional testing was performed when a steam supply was available.
17. Turbine and Turning Gear Test Demonstrated satisfactory operation of these s ystems.
18. Chemical Volume and Control Verified that the CVCS functioned according to design intent. More specifically that:

S ys t em (a) The reactor makeup control regulated blending, dilution and boration as designed.

(b) Chemical addition subsystem functioned as specified.

19. Emergency Core Cooling Verified the performance of the ECCS under full flow conditions.

S ys t em

I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.3-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 1 of 3

POST CRITICALITY TES TING

SUMMARY

TEST CONDITIONS OBJECTIVES Control Rod Assembly Drop Tests (a) Cold Shutdown To measure the drop time of control rod assemblies (b) Hot Shutdown under full flow and no flow conditions Normal control group To Verify that nuclear design predictions for endpoint Nuclear Design Check Tests configurations at hot, zero power boron concentrations, and isothermal temperature coefficient are valid Control Group Calibration All control rod assembl y groups at To verify that nuclear design predictions for control rod power assembly group differential worths are valid Power Coefficient Measurement Performed at various per levels To verify that nuclear design predictions for differential power coefficients are valid To verif y control s ystem response characteristics for the:

Automatic Control Systems Approximately 20 percent of rated (a) Steam generator level Checkout power (b) Control rod assembly automatic control system (c) Turbine control s ystem I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.3-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 2 of 3

POST CRITICALITY TES TING

SUMMARY

TEST CONDITIONS OBJECTIVES During static and/or transient conditions at the following percentages of rated power: To verify all power range instrumentation consisting of Power Range/RTD power range nuclear channels, and reactor coolant Instrumentation Calibration 30 percent RTD's were responsive to change in reactor power to 50 percent intercalibrate these systems 75 percent 90 percent 100 percent Load Swing Test 10 percent step load decrease at 50 To verif y control s ystems performance as evidenced by and 100 percent power plant parameter variations Turbine Trip Turbine trip from power To verify ability of plant to sustain plant trip and bring plant to an orderl y hot shutdown Pressurizer Effectiveness Test Hot, shutdown To verif y that pressurizer pressure is reduced at the required rate b y pressurizer spray actuation Minimum Shutdown Verification Hot, zero power To measure the minimum shutdown boron concentration with one "stuck" control rod assembl y Static Control Rod Assembly Drop To verify that a single control rod assembly inserted Test 50 percent of rated power fully or part way below the control bank results in hot channel factors below design values Reduction from 100 percent to 50 To verif y control s ystems performance as evidenced by Load Reduction percent of rated power at a ramp plant parameter variations rate of 5 percent per minute I NIN DD II AA NN AA MM II CC HH II GG AA NN PP OO WW EE RR Revision: 16.1 D.D. CC.. CC OO OO KK NN UU CC LL EE AA RR PP LL AA NN TT Table: 13.3-1 U PUP DD AA TT EE DD FF II NN AA LL SS AA FF EE TT YY AA NN AA LL YY SS II SS RR EE PP OO RR TT Page: 3 of 3

POST CRITICALITY TES TING

SUMMARY

TEST CONDITIONS OBJECTIVES Incore Power Distribution 50 percent To verify that nuclear design predicted power Measurements 75 percent distributions are valid for normal control rod patterns 100 percent and configurations Dynamic Control Rod Assembly To verify automatic detection of dropped control rod DropTest 50 percent of rated power assembly, and subsequent automatic rod withdrawal stop and turbine cutback