{{#Wiki_filter:Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 Licensing Technical Report Human Factors Engineering Operating Experience Review Implementation Plan December 2022 Revision 0 Docket: 52-050 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 www.nuscalepower.com | {{#Wiki_filter:Human Factors Engineering Operating Experience Review Implementation Plan | ||
TR-130409-NP Revision 0 Licensing Technical Report | |||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
December 2022 Revision 0 Docket: 52-050 | |||
NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 www.nuscalepower.com | |||
© Copyright 2022 by NuScale Power, LLC | © Copyright 2022 by NuScale Power, LLC | ||
© Copyright 2022 by NuScale Power, LLC i | © Copyright 2022 by NuScale Power, LLC i | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 Licensing Technical Report | |||
The NRC is permitted to make the number of | |||
COPYRIGHT NOTICE | |||
This document bears a NuScale Power, LLC, copyright notice. No right to disclose, use, or copy any of the information in this document, other than by the U.S. Nuclear Regulatory Commission (NRC), is authorized without the express, written permission of NuScale Power, LLC. | |||
The NRC is permitted to make the number of copi es of the information contained in these reports needed for its internal use in connection with gen eric and plant-specific reviews and approvals, as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by NuScale Power, LLC, copyright protection notwithstanding. | |||
Regarding nonproprietary versions of these reports, the NRC is permitted to make the number of additional copies necessary to provide copies for public viewing in appropriate docket files in public document rooms in Washington, DC, and elsewhere as may be required by NRC regulations. Copies made by the NRC must include this copyright notice in all instances and the proprietary notice if the original was identified as proprietary. | Regarding nonproprietary versions of these reports, the NRC is permitted to make the number of additional copies necessary to provide copies for public viewing in appropriate docket files in public document rooms in Washington, DC, and elsewhere as may be required by NRC regulations. Copies made by the NRC must include this copyright notice in all instances and the proprietary notice if the original was identified as proprietary. | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 Licensing Technical Report Department of Energy Acknowledgement and Disclaimer This material is based upon work supported by the Department of Energy under Award Number DE-NE0008928. | © Copyright 2022 by NuScale Power, LLC ii Human Factors Engineering Operating Experience Review Implementation Plan | ||
TR-130409-NP Revision 0 Licensing Technical Report | |||
Department of Energy Acknowledgement and Disclaimer | |||
This material is based upon work supported by the Department of Energy under Award Number DE-NE0008928. | |||
This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. | This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. | ||
Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not | Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not ne cessarily state or reflect those of the United States Government or any agency thereof. | ||
© Copyright 2022 by NuScale Power, LLC iii | |||
© Copyright 2022 by NuScale Power, LLC iii Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Table of Contents | |||
Abstract................................................................... 1 Executive Summary.......................................................... 2 1.0 Introduction.......................................................... 3 1.1 Purpose.............................................................. 3 1.2 Scope................................................................ 3 1.3 Abbreviations and Definitions.............................................. 4 2.0 Implementation........................................................ 6 2.1 Operating Experience Review Process Overview.............................. 6 2.2 Operating Experience Review Team Composition and Responsibilities............. 7 3.0 Operating Experience Review Methodology............................... 10 3.1 Review of Predecessor and Related Plants and Systems....................... 10 3.2 Review of Recognized Industry Human Factors Engineering Issues.............. 15 3.3 Review of Related Human-System Interface Technology....................... 16 3.4 Review of Issues Identified by Plant Personnel............................... 17 3.5 Review of Important Human Actions....................................... 18 3.6 Documentation........................................................ 19 3.6.1 Human Factors Engineering Issue Tracking System Database - Operating Experience Review Issues......................................... 19 4.0 References.......................................................... 21 4.1 Source Documents..................................................... 21 4.2 Referenced Documents................................................. 21 | |||
© Copyright 2022 by NuScale Power, LLC iv Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
List of Tables | |||
Table 1-1 Abbreviations.................................................... 4 Table 1-2 Definitions....................................................... 5 Table 3-1 Comparison of Commercial Pressurized Water Reactor Systems to NuScale Systems....................................................... 12 Table 3-2 Examples of Systems and Components Eliminated in the NuScale Design... 13 Table 3-3 Operating Experience Review Scope, Predecessor Determination, and Relevance..................................................... 13 Table 3-4 NUREG-1275 Human Performance Studies........................... 16 | |||
© Copyright 2022 by NuScale Power, LLC v | © Copyright 2022 by NuScale Power, LLC v | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Abstract | |||
Operating experience review (OER) is a key element of the Human Factors Engineering (HFE) | |||
Program. As part of its HFE program, NuScale Power, LLC (NuScale) conducted an extensive OER effort to identify HFE-related safety iss ues, and incorporate lessons learned as appropriate from previous designs, in both nuclear and non -nuclear industries, that may be applicable to NuScale Power Plant design. This report documents methodology to be used in the reviews of operating experience to support the NuScale Power Plant US460 standard design. The process established in this OER implementation plan is consistent with the applicable provisions of Section 3 of Human Factors Engineering Program Review Model, NUREG-0711 (Reference 4.2.1). | |||
© Copyright 2022 by NuScale Power, LLC 1 | © Copyright 2022 by NuScale Power, LLC 1 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Executive Summary | |||
As part of the Human Factors Engineering (H FE) Program, NuScale performed an extensive review of operating experience (OE) in multiple industries and facilities. The reviewed industries and facilities included the operating nuclear power plants, nuclear facilities that do not produce power, non-nuclear power plants, a U.S. military pl atform, the petrochemical industry, automotive industry, railway industry, and the airline industry. The purpose of the review was to identify HFE-related safety issues and incorporate identified positive features in the NuScale Power Plant design while avoiding negative features. Human Factors Engineering Operating Experience Review Results Summary Report, RP-0316-17614 (Reference 4.2.11) documented the results of the operating experience review (O ER) using OE up to the Design Certification Application submittal date. This implementation plan documents the methodology used in the reviews of OE in support of the NuScale Power Plant US460 standard design. | |||
Consistent with the guidance of NUREG-0711, Section 3, the scope of the OER performed by NuScale included reviews of predecessor or related plants and systems, recognized industry HFE issues, related human-system interface te chnology, issues identified by plant personnel, and important human actions. The OER goals are met by reviews of related source documents and literature, nuclear industry websites and databases. The obtained data is documented in a database and evaluated for their applicability to th e design. Applicable positive issues are also incorporated or tracked for incorporation into the design. | |||
© Copyright 2022 by NuScale Power, LLC 2 | © Copyright 2022 by NuScale Power, LLC 2 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
1.0 Introduction | |||
address applicable lessons learned in the | |||
apply the lessons learned to plant | 1.1 Purpose | ||
The NuScale operating experience review (OER) process conducts an extensive review of operating experience (OE). The purpose of the OER is to identify and document safety issues and lessons learned from the applicable OE. | |||
address applicable lessons learned in the des ign of systems in order to reduce human errors and their impact on risk and reliability of plant operation. | |||
apply the lessons learned to plant operat ions, operational procedures, training of plant operators, and human performance monitoring programs. | |||
avoid negative features in previous designs while retaining positive features. | avoid negative features in previous designs while retaining positive features. | ||
The OER scope, methodology, and the results that supported the Design Certification Application (DCA) are documented in Reference 4.2.11 consistent with the applicable guidance of NUREG-0711 (Reference 4.2.1), Section 3, and have been accepted as part of the NuScale DCA. This document outlines the implementation plan for OER to support the NuScale Power Plant US460 standard design. | The OER scope, methodology, and the results that supported the Design Certification Application (DCA) are documented in Reference 4.2.11 consistent with the applicable guidance of NUREG-0711 (Reference 4.2.1), Section 3, and have been accepted as part of the NuScale DCA. This document outlines the implementation plan for OER to support the NuScale Power Plant US460 standard design. | ||
1.2 | |||
1.2 Scope | |||
The OER scope includes reviews of the following: | |||
predecessor and related plants and systems recognized industry Human Factors Engineering (HFE) issues related human-system interface (HSI) technology issues identified by plant personnel important human actions (IHAs) | predecessor and related plants and systems recognized industry Human Factors Engineering (HFE) issues related human-system interface (HSI) technology issues identified by plant personnel important human actions (IHAs) | ||
NuScale Power Plants unique design features include multi-module applications. | NuScale Power Plants unique design features include multi-module applications. | ||
use of digital control systems. | use of digital control systems. | ||
heavy use of multiple levels of automation. | heavy use of multiple levels of automation. | ||
use of computer-based procedures. | use of computer-based procedures. | ||
The combination of these design features and the extent of their use in the design is not found in the existing commercial nuclear reactors. Therefore, the OER effort focuses on multiple industry experience in monitoring and control of multiple units in one control room. | The combination of these design features and the extent of their use in the design is not found in the existing commercial nuclear reactors. Therefore, the OER effort focuses on multiple industry experience in monitoring and control of multiple units in one control room. | ||
construction and construction testing of one or more units coincident with operating units. | construction and construction testing of one or more units coincident with operating units. | ||
© Copyright 2022 by NuScale Power, LLC 3 | © Copyright 2022 by NuScale Power, LLC 3 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
initial plant testing (preoperational and start-up testing) coincident with operating units. | |||
refueling of a unit coincident with operating units. | refueling of a unit coincident with operating units. | ||
incident and accident management of a unit coincident with operating units. | incident and accident management of a unit coincident with operating units. | ||
The OER of nuclear industry experience is limited to activities performed by licensed control room operators during normal, | |||
The OER of nuclear industry experience is limited to activities performed by licensed control room operators during normal, abnor mal, and emergency operating conditions. | |||
Maintenance or refueling activities, activities completed by craft or technical personnel (e.g., mechanical, electrical, or instrumentation and controls (I&C) maintenance; health physics; chemistry; engineering; or information technology), or activities associated with the Technical Support Center, Emergency Operations Facility, or other Emergency Response facilities are only considered when those activities are determined to impact licensed operator workload. | Maintenance or refueling activities, activities completed by craft or technical personnel (e.g., mechanical, electrical, or instrumentation and controls (I&C) maintenance; health physics; chemistry; engineering; or information technology), or activities associated with the Technical Support Center, Emergency Operations Facility, or other Emergency Response facilities are only considered when those activities are determined to impact licensed operator workload. | ||
If licensed operator workload is impacted, then the area of concern is analyzed to a degree sufficient to quantify the impact to licensed operator workload and develop HSI required to address the specific task. Evaluation results for these HFE elements for the licensed control room operators provide assurance that the control room staffing is accommodated by the Control Building design with sufficient margin for additional staffing (Reference 4.2.2). | If licensed operator workload is impacted, then the area of concern is analyzed to a degree sufficient to quantify the impact to licensed operator workload and develop HSI required to address the specific task. Evaluation results for these HFE elements for the licensed control room operators provide assurance that the control room staffing is accommodated by the Control Building design with sufficient margin for additional staffing (Reference 4.2.2). | ||
The results of the OER contribute to the basis for the determination of control room staffing and qualification levels for a future operator. Specifically, initial staffing goals for staffing and qualification levels are based, in part, on the staffing and qualification levels at the related plants and systems. Review of OE at related plants and systems includes investigation of operational problems and strengths and weaknesses resulting from staffing levels, and resulting changes to the initial staffing goals. The OER of recognized industry HFE issues included review of staffing considerations described in Nuclear Regulatory Commission (NRC) Information Notice 95-48: Results of Shift Staffing Study, October 10, 1995 (Reference 4.2.12), and work hour requirements of 10 CFR 26.205 and their impact on staffing. Use of OER in the determination of staffing and qualification levels is further discussed in Reference 4.2.2. | The results of the OER contribute to the basis for the determination of control room staffing and qualification levels for a future operator. Specifically, initial staffing goals for staffing and qualification levels are based, in part, on the staffing and qualification levels at the related plants and systems. Review of OE at related plants and systems includes investigation of operational problems and strengths and weaknesses resulting from staffing levels, and resulting changes to the initial staffing goals. The OER of recognized industry HFE issues included review of staffing considerations described in Nuclear Regulatory Commission (NRC) Information Notice 95-48: Results of Shift Staffing Study, October 10, 1995 (Reference 4.2.12), and work hour requirements of 10 CFR 26.205 and their impact on staffing. Use of OER in the determination of staffing and qualification levels is further discussed in Reference 4.2.2. | ||
1.3 | |||
1.3 Abbreviations and Definitions | |||
Table 1-1 Abbreviations Abbreviation Definition AC alternating current CNV containment vessel DC direct current DCA Design Certification Application FRA/FA functional requirements analysis and function allocation HFE Human Factors Engineering HFEITS Human Factors Engine ering issue tracking system HSI human-system interface | |||
© Copyright 2022 by NuScale Power, LLC 4 | © Copyright 2022 by NuScale Power, LLC 4 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Table 1-1 Abbreviations (Continued) | |||
Abbreviation Definition I&C instrumentation and controls IHA important human action LWR light water reactor NRC Nuclear Regulatory Commission OE operating experience OER operating experience review PWR pressurized water reactor RSR results summary report TIHA treatment of important human actions | |||
Table 1-2 Definitions Term Definition HFE issue An HFE issue that has not been reso lved in the NuScale HFE Program process. | |||
Issues are those items that need to be addre ssed at some later date and thus need to be tracked to provide reasonable assurance that they are not overlooked. | |||
HFE team A core group of human factors engineers with HFE training (or equivalent experience), experienced operat ors, and simulator engineers. | |||
HFE issue tracking An electronic database used for tra cking HFE issues within the scope of the system database NuScale Power Plant HFE Program. The OER items are a subcategory within HFEITS. | |||
Important human The actions that meet either risk or dete rministic criteria. The risk-important human actions actions are identified by the Probabilist ic Risk Assessment and human reliability analysis processes. The deterministically important human actions are derived from the transient and accident analysis, and diversity and defense-in-depth coping analysis. | |||
Module A NuScale module consists of the containment vessel, reac tor pressure vessel, and all components internal and external to each vessel, up to the disconnect flanges. | |||
OE item Any operating experience issue identified by the OER that is potentially applicable to the NuScale design and that needs further evaluation. | |||
OER team Team performing the OER activities whose members are qualified representatives from the HFE, Systems Engineering, Safety Analysis, and Operations Organizations. | |||
Unit A NuScale unit consists of the components necessary to generate electricity. This includes a primary side containing a re actor power module and its specific supporting systems, and a secondary side containing a turbine generator and its specific supporting systems. | |||
© Copyright 2022 by NuScale Power, LLC 5 | © Copyright 2022 by NuScale Power, LLC 5 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
2.0 Implementation | |||
2.1 Operating Experience Review Process Overview | |||
The OER process undertaken for the DCA established uniform practices for performing and documenting OER for the HFE Program. The process encompassed activities for OE screening and reviewing, providing recommendations, and documenting review results. | |||
The process to support the NuScale US460 design is built upon previous OER results. | The process to support the NuScale US460 design is built upon previous OER results. | ||
The categories of sources for review includes U.S. Nuclear Regulatory Commission, Human Factors Engineering (HFE) Insights for Advanced Reactors Based Upon Operating Experience, NUREG/CR-6400, 1996 (Reference 4.2.6). | The categories of sources for review includes U.S. Nuclear Regulatory Commission, Human Factors Engineering (HFE) Insights for Advanced Reactors Based Upon Operating Experience, NUREG/CR-6400, 1996 (Reference 4.2.6). | ||
similar technology from other industries. | similar technology from other industries. | ||
Line 94: | Line 177: | ||
nuclear industry databases. | nuclear industry databases. | ||
results from treatment of important human actions (TIHA). | results from treatment of important human actions (TIHA). | ||
The OER team lead identifies the specific OE items for initial screening in order to determine whether the item is applicable to the NuScale Power Plant. The items found to be applicable receive a full review. The purpose of the full review is to determine if a particular aspect of the NuScale design has already captured or provided a resolution of the issue described by the OE item. | The OER team lead identifies the specific OE items for initial screening in order to determine whether the item is applicable to the NuScale Power Plant. The items found to be applicable receive a full review. The purpose of the full review is to determine if a particular aspect of the NuScale design has already captured or provided a resolution of the issue described by the OE item. | ||
If the full review concludes that the NuScale design must determine a mitigating design solution within the scope of the HFE Program, the OE item is forwarded to the Human Factors Engineering issue tracking system ( | |||
If the full review concludes that the NuScale design must determine a mitigating design solution within the scope of the HFE Program, the OE item is forwarded to the Human Factors Engineering issue tracking system (HFE ITS). If the full review concludes that NuScale must determine a mitigating design solution outside the scope of the HFE Program, the item is forwarded to the appr opriate engineering discipline (Section 3.6). | |||
The OER process includes four major decision points: | The OER process includes four major decision points: | ||
Potential human performance issues are determined through review of the OER item causal factors. Where the OER item describes root or apparent cause, or human performance, key words such as time, stress, training, workload, management, and organization are indicative. | Potential human performance issues are determined through review of the OER item causal factors. Where the OER item describes root or apparent cause, or human performance, key words such as time, stress, training, workload, management, and organization are indicative. | ||
Applicability to the NuScale design is established by review of available NuScale design documents for the system (or like system) in question. Other HFE team members or appropriate subject matter experts are consulted as appropriate. | Applicability to the NuScale design is established by review of available NuScale design documents for the system (or like system) in question. Other HFE team members or appropriate subject matter experts are consulted as appropriate. | ||
Applicability determination comprises the initial screening of the issues to determine whether a complete review is needed. | Applicability determination comprises the initial screening of the issues to determine whether a complete review is needed. | ||
© Copyright 2022 by NuScale Power, LLC 6 | © Copyright 2022 by NuScale Power, LLC 6 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Determination of HFE Program scope is conducted by review of applicable NuScale design documents or implementation documents for HFE Program elements such as program management plan, human performanc e monitoring, TIHA, and functional requirements analysis and function allocation (FRA/FA). | |||
The OER reviewer determines if the OER item is resolved by the current design by review of HSI design documents. | The OER reviewer determines if the OER item is resolved by the current design by review of HSI design documents. | ||
The OER team is involved in decisions regarding disposition of OE items. At OER team decision points, each HFE member involved in the OER is consulted after having reviewed the available OE item, design information, and qualifying explanation. | The OER team is involved in decisions regarding disposition of OE items. At OER team decision points, each HFE member involved in the OER is consulted after having reviewed the available OE item, design information, and qualifying explanation. | ||
If an OE item is determined to be relevant and applicable to the NuScale HFE scope, but the current design documents do not address the item, the OE item becomes an HFE issue for tracking in the HFEITS database. The OE items tracked in the HFEITS are categorized to show which HFE elements they affect. This categorization facilitates future searches of the database by HFE element. | If an OE item is determined to be relevant and applicable to the NuScale HFE scope, but the current design documents do not address the item, the OE item becomes an HFE issue for tracking in the HFEITS database. The OE items tracked in the HFEITS are categorized to show which HFE elements they affect. This categorization facilitates future searches of the database by HFE element. | ||
Applicable OE items identified are entered into the HFEITS database for evaluation and disposition. | Applicable OE items identified are entered into the HFEITS database for evaluation and disposition. | ||
The OER results are used as inputs in the analysis of other HFE elements, including FRA/FA, task analysis, staffing and qualifications, TIHA, and human factors verification and validation. Specifically, the OER results are used in supporting the determination of the requirements for and allocation of | |||
The OER results are used as inputs in the analysis of other HFE elements, including FRA/FA, task analysis, staffing and qualifications, TIHA, and human factors verification and validation. Specifically, the OER results are used in supporting the determination of the requirements for and allocation of functi ons in the FRA/FA element. There are several experienced operators included as part of the HFE team (Section 2.2). These operators provide supplementary OE information related to any IHAs identified (Reference 4.2.4), | |||
which is incorporated in the task analysis, TIHA, and staffing and qualifications elements. | which is incorporated in the task analysis, TIHA, and staffing and qualifications elements. | ||
Additionally, experienced operators provide valuable insights and lessons learned in selecting challenging and workload-intensive plant operating conditions performed on a simulator as part of staffing and qualifications analyses and in performing verification and validation. | Additionally, experienced operators provide valuable insights and lessons learned in selecting challenging and workload-intensive plant operating conditions performed on a simulator as part of staffing and qualifications analyses and in performing verification and validation. | ||
2.2 | |||
The OER team lead and the remainder of the OER team are selected by the HFE supervisor from the HFE team members. As described in Reference 4.2.5, the HFE supervisor has the authority and | 2.2 Operating Experience Review Team Composition and Responsibilities | ||
The OER is conducted and supported by an experienced team of members that includes representatives from the HFE and Operations organizations, who are supported by the Systems Engineering and Safety Analysis staff. The qualifications of the HFE team members are as stipulated in the NuScale Human Factors Engineering Program Management Plan (Reference 4.2.5), and are consistent with the guidance of NUREG-0711 Appendix. | |||
The OER team lead and the remainder of the OER team are selected by the HFE supervisor from the HFE team members. As described in Reference 4.2.5, the HFE supervisor has the authority and organizati onal placement to ensure that the tasks assigned to the OER personnel who do not directly report to the HFE supervisor are completed. | |||
© Copyright 2022 by NuScale Power, LLC 7 | © Copyright 2022 by NuScale Power, LLC 7 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
The OER team includes an HFEITS database coordinator. Assigned by the team lead, the database coordinator is responsible for managing the integrity of the information that is recorded, screened, reviewed, and dispositioned in the HFEITS database. | |||
Responsibilities of the OER team lead include organizing the OER team. | Responsibilities of the OER team lead include organizing the OER team. | ||
assigning team member responsibilities. | assigning team member responsibilities. | ||
Line 120: | Line 223: | ||
ensuring that OER issues are completed with supporting documentation and entered into HFEITS as necessary. | ensuring that OER issues are completed with supporting documentation and entered into HFEITS as necessary. | ||
production of OER reports as needed. | production of OER reports as needed. | ||
Responsibilities of OER team members conducting the reviews and dispositioning the individual review items include reviewing OER issues for identification of human performance issues, sources of human error, and design elements that would support or enhance human performance. | Responsibilities of OER team members conducting the reviews and dispositioning the individual review items include reviewing OER issues for identification of human performance issues, sources of human error, and design elements that would support or enhance human performance. | ||
screening of OER issues for applicability to the NuScale design using criteria in accordance with established procedures and as discussed in Section 3.1 through Section 3.6. | screening of OER issues for applicability to the NuScale design using criteria in accordance with established procedures and as discussed in Section 3.1 through Section 3.6. | ||
Line 128: | Line 232: | ||
identifying need for NuScale design action on OER issues. | identifying need for NuScale design action on OER issues. | ||
entering actions resulting from OER into HFEITS. | entering actions resulting from OER into HFEITS. | ||
Upon completion of the OER, the team lead performs the following functions: | Upon completion of the OER, the team lead performs the following functions: | ||
resolves and closes applicable OE items in the HFEITS database collects documentation for: | resolves and closes applicable OE items in the HFEITS database collects documentation for: | ||
- sources of OE data | |||
- screening methods | |||
- screening results | |||
- interview facilities | |||
- interview results including personal information for each interviewee | |||
- results of reviews | |||
© Copyright 2022 by NuScale Power, LLC 8 | © Copyright 2022 by NuScale Power, LLC 8 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
- resolution of OE items tracked by HFEITS or engineering database ensures that the HFEITS operating experience database entries are complete and consistent and verify correct closure of OE items documents location of OER results to ensure availability of: | |||
- OE item-related systems | |||
- list of OE documents reviewed | |||
- results of reviewing relevant HSI technology | |||
- complete description and findings from interviews | |||
- list of OER-identified issues incorporated into the design | |||
- list of open issues still being tracked in the HFEITS | |||
© Copyright 2022 by NuScale Power, LLC 9 | © Copyright 2022 by NuScale Power, LLC 9 | ||
Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
3.0 Operating Experience Review Methodology | |||
The following sections describe the methodology used to address OE within the HFE Program. These sections address the applicable review criteria in NUREG-0711, Section 3, Operating Experience Review. | |||
3.1 Review of Predecessor and Related Plants and Systems | |||
3.1 | |||
The NuScale Power Plant design incorporates features such as passive safety systems, no reliance on safety-related alternating current (AC) or direct current (DC) power, and modular design that relies on automation and di gital HSI technology. The combination of these design features and the extent to which they are utilized in the NuScale Power Plant design is not found in the existing commercial nuclear reactors; therefore, existing designs are not considered direct predecessors to the NuScale Power Plant design. | |||
However, many of the NuScale systems and components are found in existing designs. | However, many of the NuScale systems and components are found in existing designs. | ||
Therefore, operating commercial nuclear power plant experience is reviewed and used appropriately in the development of the NuScale Power Plant design. | Therefore, operating commercial nuclear power plant experience is reviewed and used appropriately in the development of the NuScale Power Plant design. | ||
The NPP has achieved improvements in safety over existing plants through simplicity of design, reliance on passive safety systems, | |||
The NPP has achieved improvements in safety over existing plants through simplicity of design, reliance on passive safety systems, sm all fuel inventory, and use of additional barriers to the release of fission products to the environment. The integrated design of the NuScale Power Module eliminates external r eactor coolant loop piping and resulting large loss of coolant accidents, and the use of natur al circulation as the prime driver for the reactor coolant system removes the operating challenges posed by reactor coolant pumps and associated seals. | |||
The availability of passive safety systems for decay heat removal, emergency core cooling system, containment heat removal, and control room habitability eliminates the need for AC or DC power in a Fukushima-like event. This design removes the requirement for reliance on off-site power, safety-related AC or DC power systems, and emergency power sources, and technical specification-related issues that have caused significant OE items in the existing commercial fleet. | The availability of passive safety systems for decay heat removal, emergency core cooling system, containment heat removal, and control room habitability eliminates the need for AC or DC power in a Fukushima-like event. This design removes the requirement for reliance on off-site power, safety-related AC or DC power systems, and emergency power sources, and technical specification-related issues that have caused significant OE items in the existing commercial fleet. | ||
Each NuScale Power Module consists of a steel reactor pressure vessel within a steel containment vessel (CNV). ASME-rated pressure relief valves for the pressurizer relieve directly into the CNV, where it can be | |||
Each NuScale Power Module consists of a steel reactor pressure vessel within a steel containment vessel (CNV). ASME-rated pressure relief valves for the pressurizer relieve directly into the CNV, where it can be reutil ized by the emergency core cooling system to allow flow back into the RPV to maintain core cooling. This innovative design provides a solution to overcome the loss of coolant acci dent suffered by the Three Mile Island Unit 2 as a result of a stuck open power operated relief valve. | |||
The small CNV and evacuated annulus eliminate the need for thermal insulation around the reactor vessel, thereby reducing Generic Safety Issue 191 concerns. | The small CNV and evacuated annulus eliminate the need for thermal insulation around the reactor vessel, thereby reducing Generic Safety Issue 191 concerns. | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 associated with the above components, as well as limited conditions of operations for excessive sediment, algae, ice, and more. | The evacuated CNVs are partially immersed in an ultimate heat sink within the Reactor Building. The location of the ultimate heat sink eliminates the requirement for safety-related pumps and associated emergency power supplies, piping, valves, and coolers. This design feature removes the te chnical specifications requirements normally | ||
The integration of the decay heat removal system with the steam generators, main steam, condensate and feedwater systems | |||
These design improvements over existing | © Copyright 2022 by NuScale Power, LLC 10 Human Factors Engineering Operating Experience Review Implementation Plan | ||
Table 3-1 provides a cross-reference among systems contained in operating commercial nuclear power plants and NuScale systems. | |||
An initial screening is performed on each OE item to determine applicability to the NuScale design, and to determine whether | TR-130409-NP Revision 0 | ||
associated with the above components, as well as limited conditions of operations for excessive sediment, algae, ice, and more. | |||
The integration of the decay heat removal system with the steam generators, main steam, condensate and feedwater systems elimin ates the requirement for an auxiliary or emergency feedwater system. This integration also alleviates the maintenance and technical specification requirements for such systems. | |||
These design improvements over existing pl ants were in place before the formal OER Program was established. Considering this fact, NuScales challenge is to improve the HSI, worker environments, and plant and equipment layout to reduce human error potential and worker injuries. | |||
Table 3-1 provides a cross-reference among systems contained in operating commercial nuclear power plants and NuScale systems. Ta ble 3-2 lists examples of systems and components in commercial nuclear power plants that are eliminated in the NuScale design, and the NuScale design features that allow their elimination. If the initial screening identifies no correlation between the OE related to these eliminated systems and components and the NuScale design, the OER record is closed as not applicable. | |||
An initial screening is performed on each OE item to determine applicability to the NuScale design, and to determine whether fu rther evaluation is necessary to identify potential HFE issues related to the NuScale design. Operating experience items identified from previous light water reacto r (LWR) systems design with high relevance (greater than approximately 60 percent) to the NuScale design are candidates for detailed review, and are entered into the HFEITS database. Relevance is determined on the basis of comparison between the NuScale Power Plant and previous similar designs, and expressed in degrees of relevance. Tab le 3-3 provides such a comparison and the associated relevance expressed as HIGH, ME DIUM, or LOW, where MEDIUM relevance would be considered 40-60 percent relevant, and LOW would be less than 40 percent relevant. | |||
The need for further screening is established by the following criteria: | The need for further screening is established by the following criteria: | ||
similarity of designed systems, technology, and concept of operations designs with multi-modular monitoring and control designs with multiple identical systems monitoring in same control room designs with highly automated control designs that use digital I&C and video display units HFE issues that can affect NuScale design lessons learned that apply to NuScale The OER boundaries for this technology are extended beyond the experience of these existing plants because of the limited use and experience of the digital HSI technology in the current U.S. operating commercial nuclear power plants. Section 3.3 discusses the OER of the new HSI technology in other industries. | similarity of designed systems, technology, and concept of operations designs with multi-modular monitoring and control designs with multiple identical systems monitoring in same control room designs with highly automated control designs that use digital I&C and video display units HFE issues that can affect NuScale design lessons learned that apply to NuScale | ||
© Copyright 2022 by NuScale Power, LLC 11 | |||
The OER boundaries for this technology are extended beyond the experience of these existing plants because of the limited use and experience of the digital HSI technology in the current U.S. operating commercial nuclear power plants. Section 3.3 discusses the OER of the new HSI technology in other industries. | |||
© Copyright 2022 by NuScale Power, LLC 11 Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Table 3-1 Comparison of Commercial Pressurized Water Reactor Systems to NuScale Systems System Category Commercial PWR Systems Corresponding NuScale System Primary Systems containment system containment vessel (part of reactor module) chemical and volume control chemical and volume control system system reactor coolant system reactor coolant system (part of reactor module) pressurizer (part of reactor module) steam generator (part of reactor module) reactor pressure vessel (part of reactor module) reactor vessel internals (part of reactor module) steam generator system steam generator (part of reactor module) | |||
Control Systems reactor protection system reactor protection system engineered safety features engineered safety features actuation system actuation system diverse actuation system diverse protection system plant control module process computer rod control rod control and information system control rod drive system control rod drive system Monitoring Systems neutron monitoring system neutron monitoring system Main Power Cycle and main steam system main steam system Auxiliaries main turbine system turbine generator system condensate system feedwater and condensate system feedwater system feedwater and condensate system demineralized water transfer and demineralized water system storage system Cooling Systems passive containment cooling ultimate heat sink system (passive) system passive core cooling system emerge ncy core cooling system (passive) decay heat removal system (passive) normal residual heat removal ultimate heat sink system system containment flood and drain system spent fuel pool cooling system pool cooling water system AC & DC Power On-site standby power system backup diesel generator Systems AC power system medium voltage AC electrical distribution system low voltage AC electrical distribution system Fire Protection fire protection system fire protection system Systems HVAC Systems normal control room HVAC normal control room HVAC containment recirculation cooling not a NuScale system - NuScale containment system does not require a recirculation cooling system control room habitability system c ontrol room habitability system containment air filtration system not a NuScale system - NuScale containment does not require air filtration containment hydrogen control not a NuScale system - NuScale containment system does not require a hydrogen control system | |||
© Copyright 2022 by NuScale Power, LLC 12 Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Table 3-1 Comparison of Commercial Pressurized Water Reactor Systems to NuScale Systems (Continued) | |||
System Category Commercial PWR Systems Corresponding NuScale System Fuel Handling fuel handling and refueling fuel handling equipment Systems system refueling monitoring station spent fuel storage system | |||
Table 3-2 Examples of Systems and Components Eliminated in the NuScale Design System or Component Eliminated NuScale Design Feature in NuScale Design reactor coolant pumps buoyancy forces drive natural circulation of the primary coolant reactor coolant system piping reactor core, steam generator, and pressurizer contained within the pressurizer surge line reactor pressure vessel residual heat removal system reactor pressure ve ssel housed in a steel containment partially pumps with associated piping and immersed in water that provides an effective passive heat sink for heat exchangers long-term emergency cooling auxiliary feedwater system safety injection system | |||
Table 3-3 Operating Experience Review Scope, Predecessor Determination, and Relevance NuScale Plant, System, or System (( | |||
Technology Code Similar Plant, System, or Technology | |||
NuScale Power Module N/A None Reactor Pressure Vessel A011 PWR plants Pressurizer A012 PWR plants Containment Vessel A013 PWR plants Steam Generator A014 Ansaldo and Si et test facilities, Otto Hahn Reactor Module Support A015 None Control Rod Drive A022 PWR plants Reactor Vessel Internals A023 Ansaldo and Siet test facilities, PWR plants Reactor Fuel Assembly A025 PWR plants Control Rod Assembly A026 PWR plants Chemical and Volume Control B010 PWR plants Boron Addition System B011 PWR plants Emergency Core Cooling B020 Oregon State Universi ty NuScale Integral effects test facility | |||
Decay Heat Removal B030 GE SBWR and SWBR, KEPCO SMART testing Containment Heat Removal B040 None Control Room Habitability B060 PWR plants Normal Control Room HVAC B080 PWR plants Fuel Handling Equipment B140 PWR plants | |||
}}2(a),(c) | |||
© Copyright 2022 by NuScale Power, LLC 13 Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
Table 3-3 Operating Experience Review Scope, Predecessor Determination, and Relevance (Continued) | |||
NuScale Plant, System, or System (( | |||
Technology Code Similar Plant, System, or Technology | |||
NuScale Plant, System, or | |||
Spent Fuel Storage B160 PWR plants Pool Cooling and Cleanup System B170 PWR plants Pool Leakage Detection B180 PWR plants Containment Evacuation B190 None Main Steam C010 LWR plants Condensate and Feedwater C020 LWR plants Demineralized Water C140 LWR plants Fire Protection C190 LWR plants, Other Industries Medium Voltage AC Electrical Distribution D020 LWR plants, Other Industries Low Voltage AC Electrical Distribution D030 LWR plants, Other Industries Augmented DC Power Distribution D040 LWR plants Backup Diesel Generator D060 Other Industries Reactor Protection E011 PWR plants Neutron Monitoring E013 LWR plants Rod Control and Information E040 PWR plants Refueling Monitoring E070 PWR plants Reactor Building F010 LWR plants Digital I&C N/A LWR plants, Other Industries All video display units N/A LWR plants, Other Industries High level of automation N/A LWR plants, Other Industries Controlling more than one unit or process from same control N/A Other Industries room | |||
}}2(a),(c) | |||
In the table above, digital I&C, all video display units, high level of automation, and controlling more than one unit or process from same control room are listed as either MEDIUM or LOW. While this may seem incongruent with the importance of these topics to the NuScale design, they do accurately depict the relative OE relevance in these areas with the existing commercial reactors. Existing plants have performed individual system digital upgrades, which leaves their control rooms with a majority of analog panels and components, with an interspersing of digital control systems and video displays added on. While some automation has been utilized in existing plants (e.g., engineered safety features actuation system trips, load sequencing), no plant has utilized automation to the same degree as the NPP. Finally, while there are several dual control room plants in the U.S., and the CANDU fleet operates four reactors from the same control room, the NuScale design is novel in the control of up to six individual units from the same control room. | In the table above, digital I&C, all video display units, high level of automation, and controlling more than one unit or process from same control room are listed as either MEDIUM or LOW. While this may seem incongruent with the importance of these topics to the NuScale design, they do accurately depict the relative OE relevance in these areas with the existing commercial reactors. Existing plants have performed individual system digital upgrades, which leaves their control rooms with a majority of analog panels and components, with an interspersing of digital control systems and video displays added on. While some automation has been utilized in existing plants (e.g., engineered safety features actuation system trips, load sequencing), no plant has utilized automation to the same degree as the NPP. Finally, while there are several dual control room plants in the U.S., and the CANDU fleet operates four reactors from the same control room, the NuScale design is novel in the control of up to six individual units from the same control room. | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 3.2 | © Copyright 2022 by NuScale Power, LLC 14 Human Factors Engineering Operating Experience Review Implementation Plan | ||
TR-130409-NP Revision 0 | |||
3.2 Review of Recognized Industry Human Factors Engineering Issues | |||
NUREG/CR-6400 (Reference 4.2.6) provides a detailed list of HFE-relevant OE pertinent to the HSI design process for advanced nuclea r power plants. Six categories of issues and experience are addressed: | |||
unresolved safety issues/generic safety issues Three Mile Island issues NRC generic communications (generic letters, information notices and Part 21 reports) | unresolved safety issues/generic safety issues Three Mile Island issues NRC generic communications (generic letters, information notices and Part 21 reports) | ||
Office for Analysis and Evaluation of Operational Data issues lower power and shutdown operations operating plant event reports Sections 2 and 3 of NUREG/CR-6400 (Unresolved Safety Issues/ | Office for Analysis and Evaluation of Operational Data issues lower power and shutdown operations operating plant event reports | ||
The results of the NRCs Office for Analysis and Evaluation of Operational Data Program to identify human factors and human | |||
Sections 2 and 3 of NUREG/CR-6400 (Unresolved Safety Issues/Ge neric Safety Issues and Three Mile Island Issues) are summarized in Table II and Appendix B of NUREG-0933 (Reference 4.2.7). The issues listed in NUREG-0933 Appendix B are derived from the NRCs analysis of the issues listed in NUREG-0933 Table II. Therefore, the issues in NUREG-0933 Appendix B are a subset of the items in Table II. For this reason, NUREG-0933 Table II is used in the NuScale OER process instead of NUREG-0933 Appendix B. | |||
The results of the NRCs Office for Analysis and Evaluation of Operational Data Program to identify human factors and human perfor mance issues from mid-1980s through the year 2000 were published in Volumes 1 through 14 of NUREG-1275 (Section 5 of NUREG/CR-6400) (Reference 4.2.6). NuScales OER includes review of the items contained in these volumes (Table 3-4). The potential issues identified from initial screening of NUREG-1275 Volumes 1 through 14 are entered into the HFEITS database and evaluated using the method described in Section 3.6. | |||
The OER issues from sources other than NUREG/CR-6400 (published in January 1997) and NUREG-1275 are also reviewed for potential human performance issues or for identifying design elements that might support or enhance human performance. This includes reviews of additional literature and nuclear industry websites and databases (e.g., U.S. Nuclear Regulatory Commission, Institute of Nuclear Power Operations). | The OER issues from sources other than NUREG/CR-6400 (published in January 1997) and NUREG-1275 are also reviewed for potential human performance issues or for identifying design elements that might support or enhance human performance. This includes reviews of additional literature and nuclear industry websites and databases (e.g., U.S. Nuclear Regulatory Commission, Institute of Nuclear Power Operations). | ||
In addition to nuclear industry sources, literature, and websites of non-nuclear industries (U.S. military platform such as an aircraft carrier or submarine, the petrochemical industry, automotive industry, railway industry, and the airline industry) are also reviewed. | In addition to nuclear industry sources, literature, and websites of non-nuclear industries (U.S. military platform such as an aircraft carrier or submarine, the petrochemical industry, automotive industry, railway industry, and the airline industry) are also reviewed. | ||
The events at Chernobyl and at the Fukushima Daiichi power station preceded the design of the NuScale Power Plant. Therefore, as the development of NuScale Power Plant design is ongoing, the lessons learned from these events are considered, and the | The events at Chernobyl and at the Fukushima Daiichi power station preceded the design of the NuScale Power Plant. Therefore, as the development of NuScale Power Plant design is ongoing, the lessons learned from these events are considered, and the | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 applicable lessons learned incorporated in the design. With regard to the Fukushima event, the following documents are considered: | © Copyright 2022 by NuScale Power, LLC 15 Human Factors Engineering Operating Experience Review Implementation Plan | ||
U.S. Nuclear Regulatory Commission, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation | |||
TR-130409-NP Revision 0 | |||
applicable lessons learned incorporated in the design. With regard to the Fukushima event, the following documents are considered: | |||
U.S. Nuclear Regulatory Commission, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Stra tegies for Beyond-Design-Basis External Events, EA-12-049, March 12, 2012 (Reference 4.2.8) | |||
NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1 (Reference 4.2.9) | NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1 (Reference 4.2.9) | ||
NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 2 (Reference 4.2.10) | NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 2 (Reference 4.2.10) | ||
Table 3-4 NUREG-1275 Human Performance Studies NUREG-1275 NUREG Operating Experience Feedback Report Title | |||
1 | Table 3-4 NUREG-1275 Human Performance Studies NUREG-1275 NUREG Operating Experience Feedback Report Title Publication Date Volume No. | ||
Manufactured by Byron Jackson 8 | 1 Operating Experience Feedback Report - New Plants July 1987 2 Air Systems Problems December 1987 3 Service Water System Failures and Degradations November 1988 4 Technical Specifications March 1989 5 Progress in Scram Reduction March 1989 6 Operated Valve Problems February 1991 7 Experience with Pump Seals Installed in Reactor Coolant Pumps September 1992 Manufactured by Byron Jackson 8 Human Performance in Operating Events December 1992 9 Pressure Locking and Thermal Binding of Gate Valves March 1993 10 Reliability of Safety-Relat ed Steam Turbine-Driven Standby Pumps October 1994 11 Turbine-Generator Overspeed Protection Systems April 1995 12 Assessment of Spent Fuel Cooling February 1997 13 Evaluation of Air-Operated Valves at U.S. Light-Water Reactors February 2000 14 Causes and Significance of Design-Based Issues at U.S. Nuclear November 2000 Power Plants | ||
3.3 Review of Related Human-System Interface Technology | |||
The NuScale design uses a modern HSI design to control up to six units from one control room. Nuclear industry OE in multi-unit operati on from a single control room is limited. | |||
Therefore, the review of operating experience in these areas is expanded to other facilities and industries including nuclear installations that do not produce power, non-nuclear power plants, a U.S. military platform, the petrochemical industry, automotive industry, railway industry, and the airline industry (including air traffic controller operator experience data). | Therefore, the review of operating experience in these areas is expanded to other facilities and industries including nuclear installations that do not produce power, non-nuclear power plants, a U.S. military platform, the petrochemical industry, automotive industry, railway industry, and the airline industry (including air traffic controller operator experience data). | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 Operating experience research of HSI | © Copyright 2022 by NuScale Power, LLC 16 Human Factors Engineering Operating Experience Review Implementation Plan | ||
TR-130409-NP Revision 0 | |||
Operating experience research of HSI technol ogy in these facilities and industries focuses specifically on highly automated, digitally-controlled process systems. | |||
computerized procedures systems. | computerized procedures systems. | ||
use of flat panel displays (video display units). | use of flat panel displays (video display units). | ||
use of touch screens (as a design enhancement). | use of touch screens (as a design enhancement). | ||
multi-unit control rooms. | multi-unit control rooms. | ||
3.4 | |||
Telephone or in-person interviews of plant | 3.4 Review of Issues Identified by Plant Personnel | ||
The review of issues identified by plant personnel was performed for the DCA, and documented in a results summary report (RSR) (Reference 4.2.11). This aspect of the OER is incorporated into the predecessor des ign. As this report documents methodology to be used in the reviews of OE subsequent to the completion of the DCA, OER issues identified during the DCA Human Factors En gineering work will be evaluated against design changes implemented in the Standard Design Approval Application for the US460 standard design. | |||
Telephone or in-person interviews of plant per sonnel (nuclear and non-nuclear industries) were conducted for the DCA based on thei r experience with systems or technology applicable to the NuScale design. Personnel that were included are those with experience and knowledge in plant design docum ents, plant operations, and HFE topics discussed below. The personnel interviewed included operators (non-nuclear) or reactor operators. | |||
supervisors (non-nuclear) or senior reactor operators. | supervisors (non-nuclear) or senior reactor operators. | ||
maintenance technicians. | maintenance technicians. | ||
Line 218: | Line 394: | ||
procedure developers. | procedure developers. | ||
training staff. | training staff. | ||
Interview questions and topics were developed by the OER team lead and tailored to the job description of the individual being interviewed. | Interview questions and topics were developed by the OER team lead and tailored to the job description of the individual being interviewed. | ||
The interviews cover the following topics: | The interviews cover the following topics: | ||
plant operations | plant operations | ||
- normal plant evolutions (start-up, full-power, and shutdown) | |||
- instrument and control system degraded conditions and failures | |||
- HSI equipment failures and processing failures | |||
-transients | |||
© Copyright 2022 by NuScale Power, LLC 17 | |||
© Copyright 2022 by NuScale Power, LLC 17 Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
- accidents | |||
- reactor shutdown and cool down using remote shutdown systems HFE design topics | |||
- alarm and annunciation | |||
- display | |||
- control and automation (highly automated control systems) information processing and job aids | |||
- real-time communications with plant personnel, real-time communications with other organizations | |||
- procedures, training, staffing qualifications, and job design | |||
- multi-unit control room design effect on plant operation | |||
The data obtained from each interview was revi ewed for positive or negative aspects and further evaluated for incorporation into the NuScale design. Each potential issue identified in an interview was entered into the HFEITS database and evaluated in a manner similar to the process outlined in Section 3.6. | |||
In addition to obtaining data from outside pl ant personnel, the expertise of NuScales HFE team members was utilized to perform reviews of NuScale design documents and provide recommendations for improvements and refinements to the design as appropriate. These personnel possess experience in the operation of commercial nuclear power plants, and are an integral part of the HFE team. Inputs related to OE provided by these personnel were provided to the appropriate system design engineers and addressed by an inter-disciplinary review process. | |||
3.5 Review of Important Human Actions | |||
Important human actions include risk-impor tant human actions and deterministically important human actions. Risk-important human actions are identified early in the design process by the probabilistic risk assessment, and human reliability analysis processes. | |||
Deterministically important human actions are derived from the transient and accident analysis, and diversity and defense-in-depth co ping analysis. If IHAs are identified, they are recorded in the HFEITS database so that this information is available while analyzing OE. The HFEITS database is updated as necessary with IHAs as the PRA is updated during design. The OER issues that indicate a potential to impact NuScale-specific IHAs can be tracked as HFE issues in the HFEITS for resolution during appropriate HFE Program elements. | |||
Reference 4.2.4 contains further information on IHAs. The purpose of evaluating IHAs as part of OER is to determine whether other operating nuclear plants or systems with similar HSI technology have experienced rela ted error-causing conditions. The IHAs are used in succeeding HFE Program elements (task analysis, staffing and qualifications, and HSI design) to define the roles and responsibilities of plant personnel and to produce interfaces designed to minimize human error probabilities. More details on the IHAs are contained in the treatment of important human actions RSR (Reference 4.2.4). | |||
© Copyright 2022 by NuScale Power, LLC 18 Human Factors Engineering Operating Experience Review Implementation Plan | |||
TR-130409-NP Revision 0 | |||
In examining the OE data, both the successful completion of IHAs applicable to NuScale and the errors that may have occurred in the execution of those IHAs are identified and considered. Treatment of IHAs is further discussed in Reference 4.2.4. | |||
The human actions that are not identified as IHAs for the NuScale design but, if not performed correctly, could potentially have negative consequences are also selected for task analysis (Reference 4.2.3). This selection is accomplished with multiple subject matter experts by reviewing the OER and using their personal experience. | The human actions that are not identified as IHAs for the NuScale design but, if not performed correctly, could potentially have negative consequences are also selected for task analysis (Reference 4.2.3). This selection is accomplished with multiple subject matter experts by reviewing the OER and using their personal experience. | ||
3.6 | |||
If a potential HFE issue has been identified and cannot be resolved immediately, the issue is entered into the HFEITS database and tracked. Only the issues that are within the HFE Program scope but not incorporated by the current design are captured in HFEITS. The HFEITS issues can be evaluated for incorporation during the analyses or design of the HFE elements performed later as described in the implementation plans or RSRs | 3.6 Documentation | ||
The OER items that are preliminarily screened as applicable are entered into the HFEITS database. The database is designed to provide complete details of the collected data, and is maintained as an | |||
3.6.1 Human Factors Engineering Issue Tracking System Database - Operating Experience Review Issues | |||
The HFEITS database is used for tracking HFE issues within the scope of the NuScale Power Plant HFE Program that are identified using the screening process described in this section. These include issues identified as potential human performance issues and sources of human error and design elements that might support or enhance human performance. | |||
If a potential HFE issue has been identified and cannot be resolved immediately, the issue is entered into the HFEITS database and tracked. Only the issues that are within the HFE Program scope but not incorporated by the current design are captured in HFEITS. The HFEITS issues can be evaluated for incorporation during the analyses or design of the HFE elements performed later as described in the implementation plans or RSRs fo r those elements, as applicable. | |||
The OER items that are preliminarily screened as applicable are entered into the HFEITS database. The database is designed to provide complete details of the collected data, and is maintained as an elec tronic database. Items are categorized to show which HFE elements they affect. This categorization facilitates future OE searches of the HFEITS database by HFE element. | |||
The HFEITS database is administered by the HFE team lead. Consistency of entries is monitored during data entry and checked periodically by the OER team lead. | The HFEITS database is administered by the HFE team lead. Consistency of entries is monitored during data entry and checked periodically by the OER team lead. | ||
If an OER issue is determined to be not related to HFE scope, or not applicable to the NuScale design, a justification is written and reviewed by the OER team. Following approval of the justification, the OE item is closed, but retained in the HFEITS database. | If an OER issue is determined to be not related to HFE scope, or not applicable to the NuScale design, a justification is written and reviewed by the OER team. Following approval of the justification, the OE item is closed, but retained in the HFEITS database. | ||
If an OE item is determined to be | |||
If an OE item is determined to be applicabl e to the NuScale design but not applicable to the HFE Program scope, a justification is written and reviewed by the OER team. | |||
Following approval of the justification, the OE item is transferred to the appropriate engineering discipline. The OE item is then closed, but retained in the HFEITS database. | Following approval of the justification, the OE item is transferred to the appropriate engineering discipline. The OE item is then closed, but retained in the HFEITS database. | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 If an OE item is determined to be applicable to the NuScale HFE Program scope, but is resolved by the current design, documentation of that resolution is captured in the database. Documentation includes reference to appropriate approved design documents. The OER team reviews the resolved-by-design documentation and closes and retains the OE item in the database. | © Copyright 2022 by NuScale Power, LLC 19 Human Factors Engineering Operating Experience Review Implementation Plan | ||
An OE item that is determined to be applicable to the HFE Program scope and not resolved by the current design is documented as such in the HFEITS database. The OER team member proposes a design | |||
TR-130409-NP Revision 0 | |||
If an OE item is determined to be applicable to the NuScale HFE Program scope, but is resolved by the current design, documentation of that resolution is captured in the database. Documentation includes reference to appropriate approved design documents. The OER team reviews the resolved-by-design documentation and closes and retains the OE item in the database. | |||
An OE item that is determined to be applicable to the HFE Program scope and not resolved by the current design is documented as such in the HFEITS database. The OER team member proposes a design modifi cation to incorporate the OE item. The OER team reviews the documentation and proposed design modification. If approved, the OE item is assigned to the greater HFE team. The HFEITS issues not resolved as part of the OER are evaluated during later stages of analyses or design for incorporation as described in the RSRs for those HFE Program elements. | |||
In the event the OER team disapproves a justification or set of documentation for closure of an OE item, the OER team and HFE supervisor have the discretion to either reassign the OE item to another team member or resolve the item as a team. | In the event the OER team disapproves a justification or set of documentation for closure of an OE item, the OER team and HFE supervisor have the discretion to either reassign the OE item to another team member or resolve the item as a team. | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 4.0 | © Copyright 2022 by NuScale Power, LLC 20 Human Factors Engineering Operating Experience Review Implementation Plan | ||
TR-130409-NP Revision 0 | |||
4.0 References | |||
4.1 Source Documents | |||
4.1.1. U.S. Nuclear Regulatory Commission, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition (NUREG-0800), | |||
Formerly issued as NUREG-75/087, Chapter 18, Human Factors Engineering. | Formerly issued as NUREG-75/087, Chapter 18, Human Factors Engineering. | ||
4.1.2. U.S. Nuclear Regulatory Commission, Shutdown and Low-Power Operation at Commercial Nuclear Power Plants in the United States, NUREG-1449, September 1993. | 4.1.2. U.S. Nuclear Regulatory Commission, Shutdown and Low-Power Operation at Commercial Nuclear Power Plants in the United States, NUREG-1449, September 1993. | ||
4.1.3. U.S. Code of Federal Regulations, Contents of Applications; Technical Information, Section 52.47, Part 52, Chapter 1, Title 10 Energy (10 CFR Part 52.47). | 4.1.3. U.S. Code of Federal Regulations, Contents of Applications; Technical Information, Section 52.47, Part 52, Chapter 1, Title 10 Energy (10 CFR Part 52.47). | ||
4.2 | |||
4.2 Referenced Documents | |||
4.2.1. U.S. Nuclear Regulatory Commission, Human Factors Engineering Program Review Model, NUREG-0711, Revision 3, November 2012. | |||
4.2.2. NuScale Human Factors Engineering Staffing and Qualifications Results Summary Report, TR-130412, Revision 0. | 4.2.2. NuScale Human Factors Engineering Staffing and Qualifications Results Summary Report, TR-130412, Revision 0. | ||
4.2.3. NuScale Human Factors Engineering Task Analysis Implementation Plan, TR-130413, Revision 0. | 4.2.3. NuScale Human Factors Engineering Task Analysis Implementation Plan, TR-130413, Revision 0. | ||
4.2.4. NuScale Human Factors Engineering Treatment of Important Human Actions Results Summary Report, TR-130416, Revision 0. | 4.2.4. NuScale Human Factors Engineering Treatment of Important Human Actions Results Summary Report, TR-130416, Revision 0. | ||
4.2.5. NuScale Human Factors Engineering Program Management Plan, TR-130414, Revision 0. | 4.2.5. NuScale Human Factors Engineering Program Management Plan, TR-130414, Revision 0. | ||
4.2.6. U.S. Nuclear Regulatory Commission, Human Factors Engineering (HFE) | 4.2.6. U.S. Nuclear Regulatory Commission, Human Factors Engineering (HFE) | ||
Insights for Advanced Reactors Based Upon Operating Experience, NUREG/CR-6400, 1996. | Insights for Advanced Reactors Based Upon Operating Experience, NUREG/CR-6400, 1996. | ||
4.2.7. U.S. Nuclear Regulatory Commission, Resolution of Generic Safety issues, NUREG-0933 (Supplements 1 - 34), 2011. | 4.2.7. U.S. Nuclear Regulatory Commission, Resolution of Generic Safety issues, NUREG-0933 (Supplements 1 - 34), 2011. | ||
4.2.8. U.S. Nuclear Regulatory Commission, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, EA-12-049, March 12, 2012. | 4.2.8. U.S. Nuclear Regulatory Commission, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, EA-12-049, March 12, 2012. | ||
4.2.9. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1. | 4.2.9. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1. | ||
Human Factors Engineering Operating Experience Review Implementation Plan TR-130409-NP Revision 0 4.2.10. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 2. | © Copyright 2022 by NuScale Power, LLC 21 Human Factors Engineering Operating Experience Review Implementation Plan | ||
TR-130409-NP Revision 0 | |||
4.2.10. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 2. | |||
4.2.11. Human Factors Engineering Operating Experience Review Results Summary Report, RP-0316-17614, Revision 0. | 4.2.11. Human Factors Engineering Operating Experience Review Results Summary Report, RP-0316-17614, Revision 0. | ||
4.2.12. NRC Information Notice 95-48: Results of Shift Staffing Study, October 10, 1995. | 4.2.12. NRC Information Notice 95-48: Results of Shift Staffing Study, October 10, 1995. | ||
© Copyright 2022 by NuScale Power, LLC 22}} | © Copyright 2022 by NuScale Power, LLC 22}} |
Latest revision as of 09:12, 13 November 2024
ML23304A380 | |
Person / Time | |
---|---|
Site: | 05200050 |
Issue date: | 12/31/2022 |
From: | NuScale |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML23306A033 | List:
|
References | |
LO-151262 TR-130409-NP | |
Download: ML23304A380 (1) | |
Text
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0 Licensing Technical Report
Human Factors Engineering Operating Experience Review Implementation Plan
December 2022 Revision 0 Docket: 52-050
NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 www.nuscalepower.com
© Copyright 2022 by NuScale Power, LLC
© Copyright 2022 by NuScale Power, LLC i
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0 Licensing Technical Report
COPYRIGHT NOTICE
This document bears a NuScale Power, LLC, copyright notice. No right to disclose, use, or copy any of the information in this document, other than by the U.S. Nuclear Regulatory Commission (NRC), is authorized without the express, written permission of NuScale Power, LLC.
The NRC is permitted to make the number of copi es of the information contained in these reports needed for its internal use in connection with gen eric and plant-specific reviews and approvals, as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by NuScale Power, LLC, copyright protection notwithstanding.
Regarding nonproprietary versions of these reports, the NRC is permitted to make the number of additional copies necessary to provide copies for public viewing in appropriate docket files in public document rooms in Washington, DC, and elsewhere as may be required by NRC regulations. Copies made by the NRC must include this copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
© Copyright 2022 by NuScale Power, LLC ii Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0 Licensing Technical Report
Department of Energy Acknowledgement and Disclaimer
This material is based upon work supported by the Department of Energy under Award Number DE-NE0008928.
This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.
Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not ne cessarily state or reflect those of the United States Government or any agency thereof.
© Copyright 2022 by NuScale Power, LLC iii Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Table of Contents
Abstract................................................................... 1 Executive Summary.......................................................... 2 1.0 Introduction.......................................................... 3 1.1 Purpose.............................................................. 3 1.2 Scope................................................................ 3 1.3 Abbreviations and Definitions.............................................. 4 2.0 Implementation........................................................ 6 2.1 Operating Experience Review Process Overview.............................. 6 2.2 Operating Experience Review Team Composition and Responsibilities............. 7 3.0 Operating Experience Review Methodology............................... 10 3.1 Review of Predecessor and Related Plants and Systems....................... 10 3.2 Review of Recognized Industry Human Factors Engineering Issues.............. 15 3.3 Review of Related Human-System Interface Technology....................... 16 3.4 Review of Issues Identified by Plant Personnel............................... 17 3.5 Review of Important Human Actions....................................... 18 3.6 Documentation........................................................ 19 3.6.1 Human Factors Engineering Issue Tracking System Database - Operating Experience Review Issues......................................... 19 4.0 References.......................................................... 21 4.1 Source Documents..................................................... 21 4.2 Referenced Documents................................................. 21
© Copyright 2022 by NuScale Power, LLC iv Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
List of Tables
Table 1-1 Abbreviations.................................................... 4 Table 1-2 Definitions....................................................... 5 Table 3-1 Comparison of Commercial Pressurized Water Reactor Systems to NuScale Systems....................................................... 12 Table 3-2 Examples of Systems and Components Eliminated in the NuScale Design... 13 Table 3-3 Operating Experience Review Scope, Predecessor Determination, and Relevance..................................................... 13 Table 3-4 NUREG-1275 Human Performance Studies........................... 16
© Copyright 2022 by NuScale Power, LLC v
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Abstract
Operating experience review (OER) is a key element of the Human Factors Engineering (HFE)
Program. As part of its HFE program, NuScale Power, LLC (NuScale) conducted an extensive OER effort to identify HFE-related safety iss ues, and incorporate lessons learned as appropriate from previous designs, in both nuclear and non -nuclear industries, that may be applicable to NuScale Power Plant design. This report documents methodology to be used in the reviews of operating experience to support the NuScale Power Plant US460 standard design. The process established in this OER implementation plan is consistent with the applicable provisions of Section 3 of Human Factors Engineering Program Review Model, NUREG-0711 (Reference 4.2.1).
© Copyright 2022 by NuScale Power, LLC 1
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Executive Summary
As part of the Human Factors Engineering (H FE) Program, NuScale performed an extensive review of operating experience (OE) in multiple industries and facilities. The reviewed industries and facilities included the operating nuclear power plants, nuclear facilities that do not produce power, non-nuclear power plants, a U.S. military pl atform, the petrochemical industry, automotive industry, railway industry, and the airline industry. The purpose of the review was to identify HFE-related safety issues and incorporate identified positive features in the NuScale Power Plant design while avoiding negative features. Human Factors Engineering Operating Experience Review Results Summary Report, RP-0316-17614 (Reference 4.2.11) documented the results of the operating experience review (O ER) using OE up to the Design Certification Application submittal date. This implementation plan documents the methodology used in the reviews of OE in support of the NuScale Power Plant US460 standard design.
Consistent with the guidance of NUREG-0711, Section 3, the scope of the OER performed by NuScale included reviews of predecessor or related plants and systems, recognized industry HFE issues, related human-system interface te chnology, issues identified by plant personnel, and important human actions. The OER goals are met by reviews of related source documents and literature, nuclear industry websites and databases. The obtained data is documented in a database and evaluated for their applicability to th e design. Applicable positive issues are also incorporated or tracked for incorporation into the design.
© Copyright 2022 by NuScale Power, LLC 2
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
1.0 Introduction
1.1 Purpose
The NuScale operating experience review (OER) process conducts an extensive review of operating experience (OE). The purpose of the OER is to identify and document safety issues and lessons learned from the applicable OE.
address applicable lessons learned in the des ign of systems in order to reduce human errors and their impact on risk and reliability of plant operation.
apply the lessons learned to plant operat ions, operational procedures, training of plant operators, and human performance monitoring programs.
avoid negative features in previous designs while retaining positive features.
The OER scope, methodology, and the results that supported the Design Certification Application (DCA) are documented in Reference 4.2.11 consistent with the applicable guidance of NUREG-0711 (Reference 4.2.1), Section 3, and have been accepted as part of the NuScale DCA. This document outlines the implementation plan for OER to support the NuScale Power Plant US460 standard design.
1.2 Scope
The OER scope includes reviews of the following:
predecessor and related plants and systems recognized industry Human Factors Engineering (HFE) issues related human-system interface (HSI) technology issues identified by plant personnel important human actions (IHAs)
NuScale Power Plants unique design features include multi-module applications.
use of digital control systems.
heavy use of multiple levels of automation.
use of computer-based procedures.
The combination of these design features and the extent of their use in the design is not found in the existing commercial nuclear reactors. Therefore, the OER effort focuses on multiple industry experience in monitoring and control of multiple units in one control room.
construction and construction testing of one or more units coincident with operating units.
© Copyright 2022 by NuScale Power, LLC 3
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
initial plant testing (preoperational and start-up testing) coincident with operating units.
refueling of a unit coincident with operating units.
incident and accident management of a unit coincident with operating units.
The OER of nuclear industry experience is limited to activities performed by licensed control room operators during normal, abnor mal, and emergency operating conditions.
Maintenance or refueling activities, activities completed by craft or technical personnel (e.g., mechanical, electrical, or instrumentation and controls (I&C) maintenance; health physics; chemistry; engineering; or information technology), or activities associated with the Technical Support Center, Emergency Operations Facility, or other Emergency Response facilities are only considered when those activities are determined to impact licensed operator workload.
If licensed operator workload is impacted, then the area of concern is analyzed to a degree sufficient to quantify the impact to licensed operator workload and develop HSI required to address the specific task. Evaluation results for these HFE elements for the licensed control room operators provide assurance that the control room staffing is accommodated by the Control Building design with sufficient margin for additional staffing (Reference 4.2.2).
The results of the OER contribute to the basis for the determination of control room staffing and qualification levels for a future operator. Specifically, initial staffing goals for staffing and qualification levels are based, in part, on the staffing and qualification levels at the related plants and systems. Review of OE at related plants and systems includes investigation of operational problems and strengths and weaknesses resulting from staffing levels, and resulting changes to the initial staffing goals. The OER of recognized industry HFE issues included review of staffing considerations described in Nuclear Regulatory Commission (NRC) Information Notice 95-48: Results of Shift Staffing Study, October 10, 1995 (Reference 4.2.12), and work hour requirements of 10 CFR 26.205 and their impact on staffing. Use of OER in the determination of staffing and qualification levels is further discussed in Reference 4.2.2.
1.3 Abbreviations and Definitions
Table 1-1 Abbreviations Abbreviation Definition AC alternating current CNV containment vessel DC direct current DCA Design Certification Application FRA/FA functional requirements analysis and function allocation HFE Human Factors Engineering HFEITS Human Factors Engine ering issue tracking system HSI human-system interface
© Copyright 2022 by NuScale Power, LLC 4
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Table 1-1 Abbreviations (Continued)
Abbreviation Definition I&C instrumentation and controls IHA important human action LWR light water reactor NRC Nuclear Regulatory Commission OE operating experience OER operating experience review PWR pressurized water reactor RSR results summary report TIHA treatment of important human actions
Table 1-2 Definitions Term Definition HFE issue An HFE issue that has not been reso lved in the NuScale HFE Program process.
Issues are those items that need to be addre ssed at some later date and thus need to be tracked to provide reasonable assurance that they are not overlooked.
HFE team A core group of human factors engineers with HFE training (or equivalent experience), experienced operat ors, and simulator engineers.
HFE issue tracking An electronic database used for tra cking HFE issues within the scope of the system database NuScale Power Plant HFE Program. The OER items are a subcategory within HFEITS.
Important human The actions that meet either risk or dete rministic criteria. The risk-important human actions actions are identified by the Probabilist ic Risk Assessment and human reliability analysis processes. The deterministically important human actions are derived from the transient and accident analysis, and diversity and defense-in-depth coping analysis.
Module A NuScale module consists of the containment vessel, reac tor pressure vessel, and all components internal and external to each vessel, up to the disconnect flanges.
OE item Any operating experience issue identified by the OER that is potentially applicable to the NuScale design and that needs further evaluation.
OER team Team performing the OER activities whose members are qualified representatives from the HFE, Systems Engineering, Safety Analysis, and Operations Organizations.
Unit A NuScale unit consists of the components necessary to generate electricity. This includes a primary side containing a re actor power module and its specific supporting systems, and a secondary side containing a turbine generator and its specific supporting systems.
© Copyright 2022 by NuScale Power, LLC 5
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
2.0 Implementation
2.1 Operating Experience Review Process Overview
The OER process undertaken for the DCA established uniform practices for performing and documenting OER for the HFE Program. The process encompassed activities for OE screening and reviewing, providing recommendations, and documenting review results.
The process to support the NuScale US460 design is built upon previous OER results.
The categories of sources for review includes U.S. Nuclear Regulatory Commission, Human Factors Engineering (HFE) Insights for Advanced Reactors Based Upon Operating Experience, NUREG/CR-6400, 1996 (Reference 4.2.6).
similar technology from other industries.
operator interviews.
site visits.
literature.
nuclear industry databases.
results from treatment of important human actions (TIHA).
The OER team lead identifies the specific OE items for initial screening in order to determine whether the item is applicable to the NuScale Power Plant. The items found to be applicable receive a full review. The purpose of the full review is to determine if a particular aspect of the NuScale design has already captured or provided a resolution of the issue described by the OE item.
If the full review concludes that the NuScale design must determine a mitigating design solution within the scope of the HFE Program, the OE item is forwarded to the Human Factors Engineering issue tracking system (HFE ITS). If the full review concludes that NuScale must determine a mitigating design solution outside the scope of the HFE Program, the item is forwarded to the appr opriate engineering discipline (Section 3.6).
The OER process includes four major decision points:
Potential human performance issues are determined through review of the OER item causal factors. Where the OER item describes root or apparent cause, or human performance, key words such as time, stress, training, workload, management, and organization are indicative.
Applicability to the NuScale design is established by review of available NuScale design documents for the system (or like system) in question. Other HFE team members or appropriate subject matter experts are consulted as appropriate.
Applicability determination comprises the initial screening of the issues to determine whether a complete review is needed.
© Copyright 2022 by NuScale Power, LLC 6
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Determination of HFE Program scope is conducted by review of applicable NuScale design documents or implementation documents for HFE Program elements such as program management plan, human performanc e monitoring, TIHA, and functional requirements analysis and function allocation (FRA/FA).
The OER reviewer determines if the OER item is resolved by the current design by review of HSI design documents.
The OER team is involved in decisions regarding disposition of OE items. At OER team decision points, each HFE member involved in the OER is consulted after having reviewed the available OE item, design information, and qualifying explanation.
If an OE item is determined to be relevant and applicable to the NuScale HFE scope, but the current design documents do not address the item, the OE item becomes an HFE issue for tracking in the HFEITS database. The OE items tracked in the HFEITS are categorized to show which HFE elements they affect. This categorization facilitates future searches of the database by HFE element.
Applicable OE items identified are entered into the HFEITS database for evaluation and disposition.
The OER results are used as inputs in the analysis of other HFE elements, including FRA/FA, task analysis, staffing and qualifications, TIHA, and human factors verification and validation. Specifically, the OER results are used in supporting the determination of the requirements for and allocation of functi ons in the FRA/FA element. There are several experienced operators included as part of the HFE team (Section 2.2). These operators provide supplementary OE information related to any IHAs identified (Reference 4.2.4),
which is incorporated in the task analysis, TIHA, and staffing and qualifications elements.
Additionally, experienced operators provide valuable insights and lessons learned in selecting challenging and workload-intensive plant operating conditions performed on a simulator as part of staffing and qualifications analyses and in performing verification and validation.
2.2 Operating Experience Review Team Composition and Responsibilities
The OER is conducted and supported by an experienced team of members that includes representatives from the HFE and Operations organizations, who are supported by the Systems Engineering and Safety Analysis staff. The qualifications of the HFE team members are as stipulated in the NuScale Human Factors Engineering Program Management Plan (Reference 4.2.5), and are consistent with the guidance of NUREG-0711 Appendix.
The OER team lead and the remainder of the OER team are selected by the HFE supervisor from the HFE team members. As described in Reference 4.2.5, the HFE supervisor has the authority and organizati onal placement to ensure that the tasks assigned to the OER personnel who do not directly report to the HFE supervisor are completed.
© Copyright 2022 by NuScale Power, LLC 7
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
The OER team includes an HFEITS database coordinator. Assigned by the team lead, the database coordinator is responsible for managing the integrity of the information that is recorded, screened, reviewed, and dispositioned in the HFEITS database.
Responsibilities of the OER team lead include organizing the OER team.
assigning team member responsibilities.
managing resources and schedule.
ensuring that OER issues are completed with supporting documentation and entered into HFEITS as necessary.
production of OER reports as needed.
Responsibilities of OER team members conducting the reviews and dispositioning the individual review items include reviewing OER issues for identification of human performance issues, sources of human error, and design elements that would support or enhance human performance.
screening of OER issues for applicability to the NuScale design using criteria in accordance with established procedures and as discussed in Section 3.1 through Section 3.6.
summarizing and documenting screening results with an explanation of the applicability to the NuScale design.
identification of further sources and topics for OER.
collection, preparation, and documentation of new sources of OE applicable to the NuScale design.
conducting operator interviews using a questionnaire template.
identifying need for NuScale design action on OER issues.
entering actions resulting from OER into HFEITS.
Upon completion of the OER, the team lead performs the following functions:
resolves and closes applicable OE items in the HFEITS database collects documentation for:
- sources of OE data
- screening methods
- screening results
- interview facilities
- interview results including personal information for each interviewee
- results of reviews
© Copyright 2022 by NuScale Power, LLC 8
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
- resolution of OE items tracked by HFEITS or engineering database ensures that the HFEITS operating experience database entries are complete and consistent and verify correct closure of OE items documents location of OER results to ensure availability of:
- OE item-related systems
- list of OE documents reviewed
- results of reviewing relevant HSI technology
- complete description and findings from interviews
- list of OER-identified issues incorporated into the design
- list of open issues still being tracked in the HFEITS
© Copyright 2022 by NuScale Power, LLC 9
Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
3.0 Operating Experience Review Methodology
The following sections describe the methodology used to address OE within the HFE Program. These sections address the applicable review criteria in NUREG-0711, Section 3, Operating Experience Review.
3.1 Review of Predecessor and Related Plants and Systems
The NuScale Power Plant design incorporates features such as passive safety systems, no reliance on safety-related alternating current (AC) or direct current (DC) power, and modular design that relies on automation and di gital HSI technology. The combination of these design features and the extent to which they are utilized in the NuScale Power Plant design is not found in the existing commercial nuclear reactors; therefore, existing designs are not considered direct predecessors to the NuScale Power Plant design.
However, many of the NuScale systems and components are found in existing designs.
Therefore, operating commercial nuclear power plant experience is reviewed and used appropriately in the development of the NuScale Power Plant design.
The NPP has achieved improvements in safety over existing plants through simplicity of design, reliance on passive safety systems, sm all fuel inventory, and use of additional barriers to the release of fission products to the environment. The integrated design of the NuScale Power Module eliminates external r eactor coolant loop piping and resulting large loss of coolant accidents, and the use of natur al circulation as the prime driver for the reactor coolant system removes the operating challenges posed by reactor coolant pumps and associated seals.
The availability of passive safety systems for decay heat removal, emergency core cooling system, containment heat removal, and control room habitability eliminates the need for AC or DC power in a Fukushima-like event. This design removes the requirement for reliance on off-site power, safety-related AC or DC power systems, and emergency power sources, and technical specification-related issues that have caused significant OE items in the existing commercial fleet.
Each NuScale Power Module consists of a steel reactor pressure vessel within a steel containment vessel (CNV). ASME-rated pressure relief valves for the pressurizer relieve directly into the CNV, where it can be reutil ized by the emergency core cooling system to allow flow back into the RPV to maintain core cooling. This innovative design provides a solution to overcome the loss of coolant acci dent suffered by the Three Mile Island Unit 2 as a result of a stuck open power operated relief valve.
The small CNV and evacuated annulus eliminate the need for thermal insulation around the reactor vessel, thereby reducing Generic Safety Issue 191 concerns.
The evacuated CNVs are partially immersed in an ultimate heat sink within the Reactor Building. The location of the ultimate heat sink eliminates the requirement for safety-related pumps and associated emergency power supplies, piping, valves, and coolers. This design feature removes the te chnical specifications requirements normally
© Copyright 2022 by NuScale Power, LLC 10 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
associated with the above components, as well as limited conditions of operations for excessive sediment, algae, ice, and more.
The integration of the decay heat removal system with the steam generators, main steam, condensate and feedwater systems elimin ates the requirement for an auxiliary or emergency feedwater system. This integration also alleviates the maintenance and technical specification requirements for such systems.
These design improvements over existing pl ants were in place before the formal OER Program was established. Considering this fact, NuScales challenge is to improve the HSI, worker environments, and plant and equipment layout to reduce human error potential and worker injuries.
Table 3-1 provides a cross-reference among systems contained in operating commercial nuclear power plants and NuScale systems. Ta ble 3-2 lists examples of systems and components in commercial nuclear power plants that are eliminated in the NuScale design, and the NuScale design features that allow their elimination. If the initial screening identifies no correlation between the OE related to these eliminated systems and components and the NuScale design, the OER record is closed as not applicable.
An initial screening is performed on each OE item to determine applicability to the NuScale design, and to determine whether fu rther evaluation is necessary to identify potential HFE issues related to the NuScale design. Operating experience items identified from previous light water reacto r (LWR) systems design with high relevance (greater than approximately 60 percent) to the NuScale design are candidates for detailed review, and are entered into the HFEITS database. Relevance is determined on the basis of comparison between the NuScale Power Plant and previous similar designs, and expressed in degrees of relevance. Tab le 3-3 provides such a comparison and the associated relevance expressed as HIGH, ME DIUM, or LOW, where MEDIUM relevance would be considered 40-60 percent relevant, and LOW would be less than 40 percent relevant.
The need for further screening is established by the following criteria:
similarity of designed systems, technology, and concept of operations designs with multi-modular monitoring and control designs with multiple identical systems monitoring in same control room designs with highly automated control designs that use digital I&C and video display units HFE issues that can affect NuScale design lessons learned that apply to NuScale
The OER boundaries for this technology are extended beyond the experience of these existing plants because of the limited use and experience of the digital HSI technology in the current U.S. operating commercial nuclear power plants. Section 3.3 discusses the OER of the new HSI technology in other industries.
© Copyright 2022 by NuScale Power, LLC 11 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Table 3-1 Comparison of Commercial Pressurized Water Reactor Systems to NuScale Systems System Category Commercial PWR Systems Corresponding NuScale System Primary Systems containment system containment vessel (part of reactor module) chemical and volume control chemical and volume control system system reactor coolant system reactor coolant system (part of reactor module) pressurizer (part of reactor module) steam generator (part of reactor module) reactor pressure vessel (part of reactor module) reactor vessel internals (part of reactor module) steam generator system steam generator (part of reactor module)
Control Systems reactor protection system reactor protection system engineered safety features engineered safety features actuation system actuation system diverse actuation system diverse protection system plant control module process computer rod control rod control and information system control rod drive system control rod drive system Monitoring Systems neutron monitoring system neutron monitoring system Main Power Cycle and main steam system main steam system Auxiliaries main turbine system turbine generator system condensate system feedwater and condensate system feedwater system feedwater and condensate system demineralized water transfer and demineralized water system storage system Cooling Systems passive containment cooling ultimate heat sink system (passive) system passive core cooling system emerge ncy core cooling system (passive) decay heat removal system (passive) normal residual heat removal ultimate heat sink system system containment flood and drain system spent fuel pool cooling system pool cooling water system AC & DC Power On-site standby power system backup diesel generator Systems AC power system medium voltage AC electrical distribution system low voltage AC electrical distribution system Fire Protection fire protection system fire protection system Systems HVAC Systems normal control room HVAC normal control room HVAC containment recirculation cooling not a NuScale system - NuScale containment system does not require a recirculation cooling system control room habitability system c ontrol room habitability system containment air filtration system not a NuScale system - NuScale containment does not require air filtration containment hydrogen control not a NuScale system - NuScale containment system does not require a hydrogen control system
© Copyright 2022 by NuScale Power, LLC 12 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Table 3-1 Comparison of Commercial Pressurized Water Reactor Systems to NuScale Systems (Continued)
System Category Commercial PWR Systems Corresponding NuScale System Fuel Handling fuel handling and refueling fuel handling equipment Systems system refueling monitoring station spent fuel storage system
Table 3-2 Examples of Systems and Components Eliminated in the NuScale Design System or Component Eliminated NuScale Design Feature in NuScale Design reactor coolant pumps buoyancy forces drive natural circulation of the primary coolant reactor coolant system piping reactor core, steam generator, and pressurizer contained within the pressurizer surge line reactor pressure vessel residual heat removal system reactor pressure ve ssel housed in a steel containment partially pumps with associated piping and immersed in water that provides an effective passive heat sink for heat exchangers long-term emergency cooling auxiliary feedwater system safety injection system
Table 3-3 Operating Experience Review Scope, Predecessor Determination, and Relevance NuScale Plant, System, or System ((
Technology Code Similar Plant, System, or Technology
NuScale Power Module N/A None Reactor Pressure Vessel A011 PWR plants Pressurizer A012 PWR plants Containment Vessel A013 PWR plants Steam Generator A014 Ansaldo and Si et test facilities, Otto Hahn Reactor Module Support A015 None Control Rod Drive A022 PWR plants Reactor Vessel Internals A023 Ansaldo and Siet test facilities, PWR plants Reactor Fuel Assembly A025 PWR plants Control Rod Assembly A026 PWR plants Chemical and Volume Control B010 PWR plants Boron Addition System B011 PWR plants Emergency Core Cooling B020 Oregon State Universi ty NuScale Integral effects test facility
Decay Heat Removal B030 GE SBWR and SWBR, KEPCO SMART testing Containment Heat Removal B040 None Control Room Habitability B060 PWR plants Normal Control Room HVAC B080 PWR plants Fuel Handling Equipment B140 PWR plants2(a),(c)
© Copyright 2022 by NuScale Power, LLC 13 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Table 3-3 Operating Experience Review Scope, Predecessor Determination, and Relevance (Continued) NuScale Plant, System, or System (( Technology Code Similar Plant, System, or Technology
Spent Fuel Storage B160 PWR plants Pool Cooling and Cleanup System B170 PWR plants Pool Leakage Detection B180 PWR plants Containment Evacuation B190 None Main Steam C010 LWR plants Condensate and Feedwater C020 LWR plants Demineralized Water C140 LWR plants Fire Protection C190 LWR plants, Other Industries Medium Voltage AC Electrical Distribution D020 LWR plants, Other Industries Low Voltage AC Electrical Distribution D030 LWR plants, Other Industries Augmented DC Power Distribution D040 LWR plants Backup Diesel Generator D060 Other Industries Reactor Protection E011 PWR plants Neutron Monitoring E013 LWR plants Rod Control and Information E040 PWR plants Refueling Monitoring E070 PWR plants Reactor Building F010 LWR plants Digital I&C N/A LWR plants, Other Industries All video display units N/A LWR plants, Other Industries High level of automation N/A LWR plants, Other Industries Controlling more than one unit or process from same control N/A Other Industries room
}}2(a),(c)
In the table above, digital I&C, all video display units, high level of automation, and controlling more than one unit or process from same control room are listed as either MEDIUM or LOW. While this may seem incongruent with the importance of these topics to the NuScale design, they do accurately depict the relative OE relevance in these areas with the existing commercial reactors. Existing plants have performed individual system digital upgrades, which leaves their control rooms with a majority of analog panels and components, with an interspersing of digital control systems and video displays added on. While some automation has been utilized in existing plants (e.g., engineered safety features actuation system trips, load sequencing), no plant has utilized automation to the same degree as the NPP. Finally, while there are several dual control room plants in the U.S., and the CANDU fleet operates four reactors from the same control room, the NuScale design is novel in the control of up to six individual units from the same control room.
© Copyright 2022 by NuScale Power, LLC 14 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
3.2 Review of Recognized Industry Human Factors Engineering Issues
NUREG/CR-6400 (Reference 4.2.6) provides a detailed list of HFE-relevant OE pertinent to the HSI design process for advanced nuclea r power plants. Six categories of issues and experience are addressed: unresolved safety issues/generic safety issues Three Mile Island issues NRC generic communications (generic letters, information notices and Part 21 reports) Office for Analysis and Evaluation of Operational Data issues lower power and shutdown operations operating plant event reports
Sections 2 and 3 of NUREG/CR-6400 (Unresolved Safety Issues/Ge neric Safety Issues and Three Mile Island Issues) are summarized in Table II and Appendix B of NUREG-0933 (Reference 4.2.7). The issues listed in NUREG-0933 Appendix B are derived from the NRCs analysis of the issues listed in NUREG-0933 Table II. Therefore, the issues in NUREG-0933 Appendix B are a subset of the items in Table II. For this reason, NUREG-0933 Table II is used in the NuScale OER process instead of NUREG-0933 Appendix B.
The results of the NRCs Office for Analysis and Evaluation of Operational Data Program to identify human factors and human perfor mance issues from mid-1980s through the year 2000 were published in Volumes 1 through 14 of NUREG-1275 (Section 5 of NUREG/CR-6400) (Reference 4.2.6). NuScales OER includes review of the items contained in these volumes (Table 3-4). The potential issues identified from initial screening of NUREG-1275 Volumes 1 through 14 are entered into the HFEITS database and evaluated using the method described in Section 3.6.
The OER issues from sources other than NUREG/CR-6400 (published in January 1997) and NUREG-1275 are also reviewed for potential human performance issues or for identifying design elements that might support or enhance human performance. This includes reviews of additional literature and nuclear industry websites and databases (e.g., U.S. Nuclear Regulatory Commission, Institute of Nuclear Power Operations).
In addition to nuclear industry sources, literature, and websites of non-nuclear industries (U.S. military platform such as an aircraft carrier or submarine, the petrochemical industry, automotive industry, railway industry, and the airline industry) are also reviewed.
The events at Chernobyl and at the Fukushima Daiichi power station preceded the design of the NuScale Power Plant. Therefore, as the development of NuScale Power Plant design is ongoing, the lessons learned from these events are considered, and the
© Copyright 2022 by NuScale Power, LLC 15 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
applicable lessons learned incorporated in the design. With regard to the Fukushima event, the following documents are considered: U.S. Nuclear Regulatory Commission, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Stra tegies for Beyond-Design-Basis External Events, EA-12-049, March 12, 2012 (Reference 4.2.8) NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1 (Reference 4.2.9) NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 2 (Reference 4.2.10)
Table 3-4 NUREG-1275 Human Performance Studies NUREG-1275 NUREG Operating Experience Feedback Report Title Publication Date Volume No. 1 Operating Experience Feedback Report - New Plants July 1987 2 Air Systems Problems December 1987 3 Service Water System Failures and Degradations November 1988 4 Technical Specifications March 1989 5 Progress in Scram Reduction March 1989 6 Operated Valve Problems February 1991 7 Experience with Pump Seals Installed in Reactor Coolant Pumps September 1992 Manufactured by Byron Jackson 8 Human Performance in Operating Events December 1992 9 Pressure Locking and Thermal Binding of Gate Valves March 1993 10 Reliability of Safety-Relat ed Steam Turbine-Driven Standby Pumps October 1994 11 Turbine-Generator Overspeed Protection Systems April 1995 12 Assessment of Spent Fuel Cooling February 1997 13 Evaluation of Air-Operated Valves at U.S. Light-Water Reactors February 2000 14 Causes and Significance of Design-Based Issues at U.S. Nuclear November 2000 Power Plants
3.3 Review of Related Human-System Interface Technology
The NuScale design uses a modern HSI design to control up to six units from one control room. Nuclear industry OE in multi-unit operati on from a single control room is limited. Therefore, the review of operating experience in these areas is expanded to other facilities and industries including nuclear installations that do not produce power, non-nuclear power plants, a U.S. military platform, the petrochemical industry, automotive industry, railway industry, and the airline industry (including air traffic controller operator experience data).
© Copyright 2022 by NuScale Power, LLC 16 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
Operating experience research of HSI technol ogy in these facilities and industries focuses specifically on highly automated, digitally-controlled process systems. computerized procedures systems. use of flat panel displays (video display units). use of touch screens (as a design enhancement). multi-unit control rooms.
3.4 Review of Issues Identified by Plant Personnel
The review of issues identified by plant personnel was performed for the DCA, and documented in a results summary report (RSR) (Reference 4.2.11). This aspect of the OER is incorporated into the predecessor des ign. As this report documents methodology to be used in the reviews of OE subsequent to the completion of the DCA, OER issues identified during the DCA Human Factors En gineering work will be evaluated against design changes implemented in the Standard Design Approval Application for the US460 standard design.
Telephone or in-person interviews of plant per sonnel (nuclear and non-nuclear industries) were conducted for the DCA based on thei r experience with systems or technology applicable to the NuScale design. Personnel that were included are those with experience and knowledge in plant design docum ents, plant operations, and HFE topics discussed below. The personnel interviewed included operators (non-nuclear) or reactor operators. supervisors (non-nuclear) or senior reactor operators. maintenance technicians. supervisors and managers from Operations, Maintenance, and Work Control. operations administrators, particularly those who handle condition reports. procedure developers. training staff.
Interview questions and topics were developed by the OER team lead and tailored to the job description of the individual being interviewed.
The interviews cover the following topics: plant operations
- normal plant evolutions (start-up, full-power, and shutdown) - instrument and control system degraded conditions and failures - HSI equipment failures and processing failures -transients
© Copyright 2022 by NuScale Power, LLC 17 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
- accidents - reactor shutdown and cool down using remote shutdown systems HFE design topics - alarm and annunciation - display - control and automation (highly automated control systems) information processing and job aids - real-time communications with plant personnel, real-time communications with other organizations - procedures, training, staffing qualifications, and job design - multi-unit control room design effect on plant operation
The data obtained from each interview was revi ewed for positive or negative aspects and further evaluated for incorporation into the NuScale design. Each potential issue identified in an interview was entered into the HFEITS database and evaluated in a manner similar to the process outlined in Section 3.6.
In addition to obtaining data from outside pl ant personnel, the expertise of NuScales HFE team members was utilized to perform reviews of NuScale design documents and provide recommendations for improvements and refinements to the design as appropriate. These personnel possess experience in the operation of commercial nuclear power plants, and are an integral part of the HFE team. Inputs related to OE provided by these personnel were provided to the appropriate system design engineers and addressed by an inter-disciplinary review process.
3.5 Review of Important Human Actions
Important human actions include risk-impor tant human actions and deterministically important human actions. Risk-important human actions are identified early in the design process by the probabilistic risk assessment, and human reliability analysis processes. Deterministically important human actions are derived from the transient and accident analysis, and diversity and defense-in-depth co ping analysis. If IHAs are identified, they are recorded in the HFEITS database so that this information is available while analyzing OE. The HFEITS database is updated as necessary with IHAs as the PRA is updated during design. The OER issues that indicate a potential to impact NuScale-specific IHAs can be tracked as HFE issues in the HFEITS for resolution during appropriate HFE Program elements.
Reference 4.2.4 contains further information on IHAs. The purpose of evaluating IHAs as part of OER is to determine whether other operating nuclear plants or systems with similar HSI technology have experienced rela ted error-causing conditions. The IHAs are used in succeeding HFE Program elements (task analysis, staffing and qualifications, and HSI design) to define the roles and responsibilities of plant personnel and to produce interfaces designed to minimize human error probabilities. More details on the IHAs are contained in the treatment of important human actions RSR (Reference 4.2.4).
© Copyright 2022 by NuScale Power, LLC 18 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
In examining the OE data, both the successful completion of IHAs applicable to NuScale and the errors that may have occurred in the execution of those IHAs are identified and considered. Treatment of IHAs is further discussed in Reference 4.2.4.
The human actions that are not identified as IHAs for the NuScale design but, if not performed correctly, could potentially have negative consequences are also selected for task analysis (Reference 4.2.3). This selection is accomplished with multiple subject matter experts by reviewing the OER and using their personal experience.
3.6 Documentation
3.6.1 Human Factors Engineering Issue Tracking System Database - Operating Experience Review Issues
The HFEITS database is used for tracking HFE issues within the scope of the NuScale Power Plant HFE Program that are identified using the screening process described in this section. These include issues identified as potential human performance issues and sources of human error and design elements that might support or enhance human performance.
If a potential HFE issue has been identified and cannot be resolved immediately, the issue is entered into the HFEITS database and tracked. Only the issues that are within the HFE Program scope but not incorporated by the current design are captured in HFEITS. The HFEITS issues can be evaluated for incorporation during the analyses or design of the HFE elements performed later as described in the implementation plans or RSRs fo r those elements, as applicable.
The OER items that are preliminarily screened as applicable are entered into the HFEITS database. The database is designed to provide complete details of the collected data, and is maintained as an elec tronic database. Items are categorized to show which HFE elements they affect. This categorization facilitates future OE searches of the HFEITS database by HFE element.
The HFEITS database is administered by the HFE team lead. Consistency of entries is monitored during data entry and checked periodically by the OER team lead.
If an OER issue is determined to be not related to HFE scope, or not applicable to the NuScale design, a justification is written and reviewed by the OER team. Following approval of the justification, the OE item is closed, but retained in the HFEITS database.
If an OE item is determined to be applicabl e to the NuScale design but not applicable to the HFE Program scope, a justification is written and reviewed by the OER team. Following approval of the justification, the OE item is transferred to the appropriate engineering discipline. The OE item is then closed, but retained in the HFEITS database.
© Copyright 2022 by NuScale Power, LLC 19 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
If an OE item is determined to be applicable to the NuScale HFE Program scope, but is resolved by the current design, documentation of that resolution is captured in the database. Documentation includes reference to appropriate approved design documents. The OER team reviews the resolved-by-design documentation and closes and retains the OE item in the database.
An OE item that is determined to be applicable to the HFE Program scope and not resolved by the current design is documented as such in the HFEITS database. The OER team member proposes a design modifi cation to incorporate the OE item. The OER team reviews the documentation and proposed design modification. If approved, the OE item is assigned to the greater HFE team. The HFEITS issues not resolved as part of the OER are evaluated during later stages of analyses or design for incorporation as described in the RSRs for those HFE Program elements.
In the event the OER team disapproves a justification or set of documentation for closure of an OE item, the OER team and HFE supervisor have the discretion to either reassign the OE item to another team member or resolve the item as a team.
© Copyright 2022 by NuScale Power, LLC 20 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
4.0 References
4.1 Source Documents
4.1.1. U.S. Nuclear Regulatory Commission, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition (NUREG-0800), Formerly issued as NUREG-75/087, Chapter 18, Human Factors Engineering.
4.1.2. U.S. Nuclear Regulatory Commission, Shutdown and Low-Power Operation at Commercial Nuclear Power Plants in the United States, NUREG-1449, September 1993.
4.1.3. U.S. Code of Federal Regulations, Contents of Applications; Technical Information, Section 52.47, Part 52, Chapter 1, Title 10 Energy (10 CFR Part 52.47).
4.2 Referenced Documents
4.2.1. U.S. Nuclear Regulatory Commission, Human Factors Engineering Program Review Model, NUREG-0711, Revision 3, November 2012.
4.2.2. NuScale Human Factors Engineering Staffing and Qualifications Results Summary Report, TR-130412, Revision 0.
4.2.3. NuScale Human Factors Engineering Task Analysis Implementation Plan, TR-130413, Revision 0.
4.2.4. NuScale Human Factors Engineering Treatment of Important Human Actions Results Summary Report, TR-130416, Revision 0.
4.2.5. NuScale Human Factors Engineering Program Management Plan, TR-130414, Revision 0.
4.2.6. U.S. Nuclear Regulatory Commission, Human Factors Engineering (HFE) Insights for Advanced Reactors Based Upon Operating Experience, NUREG/CR-6400, 1996.
4.2.7. U.S. Nuclear Regulatory Commission, Resolution of Generic Safety issues, NUREG-0933 (Supplements 1 - 34), 2011.
4.2.8. U.S. Nuclear Regulatory Commission, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, EA-12-049, March 12, 2012.
4.2.9. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1.
© Copyright 2022 by NuScale Power, LLC 21 Human Factors Engineering Operating Experience Review Implementation Plan
TR-130409-NP Revision 0
4.2.10. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 2.
4.2.11. Human Factors Engineering Operating Experience Review Results Summary Report, RP-0316-17614, Revision 0.
4.2.12. NRC Information Notice 95-48: Results of Shift Staffing Study, October 10, 1995.
© Copyright 2022 by NuScale Power, LLC 22}}