NUREG-1275, Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys

From kanterella
(Redirected from NUREG-1275)
Jump to navigation Jump to search

Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys
ML20248B372
Person / Time
Site: Pilgrim
Issue date: 06/02/1989
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
References
RTR-NUREG-1275 GL-88-14, TAC-71701, NUDOCS 8906090023
Download: ML20248B372 (2)


Text

p,,

=

.pw 0 7,

  • r'

' June 2,- 1989 Y

, no s

  • ~

'~

37

' ocket.No' 50-293' D

,sa v

Hr. Ralph G. Bird

Senior Vice President - Nuclear' d

Boston Edison Company Pilgrim Nuclear Power Station-RFD#1, Rocky Hill Road -

Plymouth, Massachusetts 02360' w

Dear Mr. Bird:

SUBJECT:

RESPONSE TO GENERIC LETTER 88 14. INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY RELATED SYSTEMS - PILGRIM NUCLEAR POWER STATION-

REFERENCE:

TAC Humber 71701 Generic Letter (GL) 88-14 requested licensees and Applicants to review NUREG-1275, Volume 2. " Operating' Experience Feedback Report - Air Systems Problems,"-and perform a design and operations verification of the1 station instrument air system..

)

By letters dated February 3 and May' 30,1989, you responded to GL88-14. indicating that the required verifications had been performed and provided a discussion of your programs for maintaining proper. instrument air quality.. ' As noted.in the GL, the documentation assembled for this verification should be retained-for a future audit by the NRC staff. Therefore, you' fulfilled the requirements-of the GL for the Pilgrim Nuclear Power Station.

This completes our effort under TAC No.71701.

Sincerely, 1

1 Original Sip @

890609o023 % o2N93 Daniel G. Mcdonald, Senior Project Manager PDR ADOCK C

Project Directorate I.3..

P Division of Reactor Projects I/II cc: See next page i

DISTRIBUTION: M XAle, NRC& Local PDRs, 8 Grimes, EJordan, SVarga, BBoger,

)

'MRushbrook DMcDonald, ACRS(10), JWiggins,Rgn.I, RWessman,'WLeFave, GEdison

]

[PIL.G.L.88-14. TAC 71701]

I f

n Ql l0FC :PD h/L....:

P 1-3 j

11 j

j..... :....,

iNAME :MRus rook :DM ald:

essman l.....:............:.......................:............:............:._____......:...........

l lDATE :6/ % 9

6/ b89
6/ % 89 OFFICIAL RECORD. COPY

.f sy

.r.

4 Mr. Ralph G. Bird Boston Edison Pilgrim Nuclear Power Station ec:

Mr. K. L. Highfill Mr. Ralph G. Bird Station Director Senior Vice Presidant - Nuclear Pilgrim Nuclear Power Station Boston Edison Company RFD #1 Rocky Hill Read Pilgrim Nuclear Power Station Plymouth, Massachusetts 02360 RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office Mr. Richard N. Swanson., Manager U. S. Nuclear Regulatory Commission Nuclear Engineering Department Post Office Box 867 Boston Edison Company Plymouth, Massachusetts 02360 25 Braintree Hill Park Braintree, Massachusetts 02184 Chairman, Board of Selectmen 11 Lincoln Street Ms. Elaine D. Robinson Plymouth, Massachusetts 02360 Nuclear Information Manager Pilgrim Nuclear Power Station Office of the Commissioner RFD #1, Rocky Hill Road Massachusetts Department of Plymouth, Massachusetts 02360 Environmental Quality Engineering One Winter Street Charles V. Barry Boston, Massachusetts 02108 Secrnary of Public Safety Executive Office of Public Safety Office of the Attorney General One Ashburton Place One Ashburton Place Boston, Massachusetts 02108 20th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Comission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Regulatory Affairs and Programs Group Leader Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184

.